This document contains a utility management file and related federal contract opportunity notice. The utility management file includes definitions, references, samples of historical work orders, guidance on asset tagging, specification attributes, and degradation index criteria for a utilities and energy management contract. The federal contract opportunity notice is a pre-solicitation for base operations support services at Marine Corps Base Quantico, Virginia. Key details include that the utility management file provides requirements and background for a utilities contract to perform services such as repairs, maintenance and project work on utilities infrastructure at the base. The federal contract opportunity involves solicitation N6247017R4003 for base operations support services at Marine Corps Base Quantico, set to begin in June 2018, to be awarded by the Department of the Navy Naval Facilities Engineering Command. The services will include utilities operations and maintenance. Response and award dates are not specified but the pre-solicitation notice is to notify potential offerors of the forthcoming solicitation.
J_1601000_Utility_Management_Revised_Amd_0001.pdf
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION J
DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
TABLE OF CONTENTS
ATTACHMENT NUMBER TITLE
J-1601000-01 Definitions and Acronyms
J-1601000-02 References and Technical Documents
J-1601000-03 Utility Service Order and Project Order Workload
J-1601000-04 Utility Asset Tagging Guidance
J-1601000-05 Specification Attributes
J-1601000-06 UEM-DI Meter Group and the Direct Condition Rating Guidance
ATTACHMENT J-1601000-01
DEFINITIONS AND ACRONYMS
DEFINITION DESCRIPTION
Assessment A general term referring to either a survey or inspection of a facility to determine condition.
Asset A general term used to refer to an item, such as a component, system, building or facility, that is managed by an automated data management program, e.g., FCAP.
Business Management System (BMS)
A web-based tool that provides a systematic method for the management of business processes, common practices, and process quality improvements that produce and support the most efficient and effective delivery of NAVFAC’s products and services.
In-house Performed by Government employees.
Inspection A rigorous, detailed assessment of the condition of a facility performed to generate a fundable scope and cost estimate for prioritization and funding of maintenance and repair.
Job or Work Order An authorization for work that requires planning and estimating and has an individual line of accounting for financial and performance evaluation.
Project Work Order Any work required to return a facility, utility system, utility equipment or component to normal working condition. Project work is intended to allow for the execution of work not defined elsewhere in the contract and is generally issued for work that is not complex in nature and a detailed cost estimate or job plan is not necessary.
Project Work Order, Level 1
Project work is defined as any work that does not qualify as a service order, but is needed to maintain the agreed upon facility condition. Maintain means to repair to such a condition that it may be used for its intended purpose and to normal working condition.
Includes utility improvements and changes up to $15,000.
Project Work Order, Level 2
Project work is defined as any work that does not qualify as a service order and exceeds the limits for project work order level 1, but is needed to maintain the agreed upon facility condition. Maintain means to repair to such a condition that it may be used for its intended purpose and to normal working condition. Includes utility improvements and changes up to $25,000.
Project Work Order, Level 3
Project work is defined as any work that does not qualify as a service order and exceeds the limits for project work order level 2, but is needed to maintain the agreed upon facility condition. Maintain means to repair to such a condition that it may be used for its intended purpose and to normal working condition. Includes utility improvements and changes up to $50,000.
Service Order Any work required to return a utility, system, equipment or component to normal working condition. Service orders are minor utility problem requests or requests for other non-recurring work that is too small to be planned and estimated.
The purpose of a service order is to provide the Government with a means of issuing work up to a defined liability limit for requirements occurring outside of the specified recurring work. The Government may utilize service orders to accomplish any work up to the respective liability limit based on the service order classification.
Service Order, Emergency
Emergency is defined as any facility deficiency that immediately compromises the mission or life, health and safety. Always includes, but is not limited to, failure of any utility, fire protection, environmental control, or security alarm systems.
Service Order, Urgent Urgent is defined as any deficiency that does not immediately endanger personnel or property, but extended delays of repairs could result in damage to Government property, or soon affect the security, health, or well-being of personnel or the continued operation of a service or system.
Service Order, Routine Routine is defined as any work requirement within the defined LOL that does not qualify as emergency or urgent.
Unplanned Utility Outage
An Unplanned Utility Outage is an unscheduled utility service interruption at or before the utility service point affecting at least one occupied facility, pier, or berth, and lasting longer than 5 minutes in duration. Service/Trouble Desk personnel enter information from the field about the incident, response, and the repair in a MAXIMO Work Order Outage Log.
DEFINITION DESCRIPTION
Utility Investment Strategy
The Contractor shall engage in the Navy’s utility investment strategy to provide efficient and effective utilities that directly support warfighter readiness at the lowest possible life cycle cost, while maintaining fully functional capabilities.
Utilities Maintenance Management
The planning, prioritizing, organizing, controlling, reporting, evaluating, and adjusting of utility maintenance operations to support the CNO/NAVFAC utilities policy and objectives and satisfy customers’ facility needs. Defined by the International Facility Management Association as “the practice of coordinating the physical workplace with the people and work of the organization.”
ACRONYM TITLE
AIS Automated Information System AMI Advanced Metering Infrastructure ANSI American National Standards Institute BCS Building Control System CIRCUITS Centralized and Integrated Reporting for the Comprehensive Utilities DI Degradation Index FPOC Facility Point of Connection iNFADS Internet Navy Facilities Assets Data Store UEM Utilities and Energy Management UEM-DI Utilities and Energy Management Degradation Index UICAP Utilities Infrastructure Condition Assessment Program UEM Utility Energy Management UFC Unified Facilities Criteria UMIG Utilities Mission Integration Group UCS Utility Control System
ATTACHMENT J-1601000-02
REFERENCES AND TECHNICAL DOCUMENTS
Reference Title
MO-321 Facilities Management
MO-209 Engineering Criteria
ATTACHMENT J-1601000-03
UTILITY SERVICE ORDER AND PROJECT ORDER WORKLOAD
MCBQ Historical Workload
MCBQ Historical Samples of Required Work
Location Activity Category Project Description FY
28000 Area TRANSITE PIPE REPAIR Repair Broken Transite Water Line to Buffalo Area, 28009 FY15 OCS - Bldg
GENERATOR RENTAL Provide Generator Rental for OCS Power Outage Bldg 3230
FY15
Substation C ELEC SUBSTATION REPAIR 'Replace Electric Cables at Substation 'C FY15
TBS GEO THERMAL PIPE REPAIR
'Repair Leaking HDPE Geo Thermal Line @LZ-6 (TBS Parade Deck FY15
Electrical Dist HV ELEC DIST REPAIR
Storms that occurred during the late evening of 23 June 2015 caused multiple electrical outages throughout the Base that directly impacted critical training missions of the Base and adversely affected approximately 75% of all housing units on Base FY15
Bearrs Loop
RE-PAVE STREET AFTER
WATER LINE REPAIR
Bears Loop, repave street from water main break
FY15
27240 TEMP CHIILER RENTAL Replace A/C FY15
LZ-6 GEO THERMAL PIPE REPAIR
Repair Leaking HDPE Geo Thermal Line @LZ-6 (TBS Parade Deck) FY15
2003 CHILLER REPAIR Emergency: Repair Bldg 2003 Chiller FY15
Type of Service Order Limit of Liability Number of Calls/Orders
Emergency Service Orders $2,500 10
Urgent Service Orders $7,500 15
Routine Service Orders $7,500 20 Project Order Level 1 $15,000 5
Project Order Level 2 $25,000 3
Project Order Level 3 $50,000 2
ESTIMATED ANNUAL REQUIREMENTS
2200 TEMP CHIILER RENTAL
Install Temp Chiller at Bldg 2200 (per John D.) Temp Rental Chiller, 150 Ton FY15
OCS Water Distribution
TRANSITE PIPE REPAIR
Contract support needed to cut out and Properly Dispose of Failed 8" Transite Main Water Line. Shop 61 personnel can make repairs once piping has been cut and removed FY15
Electrical Dist HV ELEC DIST REPAIR Electrical Emergency in Housing FY15
Basewide
STORM DAMAGE REPAIRS -
UNSPECIFIED
Emergency Repairs due to Storm Damage 29/30 September
FY15
Elec Dist HV ELEC DIST REPAIR Emergency Repairs - Emergency Electrical Repairs Qtrs 1 (9 Oct 15) FY16
Elec Dist HV ELEC DIST REPAIR Electrical Repairs at Lyman at Hot Patch Road on1 6 Feb 16 FY16
3300 HV ELEC DIST REPAIR
Repair Cabling and Switch for High Voltage Primary 1500 Kva Transformer at Bldg. 3300 FY16
TBS GEO THERMAL PIPE REPAIR Repair Leak in GeoThermal Well Field at TBS Heywood Hall FY16
"EMERG REPAIRS" IN PREP
FOR BLIZZARD….
Emergency Repairs Funding Document in preparation for Blizzard Storm Weekend of 22-24 Jan 16 FY16
2013 REPAIR STEAM LEAKS Repair Multiple Steam Leaks on Steam Supply, B2013 FY16 Elect Dist HV ELEC DIST REPAIR Electrical Repairs due to Rain Storm on 25 Feb 16 FY16
TRANSFORMER &
PERIPHERALS
REPLACEMENT
Install New ABB 1500 KVA Liquid Filled Pad Mounted Transformer & Cabling at Bldg. 3300
FY16
2082 REPLACE SEWER LINE Bldg 2082 Replace Failed Sewer Line FY16 2010 CHILLER REPAIR 'Repair Chiller at Bldg. 2010' FY16 2204 TEMP CHIILER RENTAL Temp chiller needed (30 tons) FY16 5002 TEMP CHIILER RENTAL Rental Chiller for Bldg 5002 (1 May - 1 Sep) FY16
2034 TEMP CHIILER RENTAL
Bldg 2034 Provide Temp Cooling, Reset/Secure Cooling Towers & Put in Service FY16
Elect Dist -
TBS
HV ELEC DIST REPAIR
Replace Polaris 13.2 kV Feeder at Montezuma Avenue TBS (Emergency) FY16
Upshur STP
PUMP & HAUL -
EMERGENCY
Emergency Repair Document (PUMP and HAUL from Upshur to WWTP) FY16
3087 and 27007
TEMP CHIILER RENTAL Provide Temp Cooling at Bldg. 3087 and the Log Cabin'
FY16
Elect Dist HV ELEC DIST REPAIR Repair power line pulled down by truck in Master's Hill area on 3 August) FY16
2076, 2034, FLOOD REPAIRS Emergency Repairs from Flooding
FY16
5002 CHILLER REPLACEMENT Replace Chiller based on Evaluation Results FY16
2089 GENERATOR REPAIR
Repair/Replace 900 KVA Emergency Generator Control Cable at the WWTP Bldg. 2089 FY16
2004 and
TRANSFORMER &
PERIPHERALS
REPLACEMENT
Replace the 500 KVA Transformer & 600-Amp, 3-Way Pad- Mount Switch gear for bldg. 2004
FY16
122 NAT GAS LINE REPAIR Repair 1" Natural Gas line at Qtrs 122 FY16
Elect Dist HV ELEC DIST REPAIR Supply high voltage manpower to support outage at TBS/FBI on June 4TH FY16
Elect Dist HV ELEC DIST REPAIR Repair Damaged High Voltage Power Pole on Golf Course (per John D FY16
Elect Dist HV ELEC DIST REPAIR Replace Damaged Utility Power Pole on Nevelle Road FY16 Elect Dist HV ELEC DIST REPAIR Emergency Power Outage 21 Aug 16 FY16 Elect Dist HV ELEC DIST REPAIR Power Outage Neville Road FY16 Elect Dist HV ELEC DIST REPAIR Power Outage WTBN FY16 3280 FLOOD REPAIRS Emergency CC Buy to clean up flood damage on 6 Jan 16 FY16 Emergency repairs at Camp Barrett
HV ELEC DIST REPAIR Electrical repairs at Camp Barrett
FY17
Water Dist TRANSITE PIPE REPAIR Repair Transite Water on Mars Station Rd 15 Dec 16 FY17
Elec Dist HV ELEC DIST REPAIR Used to restore power in various locations Basewide on 23 Jan 17, during and following rain/wind storm FY17
2082 Sewer Dist
SEWER LINE REPAIR Bldg 2082 Replace/Reroute Failed Sewer Line (interior work)
FY17
2040 CHILLER REPAIR Bldg 2040 Repair Chiller #2 FY17
REPL TRANSFORMER AND
EMERG GENERATOR
Replace Failed 150 KVA Transformer & Repair Emergency Generator Bldg. 3302 (Thomason Park water pumping station) FY17
Elect Dist ELEC SUBSTATION REPAIR Catlin Substation Electrical Bus Repair Bldg. 3119A FY17
24143 HV ELEC DIST REPAIR
Repair Main Electrical Power Cable Fault and Install 50Kva Transformer for Bldg. 24143; FY17
24157 GENERATOR REPAIR
Repair Emergency Generator (Generac 100-kW) Controller, Block Heater & Wiring Bldg. 24157 FY17
2818LS LIFT STN CONTROLS REPAIR
Lift Station Repairs: Repair Level Sensors, PLC Modules, Float Switches, VFD at Bldg. 2818LS; FY17
Water Dist TRANSITE PIPE REPAIR Emergency Funds: Used to repair transite water line at VRE parking lot early June 2017 FY17
1303 CL2 GAS SYSTEM REPAIR
Repair Mainside Water Plant CL2 Gas Feed System and Gas Monitoring System Bldg. 1303 FY17
ELEC. REPAIRS -
UNSPECIFIED
Used on 28 June to make emergency electrical repairs to Bldg 2000, Bruce Hall Mess Hall FY17
TRANSITE PIPE REPAIR
Used 25 July to Repair Broken 16" Transite Potable Water Line Bldg. 2074 FY17
3250 and
5121LS
GENERATOR REPAIR
Immediate Repairs to Emergency Generators at Bldgs. 3250 &
5121LS FY17
Water Dist TRANSITE PIPE REPAIR AIM Services, Inc.; Cut out a 6' foot section of 8" transite water line and dispose of at OCS FY17
ELEC. AUTO TRANSFER
SWITCH REPAIR
Bldg 2247 Install Emergency Power Automatic Transfer Switch FY17
24162 GENERATOR REPAIR
Trouble shoot and repair Cummins Power Generation, Mod# DGFC-5635328, 200-KW Emergency Generator FY17
2201A NAT GAS LINE REPAIR Repair Leaking Gas Line at Bldg 2201 FY17
ATTACHMENT J-1601000-04
UTILITY ASSET TAGGING GUIDANCE
The Contractor shall install asset label with barcode on all equipment maintained as a part of the Inventory Management Program. Installation of these tags shall be phased in over the base year to occur as inventory is completed. All equipment tags or stickers used shall be durable, water and heat resistant. As equipment is replaced or new equipment installed, the Contractor shall attach new tags and provide an update of all equipment information within Maximo.
Equipment tags shall match the asset number of the equipment per record in USMC MAXIMO.
USMC MAXIMO EQUIPMENT TAG: a tag with a visible unique public works number (PW00000) and a readable/scanable bar code, affixed to individual equipment.
USMC MAXIMO EQUIPMENT TAGGING: obtaining & affixing an USMC MAXIMO equipment tag to Individual equipment.
USMC MAXIMO EQUIPMENT TAG REPORTING: reporting of existing USMC MAXIMO equipment tag Number(s) to the designated government USMC MAXIMO engineering tech prior to removal and/or replacement or reinstallation of any such equipment during construction.
OBTAINING USMC MAXIMO EQUIPMENT TAGS: Contact the MCB Quantico USMC MAXIMO Engineering Tech located in building 3252 Barnett Ave @ telephone number (703)
784-1484. Have all pertinent USMC MAXIMO equipment data available before calling for new USMC MAXIMO tags.
AFFIXING USMC MAXIMO EQUIPMENT TAGS: Affix the appropriate USMC MAXIMO equipment tag to USMC MAXIMO equipment as specified and as directed by the contracting officer or designated government representative.
ATTACHMENT J-1601000-05
SPECIFICATION ATTRIBUTES
CLASSIFICATION REQUIRED SPECIFICATION FIELD
Actuator Actuator Type
Actuator Rated Pressure
Actuator Rated Pressure UOM
AirDryer Air Dryer Type
Barscreen Bar Screen Type
BatterySystem Battery Role
BatterySystem Battery Type
BatterySystem Number Of Batteries
Boiler Type ID
Boiler National Board No.
Boiler Capacity
Boiler Capacity UOM
Boiler Primary Fuel Type
Boiler Secondary Fuel Type
Burner UL Number
Burner Fuel Type
CapacitorBank Cap Bank Type
CapacitorBank Control Type
CapacitorBank Install Type
CapacitorBank Nominal Voltage
CapacitorBank Voltage Class
CapacitorBank Total Bank KVAR
ChemicalAddtion Chemical Type
Chiller Capacity
Chiller Capacity UOM
Chiller Compressor Type
Compressor NFAID
Compressor Compressor Type
CondensateCollector Steam Condensate Collector Type
CondensateCollector Associated Line Type
ControlSystem Type
ControlSystem Voltage
ControlValve Type
ControlValve Diameter
ControlValve Diameter UOM
ControlValve Regulation Type
Classification Required Specification Field
ControlValve Material
DeaeratorAndStorageTank Deaerator Type
DeaeratorAndStorageTank Deaerator Capacity
CLASSIFICATION REQUIRED SPECIFICATION FIELD
DeaeratorAndStorageTank Deaerator Capacity UOM
DeaeratorAndStorageTank Storage Tank Volume
DeaeratorAndStorageTank Volume UOM
DeaeratorAndStorageTank Tank Material
DifferentialRelay Differential Relay Type
DifferentialRelay Calibration Date
DynamicProtectiveDevice Dyn Pro Dev Type
DynamicProtectiveDevice Device Control
DynamicProtectiveDevice Voltage Class
DynamicProtectiveDevice Interr Mechanism
DynamicProtectiveDevice Gang Operated
DynamicProtectiveDevice Interr Medium
DynamicProtectiveDevice Install Type
DynamicProtectiveDevice Nominal Voltage
ElectricLine Electric Line Type
ElectricLine Circuit Length
ElectricLine Length UOM
ElectricLine Voltage Class
ElectricLine Conductors per Phase
ElectricLine Install Type
ElectricLine Nominal Voltage
ElectricLine Radial Feeder
ElectricLine Cable in Conduit
ElectricMeter Electric Meter Role
ElectricMeter Meter Form
ElectricMeter Meter Class
ElectricMeter Nominal Voltage
ElectricPanel Panel Type
ElectricPanel Voltage
ElectricPanel Amp Rating
ElectricPanel Number Spaces
ElectroMechanicalRelay Relay Type
ElectroMechanicalRelay IEEE Device No
ElectroMechanicalRelay Calibration Date
ElectroMechanicalRelay Voltage Class
Enclosure Enclosure Type
Engine Driven Asset
Engine Fuel Type
ExpansionJoint Steam Exp Joint Type
ExpansionJoint Assoc Line Type
CLASSIFICATION REQUIRED SPECIFICATION FIELD
ExpansionJoint Diameter
ExpansionJoint Diameter UOM
ExpansionJoint Material
ExteriorLights Exterior Lights Type
ExteriorLights Nominal Voltage
ExteriorLights Light Ownership
ExteriorLights Wattage
ExteriorLights Lamp Type
ExteriorLights Quantity
Fan Fan Role
Filter Filter Type
Filter Filter Material
Filter Capacity
Filter Capacity UOM
Filter Rated Flow
Filter Rated Flow UOM
GearDrive Shaft Alignment
GearDrive Rated Power
GearDrive Power UOM
Generator Rated KW
Generator Generator Type
Generator Voltage Class
Generator Nominal Voltage
GreaseTrapAndOilWaterSeparator Pretreatment Device Type
GreaseTrapAndOilWaterSeparator System Type
GreaseTrapAndOilWaterSeparator Material
GritRemoval Grit Removal Type
Ground Grounding Device Type
Ground Ground Type
HeatExchanger Heat Exchanger Role
Hydrant Year Manufactured
Hydrant Bonnet Color
Hydrant Material
Hydrant Hydrant Type
Hydrant Seat Diameter
Hydrant Diameter UOM
Instrumentation Instrumentation Type
Insulator Insulator Type
Insulator Insulator Material
Insulator Install Type
CLASSIFICATION REQUIRED SPECIFICATION FIELD
Insulator Voltage Class
IonExchangeUnit Capacity
IonExchangeUnit Capacity UOM
LVBreakerPanel Install Type
LVBreakerPanel Nominal Voltage
LVBreakerPanel Wire
LVBreakerPanel Rated Ampacity
LVBreakerPanel Number Phases
LVBreakerPanel Number Spaces
LVBreakerPanel Spaces Filled
MechanicalMeter Mech Meter Role
MechanicalMeter Mech Meter Billing Type
MechanicalMeter Remote Read Indicator
MechanicalMeter Material
MechanicalMeter Meter Type
Mixer Mixer Type
Motor Motor Type
Motor Motor Control Type
Motor RPM
Motor Rated HP
Motor Nominal Voltage
Motor Voltage Class
OvercurrentRelay Overcurrent Relay Type
OvercurrentRelay Calibration Date
Pipe Service Area
Pipe Line Type
Pipe Pipe Length
Pipe Pipe Length UOM
Pipe Material
PowerInverter Nom. Input Volt.
PowerInverter Nom. AC Volt. Out
PowerInverter Cont/Nom Pwr Out.
Pump Type
Pump Submersible Indicator
Pump Rated Flow
Pump Rated Flow UOM
Pump Mechanical System Type
Pump Material
Receptacle Receptacle Type
Receptacle Install Type
CLASSIFICATION REQUIRED SPECIFICATION FIELD
Receptacle Voltage Class
Receptacle Nominal Voltage
Receptacle Rated Ampacity
ReliefValve Type
ReliefValve Diameter
ReliefValve Diameter UOM
ReliefValve Material
RotatingBiologicalContactor Capacity
RotatingBiologicalContactor Capacity UOM
ShorePowerBox Shore Power Box Type
ShorePowerBox Voltage Class
ShorePowerBox Nominal Voltage
ShorePowerBox Install Type
SolidStateRelay Relay Type
SolidStateRelay IEEE Device No
SolidStateRelay Calibration Date
SolidStateRelay Voltage Class
Stack Material
Stack Height
Stack Height UOM
Stack Mult. Boilers
Stack Mounting System
StaticProtectiveDevice Device Type
StaticProtectiveDevice Install Type
StaticProtectiveDevice Voltage Class
SupportStructure Structure Material
SupportStructure Supp Struct Type
SupportStructure Thermal Support Type
SurfaceStructure Structure Material
SurfaceStructure Surface Structure Type
SwitchUnit Switch Type
SwitchUnit Voltage Class
SwitchUnit Sw Insul Medium
SwitchUnit Nominal Voltage
SwitchUnit Gang Operated
SwitchUnit Install Type
SystemValve Type
SystemValve Diameter
SystemValve Diameter UOM
SystemValve Material
CLASSIFICATION REQUIRED SPECIFICATION FIELD
Tank Type
Tank Material
Tank Contents
Tank Volume
Tank Volume UOM
Transformer TransformerType
Transformer Rated KVA
Transformer Install Type
Transformer Nominal HV
Transformer HV Protection
Transformer Nominal LV
Transformer CoolingType
Transformer HSide Taps
Trap Type
TreatmentProcessStructure Capacity
TreatmentProcessStructure Capacity UOM
UndergroundStructure Underground Struc Type
UndergroundStructure Structure Material
VoltageRegulator Volt Reg Type
VoltageRegulator Install Type
VoltageRegulator Rated KVA
VoltageRegulator Nominal Voltage
Well Rated Flow
Well Rated Flow UOM
ATTACHMENT J-1601000-06
UEM-DI METER GROUP AND THE DIRECT CONDITION RATING GUIDANCE
Likelihood Category Degradation Index
F ul ly F un ct io na l Negligible = 1 No noticeable defects. Some aging or wear may be visible. Fully functional.
Not Likely = 2 Only minor deterioration or defects are evident. Noticeable wear or aging is visible. Fully functional. Minor maintenance may be required.
Possible = 3 Deterioration or defects are evident. Function is not significantly affected.
Minor repairs are required.
F un ct io n A ff ec te d
Likely = 4 Serious deterioration or defects in at least some portion of the asset. Function is significantly affected. Extensive repairs or replacement are required.
Very Likely = 5 Extensive deterioration or defects in the asset. Not functional, barely functional, or beyond repair.
File details come from the government source that posted it. Updated .