TGI_3819P12344A01_c0v0.pdf
PDF 140 KB Posted
- Attached to
- USS BLUE RIDGE (LCC-19) 5C1 DSRA TYCOM 1
- Solicitation number
- N6264925RA021
About this file
This document is a Task Group Instruction (TGI) for cleaning, inspecting, repairing, and preserving the clean salt water ballast tank (9-98-1-W) on the USS BLUE RIDGE (LCC-19). The TGI details specific maintenance procedures including visual inspection of the tank's preservation coating, marking corroded or damaged areas, general cleaning at Level III, manhole cover installation, welding and repair of bolting ring holes, and repair of tank surfaces involving up to one linear foot of weld repair, 60 square inches of base metal weld buildup, 10 square feet of plate replacement, and 4 linear feet of stiffener replacement.
The work is part of a larger ship repair and maintenance contract with a planned contractor work period from January 12, 2026 to May 15, 2027. The instruction includes specific requirements for nondestructive testing, surface preservation, and adherence to multiple technical references. Special requirements include SURFMEPP cleanliness standards, a potential lead hazard, and work that affects a fire zone boundary necessitating a non-flammable closure. The task will be performed at multiple locations including the salt water ballast tank, Intel Storeroom, and Chemical Warfare Defense Equipment Storeroom.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
FOUO: Public availability to be determined under 5 USC 552
TASK GROUP INSTRUCTION
AIM REV 20.11.4.0 (OCTOBER 2020)
TGI COMPONENT NAME: TYPE: PHASE: REPEAT: CHANGE:
NO.: SW BLST TK 9-98-1-W AY A 0 0
SHIP/HULL NO.: SHIP/HULL NAME: SYSTEM: PROJ/WO NO: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P
CU PHASE TITLE:
F/O - CLEAN, INSPECT, REPAIR, AND PRESERVE CLEAN SALT WATER BALLAST (9-98-1-W)
PREPARING ACTIVITY:
PREPARED BY: CODE PHONE DATE
TOMOHIKO ANDO 231B. 315-243-4372 12-JAN-2024
APPROVED BY: CODE PHONE DATE
RYOUTA TAKAGI 231B. 315-243-4502 12-JAN-2024
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
REASON FOR WORK/NEED FOR CHANGE:
CHANGE INSTRUCTIONS:
SPECIAL REQUIREMENTS:
SURFMEPP
CLEANLINESS FOR PIPING SYSTEM/EQUIPMENT LEVEL III
This work affects a fire zone boundary. Fabrication and/or staging of a non-flammable closure is required
WORK CERTIFICATION SIGNATURES
COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
ACCEPTANCE OF COMPLETED WORK
PHYSICAL INSPECTION PHYSICAL INSPECTION COMPLETED: BADGE NO.: SHOP/CODE: PHONE: DATE:
REQUIRED:☐YES ☒NO
RECORDS REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
TGI NO.: SW BLST TK 9-98-1-W AY A 0
FOUO
SHIP: LCC-19 CHG/VER: 0/0
LIST OF EFFECTIVE PAGES
SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO.
1-5 J1-2 M-1
1. SCOPE/PURPOSE
1.1 Title: Clean Salt Water Ballast (9-98-1-W); clean, inspect, repair, and preserve
1.2 Location of Work:
1.2.1 Clean Salt Water Ballast (9-98-1-W)
1.2.2 Intel Storeroom (7-102-1-A)
1.2.3 Chemical Warfare Defense Equipment Storeroom (7-106-1-K)
1.3 Identification:
1.3.1 Quantity (One EA), Clean Salt Water Ballast
Tank No.: 9-98-1-W Capacity: 75,833 Gallons
1.3.2 Quantity (2 EA), Manhole Cover Plate(s) for 9-98-1-W
Manhole No.: 7-103-1 and 7-108-1 Size: 15 Inches x 23 Inches Material: Steel
1.3.3 Quantity (2 EA), Bolting Ring for Manhole Cover Plate(s) for 9-98-1-W Manhole No.: 7-103-1 and 7-108-1 Material: Steel
1.4 Security Classification: None.
1.5 Initial Condition:
1.5.1 Potential Lead Hazard
1.6 Contractor work start date:
1.7 Contractor work completion date:
2. REFERENCES:
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
1 NSI FY-25 NAVSEA Standard Items - ORG N 2 LI FY-25 Local Standard Items - ORG N
3 TM S9086-
CJ-STM-
010/CH-075
Fasteners 7 N
1/12/2026
5/15/2027
FOUO
SHIP: LCC-19 CHG/VER: 0/0
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
4 DWG 100-
2491003
SHELL PLTG & STGR FRAME 51
1/2 -102 1/4 CL TO 4 TH DECK
G Y AL
L
5 DWG 100-
2491005
SHELL PLTG & STGR FRAME 102
1/4 STERN CL TO 4 TH DECK
F Y AL
6 DWG 114-
2491163
SHAFT ALLEY BHD F Y AL
7 DWG 101-
2491012
CVK & Shell Long AFT FR 51 1/2 L Y AL
8 DWG 103-
2491034
1ST & 2ND PLATF PLTG AFT
FR98
H Y AL
9 DWG 114-
2491158
TRANSV BHD FR 98 &109 K Y AL
10 DWG 101-
2491014
FLOORS FR 99-120 D Y SE
E N
OT
E
11 DWG 123-
4354697
CHT #1, 2, 3 & 4 FR 48 - 52 P/S &
FR 98 - 102 P/S
E Y SE
E N
OT
E
3. APPENDICES:
3.1 Appendix “J” TGI Job Summary Information Sheet
3.2 Appendix "M" TGI Material List
3.3 Appendix “D” Deficiency Form
4. GENERAL REQUIREMENTS:
4.1 Not Applicable.
5. PROCEDURE:
5.1 Accomplish the requirements of 099-902YO of 2.2 for each tank listed in 1.3.1.
5.1.1 Accomplish a visual inspection of each tank listed in 1.3.1 for existing preservation coating.
5.1.1.1 Mark each corroded, damaged and/or deteriorated coating area in each tank.
5.1.1.2 Submit one legible copy, in hard copy or approved transferrable media, of a report with a sketch listing results of the requirements of 5.1.1.1 to the SUPERVISOR.
5.1.2 Accomplish the requirements of 009-107 of 2.1.
5.1.2.1 Ensure General Cleaning must be Level III.
5.1.3 Accomplish installation of each manhole cover for each tank listed in 1.3.1 in accordance with Figure 075-4-1 of 2.3.
5.2 Weld fill, drill, and tap a total of 10 each stripped manhole cover bolting ring holes for each tank listed in 1.3.1 as designated by the SUPERVISOR. See 5.8.5.
5.2.1 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column A, Lines One through 7.
FOUO
SHIP: LCC-19 CHG/VER: 0/0
5.3 Repair each tank listed in 1.3.1, based on the CCIMS assessment report as designated by the SUPERVISOR, using 2.4 through 2.11 for guidance. See 5.8.4 through 5.8.6.
5.3.1 Vee-out and weld a total of one linear foot of each deteriorated and damaged weld. Each area of repair must include deck, bulkhead, shell plating, and overhead.
5.3.2 Chip and grind each surface flush in way of each repair.
5.3.3 Base metal weld buildup a total of 60 square inches of each plate defect in the tank.
5.3.3.1 For bidding purposes the base metal weld buildup must be one quarter inch thick.
5.3.3.2 Surface must be ground to sound metal prior to base metal weld buildup.
5.3.3.3 Fill each local pit and groove with weld material prior to application of each principal build up layer.
5.3.3.4 Grind each surface of completed base weld metal buildup smooth if greater than 1/8 inch above plate surface.
5.3.4 Remove existing, fabricate and install new a total of 10 square feet of deteriorated plate.
5.3.5 Remove existing, fabricate and install new a total of 4 linear feet of defective stiffener.
5.3.6 Accomplish the requirements of 009-12 of 2.1, including Table 2, Columns A, Lines One through 7.
5.3.6.1 Accomplish nondestructive testing in accordance with Line 11.
5.3.7 Accomplish the requirements of 009-25 of 2.1 for an air hose, water hose, or vacuum box test of each new insert weld seam. Allowable leakage: None.
5.4 Accomplish the requirements of 009-32 of 2.1, including Table 4, Line(s) 17, for tank side surface and Table 3, Line(s) 25, for storeroom side surface of each cover plate listed in 1.3.2.
5.5 Accomplish the requirements of 009-32 of 2.1 for each bolting ring listed in 1.3.3.
5.6 Accomplish the requirements of 009-32 of 2.1, including Table 4, Line(s) 17, for a total of 983 square feet of defective painted surfaces, for each tank listed in 1.3.1, as designated by the SUPERVISOR.
5.6.1 The preservation area must not exceed 10 square feet per one area.
5.7 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
5.8 Notes:
5.8.1 Planner: Code 231B T. Ando, 243-4372
5.8.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598
5.8.3 This TGI meets the intent of DDG CSWT File Nos. 123-133, 123-142, and 123-143.
5.8.4 CCIMS assessment of each tank listed in 1.3.1 will be accomplished by SRF-JRMC (TGI No. 3819P12344I01), and the Project team will provide the assessment report with engineering evaluation under DL process for front loading structure repair.
FOUO
SHIP: LCC-19 CHG/VER: 0/0
5.8.5 Removal and installation of interferences, and gas free operation, preservation of boundary spaces relating to front loading structure repair are not included in this TGI. They will be covered by a DL in the future based on Contractor submitted condition report.
5.8.6 Materials for structure members relating to front loading repair will be provided in the future as a DL based on Contractor submitted condition report.
5.8.7 Work per this instruction involves cutting an access (or removal of a door) through a fire zone bulkhead, through the hull of the ship above the turn of the bilge, through ventilation components (ducting, plenums, etc.), or through any air-tight, fume-tight or watertight bulkheads normally used to control air flow in the event of a shipboard fire. A nonflammable closure is required in accordance with COMNAVSEASYSCOM MSG R 261400Z JUL 12. The closure, if not continuously in use, shall be staged near the access, readily visible and accessible, so that any emergency responder can install the closure to affect proper air flow onboard the ship.
5.8.8 WPC will copy the following pages in reference.
REF. 2.10: Pages 3, 4, 5, 6, 7, and 8 REF. 2.11: Pages One, 4, 5, 6, and 7
5.8.9 JCNs ER01-ZAK7, ER01-ZAW4, and ER01-ZAX2 are related to this TGI.
5.9 Government Furnished Material (GFM): None
5.10 SRF-JRMC will provide the following service work: (TGI No. 3819P12344S02).
5.10.1 [C740] Crane and crane rigging service.
5.10.2 [X99E] Utility service, electrical.
5.10.3 [X99M] Utilities service, including low pressure air supply, water supply, and steam supply.
5.10.4 [C106.1] Safety inspection for SRF-JRMC employees.
5.10.5 [C106.2] Gas free inspection for SRF-JRMC employees.
5.10.6 [C133] QA Inspection for (G) symbol(s).
5.10.7 [C135] QA inspection for (G) symbol(s).
5.10.8 [C250] Technical support.
FOUO
J-1
SHIP: LCC-19 CHG/VER: 0/0
APPENDIX "J"
TGI JOB SUMMARY INFORMATION SHEET
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
SW BLST TK 9-98-1-W AY A 0 0
CU PHASE TITLE:
F/O - CLEAN, INSPECT, REPAIR, AND PRESERVE CLEAN SALT WATER BALLAST (9-98-1-W)
PRIMARY COMPONENT:
COMPONENT UNIT LIST (FOR ASSEMBLIES):
MANHOLE 7-108-1 HA MANHOLE 7-103-1 HA BLST 9-98-1-W TK
ATTACHMENT LIST:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA ,TAKEHIDE
JO: KO: TOTAL MAN HRS: PLANNING ACCEPTANCE:
3819P12344 A01
TOTAL MAT’L COST TOTAL DURATION:
CU PHASE DESCRIPTION:
The purpose of this TGI is to clean, inspect repair, and preserve clean salt water ballast (9-98-1-W).
Location of Work:
Clean Salt Water Ballast (9-98-1-W) Intel Storeroom (7-102-1-A) Chemical Warfare Defense Equipment Storeroom (7-106-1-K)
TASK NAME
SHOP TSD/WC TS CREW# MHRS
HIGH RAD
HOURS
RC
GRID#
5.1 LBR HRs, PNTR HRs 22 KE PC
5.2 SFTR HRs, WELD HRs, PNTR HRs, QA HRs 22 KE PC
5.3 SFTR HRs, WELD HRs, PNTR HRs, CARP HRs, QA HRs 22 KE PC
5.4 PNTR HRs, QA HRs 22 KE PC
5.5 PNTR HRs, RGRS HRs QA HRs 22 KE PC
5.6 PNTR HRs, QA HRs 22 KE PC
PNTR HRs, QA HRs 22 KE PC
Dewatering/Cleaning Work CFM for marine chemist, tank watch cost, gaskets, fasteners, and misc.
22 MQ CS
Structural Work CFM for fire watch and tank watch cost, MT inspection cost, lead sampling/analysis cost, air compressor rental cost and fuel oil cost for air hose test, and MISC such as electrode, gases, temporary closure and covering material, and other consumable.
22 MQ CS
Preservation Work CFM for all paints, thinner, grit including waste disposal cost, confined space watch cost, and MISC such as covering material, and other consumable.
22 MQ CS
FOUO
J-2
SHIP: LCC-19 CHG/VER: 0/0
TASK NAME
SHOP TSD/WC TS CREW# MHRS
HIGH RAD
HOURS
RC
GRID#
Process Funding Document. 10 CT OM 1 1 0
FOUO
M-1
SHIP: LCC-19 CHG/VER: 0/0
APPENDIX “M”
TGI MATERIAL LIST
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
SW BLST TK 9-98-1-W AY A 0 0
CU PHASE TITLE:
F/O - CLEAN, INSPECT, REPAIR, AND PRESERVE CLEAN SALT WATER BALLAST (9-98-1-W)
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV
JOB ORDER: KEY OP:
3819P12344 A01
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
NOTES:
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR APPENDIX "D"
DEFICIENCY FORM
☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One)
2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
LCC-19 SW BLST TK 9-98-1-W AY A 0
4a. ICN: 4b. KEY OP: 5. LOC SPACE/LVL: FRAME: P/S/C: 6. CAUSED BY:
3819P12344 A01
7. DESCRIPTION:
8. ORIGINATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
9. CORRECTIVE ACTION:
10. EVALUATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
FOR NON-NUCLEAR USE ONLY
11. RFD/RFW REQ’D ☐ LAR REQ'D ☐
ILS MOD REQ’D ☐
SRD/PLAN REV REQ'D ☐
DWG NO.: _____________________ S/A NO.: ___________________
12. ISOLATION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.:
SATISFACTORY:
13. SUBSAFE OQE RECORD? SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
YES ☐ NO ☐
14. CORRECTIVE ACTION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE:
15. INSPECTION REQ’D? INSPECTION COMPLETE/SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
_________:YES ☐ NO ☐
16. RECORDS REVIEW SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE (DR ONLY)
DL’s ISSUED
(DR ONLY)
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR Deficiency Form Continuation Sheet ☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One) 2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
LCC-19 SW BLST TK 9-98-1-W AY A 0