This document is a WebAIM Short Form Task Group Instruction (TGI) for the USS Blue Ridge (LCC-19), specifically focusing on the operational test for A/C Plant #5. The TGI is dated 29-AUG-2024 and is part of the broader ship repair and maintenance project (Project 19P, System 51425). The document details specific work tasks for multiple groups, including contractor work, quality assurance (QA) work, and test work, all centered on accomplishing and documenting a tightness and operational test in accordance with the referenced technical procedure (TP 51425-3-301KTR). Key personnel involved include Daisuke Enomoto (preparer), Riley Higa (approver), and Takehide Yaginuma (zone manager), with the document marked as For Official Use Only (FOUO).
The TGI provides a structured breakdown of tasks, including contractor work to accomplish and document the tightness and operational test, QA work verification, support/function work documentation, and a specific test task for vibration analysis. The document is part of a larger naval ship repair and maintenance effort for the USS Blue Ridge at the Fleet Activities Yokosuka Naval Base, aligned with the solicitation N6264925RA021 for a Docking-Selected Restricted Availability (DSRA) project. The task is one of 47 Task Group Instructions covering various ship repair, overhaul, preservation, and replacement work, with an anticipated contract performance period from 12-Jan-2026 through 15-May-2027.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
29-AUG-2024 0927
20.14.15.0.8998 (August 2024) ICN: 3819P14203 KeyOp: T03
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 51425-3-301KTR TT T 1 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 51425
CU PHASE TITLE: A/C PLANT #5 (T & OP) - KTR
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 2
ES01NPNW * ES01NPNX * ES01NPNY * ES01NPNZ * ES01NPP0 * ES01NPP1 * ES01NPFP * ES01NPFN * ES01NPFK *
ES01NPFF * ES01NPFG * ES01NPFH * ES01NPFJ * ES01NPFL * ES01NPFM * EA05L094
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
ENOMOTO, DAISUKE 246.2 3152437296 14-AUG-2024
APPROVED BY: CODE: PHONE: DATE:
HIGA, RILEY 246.2 3152432291 26-AUG-2024
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
EA05-L094 * ES01-NPFF * ES01-NPFG * ES01-NPFH * ES01-NPFJ * ES01-NPFK * ES01-NPFL * ES01-NPFM * ES01-NPFN *
ES01-NPFP * ES01-NPNW * ES01-NPNX * ES01-NPNY * ES01-NPNZ * ES01-NPP0
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA, TAKEHIDE U
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
142A0003
Operational Test for A/C Plant #5 - KTR.
TGI Short Form
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
29-AUG-2024 0927
20.14.15.0.8998 (August 2024) (Continued) ICN: 3819P14203 KeyOp: T03
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: 51425-3-301KTR TT T 1 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P 51425
CU PHASE TITLE: A/C PLANT #5 (T & OP) - KTR
FOUO Pg 2 of 2
JCNs (Cont.):
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 TP 51425-3-301KTR AC PLANT #5 (T & OP) - KTR LAT Y
TASK NAME / TASK DESCRIPTION
SHOP/
TSD TS
SF
WC
CREW
# MHRS RWRK
(V) Contractor work:
Accomplish/document the tightness & operational test in accordance with reference, TP 51425-3-301KTR.
22/KE PC N
(G) QA work:
Accomplish/document the tightness & operational test in accordance with reference, TP 51425-3-301KTR.
33/G1 QA N
(S) S/F work:
Accomplish/document the tightness & operational test in accordance with reference, TP 51425-3-301KTR.
/ EA05 N
Test work:
Conduct vibration analysis in accordance with reference, TP 51425-3-
301KTR.
46/J5 JN N
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 3819P14203 KEY OP: T03
ES01-NPP1