J-0200000-14_ELINS_Amend_0003.xlsx

XLSX spreadsheet 1 MB Posted

Attached to
BASE OPERATIONS SUPPORT (BOS) SERVICES LOCATED AT THE MARINE CORPS BASE QUANTICO, VIRGINIA Federal contract opportunity
Solicitation number
N6247017R4003
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

This document outlines recurring and non-recurring facility services requirements for the Base Operations Support contract at Marine Corps Base Quantico in Virginia. Key details include:

  • Recurring services include facility management, facility investment, pest control, grounds maintenance, utility management, wastewater management, and environmental services. Specific recurring line items are identified for infrastructure assessment, work orders, preventative maintenance, and other facility support activities.

  • Non-recurring services include equipment rentals, inspections, cleaning, repairs and construction projects. Example non-recurring line items cover chiller and generator rentals, pressure washing, meter installations, spill response, waste removal and sampling/analysis.

  • The period of performance is a base year plus four option years. Pricing is solicited for recurring services in the base and first option periods. Non-recurring work is priced individually per line item as needed.

J-0200000-14_ELINS_Amend_0003.xlsx

View the file

Other files for this federal contract opportunity

Other files attached to BASE OPERATIONS SUPPORT (BOS) SERVICES LOCATED AT THE MARINE CORPS BASE QUANTICO, VIRGINIA, newest first.
File Type Posted
N62470-17-R-4003_Amendment_0006.pdf PDF
J-0200000-14_ELINS_Final_Amend_0006.xlsx XLSX spreadsheet
J-0200000-02_Amendment_0005.pdf PDF
J-0200000-02-C_CBA_Wage_Schedule_IUOE_EMCOR_2019_Amdt_0005.pdf PDF
N6247017R4003_Amendment_0005.pdf PDF
J-0200000-14_ELINS_Final_Amendment_0005.xlsx XLSX spreadsheet
N6247017R4003_Amendment_0004.pdf PDF
1601000_C_Utility_Management_Amendment_0004.pdf PDF
Attachment_J-5_FTE_QBOSC_Amendment_0004.xlsx XLSX spreadsheet
N6247017R4003_Amendment_0003.pdf PDF
J_0401000_Force_Protection_Amendment_0003.pdf PDF
J_1502000_Facility_Investment_Amendment_0003.pdf PDF
N62470-17-R-4003_Amendment_0002.pdf PDF
Attachment_J-9_Site_Visit_Sign-in.pdf PDF
Attachment_J-10_Site_Visit_Presentation.pdf PDF
J-2_Map_of_Marine_Corps_Base_Quantico_Virginia.pdf PDF
J_1502000_Facility_Investment_Revised_Amd_0001.pdf PDF
N62470-17-R-4003_Amendment_0001.pdf PDF
J_1601000_Utility_Management_Revised_Amd_0001.pdf PDF
Attachment_J-1_Visitor_Access_Pass.xls XLS spreadsheet
N62470-17-R-4003_QBOS_RFP.pdf PDF
Attachment_J-4_Past_Performance_Questionnaire.pdf PDF
Attachment_J-3_Corporate_Experience_Form.docx DOCX document
N6247017R4003_N62470-17-R-4003_Pre-Sol_Notice_PRINT.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ELINs-Base Period-Recurring

ATTACHMENT J-0200000-14
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N62470-17-R-4003
EXHIBIT A - BASE PERIOD - RECURRING WORK
CLIN 0001
In total, ELINs A001-A141 sum to Line Item 0001 and represent the Recurring Work award for the Base Period of performance.
Recurring Work Price - Base Period
PROVIDE PRICES TO PERFORM FACILITY SERVICES RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
ELINs A001 THROUGH A141
ELIN / Sub ELINDescriptionQuantityUnit of IssueUnit PriceTotal PriceIMAP CAC
MCBQ (MARINE CORPS BASE QUANTICO) - Recurring Work (ELINs A001 through A007)
A001MCBQ - Specification 1501000 Facility Management (FP), Spec Item 3
A001AAInfrastructure Condition Assessment Program (ICAP), Spec Item 3.112MO$ - 0$ - 0
A001ABWork Order Tracking Spec Item 3.312MO$ - 0$ - 0
A002MCBQ - Specification 1502000 Facility Investment (ST), Spec Item 3
Service Orders, Spec Item 3.1
A002AAEmergency Service Orders, Spec Item 3.1.112MO$ - 0$ - 0
A002ABUrgent Service Orders, Spec Item 3.1.212MO$ - 0$ - 0
A002ACRoutine Service Orders, Spec Item 3.1.312MO$ - 0$ - 0
Project Work Orders, Spec Item 3.2
A002ADProject Work Order Level 112MO$ - 0$ - 0
A002AEProject Work Order Level 212MO$ - 0$ - 0
A002AFProject Work Order Level 312MO$ - 0$ - 0
Preventive Maintenance Program (PM), Spec Item 3.3
A002AGCathodic Protection Systems, Spec Item 3.3.412MO$ - 0$ - 0
A002AHFire Protection Systems, Spec Item 3.3.612MO$ - 0$ - 0
A002AJWeapons Bluing Equipment, Spec Item 3.3.1012MO$ - 0$ - 0
Other Recurring Services Program, Spec Item 3.6
A002AKGrease Traps, Spec Item 3.6.112MO$ - 0$ - 0
A002ALExhaust Hoods and Ducts, Spec Item 3.6.212MO$ - 0$ - 0
A002AMHVAC Water Testing and Treatment Services, Spec Item 3.6.312MO$ - 0$ - 0
A002ANBoiler Water Testing and Treatment Services, Spec Item 3.6.512MO$ - 0$ - 0
A002APOil Water Separators (OWS), Spec Item 3.6.712MO$ - 0$ - 0
A002AQLocksmith Services, Spec Item 3.6.812MO$ - 0$ - 0
A002ARSolar Panel Maintenance, Spec Item 3.6.1212MO$ - 0$ - 0
A002ASCompressed Natural Gas (CNG) System Inspection and Repair, Spec Item 3.6.1312MO$ - 0$ - 0
A003MCBQ - Specification 1503020 Pest Control (FX), Spec Item 3
A003AAScheduled Pest Control Services, Spec Item 3.112MO$ - 0$ - 0
A003ABUnscheduled Pest Control Services, Spec Item 3.212MO$ - 0$ - 0
A004MCBQ - Specification 1503050 Grounds Maintenance and Landscaping (FX), Spec Item 3
A004AAStorm Drainage Systems, Spec Item 3.212MO$ - 0$ - 0
A005MCBQ - Specification 1601000 Utility Management (FP), Spec Item 3
Service Orders, Spec Item 3.1
A005AAEmergency Service Orders, Spec Item 3.1.112MO$ - 0$ - 0
A005ABUrgent Service Orders, Spec Item 3.1.212MO$ - 0$ - 0
A005ACRoutine Service Orders, Spec Item 3.1.312MO$ - 0$ - 0
Project Work Orders, Spec Item 3.2
A005ADProject Work Order Level 1, Spec Item 3.2.112MO$ - 0$ - 0
A005AEProject Work Order Level 2, Spec Item 3.2.212MO$ - 0$ - 0
A005AFProject Work Order Level 3, Spec Item 3.2.312MO$ - 0$ - 0
Utility Infrastructure Condition Assessment (UICAP) Support, Spec Item 3.3
A005AGInventory Management, Spec Item 3.3.112MO$ - 0$ - 0
A005AHCondition Assessment, Spec Item 3.3.212MO$ - 0$ - 0
A006MCBQ - Specification 1604000 Wastewater, Spec Item 3
Preventive Maintenance (PM) Program, Spec Item 3.1
A006AAWastewater Instrumentation Systems, Spec Item 3.1.112MO$ - 0$ - 0
A007MCBQ - Specification 1800000 Environmental (EC), Spec Item 3
A007AAOil and Hazardous Substance Spill Response and Cleanup Ashore, Spec Item 3.112MO$ - 0$ - 0
A008-A011Reserved
MCBQ SUBTOTAL:$ - 0
NMCL / BUMED (Naval Medical Clinic Quantico/Dental Clinic) - Recurring Work (ELINs A012 through A014)
A012NMCL - Specification 1501000 Facility Management (FP), Spec Item 3
A012AAInfrastructure Condition Assessment Program (ICAP), Spec Item 3.112MO$ - 0$ - 0
A012ABControl Systems, Spec Item 3.212MO$ - 0$ - 0
A012ACWork Order Tracking Spec Item 3.312MO$ - 0$ - 0
A013NMCL - Specification 1502000 Facility Investment (ST), Spec Item 3
Service Orders, Spec Item 3.1
A013AAEmergency Service Orders, Spec Item 3.1.112MO$ - 0$ - 0
A013ABUrgent Service Orders, Spec Item 3.1.212MO$ - 0$ - 0
A013ACRoutine Service Orders, Spec Item 3.1.312MO$ - 0$ - 0
Preventive Maintenance Program (PM), Spec Item 3.3
A013ADHVAC and Refrigeration Systems, Spec Item 3.3.112MO$ - 0$ - 0
A013AEInterior and Exterior Lighting Systems, Spec Item 3.3.212MO$ - 0$ - 0
A013AFBoilers and UPVs, Spec Item 3.3.312MO$ - 0$ - 0
A013AGLightning Arrestors and Grounding Devices, Spec Item 3.3.512MO$ - 0$ - 0
A013AHFire Protection Systems, Spec Item 3.3.612MO$ - 0$ - 0
A013AJAuxiliary Generators, Spec Item 3.3.712MO$ - 0$ - 0
A013AKEmergency and Exit Lighting Systems, Spec Item 3.3.1112MO$ - 0$ - 0
A013ALRoll-Up, Overhead and Automated Doors, Spec Item 3.3.1412MO$ - 0$ - 0
A013AMBuilding Controls Systems (BCS), Spec Item 3.3.1812MO$ - 0$ - 0
A013ANFacility Electrical Systems, Spec Item 3.3.1912MO$ - 0$ - 0
Inspection, Testing, and Certification Program, Spec Item 3.5
A013APBoilers and UPVs, Spec Item 3.5.112MO$ - 0$ - 0
A013AQBackflow Prevention Devices, Spec Item 3.5.212MO$ - 0$ - 0
A013AREmergency and Exit Lighting Systems, Spec Item 3.5.512MO$ - 0$ - 0
Other Recurring Services Program, Spec Item 3.6
A013ASDrinking Fountains/Water Coolers, Spec Item 3.6.1012MO$ - 0$ - 0
A014NMCL - Specification 1503060 Pavement Clearance (FX), Spec Item 3
A014AASnow and Ice Removal Services, Spec Item 3.212MO$ - 0$ - 0
A015-A19Reserved
NMCL SUBTOTAL:$ - 0
National Museum of the Marine Corps (NMMC) - Recurring Work (ELINs A020 through A027)
A020NMMC - Specification 0401000 Force Protection (Armed Security Personnel), Spec Item 3
A020AAEntry Control Point Services, Spec Item 3.112MO$ - 0$ - 0
A020ABRoving Guard Services, Spec Item 3.212MO$ - 0$ - 0
A020ACDispatching Services, Spec Item 3.312MO$ - 0$ - 0
A020ADAccess Badge Management, Spec Item 3.412MO$ - 0$ - 0
A021NMMC - Specification 1501000 Facility Management (FP), Spec Item 3
A021AAInfrastructure Condition Assessment Program (ICAP), Spec Item 3.112MO$ - 0$ - 0
A021ABControl Systems, Spec Item 3.212MO$ - 0$ - 0
A021ACWork Order Tracking Spec Item 3.312MO$ - 0$ - 0
A022NMMC - Specification 1502000 Facility Investment (ST), Spec Item 3
Service Orders, Spec Item 3.1
A022AAEmergency Service Orders, Spec Item 3.1.112MO$ - 0$ - 0
A022ABUrgent Service Orders, Spec Item 3.1.212MO$ - 0$ - 0
A022ACRoutine Service Orders, Spec Item 3.1.312MO$ - 0$ - 0
Project Work Orders, Spec Item 3.2
A022ADProject Work Order Level 1, Spec Item 3.2.112MO$ - 0$ - 0
A022AEProject Work Order Level 2, Spec Item 3.2.212MO$ - 0$ - 0
Preventive Maintenance Program (PM), Spec Item 3.2
A022AFHVAC and Refrigeration Systems, Spec Item 3.3.112MO$ - 0$ - 0
A022AGInterior and Exterior Lighting Systems, Spec Item 3.3.212MO$ - 0$ - 0
A022AHFire Protection Systems, Spec Item 3.3.612MO$ - 0$ - 0
A022AJAuxiliary Generators, Spec Item 3.3.712MO$ - 0$ - 0
A022AKUninterrupted Power Systems (UPS), Spec Item 3.3.812MO$ - 0$ - 0
A022ALVehicle Barrier and Gate Systems, Spec Item 3.3.912MO$ - 0$ - 0
A022AMVertical Transportation Equipment (VTE), Spec Item 3.3.1212MO$ - 0$ - 0
A022ANRoll-Up, Overhead and Automated Doors, Spec Item 3.3.1412MO$ - 0$ - 0
A022APEmergency Eyewash and Shower Stations, Spec Item 3.3.1512MO$ - 0$ - 0
A022AQLifts and Mobile Scaffolds, Spec Item 3.3.1612MO$ - 0$ - 0
A022ARBuilding Controls Systems (BCS), Spec Item 3.3.1812MO$ - 0$ - 0
A022ASFacility Electrical Systems, Spec Item 3.3.1912MO$ - 0$ - 0
Plant Systems Operation and Maintenance, Spec Item 3.4
A022ATPlant Systems Operation and Maintenance, Spec Items 3.4.1 through 3.4.612MO$ - 0$ - 0
Inspection, Testing, and Certification Program, Spec Item 3.5
A022AUBackflow Prevention Devices, Spec Item 3.5.212MO$ - 0$ - 0
A022AVVertical Transportation Equipment (VTE), Spec Item 3.5.312MO$ - 0$ - 0
A022AWFall Protection Systems for Facilities and Structures, Spec Item 3.5.412MO$ - 0$ - 0
Other Recurring Services Program, Spec Item 3.6
A022AXGrease Traps, Spec Item 3.6.112MO$ - 0$ - 0
A022AYExhaust Hoods and Ducts, Spec Item 3.6.212MO$ - 0$ - 0
A022AZHVAC Seasonal Start-Up and Shutdown, Spec Item 3.6.412MO$ - 0$ - 0
A022BABoiler Seasonal Start-Up and Shutdown, Spec Item 3.6.612MO$ - 0$ - 0
A022BBDrinking Fountains/Water Coolers, Spec Item 3.6.1012MO$ - 0$ - 0
A022BCBuilding Drainage System, Spec Item 3.6.1112MO$ - 0$ - 0
A023NMMC - Specification 1503010 Custodial (FX), Spec Item 3
A023AAScheduled Custodial Services, Spec Item 3.112MO$ - 0$ - 0
A023ABUnscheduled Custodial Services, Spec Item 3.212MO$ - 0$ - 0
A024NMMC - Specification 1503020 Pest Control (FX), Spec Item 3
A024AAScheduled Pest Control Services, Spec Item 3.112MO$ - 0$ - 0
A024ABUnscheduled Pest Control Services, Spec Item 3.212MO$ - 0$ - 0
A025NMMC - Specification 1503030 Integrated Solid Waste Management (ISWM) (FX), Spec Item 3
A025AASolid Waste Collection, Spec Items 3.1 through 3.512MO$ - 0$ - 0
A026NMMC - Specification 1503050 Grounds Maintenance and Landscaping (FX), Spec Item 3
A026AAImproved Grounds, Spec Item 3.112MO$ - 0$ - 0
A026ABStorm Drainage Systems, Spec Item 3.212MO$ - 0$ - 0
A026ACOutdoor Waste Collection, Spec Item 3.312MO$ - 0$ - 0
A026ADPlaygrounds Maintenance, Spec Item 3.412MO$ - 0$ - 0
A027NMMC - Specification 1503060 Pavement Clearance (FX), Spec Item 3
A027AAPavement Sweeping Services, Spec Item 3.112MO$ - 0$ - 0
A027ABSnow and Ice Removal Services, Spec Item 3.212MO$ - 0$ - 0
A028-A034Reserved
NMMC SUBTOTAL:$ - 0
Civilian Manpower Management (MANPOWER) - Recurring Work (ELINs A035 through A036)
A035MANPOWER- Specification 1501000 Facility Management (FP), Spec Item 3
A035AAInfrastructure Condition Assessment Program (ICAP), Spec Item 3.112MO$ - 0$ - 0
A035ABWork Order Tracking Spec Item 3.312MO$ - 0$ - 0
A036MANPOWER - Specification 1502000 Facility Investment (ST), Spec Item 3
Service Orders, Spec Item 3.1
A036AAEmergency Service Orders, Spec Item 3.1.112MO$ - 0$ - 0
A036ABUrgent Service Orders, Spec Item 3.1.212MO$ - 0$ - 0
A036ACRoutine Service Orders, Spec Item 3.1.312MO$ - 0$ - 0
Preventive Maintenance Program (PM), Spec Item 3.3
A036ADHVAC and Refrigeration Systems, Spec Item 3.3.112MO$ - 0$ - 0
A036AEAuxiliary Generators, Spec Item 3.3.712MO$ - 0$ - 0
A036AFUninterrupted Power Systems (UPS), Spec Item 3.3.812MO$ - 0$ - 0
A037-A044Reserved
MANPOWER SUBTOTAL:$ - 0
Marine Corp Air Facility (MCAF) - Recurring Work (ELINs A045 through A047)
A045MCAF- Specification 1501000 Facility Management (FP), Spec Item 3
A045AAInfrastructure Condition Assessment Program (ICAP), Spec Item 3.112MO$ - 0$ - 0
A045ABWork Order Tracking Spec Item 3.312MO$ - 0$ - 0
A046MCAF - Specification 1502000 Facility Investment (ST), Spec Item 3
Service Orders, Spec Item 3.1
A046AAEmergency Service Orders, Spec Item 3.1.112MO$ - 0$ - 0
A046ABUrgent Service Orders, Spec Item 3.1.212MO$ - 0$ - 0
A046ACRoutine Service Orders, Spec Item 3.1.312MO$ - 0$ - 0
Project Work Orders, Spec Item 3.2
A046ADProject Work Order Level 112MO$ - 0$ - 0
A046AEProject Work Order Level 212MO$ - 0$ - 0
Preventive Maintenance Program (PM), Spec Item 3.3
A046AFHVAC and Refrigeration Systems, Spec Item 3.3.112MO$ - 0$ - 0
A046AGInterior and Exterior Lighting Systems, Spec Item 3.3.212MO$ - 0$ - 0
A046AHBoilers and UPVs, Spec Item 3.3.312MO$ - 0$ - 0
A046AJFire Protection Systems, Spec Item 3.3.612MO$ - 0$ - 0
A046AKAuxiliary Generators, Spec Item 3.3.712MO$ - 0$ - 0
A046ALUninterrupted Power Systems (UPS), Spec Item 3.3.812MO$ - 0$ - 0
A046AMAirfield Lighting Systems, Spec Item 3.3.1312MO$ - 0$ - 0
Inspection, Testing, and Certification Program, Spec Item 3.5
A046ANBoilers and UPVs, Spec Item 3.5.112MO$ - 0$ - 0
A046APBackflow Prevention Devices, Spec Item 3.5.212MO$ - 0$ - 0
Other Recurring Services Program, Spec Item 3.6
A046AQGrease Traps, Spec Item 3.6.112MO$ - 0$ - 0
A046ARExhaust Hoods and Ducts, Spec Item 3.6.212MO$ - 0$ - 0
A046ASOil Water Separators (OWS), Spec Item 3.6.712MO$ - 0$ - 0
A047MCAF - Specification 1503020 Pest Control (FX), Spec Item 3
A047AAScheduled Pest Control Services, Spec Item 3.112MO$ - 0$ - 0
A047ABUnscheduled Pest Control Services, Spec Item 3.212MO$ - 0$ - 0
A048-A051Reserved
MCAF SUBTOTAL:$ - 0
Marine Corps Helicopter Squadron One (HMX-1) Medical/Dental Clinic - BUMED - Recurring Work (ELIN A052)
A052HMX-1 Medical/Dental Clinic - Specification 1503010 Custodial (FX), Spec Item 3
A052AAScheduled Custodial Services, Spec Item 3.112MO$ - 0$ - 0
A052ABUnscheduled Custodial Services, Spec Item 3.212MO$ - 0$ - 0
A053-A057Reserved
HMX-1 Medical/Dental Clinic SUBTOTAL:$ - 0
Marine Corps Community Services (MCCS) - Recurring Work (ELIN A058)
A058MCCS - Specification 1503020 Pest Control (FX), Spec Item 3
A058AAScheduled Pest Control Services, Spec Item 3.112MO$ - 0$ - 0
A058ABUnscheduled Pest Control Services, Spec Item 3.212MO$ - 0$ - 0
A059-A065Reserved
MCCS SUBTOTAL:$ - 0
Department of Defense Education Activity (DoDEA) - Recurring Work (ELINs A066 through A067)
A066DoDEA - Specification 1502000 Facility Investment (ST), Spec Item 3
Preventive Maintenance Program (PM), Spec Item 3.3
A066AAFire Protection Systems, Spec Item 3.3.612MO$ - 0$ - 0
Other Recurring Services Program, Spec Item 3.6
A066ABExhaust Hoods and Ducts, Spec Item 3.6.212MO$ - 0$ - 0
A067DoDEA - Specification 1503020 Pest Control (FX), Spec Item 3
A067AAScheduled Pest Control Services, Spec Item 3.112MO$ - 0$ - 0
A067ABUnscheduled Pest Control Services, Spec Item 3.212MO$ - 0$ - 0
A068-A073Reserved
DoDEA SUBTOTAL:$ - 0
Marine Corps Cyberspace Operations Group (MCCOG) - Recurring Work (ELINs A074 through A077)
A074MCCOG - Specification 1501000 Facility Management (FP), Spec Item 3
A074AAInfrastructure Condition Assessment Program (ICAP), Spec Item 3.112MO$ - 0$ - 0
A074ABControl Systems, Spec Item 3.212MO$ - 0$ - 0
A074ACWork Order Tracking Spec Item 3.312MO$ - 0$ - 0
A075MCCOG - Specification 1502000 Facility Investment (ST), Spec Item 3
Service Orders, Spec Item 3.1
A075AAEmergency Service Orders, Spec Item 3.1.112MO$ - 0$ - 0
A075ABUrgent Service Orders, Spec Item 3.1.212MO$ - 0$ - 0
A075ACRoutine Service Orders, Spec Item 3.1.312MO$ - 0$ - 0
Project Work Orders, Spec Item 3.2
A075ADProject Work Order Level 1, Spec Item 3.2.112MO$ - 0$ - 0
A075AEProject Work Order Level 2, Spec Item 3.2.212MO$ - 0$ - 0
A075AFProject Work Order Level 3, Spec Item 3.2.312MO$ - 0$ - 0
Preventive Maintenance Program (PM), Spec Item 3.3
A075AGHVAC and Refrigeration Systems, Spec Item 3.3.112MO$ - 0$ - 0
A075AHBoilers and UPVs, Spec Item 3.3.312MO$ - 0$ - 0
A075AJAuxiliary Generators, Spec Item 3.3.712MO$ - 0$ - 0
A075AKUninterrupted Power Systems (UPS), Spec Item 3.3.812MO$ - 0$ - 0
A075ALVertical Transportation Equipment (VTE), Spec Item 3.3.1212MO$ - 0$ - 0
A075AMRoll-Up, Overhead and Automated Doors, Spec Item 3.3.1412MO$ - 0$ - 0
A075ANRainwater Harvesting System, Spec Item 3.3.1712MO$ - 0$ - 0
A075APBuilding Controls Systems (BCS), Spec Item 3.3.1812MO$ - 0$ - 0
Inspection, Testing, and Certification Program, Spec Item 3.5
A075AQBoilers and UPVs, Spec Item 3.5.112MO$ - 0$ - 0
A075ARBackflow Prevention Devices, Spec Item 3.5.212MO$ - 0$ - 0
A075ASVertical Transportation Equipment (VTE), Spec Item 3.5.312MO$ - 0$ - 0
Other Recurring Services Program, Spec Item 3.6
A075ATHVAC Water Testing and Treatment, Spec Item 3.6.312MO$ - 0$ - 0
A075AUBoiler Water Testing and Treatment, Spec Item 3.6.512MO$ - 0$ - 0
A076MCCOG - Specification 1503020 Pest Control (FX), Spec Item 3
A076AAScheduled Pest Control Services, Spec Item 3.112MO$ - 0$ - 0
A077-A081Reserved
MCCOG SUBTOTAL:$ - 0
Marine Corps Investigative Agency (MCIA) - Recurring Work (ELINs A082 through A084)
A082MCIA - Specification 1501000 Facility Management (FP), Spec Item 3
A082AAInfrastructure Condition Assessment Program (ICAP), Spec Item 3.112MO$ - 0$ - 0
A082ABControl Systems, Spec Item 3.2 (No Service Required only During Base Period - Still Under Warranty)0MO$ - 0$ - 0
A082ACWork Order Tracking Spec Item 3.312MO$ - 0$ - 0
A083MCIA - Specification 1502000 Facility Investment (ST), Spec Item 3
Service Orders, Spec Item 3.1
A083AAEmergency Service Orders, Spec Item 3.1.112MO$ - 0$ - 0
A083ABUrgent Service Orders, Spec Item 3.1.212MO$ - 0$ - 0
A083ACRoutine Service Orders, Spec Item 3.1.312MO$ - 0$ - 0
Preventive Maintenance Program (PM), Spec Item 3.3
A083ADHVAC and Refrigeration Systems, Spec Item 3.3.112MO$ - 0$ - 0
A083AEAuxiliary Generators, Spec Item 3.3.712MO$ - 0$ - 0
A083AFUninterrupted Power Systems (UPS), Spec Item 3.3.812MO$ - 0$ - 0
A083AGBuilding Controls Systems (BCS), Spec Item 3.3.18 (No Service Required only During Base Period - Still Under Warranty)0MO$ - 0$ - 0
A084-A089Reserved
MCIA SUBTOTAL:$ - 0
Marine Corps Information Operations Center (MCIOC) - Recurring Work (ELINs A090 through A092)
A090MCIOC - Specification 1501000 Facility Management (FP), Spec Item 3
A090AAInfrastructure Condition Assessment Program (ICAP), Spec Item 3.112MO$ - 0$ - 0
A090ABControl Systems, Spec Item 3.212MO$ - 0$ - 0
A090ACWork Order Tracking Spec Item 3.312MO$ - 0$ - 0
A091MCIOC - Specification 1502000 Facility Investment (ST), Spec Item 3
Service Orders, Spec Item 3.1
A091AARoutine Service Orders, Spec Item 3.1.312MO$ - 0$ - 0
Preventive Maintenance Program (PM), Spec Item 3.3
A091ABHVAC and Refrigeration Systems, Spec Item 3.3.112MO$ - 0$ - 0
A091ACBoilers and UPVs, Spec Item 3.3.312MO$ - 0$ - 0
A091ADAuxiliary Generators, Spec Item 3.3.712MO$ - 0$ - 0
A091AEUninterrupted Power Systems (UPS), Spec Item 3.3.812MO$ - 0$ - 0
A091AFBuilding Controls Systems (BCS), Spec Item 3.3.1812MO$ - 0$ - 0
A091AGFacility Electrical Systems, Spec Item 3.3.1912MO$ - 0$ - 0
Inspection, Testing, and Certification Program, Spec Item 3.5
A091AHBoilers and UPVs, Spec Item 3.5.112MO$ - 0$ - 0
A091AJBackflow Prevention Devices, Spec Item 3.5.212MO$ - 0$ - 0
A092-A097Reserved
MCIOC SUBTOTAL:$ - 0
Marine Corps Support Activity (MCSA) / MARFORRES - Camp Upshur - Recurring Work (ELINs A098 through A099)
A098MCSA / MARFORRES - Specification 1503050 Grounds Maintenance and Landscaping (FX), Spec Item 3
A098AAImproved Grounds, Spec Item 3.112MO$ - 0$ - 0
A098ABOutdoor Waste Collection, Spec Item 3.312MO$ - 0$ - 0
A099MCSA / MARFORRES- Specification 1503060 Pavement Clearance (FX), Spec Item 3
A099AAPavement Sweeping Services, Spec Item 3.112MO$ - 0$ - 0
A099ABSnow and Ice Removal Services, Spec Item 3.212MO$ - 0$ - 0
A100-A107Reserved
MCSA / MARFORRES SUBTOTAL:$ - 0
MARCORSYSCOM (MCSC) - Recurring Work (ELIN A108)
A108MCSC - Specification 1502000 Facility Investment (ST), Spec Item 3
Preventive Maintenance Program (PM), Spec Item 3.3
A108AAAuxiliary Generators, Spec Item 3.3.712MO$ - 0$ - 0
A108ABRoll-Up, Overhead, Automated Doors, Spec Item 3.3.1412MO$ - 0$ - 0
A108ACEmergency Eyewash and Showers Stations, Spec Item 3.3.1512MO$ - 0$ - 0
A109-A115Reserved
MCSC SUBTOTAL:$ - 0
DECA COMMISSARY - Recurring Work (ELINs A116)
A116DECA COMMISSARY - Specification 1503020 Pest Control (FX), Spec Item 3
A116AAScheduled Pest Control Services, Spec Item 3.112MO$ - 0$ - 0
A116ABUnscheduled Pest Control Services, Spec Item 3.212MO$ - 0$ - 0
A117-A121Reserved
DECA COMMISSARY SUBTOTAL:$ - 0
Marine Corps University (MCU) - Recurring Work (ELINs A122 through A125)
A122MCU - Specification 1501000 Facility Management (FP), Spec Item 3
A122AAInfrastructure Condition Assessment Program (ICAP), Spec Item 3.112MO$ - 0$ - 0
A122ABControl Systems, Spec Item 3.212MO$ - 0$ - 0
A122ACWork Order Tracking Spec Item 3.312MO$ - 0$ - 0
A123MCU - Specification 1502000 Facility Investment (ST), Spec Item 3
Service Orders, Spec Item 3.1
A123AAEmergency Service Orders, Spec Item 3.1.112MO$ - 0$ - 0
A123ABRoutine Service Orders, Spec Item 3.1.312MO$ - 0$ - 0
Preventive Maintenance Program (PM), Spec Item 3.3
A123ACHVAC and Refrigeration Systems, Spec Item 3.3.112MO$ - 0$ - 0
A123ADInterior and Exterior Lighting Systems, Spec Item 3.3.212MO$ - 0$ - 0
A123AEBoilers and UPVs, Spec Item 3.3.312MO$ - 0$ - 0
A123AFUninterrupted Power Systems (UPS), Spec Item 3.3.812MO$ - 0$ - 0
A123AGEmergency Eyewash and Showers Stations, Spec Item 3.3.1512MO$ - 0$ - 0
A123AHBuilding Controls Systems (BCS), Spec Item 3.3.1812MO$ - 0$ - 0
A123AJFacility Electrical Systems, Spec Item 3.3.1912MO$ - 0$ - 0
A123AKPumps, Spec Item 3.3.2012MO$ - 0$ - 0
A123ALOrnamental Fountains, Spec Item 3.3.2112MO$ - 0$ - 0
Inspection, Testing, and Certification Program, Spec Item 3.5
A123AMBoilers and UPVs, Spec Item 3.5.112MO$ - 0$ - 0
A123ANBackflow Prevention Devices, Spec Item 3.5.212MO$ - 0$ - 0
A123APStage Rigging System, Spec Item 3.5.612MO$ - 0$ - 0
Other Recurring Services Program, Spec Item 3.6
A123AQFountain Seasonal Start-up and Shutdown, Spec Item 3.6.912MO$ - 0$ - 0
A123ARDrinking Fountains/Water Coolers, Spec Item 3.6.1012MO$ - 0$ - 0
A124MCU- Specification 1503050 Grounds Maintenance and Landscaping (FX), Spec Item 3
A124AAImproved Grounds, Spec Item 3.112MO$ - 0$ - 0
A125MCU - Specification 1503060 Pavement Clearance (FX), Spec Item 3
A125AASnow and Ice Removal Services, Spec Item 3.212MO$ - 0$ - 0
A126-A129Reserved
MCU SUBTOTAL:$ - 0
G6 COMMUNICATION - Recurring Work (ELINs A130 through A131)
A130G6 - Specification 1501000 Facility Management (FP), Spec Item 3
A130AAInfrastructure Condition Assessment Program (ICAP), Spec Item 3.112MO$ - 0$ - 0
A130ABWork Order Tracking Spec Item 3.312MO$ - 0$ - 0
A131G6 - Specification 1502000 Facility Investment (ST), Spec Item 3
Service Orders, Spec Item 3.1
A131AARoutine Service Orders, Spec Item 3.1.312MO$ - 0$ - 0
Preventive Maintenance Program (PM), Spec Item 3.3
A131ABHVAC and Refrigeration Systems, Spec Item 3.3.112MO$ - 0$ - 0
A132-A139Reserved
G6 COMMUNICATIONS SUBTOTAL:$ - 0
Training and Education Command (TECOM) - Recurring Work (ELINs A140 through A141)
A140TECOM - Specification 1501000 Facility Management (FP), Spec Item 3
A140AAInfrastructure Condition Assessment Program (ICAP), Spec Item 3.112MO$ - 0$ - 0
A140ABWork Order Tracking Spec Item 3.312MO$ - 0$ - 0
A141TECOM - Specification 1502000 Facility Investment (ST), Spec Item 3
Preventive Maintenance Program (PM), Spec Item 3.3
A141AAHVAC and Refrigeration Systems, Spec Item 3.3.112MO$ - 0$ - 0

TECOM SUBTOTAL: $ - 0

TOTAL FOR LINE ITEM 0001 - BASE PERIOD - RECURRING WORK (ELINs A001 THROUGH A141) $ - 0

&"Times New Roman,Regular"Page &P of &N

SECTION J

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6'

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

IN ACCORDANCE WITH SECTION C, C.10.1.l

ELIN A001EW through A001FI

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.

Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Posts Set in Concrete/Asphalt.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.

Surface Depth to Match Surrounding.

Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

EXHIBIT A

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.

IN ACCORDANCE WITH SECTION C, C.10.2

ELIN A001FJ

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

EXHIBIT A

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

6' Fence Height Driven Posts

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, 6' Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, 6' Height, Free-Standing

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

With Barbwire, 7' Fence Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, With Barbwire, 7' Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, With Barbwire, 7' Height, Free-Standing

ELINs-Base Period-Non Recurring

ATTACHMENT J-0200000-14
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT # N62470-17-R-4003
EXHIBIT A - BASE PERIOD - NON-RECURRING WORK
CLIN 0002
Non-Recurring Work Price - Base Period
PROVIDE PRICES TO PERFORM NON-RECURRING WORK SERVICES - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINs A700 THROUGH A820
Part Number (ELIN)Part Name (Product) (120 Characters)ARO DaysPSC CodeLong Description (NTE 2,048)Unit PriceUnit of IssueEstimated QuantityExtended PriceCAC
(Col. F x Col. H = Col. I)
Specification 1502000 - Facility Investment
A700Chiller Rental (225 Ton)3Price per month to include delivery, installation, setup, removal, required cable and fittings, hose, single-point electrical connections, high-efficiency VFDs, and CFC-free refrigerants. Price per month to include delivery/removal of chiller to/from the site, installation, setup, required ancillary supplies, control panels, all connections to the facility, operation, and maintenance. Delivery within 72 hours of notification or as specified in the order.MO6$0.00
A701Generator Rental (300KW)1Price per month to include delivery, setup, removal, required cables, distribution panels, and fuel tank. Includes connection to multiple facilties or equipment. Price per month to include delivery, setup, removal, required cables, distribution panels, all connections to the faciltiy, fuel tank, operation, maintenance. The Contractor is responsible for all fuel and refueling. All fuel will be provided by the Contractor at no cost to the Government. Delivery within 24 hours of notification or as specified in the order.MO6$0.00
A702Pressure Washing Service3The Contractor shall provide miscellaneous pressure washings up to 5,000 SF of surface per order. Surfaces may be horizontal or vertical areas related to, attached to, or adjoining to facilities. The Contractor shall utilize high-pressure water equipment to clean exterior facility and adjoining surfaces as requested and to exclude windows surfaces. Pressure washing may require the use of man lift and other devices to perform work safely. This may require work after normal working hours to prevent disruption to operations. Complete all work within 3 working days or as specified in the order.EA10$0.00
A703Advanced Metering Infrastructure (AMI) - Electric Metering Devices7Provide labor, management, supervision, tools, material, and equipment required to purchase, install and test AMI electric metering device(s). Sample of Advanced Metering Infrastructure (AMI) – Electric Metering Devices is provided in "J-1502000-40. AMI Inventory." Location(s) to install newly purchased devices will be provided with the order. Complete all work within 7 working days or as specified in the order.EA5$0.00
A704Advanced Metering Infrastructure (AMI) - Natural Gas Metering Devices7Provide labor, management, supervision, tools, material, and equipment required to purchase, install and test AMI natural gas metering device(s). Sample of Advanced Metering Infrastructure (AMI) – Natural Gas Metering Devices is provided in J"J-1502000-40. AMI Inventory." Location(s) to install newly purchased devices will be provided with the order. Complete all work within 7 working days or as specified in the order.EA5$0.00
A705Advanced Metering Infrastructure (AMI) - Water Metering Devices7Provide labor, management, supervision, tools, material, and equipment required to purchase, install and test AMI water metering device(s). Sample of Advanced Metering Infrastructure (AMI) – Water Metering Devices is provided in "J-1502000-40. AMI Inventory." Location(s) to install newly purchased devices will be provided with the order. Complete all work within 7 working days or as specified in the order.EA5$0.00
A706-A711Reserved
Specification 1503010 - Custodial
A712Vacuum Carpets and Rugs3S214Provide labor, management, supervision, tools, material, and equipment required to vacuum carpets and rugs to ensure they are clean. Complete all work within 3 working days or as specified in the order.SF5,000$0.00
A713Carpet and Rug Deep Cleaning3S214Provide labor, management, supervision, tools, material, and equipment required to carpet and rug deep cleaning. The Contractor shall deep clean carpets and rugs to ensure that floors are clean and sightly. Acceptable methods for deep cleaning include shampooing, chemical extraction, steam cleaning, and other similar deep cleaning processes. Complete all work within 3 working days or as specified in the order.SF9,000$0.00
A714Machine Scrub Floors3S201Provide labor, management, supervision, tools, material, and equipment required to machine scrub floors. Floor surfaces, including joints and corners, are clean and sightly, without embedded dirt, cleaning solution, film debris, stains, marks, wads of gum, tar and similar substances. Complete all work within 3 working days or as specified in the order.SF5,000$0.00
A715Damp Mop Floors3S201Provide labor, management, supervision, tools, material, and equipment required to damp mop floors. Kitchen and restroom floors shall be sanitized. This service includes the floors to be swept prior to wet-mopping. Complete all work within 3 working days or as specified in the order.SF5,000$0.00
A716Low Area Cleaning3S201Provide labor, management, supervision, tools, material, and equipment required to clean low areas. All dust and debris shall be removed. Low area cleaning includes all furniture and fixtures (e.g., doors, partitions, radiators, equipment, hand railings in stairways, grills, ledges, sills, walls, doors, light fixtures, chalk and dry boards and trays, miscellaneous hardware and bright metal work, and similar dust catching surfaces) to a maximum height of 6.8 feet above floor level. Complete all work within 3 working days or as specified in the order.SF2,000$0.00
A717High Area Cleaning3S201Provide labor, management, supervision, tools, material, and equipment required to clean high areas. High area cleaning includes all areas that are vertical and horizontal above 6.8 feet and can exceed 13 feet from floor level. Cleaning may be performed with extension tools or step ladders. All dust and debris shall be removed. Surfaces below the work shall be protected from dust and debris. Complete all work within 3 working days or as specified in the order.SF2,000$0.00
A718Interior Window Cleaning3S201Provide labor, management, supervision, tools, material, and equipment required to clean interior window surfaces and adjacent areas to ensure that surfaces are clean. The Contractor's cleaning techniques and products shall protect the integrity of the glass surface and finish and adjacent areas. Complete all work within 3 working days or as specified in the order.SF3,000$0.00
A719Exterior Ground Floor Window Cleaning3S201Provide labor, management, supervision, tools, material, and equipment required to clean exterior window surfaces and adjacent areas to ensure that surfaces are clean. The Contractor's cleaning techniques and products shall protect the integrity of the glass surface and finish and adjacent areas. Complete all work within 3 working days or as specified in the order.SF3,000$0.00
A720Exterior Elevated Floor Window Cleaning3S201Provide labor, management, supervision, tools, material, and equipment required to clean exterior window surfaces above ground floors and adjacent areas to ensure that surfaces are clean. The Contractor's cleaning techniques and products shall protect the integrity of the glass surface and finish and adjacent areas. Complete all work within 3 working days or as specified in the order.SF3,000$0.00
A721Window Blinds Cleaning3S201Provide labor, management, supervision, tools, material, and equipment required to remove, clean, and rehang window blinds. Complete all work within 3 working days or as specified in the order.SF3,000$0.00
A722Glass Surface Cleaning3S201Provide labor, management, supervision, tools, material, and equipment required to clean glass surfaces. The Contract shall ensure that glass surfaces are sightly and free of all dirt and provide a clear, streak-, smudge- and mark-free appearance regardless of height. Glass surfaces include but are not limited to interior doors, (including associated transoms and sidelights). Complete all work within 3 working days or as specified in the order.SF1,000$0.00
A723Restroom Cleaning and Servicing1S201Provide labor, management, supervision, tools, material, and equipment required to clean and servicing restrooms. All restroom surfaces are cleaned, sanitized and deodorized. Restroom supplies are completely restocked and all dispensers are in working condition. After work is completed, restrooms are clean, sanitary and sightly. Complete all work within 1 working days or as specified in the order.SF8,000$0.00
A724Perimeter Area Cleaning3S201Provide labor, management, supervision, tools, material, and equipment required to debris removal. The Contractor shall police the area and remove all trash and debris. Area shall be free of all trash and debris and waste containers shall be emptied. This service may be ordered for the interior or exterior of buildings. Complete all work within 3 working days or as specified in the order.SF500$0.00
A725Stripping and Refinishing1S201Provide labor, management, supervision, tools, material, and equipment required to stripping and refinishing floors at designated location(s). Complete all work within 3 working days or as specified in the order.SF3,000$0.00
A726Cigarette Urn Cleaning1S201Provide labor, management, supervision, tools, material, and equipment required to remove and disposal of cigarettes waste, clean urn and refill with sand as required. Complete all work within 1 working days or as specified in the order.EA20$0.00
A727Shower Revitalization1S201Provide labor, management, supervision, tools, material, and equipment required to deep clean floor and wall tiles and showers, clean caulk, re-grout and seal to restore wall and floor surfaces. It includes replacing shower liners and rings. Complete all work within 1 working days or as specified in the order.SF2,000$0.00
A728Flood Clean-up (carpeted flooring)3S201Provide labor, management, supervision, tools, material, and equipment required to extract water from and completely dry carpeted flooring to ensure floor surface is completely dry. Complete all work within 3 working days or as specified in the order.HR450$0.00
A729Flood Clean-up (hard surfaced flooring)3S201Provide labor, management, supervision, tools, material, and equipment required to extract water from and completely dry hard surfaced flooring to ensure floor surface is completely dry. Complete all work within 3 working days or as specified in the order.HR450$0.00
A730-A735Reserved
Specification 1503020 - Pest Control
A736Adult Mosquito Surveillance2S207Provide labor, management, supervision, tools, material, and equipment required to conduct surveillance for adult mosquitos using light trap(s) and deliver catches to Naval Hospital Sigonella Preventive Medicine within 2 working days following receipt of the task order. Complete work within time periods specified in J-1503020.EA50$0.00
A737Adult Mosquito Control1S207Provide labor, management, supervision, tools, material, and equipment required to apply a mosquito adulticide (ULV formulation) at the designated location(s) within time period of 24 hours to respond. Pest control services for adult mosquitoes shall be performed in the early morning hours (between 3am-6am). The Contractor shall nebulize and spray approved pesticide utilizing fog-generating equipment as requested in the order. Contractor shall respond wihin 1 working day and complete work within time periods specified in J-1503020.EA5$0.00
A738Larval Mosquito Surveillance2S207Provide labor, management, supervision, tools, material, and equipment required to conduct surveillance of designated mosquito breeding sites for immature mosquitoes (eggs, larvae, and pupae). Time Period to Respond: within 2 working days. Complete work within time periods specified in J-1503020.EA50$0.00
A739Larval and Pupal Mosquito Control1S207Provide labor, management, supervision, tools, material, and equipment required to control larval and pupal mosquitoes in designated area(s) and time periods to control within time period of 1 working day to respond. Complete work within time periods specified in J-1503020.EA50$0.00
A740Nuisance Pest Control1S207Provide labor, management, supervision, tools, material, and equipment required to conduct surveillance and control ants, cockroaches, silverfish, centipedes, millipedes, beetles, fleas, spiders, and/or stored product pests at the designated location(s) per the applicable General Requirements and Performance Standards (Nuisance Pest Requirements) within time period of 3 working days to respond, 7 working days to obtain control, and 30 days to maintain control. (up to 164 square feet)EA20$0.00
A741Disease Vector and Health Pest Control1S207Provide labor, management, supervision, tools, material, and equipment required to conduct surveillance and control bed bugs, bees, wasps, hornets, and other stinging arthropods, filth flies, and/or ticks at the designated location(s) per the applicable General Requirements and Performance Standards (Disease Vector and Health Pest Requirements) within time period of 1 working day to respond.EA15$0.00
A742Vertebrate Pest Control1S207Provide labor, management, supervision, tools, material, and equipment required to conduct surveillance and control commensal rodents, pest birds, feral dogs and cats, and snakes in and around designated location(s) per the applicable General Requirements and Performance Standards (Vertebrate Pest Requirements) within time period of 24 hours to respond, and time periods to obtain and maintain control as specified in Pest Control Section J. (up to 164 square feet)
EA15$0.00
A743Termite and Other Wood Destroying Organisms Survey5S207Provide labor and materials to conduct surveillance in a facility for all termites species and other wood destroying organisms including fungal rots, carpenter ants, and wood boring beetles within following time periods to respond: within 4 hours after receipt of the order if reported as a swarm, otherwise, 5 working days. Complete work within time periods specified in J-1503020.EA50$0.00
A744Termite Control5S207Provide labor, management, supervision, tools, material, and equipment required to control infestations of subterranean termites per J-1503020 (Termite Control Specifications) within time period of 5 working days after receipt of the task order to respond. Complete work within time periods specified in J-1503020.SF1,000$0.00
A745Weed Control (Herbicide Treatment)7S207Provide labor, management, supervision, tools, material, and equipment required to perform selective herbicide treatment to the location(s) indicated on the order. Selective herbicide shall be handled and applied as indicated by the manufacturer printed directions/instructions. Herbicide products shall be usable at locations normally frequented by persons / pets. Herbicide shall destroy only the infesting weeds without harming/damaging the surrounding ornamental vegetation (such as lawn, ornamental plants, etc). All warning signs indicating herbicide application/contamination to limit/restrict utilization of the application areas shall be used and enforced for the decay period of the herbicide being used. Herbicide shall not be used when the environment conditions conflict with manufacturers printed directions. Herbicide products shall be submitted to the KO for approval prior their use. Use of not approved herbicide is prohibited. Time Period to Respond: 7 working days.SF5,000$0.00
A746Vertebrate Carcass Removal (up to 5 pounds)1S207Provide labor, management, supervision, tools, material, and equipment required to remove vertebrate carcass. Complete work within 1 working day or as specified in the order.EA25$0.00
A747-A751Reserved
Specification 1503030 - Integrated Solid Waste Management (ISWM)
A752Bulky Waste Removal and Disposal3Provide labor, management, supervision, tools, material, and equipment required to perform integrated solid waste management services. The Contractor shall removed and dispose bulky waste at the designed location(s). Bulky waste include appliances such as refrigerators, stoves, dishwashers, washers, driers, and electronic items such as monitors, computers, televisions, printers, and similar. Bulky waste shall be transported, disposed or recycled in accordance with applicable laws and regulations. Complete all work within 3 working days. Submit documentation supporting disposal/recycling within five working days. (Not to exceed 40 cubic yards)EA10$0.00
A753Solid Waste Removal and Disposal - Provide Commercial Container - 8 Cubic Yard2Provide labor, management, supervision, tools, material, and equipment required to perform integrated solid waste management services. The Contractor shall provide and deliver 8-cubic yard container(s) at location(s) identified in the order and dispose of the entire contents of solid waste. Waste shall be transported, disposed or recycled in accordance with applicable laws and regulations. Containers(s) shall be removed within 1 working day past requirement termination. Container(s) delivery shall be completed within 2 working days. The order will include the delivery/pick-up dates and location.DA5$0.00
A754Solid Waste Removal and Disposal - Provide Commercial Container - 30 Cubic Yard2Provide labor, management, supervision, tools, material, and equipment required to perform integrated solid waste management services. The Contractor shall provide and deliver 30-cubic yard container(s) at location(s) identified in the order and dispose of the entire contents of solid waste. Waste shall be transported, disposed or recycled in accordance with applicable laws and regulations. Containers(s) shall be removed within 1 working day past requirement termination. Container(s) delivery shall be completed within 2 working days. The order will include the delivery/pick-up dates and location.DA5$0.00
A755Mixed Construction Material Waste Removal and Disposal - Provide Commerical Container - 8 Cubic Yard2Provide labor, management, supervision, tools, material, and equipment required to perform integrated solid waste management services. The Contractor shall provide and deliver 8-cubic yard container(s) at location(s) identified in the order and dispose of mixed construction material waste. Mixed construction material waste shall be transported, disposed or recycled in accordance with applicable laws and regulations. Containers(s) shall be removed within 1 working day past requirement termination. Container(s) delivery shall be completed within 2 working days. The order will include the delivery/pick-up dates and location.DA5$0.00
A756Mixed Construction Material Waste Removal and Disposal - Provide Commerical Containers - 30 Cubic Yard2Provide labor, management, supervision, tools, material, and equipment required to perform integrated solid waste management services. The Contractor shall provide and deliver 30-cubic yard container(s) at location(s) identified in the order and dispose of mixed construction material waste. Mixed construction material waste shall be transported, disposed or recycled in accordance with applicable laws and regulations. Containers(s) shall be removed within 1 working day past requirement termination. Container(s) delivery shall be completed within 2 working days. The order will include the delivery/pick-up dates and location.DA5$0.00

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .