J-0200000-14_ELINS_Final_Amendment_0005.xlsx
XLSX spreadsheet 1 MB Posted
- Attached to
- BASE OPERATIONS SUPPORT (BOS) SERVICES LOCATED AT THE MARINE CORPS BASE QUANTICO, VIRGINIA Federal contract opportunity
- Solicitation number
- N6247017R4003
About this file
This attachment provides details for a base operations support services solicitation for Marine Corps Base Quantico in Virginia. The solicitation seeks to award a contract to provide recurring and non-recurring facility services and environmental services at the base. Recurring services include facility management, facility investment, pest control, grounds maintenance, utility management, wastewater management, and environmental services. Non-recurring services include facility investment tasks such as HVAC and generator rentals, custodial services, integrated solid waste management, and environmental spill response. The attachment outlines the required services by location and specification using detailed line item numbers and descriptions. Pricing is to be provided by unit of issue for the base period and each option period.
J-0200000-14_ELINS_Final_Amendment_0005.xlsx
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ELINs-Base Period-Recurring
| ATTACHMENT J-0200000-14 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # N62470-17-R-4003 |
| EXHIBIT A - BASE PERIOD - RECURRING WORK | ||||||
| CLIN 0001 | ||||||
| In total, ELINs A001-A141 sum to Line Item 0001 and represent the Recurring Work award for the Base Period of performance. | ||||||
| Recurring Work Price - Base Period | ||||||
| PROVIDE PRICES TO PERFORM FACILITY SERVICES RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | ||||||
| ELINs A001 THROUGH A141 | ||||||
| ELIN / Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Total Price | IMAP CAC |
| MCBQ (MARINE CORPS BASE QUANTICO) - Recurring Work (ELINs A001 through A007) | |||||
| A001 | MCBQ - Specification 1501000 Facility Management (FP), Spec Item 3 | ||||
| A001AA | Infrastructure Condition Assessment Program (ICAP), Spec Item 3.1 | 12 | MO | $ - 0 | $ - 0 |
| A001AB | Work Order Tracking Spec Item 3.3 | 12 | MO | $ - 0 | $ - 0 |
| A002 | MCBQ - Specification 1502000 Facility Investment (ST), Spec Item 3 | ||||
| Service Orders, Spec Item 3.1 | |||||
| A002AA | Emergency Service Orders, Spec Item 3.1.1 | 12 | MO | $ - 0 | $ - 0 |
| A002AB | Urgent Service Orders, Spec Item 3.1.2 | 12 | MO | $ - 0 | $ - 0 |
| A002AC | Routine Service Orders, Spec Item 3.1.3 | 12 | MO | $ - 0 | $ - 0 |
| Project Work Orders, Spec Item 3.2 | |||||
| A002AD | Project Work Order Level 1 | 12 | MO | $ - 0 | $ - 0 |
| A002AE | Project Work Order Level 2 | 12 | MO | $ - 0 | $ - 0 |
| A002AF | Project Work Order Level 3 | 12 | MO | $ - 0 | $ - 0 |
| Preventive Maintenance Program (PM), Spec Item 3.3 | |||||
| A002AG | Cathodic Protection Systems, Spec Item 3.3.4 | 12 | MO | $ - 0 | $ - 0 |
| A002AH | Fire Protection Systems, Spec Item 3.3.6 | 12 | MO | $ - 0 | $ - 0 |
| A002AJ | Weapons Bluing Equipment, Spec Item 3.3.10 | 12 | MO | $ - 0 | $ - 0 |
| Other Recurring Services Program, Spec Item 3.6 | |||||
| A002AK | Grease Traps, Spec Item 3.6.1 | 12 | MO | $ - 0 | $ - 0 |
| A002AL | Exhaust Hoods and Ducts, Spec Item 3.6.2 | 12 | MO | $ - 0 | $ - 0 |
| A002AM | HVAC Water Testing and Treatment Services, Spec Item 3.6.3 | 12 | MO | $ - 0 | $ - 0 |
| A002AN | Boiler Water Testing and Treatment Services, Spec Item 3.6.5 | 12 | MO | $ - 0 | $ - 0 |
| A002AP | Oil Water Separators (OWS), Spec Item 3.6.7 | 12 | MO | $ - 0 | $ - 0 |
| A002AQ | Locksmith Services, Spec Item 3.6.8 | 12 | MO | $ - 0 | $ - 0 |
| A002AR | Solar Panel Maintenance, Spec Item 3.6.12 | 12 | MO | $ - 0 | $ - 0 |
| A002AS | Compressed Natural Gas (CNG) System Inspection and Repair, Spec Item 3.6.13 | 12 | MO | $ - 0 | $ - 0 |
| A003 | MCBQ - Specification 1503020 Pest Control (FX), Spec Item 3 | ||||
| A003AA | Scheduled Pest Control Services, Spec Item 3.1 | 12 | MO | $ - 0 | $ - 0 |
| A003AB | Unscheduled Pest Control Services, Spec Item 3.2 | 12 | MO | $ - 0 | $ - 0 |
| A004 | MCBQ - Specification 1503050 Grounds Maintenance and Landscaping (FX), Spec Item 3 | ||||
| A004AA | Storm Drainage Systems, Spec Item 3.2 | 12 | MO | $ - 0 | $ - 0 |
| A005 | MCBQ - Specification 1601000 Utility Management (FP), Spec Item 3 | ||||
| Service Orders, Spec Item 3.1 | |||||
| A005AA | Emergency Service Orders, Spec Item 3.1.1 | 12 | MO | $ - 0 | $ - 0 |
| A005AB | Urgent Service Orders, Spec Item 3.1.2 | 12 | MO | $ - 0 | $ - 0 |
| A005AC | Routine Service Orders, Spec Item 3.1.3 | 12 | MO | $ - 0 | $ - 0 |
| Project Work Orders, Spec Item 3.2 | |||||
| A005AD | Project Work Order Level 1, Spec Item 3.2.1 | 12 | MO | $ - 0 | $ - 0 |
| A005AE | Project Work Order Level 2, Spec Item 3.2.2 | 12 | MO | $ - 0 | $ - 0 |
| A005AF | Project Work Order Level 3, Spec Item 3.2.3 | 12 | MO | $ - 0 | $ - 0 |
| Utility Infrastructure Condition Assessment (UICAP) Support, Spec Item 3.3 | |||||
| A005AG | Inventory Management, Spec Item 3.3.1 | 12 | MO | $ - 0 | $ - 0 |
| A005AH | Condition Assessment, Spec Item 3.3.2 | 12 | MO | $ - 0 | $ - 0 |
| A006 | MCBQ - Specification 1604000 Wastewater, Spec Item 3 | ||||
| Preventive Maintenance (PM) Program, Spec Item 3.1 | |||||
| A006AA | Wastewater Instrumentation Systems, Spec Item 3.1.1 | 12 | MO | $ - 0 | $ - 0 |
| A007 | MCBQ - Specification 1800000 Environmental (EC), Spec Item 3 | ||||
| A007AA | Oil and Hazardous Substance Spill Response and Cleanup Ashore, Spec Item 3.1 | 12 | MO | $ - 0 | $ - 0 |
| A008-A011 | Reserved | ||||
| MCBQ SUBTOTAL: | $ - 0 |
| NMCL / BUMED (Naval Medical Clinic Quantico/Dental Clinic) - Recurring Work (ELINs A012 through A014) | |||||
| A012 | NMCL - Specification 1501000 Facility Management (FP), Spec Item 3 | ||||
| A012AA | Infrastructure Condition Assessment Program (ICAP), Spec Item 3.1 | 12 | MO | $ - 0 | $ - 0 |
| A012AB | Control Systems, Spec Item 3.2 | 12 | MO | $ - 0 | $ - 0 |
| A012AC | Work Order Tracking Spec Item 3.3 | 12 | MO | $ - 0 | $ - 0 |
| A013 | NMCL - Specification 1502000 Facility Investment (ST), Spec Item 3 | ||||
| Service Orders, Spec Item 3.1 | |||||
| A013AA | Emergency Service Orders, Spec Item 3.1.1 | 12 | MO | $ - 0 | $ - 0 |
| A013AB | Urgent Service Orders, Spec Item 3.1.2 | 12 | MO | $ - 0 | $ - 0 |
| A013AC | Routine Service Orders, Spec Item 3.1.3 | 12 | MO | $ - 0 | $ - 0 |
| Preventive Maintenance Program (PM), Spec Item 3.3 | |||||
| A013AD | HVAC and Refrigeration Systems, Spec Item 3.3.1 | 12 | MO | $ - 0 | $ - 0 |
| A013AE | Interior and Exterior Lighting Systems, Spec Item 3.3.2 | 12 | MO | $ - 0 | $ - 0 |
| A013AF | Boilers and UPVs, Spec Item 3.3.3 | 12 | MO | $ - 0 | $ - 0 |
| A013AG | Lightning Arrestors and Grounding Devices, Spec Item 3.3.5 | 12 | MO | $ - 0 | $ - 0 |
| A013AH | Fire Protection Systems, Spec Item 3.3.6 | 12 | MO | $ - 0 | $ - 0 |
| A013AJ | Auxiliary Generators, Spec Item 3.3.7 | 12 | MO | $ - 0 | $ - 0 |
| A013AK | Emergency and Exit Lighting Systems, Spec Item 3.3.11 | 12 | MO | $ - 0 | $ - 0 |
| A013AL | Roll-Up, Overhead and Automated Doors, Spec Item 3.3.14 | 12 | MO | $ - 0 | $ - 0 |
| A013AM | Building Controls Systems (BCS), Spec Item 3.3.18 | 12 | MO | $ - 0 | $ - 0 |
| A013AN | Facility Electrical Systems, Spec Item 3.3.19 | 12 | MO | $ - 0 | $ - 0 |
| Inspection, Testing, and Certification Program, Spec Item 3.5 | |||||
| A013AP | Boilers and UPVs, Spec Item 3.5.1 | 12 | MO | $ - 0 | $ - 0 |
| A013AQ | Backflow Prevention Devices, Spec Item 3.5.2 | 12 | MO | $ - 0 | $ - 0 |
| A013AR | Emergency and Exit Lighting Systems, Spec Item 3.5.5 | 12 | MO | $ - 0 | $ - 0 |
| Other Recurring Services Program, Spec Item 3.6 | |||||
| A013AS | Drinking Fountains/Water Coolers, Spec Item 3.6.10 | 12 | MO | $ - 0 | $ - 0 |
| A014 | NMCL - Specification 1503060 Pavement Clearance (FX), Spec Item 3 | ||||
| A014AA | Snow and Ice Removal Services, Spec Item 3.2 | 12 | MO | $ - 0 | $ - 0 |
| A015-A19 | Reserved | ||||
| NMCL SUBTOTAL: | $ - 0 |
| National Museum of the Marine Corps (NMMC) - Recurring Work (ELINs A020 through A027) | |||||
| A020 | NMMC - Specification 0401000 Force Protection (Armed Security Personnel), Spec Item 3 | ||||
| A020AA | Entry Control Point Services, Spec Item 3.1 | 12 | MO | $ - 0 | $ - 0 |
| A020AB | Roving Guard Services, Spec Item 3.2 | 12 | MO | $ - 0 | $ - 0 |
| A020AC | Dispatching Services, Spec Item 3.3 | 12 | MO | $ - 0 | $ - 0 |
| A020AD | Access Badge Management, Spec Item 3.4 | 12 | MO | $ - 0 | $ - 0 |
| A020AE | Shipping and Receiving Service, Spec Item 3.5 | 12 | MO | $ - 0 | $ - 0 |
| A021 | NMMC - Specification 1501000 Facility Management (FP), Spec Item 3 | ||||
| A021AA | Infrastructure Condition Assessment Program (ICAP), Spec Item 3.1 | 12 | MO | $ - 0 | $ - 0 |
| A021AB | Control Systems, Spec Item 3.2 | 12 | MO | $ - 0 | $ - 0 |
| A021AC | Work Order Tracking Spec Item 3.3 | 12 | MO | $ - 0 | $ - 0 |
| A022 | NMMC - Specification 1502000 Facility Investment (ST), Spec Item 3 | ||||
| Service Orders, Spec Item 3.1 | |||||
| A022AA | Emergency Service Orders, Spec Item 3.1.1 | 12 | MO | $ - 0 | $ - 0 |
| A022AB | Urgent Service Orders, Spec Item 3.1.2 | 12 | MO | $ - 0 | $ - 0 |
| A022AC | Routine Service Orders, Spec Item 3.1.3 | 12 | MO | $ - 0 | $ - 0 |
| Project Work Orders, Spec Item 3.2 | |||||
| A022AD | Project Work Order Level 1, Spec Item 3.2.1 | 12 | MO | $ - 0 | $ - 0 |
| A022AE | Project Work Order Level 2, Spec Item 3.2.2 | 12 | MO | $ - 0 | $ - 0 |
| Preventive Maintenance Program (PM), Spec Item 3.2 | |||||
| A022AF | HVAC and Refrigeration Systems, Spec Item 3.3.1 | 12 | MO | $ - 0 | $ - 0 |
| A022AG | Interior and Exterior Lighting Systems, Spec Item 3.3.2 | 12 | MO | $ - 0 | $ - 0 |
| A022AH | Fire Protection Systems, Spec Item 3.3.6 | 12 | MO | $ - 0 | $ - 0 |
| A022AJ | Auxiliary Generators, Spec Item 3.3.7 | 12 | MO | $ - 0 | $ - 0 |
| A022AK | Uninterrupted Power Systems (UPS), Spec Item 3.3.8 | 12 | MO | $ - 0 | $ - 0 |
| A022AL | Vehicle Barrier and Gate Systems, Spec Item 3.3.9 | 12 | MO | $ - 0 | $ - 0 |
| A022AM | Vertical Transportation Equipment (VTE), Spec Item 3.3.12 | 12 | MO | $ - 0 | $ - 0 |
| A022AN | Roll-Up, Overhead and Automated Doors, Spec Item 3.3.14 | 12 | MO | $ - 0 | $ - 0 |
| A022AP | Emergency Eyewash and Shower Stations, Spec Item 3.3.15 | 12 | MO | $ - 0 | $ - 0 |
| A022AQ | Lifts and Mobile Scaffolds, Spec Item 3.3.16 | 12 | MO | $ - 0 | $ - 0 |
| A022AR | Building Controls Systems (BCS), Spec Item 3.3.18 | 12 | MO | $ - 0 | $ - 0 |
| A022AS | Facility Electrical Systems, Spec Item 3.3.19 | 12 | MO | $ - 0 | $ - 0 |
| Plant Systems Operation and Maintenance, Spec Item 3.4 | |||||
| A022AT | Plant Systems Operation and Maintenance, Spec Items 3.4.1 through 3.4.6 | 12 | MO | $ - 0 | $ - 0 |
| Inspection, Testing, and Certification Program, Spec Item 3.5 | |||||
| A022AU | Backflow Prevention Devices, Spec Item 3.5.2 | 12 | MO | $ - 0 | $ - 0 |
| A022AV | Vertical Transportation Equipment (VTE), Spec Item 3.5.3 | 12 | MO | $ - 0 | $ - 0 |
| A022AW | Fall Protection Systems for Facilities and Structures, Spec Item 3.5.4 | 12 | MO | $ - 0 | $ - 0 |
| Other Recurring Services Program, Spec Item 3.6 | |||||
| A022AX | Grease Traps, Spec Item 3.6.1 | 12 | MO | $ - 0 | $ - 0 |
| A022AY | Exhaust Hoods and Ducts, Spec Item 3.6.2 | 12 | MO | $ - 0 | $ - 0 |
| A022AZ | HVAC Seasonal Start-Up and Shutdown, Spec Item 3.6.4 | 12 | MO | $ - 0 | $ - 0 |
| A022BA | Boiler Seasonal Start-Up and Shutdown, Spec Item 3.6.6 | 12 | MO | $ - 0 | $ - 0 |
| A022BB | Drinking Fountains/Water Coolers, Spec Item 3.6.10 | 12 | MO | $ - 0 | $ - 0 |
| A022BC | Building Drainage System, Spec Item 3.6.11 | 12 | MO | $ - 0 | $ - 0 |
| A023 | NMMC - Specification 1503010 Custodial (FX), Spec Item 3 | ||||
| A023AA | Scheduled Custodial Services, Spec Item 3.1 | 12 | MO | $ - 0 | $ - 0 |
| A023AB | Unscheduled Custodial Services, Spec Item 3.2 | 12 | MO | $ - 0 | $ - 0 |
| A024 | NMMC - Specification 1503020 Pest Control (FX), Spec Item 3 | ||||
| A024AA | Scheduled Pest Control Services, Spec Item 3.1 | 12 | MO | $ - 0 | $ - 0 |
| A024AB | Unscheduled Pest Control Services, Spec Item 3.2 | 12 | MO | $ - 0 | $ - 0 |
| A025 | NMMC - Specification 1503030 Integrated Solid Waste Management (ISWM) (FX), Spec Item 3 | ||||
| A025AA | Solid Waste Collection, Spec Items 3.1 through 3.5 | 12 | MO | $ - 0 | $ - 0 |
| A026 | NMMC - Specification 1503050 Grounds Maintenance and Landscaping (FX), Spec Item 3 | ||||
| A026AA | Improved Grounds, Spec Item 3.1 | 12 | MO | $ - 0 | $ - 0 |
| A026AB | Storm Drainage Systems, Spec Item 3.2 | 12 | MO | $ - 0 | $ - 0 |
| A026AC | Outdoor Waste Collection, Spec Item 3.3 | 12 | MO | $ - 0 | $ - 0 |
| A026AD | Playgrounds Maintenance, Spec Item 3.4 | 12 | MO | $ - 0 | $ - 0 |
| A027 | NMMC - Specification 1503060 Pavement Clearance (FX), Spec Item 3 | ||||
| A027AA | Pavement Sweeping Services, Spec Item 3.1 | 12 | MO | $ - 0 | $ - 0 |
| A027AB | Snow and Ice Removal Services, Spec Item 3.2 | 12 | MO | $ - 0 | $ - 0 |
| A028-A034 | Reserved | ||||
| NMMC SUBTOTAL: | $ - 0 |
| Civilian Manpower Management (MANPOWER) - Recurring Work (ELINs A035 through A036) | |||||
| A035 | MANPOWER- Specification 1501000 Facility Management (FP), Spec Item 3 | ||||
| A035AA | Infrastructure Condition Assessment Program (ICAP), Spec Item 3.1 | 12 | MO | $ - 0 | $ - 0 |
| A035AB | Work Order Tracking Spec Item 3.3 | 12 | MO | $ - 0 | $ - 0 |
| A036 | MANPOWER - Specification 1502000 Facility Investment (ST), Spec Item 3 | ||||
| Service Orders, Spec Item 3.1 | |||||
| A036AA | Emergency Service Orders, Spec Item 3.1.1 | 12 | MO | $ - 0 | $ - 0 |
| A036AB | Urgent Service Orders, Spec Item 3.1.2 | 12 | MO | $ - 0 | $ - 0 |
| A036AC | Routine Service Orders, Spec Item 3.1.3 | 12 | MO | $ - 0 | $ - 0 |
| Preventive Maintenance Program (PM), Spec Item 3.3 | |||||
| A036AD | HVAC and Refrigeration Systems, Spec Item 3.3.1 | 12 | MO | $ - 0 | $ - 0 |
| A036AE | Auxiliary Generators, Spec Item 3.3.7 | 12 | MO | $ - 0 | $ - 0 |
| A036AF | Uninterrupted Power Systems (UPS), Spec Item 3.3.8 | 12 | MO | $ - 0 | $ - 0 |
| A037-A044 | Reserved | ||||
| MANPOWER SUBTOTAL: | $ - 0 |
| Marine Corp Air Facility (MCAF) - Recurring Work (ELINs A045 through A047) | |||||
| A045 | MCAF- Specification 1501000 Facility Management (FP), Spec Item 3 | ||||
| A045AA | Infrastructure Condition Assessment Program (ICAP), Spec Item 3.1 | 12 | MO | $ - 0 | $ - 0 |
| A045AB | Work Order Tracking Spec Item 3.3 | 12 | MO | $ - 0 | $ - 0 |
| A046 | MCAF - Specification 1502000 Facility Investment (ST), Spec Item 3 | ||||
| Service Orders, Spec Item 3.1 | |||||
| A046AA | Emergency Service Orders, Spec Item 3.1.1 | 12 | MO | $ - 0 | $ - 0 |
| A046AB | Urgent Service Orders, Spec Item 3.1.2 | 12 | MO | $ - 0 | $ - 0 |
| A046AC | Routine Service Orders, Spec Item 3.1.3 | 12 | MO | $ - 0 | $ - 0 |
| Project Work Orders, Spec Item 3.2 | |||||
| A046AD | Project Work Order Level 1 | 12 | MO | $ - 0 | $ - 0 |
| A046AE | Project Work Order Level 2 | 12 | MO | $ - 0 | $ - 0 |
| Preventive Maintenance Program (PM), Spec Item 3.3 | |||||
| A046AF | HVAC and Refrigeration Systems, Spec Item 3.3.1 | 12 | MO | $ - 0 | $ - 0 |
| A046AG | Interior and Exterior Lighting Systems, Spec Item 3.3.2 | 12 | MO | $ - 0 | $ - 0 |
| A046AH | Boilers and UPVs, Spec Item 3.3.3 | 12 | MO | $ - 0 | $ - 0 |
| A046AJ | Fire Protection Systems, Spec Item 3.3.6 | 12 | MO | $ - 0 | $ - 0 |
| A046AK | Auxiliary Generators, Spec Item 3.3.7 | 12 | MO | $ - 0 | $ - 0 |
| A046AL | Uninterrupted Power Systems (UPS), Spec Item 3.3.8 | 12 | MO | $ - 0 | $ - 0 |
| A046AM | Airfield Lighting Systems, Spec Item 3.3.13 | 12 | MO | $ - 0 | $ - 0 |
| Inspection, Testing, and Certification Program, Spec Item 3.5 | |||||
| A046AN | Boilers and UPVs, Spec Item 3.5.1 | 12 | MO | $ - 0 | $ - 0 |
| A046AP | Backflow Prevention Devices, Spec Item 3.5.2 | 12 | MO | $ - 0 | $ - 0 |
| Other Recurring Services Program, Spec Item 3.6 | |||||
| A046AQ | Grease Traps, Spec Item 3.6.1 | 12 | MO | $ - 0 | $ - 0 |
| A046AR | Exhaust Hoods and Ducts, Spec Item 3.6.2 | 12 | MO | $ - 0 | $ - 0 |
| A046AS | Oil Water Separators (OWS), Spec Item 3.6.7 | 12 | MO | $ - 0 | $ - 0 |
| A047 | MCAF - Specification 1503020 Pest Control (FX), Spec Item 3 | ||||
| A047AA | Scheduled Pest Control Services, Spec Item 3.1 | 12 | MO | $ - 0 | $ - 0 |
| A047AB | Unscheduled Pest Control Services, Spec Item 3.2 | 12 | MO | $ - 0 | $ - 0 |
| A048-A051 | Reserved | ||||
| MCAF SUBTOTAL: | $ - 0 |
| Marine Corps Helicopter Squadron One (HMX-1) Medical/Dental Clinic - BUMED - Recurring Work (ELIN A052) | |||||
| A052 | HMX-1 Medical/Dental Clinic - Specification 1503010 Custodial (FX), Spec Item 3 | ||||
| A052AA | Scheduled Custodial Services, Spec Item 3.1 | 12 | MO | $ - 0 | $ - 0 |
| A052AB | Unscheduled Custodial Services, Spec Item 3.2 | 12 | MO | $ - 0 | $ - 0 |
| A053-A057 | Reserved | ||||
| HMX-1 Medical/Dental Clinic SUBTOTAL: | $ - 0 |
| Marine Corps Community Services (MCCS) - Recurring Work (ELIN A058) | |||||
| A058 | MCCS - Specification 1503020 Pest Control (FX), Spec Item 3 | ||||
| A058AA | Scheduled Pest Control Services, Spec Item 3.1 | 12 | MO | $ - 0 | $ - 0 |
| A058AB | Unscheduled Pest Control Services, Spec Item 3.2 | 12 | MO | $ - 0 | $ - 0 |
| A059-A065 | Reserved | ||||
| MCCS SUBTOTAL: | $ - 0 |
| Department of Defense Education Activity (DoDEA) - Recurring Work (ELINs A066 through A067) | |||||
| A066 | DoDEA - Specification 1502000 Facility Investment (ST), Spec Item 3 | ||||
| Preventive Maintenance Program (PM), Spec Item 3.3 | |||||
| A066AA | Fire Protection Systems, Spec Item 3.3.6 | 12 | MO | $ - 0 | $ - 0 |
| Other Recurring Services Program, Spec Item 3.6 | |||||
| A066AB | Exhaust Hoods and Ducts, Spec Item 3.6.2 | 12 | MO | $ - 0 | $ - 0 |
| A067 | DoDEA - Specification 1503020 Pest Control (FX), Spec Item 3 | ||||
| A067AA | Scheduled Pest Control Services, Spec Item 3.1 | 12 | MO | $ - 0 | $ - 0 |
| A067AB | Unscheduled Pest Control Services, Spec Item 3.2 | 12 | MO | $ - 0 | $ - 0 |
| A068-A073 | Reserved | ||||
| DoDEA SUBTOTAL: | $ - 0 |
| Marine Corps Cyberspace Operations Group (MCCOG) - Recurring Work (ELINs A074 through A077) | |||||
| A074 | MCCOG - Specification 1501000 Facility Management (FP), Spec Item 3 | ||||
| A074AA | Infrastructure Condition Assessment Program (ICAP), Spec Item 3.1 | 12 | MO | $ - 0 | $ - 0 |
| A074AB | Control Systems, Spec Item 3.2 | 12 | MO | $ - 0 | $ - 0 |
| A074AC | Work Order Tracking Spec Item 3.3 | 12 | MO | $ - 0 | $ - 0 |
| A075 | MCCOG - Specification 1502000 Facility Investment (ST), Spec Item 3 | ||||
| Service Orders, Spec Item 3.1 | |||||
| A075AA | Emergency Service Orders, Spec Item 3.1.1 | 12 | MO | $ - 0 | $ - 0 |
| A075AB | Urgent Service Orders, Spec Item 3.1.2 | 12 | MO | $ - 0 | $ - 0 |
| A075AC | Routine Service Orders, Spec Item 3.1.3 | 12 | MO | $ - 0 | $ - 0 |
| Project Work Orders, Spec Item 3.2 | |||||
| A075AD | Project Work Order Level 1, Spec Item 3.2.1 | 12 | MO | $ - 0 | $ - 0 |
| A075AE | Project Work Order Level 2, Spec Item 3.2.2 | 12 | MO | $ - 0 | $ - 0 |
| A075AF | Project Work Order Level 3, Spec Item 3.2.3 | 12 | MO | $ - 0 | $ - 0 |
| Preventive Maintenance Program (PM), Spec Item 3.3 | |||||
| A075AG | HVAC and Refrigeration Systems, Spec Item 3.3.1 | 12 | MO | $ - 0 | $ - 0 |
| A075AH | Boilers and UPVs, Spec Item 3.3.3 | 12 | MO | $ - 0 | $ - 0 |
| A075AJ | Auxiliary Generators, Spec Item 3.3.7 | 12 | MO | $ - 0 | $ - 0 |
| A075AK | Uninterrupted Power Systems (UPS), Spec Item 3.3.8 | 12 | MO | $ - 0 | $ - 0 |
| A075AL | Vertical Transportation Equipment (VTE), Spec Item 3.3.12 | 12 | MO | $ - 0 | $ - 0 |
| A075AM | Roll-Up, Overhead and Automated Doors, Spec Item 3.3.14 | 12 | MO | $ - 0 | $ - 0 |
| A075AN | Rainwater Harvesting System, Spec Item 3.3.17 | 12 | MO | $ - 0 | $ - 0 |
| A075AP | Building Controls Systems (BCS), Spec Item 3.3.18 | 12 | MO | $ - 0 | $ - 0 |
| Inspection, Testing, and Certification Program, Spec Item 3.5 | |||||
| A075AQ | Boilers and UPVs, Spec Item 3.5.1 | 12 | MO | $ - 0 | $ - 0 |
| A075AR | Backflow Prevention Devices, Spec Item 3.5.2 | 12 | MO | $ - 0 | $ - 0 |
| A075AS | Vertical Transportation Equipment (VTE), Spec Item 3.5.3 | 12 | MO | $ - 0 | $ - 0 |
| Other Recurring Services Program, Spec Item 3.6 | |||||
| A075AT | HVAC Water Testing and Treatment, Spec Item 3.6.3 | 12 | MO | $ - 0 | $ - 0 |
| A075AU | Boiler Water Testing and Treatment, Spec Item 3.6.5 | 12 | MO | $ - 0 | $ - 0 |
| A076 | MCCOG - Specification 1503020 Pest Control (FX), Spec Item 3 | ||||
| A076AA | Scheduled Pest Control Services, Spec Item 3.1 | 12 | MO | $ - 0 | $ - 0 |
| A077-A081 | Reserved | ||||
| MCCOG SUBTOTAL: | $ - 0 |
| Marine Corps Investigative Agency (MCIA) - Recurring Work (ELINs A082 through A084) | |||||
| A082 | MCIA - Specification 1501000 Facility Management (FP), Spec Item 3 | ||||
| A082AA | Infrastructure Condition Assessment Program (ICAP), Spec Item 3.1 | 12 | MO | $ - 0 | $ - 0 |
| A082AB | Control Systems, Spec Item 3.2 (No Service Required only During Base Period - Still Under Warranty) | 0 | MO | $ - 0 | $ - 0 |
| A082AC | Work Order Tracking Spec Item 3.3 | 12 | MO | $ - 0 | $ - 0 |
| A083 | MCIA - Specification 1502000 Facility Investment (ST), Spec Item 3 | ||||
| Service Orders, Spec Item 3.1 | |||||
| A083AA | Emergency Service Orders, Spec Item 3.1.1 | 12 | MO | $ - 0 | $ - 0 |
| A083AB | Urgent Service Orders, Spec Item 3.1.2 | 12 | MO | $ - 0 | $ - 0 |
| A083AC | Routine Service Orders, Spec Item 3.1.3 | 12 | MO | $ - 0 | $ - 0 |
| Preventive Maintenance Program (PM), Spec Item 3.3 | |||||
| A083AD | HVAC and Refrigeration Systems, Spec Item 3.3.1 | 12 | MO | $ - 0 | $ - 0 |
| A083AE | Auxiliary Generators, Spec Item 3.3.7 | 12 | MO | $ - 0 | $ - 0 |
| A083AF | Uninterrupted Power Systems (UPS), Spec Item 3.3.8 | 12 | MO | $ - 0 | $ - 0 |
| A083AG | Building Controls Systems (BCS), Spec Item 3.3.18 (No Service Required only During Base Period - Still Under Warranty) | 0 | MO | $ - 0 | $ - 0 |
| A084-A089 | Reserved | ||||
| MCIA SUBTOTAL: | $ - 0 |
| Marine Corps Information Operations Center (MCIOC) - Recurring Work (ELINs A090 through A092) | |||||
| A090 | MCIOC - Specification 1501000 Facility Management (FP), Spec Item 3 | ||||
| A090AA | Infrastructure Condition Assessment Program (ICAP), Spec Item 3.1 | 12 | MO | $ - 0 | $ - 0 |
| A090AB | Control Systems, Spec Item 3.2 | 12 | MO | $ - 0 | $ - 0 |
| A090AC | Work Order Tracking Spec Item 3.3 | 12 | MO | $ - 0 | $ - 0 |
| A091 | MCIOC - Specification 1502000 Facility Investment (ST), Spec Item 3 | ||||
| Service Orders, Spec Item 3.1 | |||||
| A091AA | Routine Service Orders, Spec Item 3.1.3 | 12 | MO | $ - 0 | $ - 0 |
| Preventive Maintenance Program (PM), Spec Item 3.3 | |||||
| A091AB | HVAC and Refrigeration Systems, Spec Item 3.3.1 | 12 | MO | $ - 0 | $ - 0 |
| A091AC | Boilers and UPVs, Spec Item 3.3.3 | 12 | MO | $ - 0 | $ - 0 |
| A091AD | Auxiliary Generators, Spec Item 3.3.7 | 12 | MO | $ - 0 | $ - 0 |
| A091AE | Uninterrupted Power Systems (UPS), Spec Item 3.3.8 | 12 | MO | $ - 0 | $ - 0 |
| A091AF | Building Controls Systems (BCS), Spec Item 3.3.18 | 12 | MO | $ - 0 | $ - 0 |
| A091AG | Facility Electrical Systems, Spec Item 3.3.19 | 12 | MO | $ - 0 | $ - 0 |
| Inspection, Testing, and Certification Program, Spec Item 3.5 | |||||
| A091AH | Boilers and UPVs, Spec Item 3.5.1 | 12 | MO | $ - 0 | $ - 0 |
| A091AJ | Backflow Prevention Devices, Spec Item 3.5.2 | 12 | MO | $ - 0 | $ - 0 |
| A092-A097 | Reserved | ||||
| MCIOC SUBTOTAL: | $ - 0 |
| Marine Corps Support Activity (MCSA) / MARFORRES - Camp Upshur - Recurring Work (ELINs A098 through A099) | |||||
| A098 | MCSA / MARFORRES - Specification 1503050 Grounds Maintenance and Landscaping (FX), Spec Item 3 | ||||
| A098AA | Improved Grounds, Spec Item 3.1 | 12 | MO | $ - 0 | $ - 0 |
| A098AB | Outdoor Waste Collection, Spec Item 3.3 | 12 | MO | $ - 0 | $ - 0 |
| A099 | MCSA / MARFORRES- Specification 1503060 Pavement Clearance (FX), Spec Item 3 | ||||
| A099AA | Pavement Sweeping Services, Spec Item 3.1 | 12 | MO | $ - 0 | $ - 0 |
| A099AB | Snow and Ice Removal Services, Spec Item 3.2 | 12 | MO | $ - 0 | $ - 0 |
| A100-A107 | Reserved | ||||
| MCSA / MARFORRES SUBTOTAL: | $ - 0 |
| MARCORSYSCOM (MCSC) - Recurring Work (ELIN A108) | |||||
| A108 | MCSC - Specification 1502000 Facility Investment (ST), Spec Item 3 | ||||
| Preventive Maintenance Program (PM), Spec Item 3.3 | |||||
| A108AA | Auxiliary Generators, Spec Item 3.3.7 | 12 | MO | $ - 0 | $ - 0 |
| A108AB | Roll-Up, Overhead, Automated Doors, Spec Item 3.3.14 | 12 | MO | $ - 0 | $ - 0 |
| A108AC | Emergency Eyewash and Showers Stations, Spec Item 3.3.15 | 12 | MO | $ - 0 | $ - 0 |
| A109-A115 | Reserved | ||||
| MCSC SUBTOTAL: | $ - 0 |
| DECA COMMISSARY - Recurring Work (ELINs A116) | |||||
| A116 | DECA COMMISSARY - Specification 1503020 Pest Control (FX), Spec Item 3 | ||||
| A116AA | Scheduled Pest Control Services, Spec Item 3.1 | 12 | MO | $ - 0 | $ - 0 |
| A116AB | Unscheduled Pest Control Services, Spec Item 3.2 | 12 | MO | $ - 0 | $ - 0 |
| A117-A121 | Reserved | ||||
| DECA COMMISSARY SUBTOTAL: | $ - 0 |
| Marine Corps University (MCU) - Recurring Work (ELINs A122 through A125) | |||||
| A122 | MCU - Specification 1501000 Facility Management (FP), Spec Item 3 | ||||
| A122AA | Infrastructure Condition Assessment Program (ICAP), Spec Item 3.1 | 12 | MO | $ - 0 | $ - 0 |
| A122AB | Control Systems, Spec Item 3.2 | 12 | MO | $ - 0 | $ - 0 |
| A122AC | Work Order Tracking Spec Item 3.3 | 12 | MO | $ - 0 | $ - 0 |
| A123 | MCU - Specification 1502000 Facility Investment (ST), Spec Item 3 | ||||
| Service Orders, Spec Item 3.1 | |||||
| A123AA | Emergency Service Orders, Spec Item 3.1.1 | 12 | MO | $ - 0 | $ - 0 |
| A123AB | Routine Service Orders, Spec Item 3.1.3 | 12 | MO | $ - 0 | $ - 0 |
| Preventive Maintenance Program (PM), Spec Item 3.3 | |||||
| A123AC | HVAC and Refrigeration Systems, Spec Item 3.3.1 | 12 | MO | $ - 0 | $ - 0 |
| A123AD | Interior and Exterior Lighting Systems, Spec Item 3.3.2 | 12 | MO | $ - 0 | $ - 0 |
| A123AE | Boilers and UPVs, Spec Item 3.3.3 | 12 | MO | $ - 0 | $ - 0 |
| A123AF | Uninterrupted Power Systems (UPS), Spec Item 3.3.8 | 12 | MO | $ - 0 | $ - 0 |
| A123AG | Emergency Eyewash and Showers Stations, Spec Item 3.3.15 | 12 | MO | $ - 0 | $ - 0 |
| A123AH | Building Controls Systems (BCS), Spec Item 3.3.18 | 12 | MO | $ - 0 | $ - 0 |
| A123AJ | Facility Electrical Systems, Spec Item 3.3.19 | 12 | MO | $ - 0 | $ - 0 |
| A123AK | Pumps, Spec Item 3.3.20 | 12 | MO | $ - 0 | $ - 0 |
| A123AL | Ornamental Fountains, Spec Item 3.3.21 | 12 | MO | $ - 0 | $ - 0 |
| Inspection, Testing, and Certification Program, Spec Item 3.5 | |||||
| A123AM | Boilers and UPVs, Spec Item 3.5.1 | 12 | MO | $ - 0 | $ - 0 |
| A123AN | Backflow Prevention Devices, Spec Item 3.5.2 | 12 | MO | $ - 0 | $ - 0 |
| A123AP | Stage Rigging System, Spec Item 3.5.6 | 12 | MO | $ - 0 | $ - 0 |
| Other Recurring Services Program, Spec Item 3.6 | |||||
| A123AQ | Fountain Seasonal Start-up and Shutdown, Spec Item 3.6.9 | 12 | MO | $ - 0 | $ - 0 |
| A123AR | Drinking Fountains/Water Coolers, Spec Item 3.6.10 | 12 | MO | $ - 0 | $ - 0 |
| A124 | MCU- Specification 1503050 Grounds Maintenance and Landscaping (FX), Spec Item 3 | ||||
| A124AA | Improved Grounds, Spec Item 3.1 | 12 | MO | $ - 0 | $ - 0 |
| A125 | MCU - Specification 1503060 Pavement Clearance (FX), Spec Item 3 | ||||
| A125AA | Snow and Ice Removal Services, Spec Item 3.2 | 12 | MO | $ - 0 | $ - 0 |
| A126-A129 | Reserved | ||||
| MCU SUBTOTAL: | $ - 0 |
| G6 COMMUNICATION - Recurring Work (ELINs A130 through A131) | |||||
| A130 | G6 - Specification 1501000 Facility Management (FP), Spec Item 3 | ||||
| A130AA | Infrastructure Condition Assessment Program (ICAP), Spec Item 3.1 | 12 | MO | $ - 0 | $ - 0 |
| A130AB | Work Order Tracking Spec Item 3.3 | 12 | MO | $ - 0 | $ - 0 |
| A131 | G6 - Specification 1502000 Facility Investment (ST), Spec Item 3 | ||||
| Service Orders, Spec Item 3.1 | |||||
| A131AA | Routine Service Orders, Spec Item 3.1.3 | 12 | MO | $ - 0 | $ - 0 |
| Preventive Maintenance Program (PM), Spec Item 3.3 | |||||
| A131AB | HVAC and Refrigeration Systems, Spec Item 3.3.1 | 12 | MO | $ - 0 | $ - 0 |
| A132-A139 | Reserved | ||||
| G6 COMMUNICATIONS SUBTOTAL: | $ - 0 |
| Training and Education Command (TECOM) - Recurring Work (ELINs A140 through A141) | |||||
| A140 | TECOM - Specification 1501000 Facility Management (FP), Spec Item 3 | ||||
| A140AA | Infrastructure Condition Assessment Program (ICAP), Spec Item 3.1 | 12 | MO | $ - 0 | $ - 0 |
| A141 | TECOM - Specification 1502000 Facility Investment (ST), Spec Item 3 | ||||
| Preventive Maintenance Program (PM), Spec Item 3.3 | |||||
| A141AA | HVAC and Refrigeration Systems, Spec Item 3.3.1 | 12 | MO | $ - 0 | $ - 0 |
TECOM SUBTOTAL: $ - 0
TOTAL FOR LINE ITEM 0001 - BASE PERIOD - RECURRING WORK (ELINs A001 THROUGH A141) $ - 0
&"Times New Roman,Regular"Page &P of &N
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6'
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C, C.10.1.l
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Posts Set in Concrete/Asphalt.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.
Surface Depth to Match Surrounding.
Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
EXHIBIT A
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.
IN ACCORDANCE WITH SECTION C, C.10.2
ELIN A001FJ
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
EXHIBIT A
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
6' Fence Height Driven Posts
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height, Free-Standing
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
With Barbwire, 7' Fence Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height, Free-Standing
ELINs-Base Period-Non Recurring
| ATTACHMENT J-0200000-14 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT # N62470-17-R-4003 |
| EXHIBIT A - BASE PERIOD - NON-RECURRING WORK |
| CLIN 0002 |
| Non-Recurring Work Price - Base Period | |||||||||
| PROVIDE PRICES TO PERFORM NON-RECURRING WORK SERVICES - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | |||||||||
| ELINs A700 THROUGH A820 | |||||||||
| Part Number (ELIN) | Part Name (Product) (120 Characters) | ARO Days | PSC Code | Long Description (NTE 2,048) | Unit Price | Unit of Issue | Estimated Quantity | Extended Price | CAC |
| (Col. F x Col. H = Col. I) |
| Specification 1502000 - Facility Investment | |||||||||
| A700 | Chiller Rental (225 Ton) | 3 | Price per month to include delivery, installation, setup, removal, required cable and fittings, hose, single-point electrical connections, high-efficiency VFDs, and CFC-free refrigerants. Price per month to include delivery/removal of chiller to/from the site, installation, setup, required ancillary supplies, control panels, all connections to the facility, operation, and maintenance. Delivery within 72 hours of notification or as specified in the order. | MO | 6 | $0.00 | |||
| A701 | Generator Rental (300KW) | 1 | Price per month to include delivery, setup, removal, required cables, distribution panels, and fuel tank. Includes connection to multiple facilties or equipment. Price per month to include delivery, setup, removal, required cables, distribution panels, all connections to the faciltiy, fuel tank, operation, maintenance. The Contractor is responsible for all fuel and refueling. All fuel will be provided by the Contractor at no cost to the Government. Delivery within 24 hours of notification or as specified in the order. | MO | 6 | $0.00 | |||
| A702 | Pressure Washing Service | 3 | The Contractor shall provide miscellaneous pressure washings up to 5,000 SF of surface per order. Surfaces may be horizontal or vertical areas related to, attached to, or adjoining to facilities. The Contractor shall utilize high-pressure water equipment to clean exterior facility and adjoining surfaces as requested and to exclude windows surfaces. Pressure washing may require the use of man lift and other devices to perform work safely. This may require work after normal working hours to prevent disruption to operations. Complete all work within 3 working days or as specified in the order. | EA | 10 | $0.00 | |||
| A703 | Advanced Metering Infrastructure (AMI) - Electric Metering Devices | 7 | Provide labor, management, supervision, tools, material, and equipment required to purchase, install and test AMI electric metering device(s). Sample of Advanced Metering Infrastructure (AMI) – Electric Metering Devices is provided in "J-1502000-40. AMI Inventory." Location(s) to install newly purchased devices will be provided with the order. Complete all work within 7 working days or as specified in the order. | EA | 5 | $0.00 | |||
| A704 | Advanced Metering Infrastructure (AMI) - Natural Gas Metering Devices | 7 | Provide labor, management, supervision, tools, material, and equipment required to purchase, install and test AMI natural gas metering device(s). Sample of Advanced Metering Infrastructure (AMI) – Natural Gas Metering Devices is provided in J"J-1502000-40. AMI Inventory." Location(s) to install newly purchased devices will be provided with the order. Complete all work within 7 working days or as specified in the order. | EA | 5 | $0.00 | |||
| A705 | Advanced Metering Infrastructure (AMI) - Water Metering Devices | 7 | Provide labor, management, supervision, tools, material, and equipment required to purchase, install and test AMI water metering device(s). Sample of Advanced Metering Infrastructure (AMI) – Water Metering Devices is provided in "J-1502000-40. AMI Inventory." Location(s) to install newly purchased devices will be provided with the order. Complete all work within 7 working days or as specified in the order. | EA | 5 | $0.00 | |||
| A706-A711 | Reserved | ||||||||
| Specification 1503010 - Custodial | |||||||||
| A712 | Vacuum Carpets and Rugs | 3 | S214 | Provide labor, management, supervision, tools, material, and equipment required to vacuum carpets and rugs to ensure they are clean. Complete all work within 3 working days or as specified in the order. | SF | 5,000 | $0.00 | ||
| A713 | Carpet and Rug Deep Cleaning | 3 | S214 | Provide labor, management, supervision, tools, material, and equipment required to carpet and rug deep cleaning. The Contractor shall deep clean carpets and rugs to ensure that floors are clean and sightly. Acceptable methods for deep cleaning include shampooing, chemical extraction, steam cleaning, and other similar deep cleaning processes. Complete all work within 3 working days or as specified in the order. | SF | 9,000 | $0.00 | ||
| A714 | Machine Scrub Floors | 3 | S201 | Provide labor, management, supervision, tools, material, and equipment required to machine scrub floors. Floor surfaces, including joints and corners, are clean and sightly, without embedded dirt, cleaning solution, film debris, stains, marks, wads of gum, tar and similar substances. Complete all work within 3 working days or as specified in the order. | SF | 5,000 | $0.00 | ||
| A715 | Damp Mop Floors | 3 | S201 | Provide labor, management, supervision, tools, material, and equipment required to damp mop floors. Kitchen and restroom floors shall be sanitized. This service includes the floors to be swept prior to wet-mopping. Complete all work within 3 working days or as specified in the order. | SF | 5,000 | $0.00 | ||
| A716 | Low Area Cleaning | 3 | S201 | Provide labor, management, supervision, tools, material, and equipment required to clean low areas. All dust and debris shall be removed. Low area cleaning includes all furniture and fixtures (e.g., doors, partitions, radiators, equipment, hand railings in stairways, grills, ledges, sills, walls, doors, light fixtures, chalk and dry boards and trays, miscellaneous hardware and bright metal work, and similar dust catching surfaces) to a maximum height of 6.8 feet above floor level. Complete all work within 3 working days or as specified in the order. | SF | 2,000 | $0.00 | ||
| A717 | High Area Cleaning | 3 | S201 | Provide labor, management, supervision, tools, material, and equipment required to clean high areas. High area cleaning includes all areas that are vertical and horizontal above 6.8 feet and can exceed 13 feet from floor level. Cleaning may be performed with extension tools or step ladders. All dust and debris shall be removed. Surfaces below the work shall be protected from dust and debris. Complete all work within 3 working days or as specified in the order. | SF | 2,000 | $0.00 | ||
| A718 | Interior Window Cleaning | 3 | S201 | Provide labor, management, supervision, tools, material, and equipment required to clean interior window surfaces and adjacent areas to ensure that surfaces are clean. The Contractor's cleaning techniques and products shall protect the integrity of the glass surface and finish and adjacent areas. Complete all work within 3 working days or as specified in the order. | SF | 3,000 | $0.00 | ||
| A719 | Exterior Ground Floor Window Cleaning | 3 | S201 | Provide labor, management, supervision, tools, material, and equipment required to clean exterior window surfaces and adjacent areas to ensure that surfaces are clean. The Contractor's cleaning techniques and products shall protect the integrity of the glass surface and finish and adjacent areas. Complete all work within 3 working days or as specified in the order. | SF | 3,000 | $0.00 | ||
| A720 | Exterior Elevated Floor Window Cleaning | 3 | S201 | Provide labor, management, supervision, tools, material, and equipment required to clean exterior window surfaces above ground floors and adjacent areas to ensure that surfaces are clean. The Contractor's cleaning techniques and products shall protect the integrity of the glass surface and finish and adjacent areas. Complete all work within 3 working days or as specified in the order. | SF | 3,000 | $0.00 | ||
| A721 | Window Blinds Cleaning | 3 | S201 | Provide labor, management, supervision, tools, material, and equipment required to remove, clean, and rehang window blinds. Complete all work within 3 working days or as specified in the order. | SF | 3,000 | $0.00 | ||
| A722 | Glass Surface Cleaning | 3 | S201 | Provide labor, management, supervision, tools, material, and equipment required to clean glass surfaces. The Contract shall ensure that glass surfaces are sightly and free of all dirt and provide a clear, streak-, smudge- and mark-free appearance regardless of height. Glass surfaces include but are not limited to interior doors, (including associated transoms and sidelights). Complete all work within 3 working days or as specified in the order. | SF | 1,000 | $0.00 | ||
| A723 | Restroom Cleaning and Servicing | 1 | S201 | Provide labor, management, supervision, tools, material, and equipment required to clean and servicing restrooms. All restroom surfaces are cleaned, sanitized and deodorized. Restroom supplies are completely restocked and all dispensers are in working condition. After work is completed, restrooms are clean, sanitary and sightly. Complete all work within 1 working days or as specified in the order. | SF | 8,000 | $0.00 | ||
| A724 | Perimeter Area Cleaning | 3 | S201 | Provide labor, management, supervision, tools, material, and equipment required to debris removal. The Contractor shall police the area and remove all trash and debris. Area shall be free of all trash and debris and waste containers shall be emptied. This service may be ordered for the interior or exterior of buildings. Complete all work within 3 working days or as specified in the order. | SF | 500 | $0.00 | ||
| A725 | Stripping and Refinishing | 1 | S201 | Provide labor, management, supervision, tools, material, and equipment required to stripping and refinishing floors at designated location(s). Complete all work within 3 working days or as specified in the order. | SF | 3,000 | $0.00 | ||
| A726 | Cigarette Urn Cleaning | 1 | S201 | Provide labor, management, supervision, tools, material, and equipment required to remove and disposal of cigarettes waste, clean urn and refill with sand as required. Complete all work within 1 working days or as specified in the order. | EA | 20 | $0.00 | ||
| A727 | Shower Revitalization | 1 | S201 | Provide labor, management, supervision, tools, material, and equipment required to deep clean floor and wall tiles and showers, clean caulk, re-grout and seal to restore wall and floor surfaces. It includes replacing shower liners and rings. Complete all work within 1 working days or as specified in the order. | SF | 2,000 | $0.00 | ||
| A727 | Flood Clean-up (carpeted flooring) | 3 | S201 | Provide labor, management, supervision, tools, material, and equipment required to extract water from and completely dry carpeted flooring to ensure floor surface is completely dry. Complete all work within 3 working days or as specified in the order. | HR | 450 | $0.00 | ||
| A728 | Flood Clean-up (hard surfaced flooring) | 3 | S201 | Provide labor, management, supervision, tools, material, and equipment required to extract water from and completely dry hard surfaced flooring to ensure floor surface is completely dry. Complete all work within 3 working days or as specified in the order. | HR | 450 | $0.00 | ||
| A729-A735 | Reserved | ||||||||
| Specification 1503020 - Pest Control | |||||||||
| A736 | Adult Mosquito Surveillance | 2 | S207 | Provide labor, management, supervision, tools, material, and equipment required to conduct surveillance for adult mosquitos using light trap(s) and deliver catches to Naval Medical Clinic Quantico Hospital Sigonella Preventive Medicine within 2 working days following receipt of the task order. Complete work within time periods specified in J-1503020. | EA | 50 | $0.00 | ||
| A737 | Adult Mosquito Control | 1 | S207 | Provide labor, management, supervision, tools, material, and equipment required to apply a mosquito adulticide (ULV formulation) at the designated location(s) within time period of 24 hours to respond. Pest control services for adult mosquitoes shall be performed in the early morning hours (between 3am-6am). The Contractor shall nebulize and spray approved pesticide utilizing fog-generating equipment as requested in the order. Contractor shall respond wihin 1 working day and complete work within time periods specified in J-1503020. | AC | 55,000 | $0.00 | ||
| A738 | Larval Mosquito Surveillance | 2 | S207 | Provide labor, management, supervision, tools, material, and equipment required to conduct surveillance of designated mosquito breeding sites for immature mosquitoes (eggs, larvae, and pupae). Time Period to Respond: within 2 working days. Complete work within time periods specified in J-1503020. (up to 164 square feet) | EA | 50 | $0.00 | ||
| A739 | Larval and Pupal Mosquito Control | 1 | S207 | Provide labor, management, supervision, tools, material, and equipment required to control larval and pupal mosquitoes in designated area(s) and time periods to control within time period of 1 working day to respond. Complete work within time periods specified in J-1503020. (up to 164 square feet) | EA | 50 | $0.00 | ||
| A740 | Nuisance Pest Control | 1 | S207 | Provide labor, management, supervision, tools, material, and equipment required to conduct surveillance and control ants, cockroaches, silverfish, centipedes, millipedes, beetles, fleas, spiders, and/or stored product pests at the designated location(s) per the applicable General Requirements and Performance Standards (Nuisance Pest Requirements) within time period of 3 working days to respond, 7 working days to obtain control, and 30 days to maintain control. (up to 164 square feet) | EA | 20 | $0.00 | ||
| A741 | Disease Vector and Health Pest Control | 1 | S207 | Provide labor, management, supervision, tools, material, and equipment required to conduct surveillance and control bed bugs, bees, wasps, hornets, and other stinging arthropods, filth flies, and/or ticks at the designated location(s) per the applicable General Requirements and Performance Standards (Disease Vector and Health Pest Requirements) within time period of 1 working day to respond. (up to 164 square feet) | EA | 15 | $0.00 | ||
| A742 | Vertebrate Pest Control | 1 | S207 | Provide labor, management, supervision, tools, material, and equipment required to conduct surveillance and control commensal rodents, pest birds, feral dogs and cats, and snakes in and around designated location(s) per the applicable General Requirements and Performance Standards (Vertebrate Pest Requirements) within time period of 24 hours to respond, and time periods to obtain and maintain control as specified in Pest Control Section J. (up to 164 square feet) | |||||
| EA | 15 | $0.00 | |||||||
| A743 | Termite and Other Wood Destroying Organisms Survey | 5 | S207 | Provide labor and materials to conduct surveillance in a facility for all termites species and other wood destroying organisms including fungal rots, carpenter ants, and wood boring beetles within following time periods to respond: within 4 hours after receipt of the order if reported as a swarm, otherwise, 5 working days. Complete work within time periods specified in J-1503020. (up to 164 square feet) | EA | 50 | $0.00 | ||
| A744 | Termite Control | 5 | S207 | Provide labor, management, supervision, tools, material, and equipment required to control infestations of subterranean termites per J-1503020 (Termite Control Specifications) within time period of 5 working days after receipt of the task order to respond. Complete work within time periods specified in J-1503020. | SF | 1,000 | $0.00 | ||
| A745 | Weed Control (Herbicide Treatment) | 7 | S207 | Provide labor, management, supervision, tools, material, and equipment required to perform selective herbicide treatment to the location(s) indicated on the order. Selective herbicide shall be handled and applied as indicated by the manufacturer printed directions/instructions. Herbicide products shall be usable at locations normally frequented by persons / pets. Herbicide shall destroy only the infesting weeds without harming/damaging the surrounding ornamental vegetation (such as lawn, ornamental plants, etc). All warning signs indicating herbicide application/contamination to limit/restrict utilization of the application areas shall be used and enforced for the decay period of the herbicide being used. Herbicide shall not be used when the environment conditions conflict with manufacturers printed directions. Herbicide products shall be submitted to the KO for approval prior their use. Use of not approved herbicide is prohibited. Time Period to Respond: 7 working days. | SF | 5,000 | $0.00 | ||
| A746 | Vertebrate Carcass Removal (up to 5 pounds) | 1 | S207 | Provide labor, management, supervision, tools, material, and equipment required to remove vertebrate carcass. Complete work within 1 working day or as specified in the order. | EA | 25 | $0.00 | ||
| A747-A751 | Reserved | ||||||||
| Specification 1503030 - Integrated Solid Waste Management (ISWM) | |||||||||
| A752 | Bulky Waste Removal and Disposal | 3 | Provide labor, management, supervision, tools, material, and equipment required to perform integrated solid waste management services. The Contractor shall removed and dispose bulky waste at the designed location(s). Bulky waste include appliances such as refrigerators, stoves, dishwashers, washers, driers, and electronic items such as monitors, computers, televisions, printers, and similar. Bulky waste shall be transported, disposed or recycled in accordance with applicable laws and regulations. Complete all work within 3 working days. Submit documentation supporting disposal/recycling within five working days. (Not to exceed 40 cubic yards) | EA | 10 | $0.00 | |||
| A753 | Solid Waste Removal and Disposal - Provide Commercial Container - 8 Cubic Yard | 2 | Provide labor, management, supervision, tools, material, and equipment required to perform integrated solid waste management services. The Contractor shall provide and deliver 8-cubic yard container(s) at location(s) identified in the order and dispose of the entire contents of solid waste. Waste shall be transported, disposed or recycled in accordance with applicable laws and regulations. Containers(s) shall be removed within 1 working day past requirement termination. Container(s) delivery shall be completed within 2 working days. The order will include the delivery/pick-up dates and location. | DA | 5 | $0.00 | |||
| A754 | Solid Waste Removal and Disposal - Provide Commercial Container - 30 Cubic Yard | 2 | Provide labor, management, supervision, tools, material, and equipment required to perform integrated solid waste management services. The Contractor shall provide and deliver 30-cubic yard container(s) at location(s) identified in the order and dispose of the entire contents of solid waste. Waste shall be transported, disposed or recycled in accordance with applicable laws and regulations. Containers(s) shall be removed within 1 working day past requirement termination. Container(s) delivery shall be completed within 2 working days. The order will include the delivery/pick-up dates and location. | DA | 5 | $0.00 | |||
| A755 | Mixed Construction Material Waste Removal and Disposal - Provide Commerical Container - 8 Cubic Yard | 2 | Provide labor, management, supervision, tools, material, and equipment required to perform integrated solid waste management services. The Contractor shall provide and deliver 8-cubic yard container(s) at location(s) identified in the order and dispose of mixed construction material waste. Mixed construction material waste shall be transported, disposed or recycled in accordance with applicable laws and regulations. Containers(s) shall be removed within 1 working day past requirement termination. Container(s) delivery shall be completed within 2 working days. The order will include the delivery/pick-up dates and location. | DA | 5 | $0.00 | |||
| A756 | Mixed Construction Material Waste Removal and Disposal - Provide Commerical Containers - 30 Cubic Yard | 2 | Provide labor, management, supervision, tools, material, and equipment required to perform integrated solid waste management services. The Contractor shall provide and deliver 30-cubic yard container(s) at location(s) identified in the order and dispose of mixed construction material waste. Mixed construction material waste shall be transported, disposed or recycled in accordance with applicable laws and regulations. Containers(s) shall be removed within 1 working day past requirement termination. Container(s) delivery shall be completed within 2 working days. The order will include the delivery/pick-up dates and location. | DA | 5 | $0.00 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .