J-0200000-16_Exhibit_Line_Item_Numbers_Amendment_08.xlsx

XLSX spreadsheet 286 KB Posted

Attached to
BASE OPERATIONS SUPPORT (BOS) SERVICES AT NAVAL SUPPORT ACTIVITY (NSA) ANNAPOLIS, MARYLAND, TO INCLUDE SERVICES AT THE UNITED STATES NAVAL ACADEMY
Solicitation number
N6247016R5008
Issued by

About this file

This document provides line item numbers and pricing for recurring and non-recurring facility services required by the solicitation for Base Operations Support (BOS) Services at Naval Support Activity (NSA) Annapolis, Maryland, including services at the United States Naval Academy. Recurring services include facility management, facility investment such as preventative maintenance and inspections, pest control, solid waste management, and pavement clearance. Non-recurring services include interior and exterior painting, asbestos and lead abatement, ceiling and flooring replacement, backflow preventer repair and replacement, fire protection device replacement, variable frequency drive replacement, direct digital control system component replacement, and unit priced labor. Pricing is required for each individual line item number for the base period and first option period.

J-0200000-16_Exhibit_Line_Item_Numbers_Amendment_08.xlsx

View the file

Other files

File Type Posted
N62470-16-R-5008_Annapolis_BOS_RFP_Amendment_0012.pdf PDF
J-1502000-07.a_Rickover_HVAC_Equipment_Schedule_Amend_12.pdf PDF
J-0200000-16_Exhibit_Line_Item_Numbers_Amend_12.xlsx XLSX spreadsheet
J-1502000-09_Outdoor_Non_Street_Lighting_Inventory_Amend_12.pdf PDF
J-0200000-02_Wage_Determinations_SCA_DBA_Amendment_11.pdf PDF
J-0200000-16_Exhibit_Line_Item_Numbers_Amend_11.xlsx XLSX spreadsheet
J-0200000_Management_and_Administration_Amend_11.pdf PDF
N62470-16-R-5008_Annapolis_BOS_RFP_Amendment_0011.pdf PDF
N62470-16-R-5008_Annapolis_BOS_RFP_Amendment_0010.pdf PDF
N62470-16-R-5008_Annapolis_BOS_RFP_Amendment_0009.pdf PDF
N62470-16-R-5008_Annapolis_BOS_RFP_Amendment_0008.pdf PDF
J-1503070_Special_Events_Amendment_08.pdf PDF
Attachment_J-8_Small_Business_Participation_and_Commitment_Strategy_Amend_07.docx DOCX document
N62470-16-R-5008_Annapolis_BOS_RFP_Amendment_0007.pdf PDF
Attachment_J-5_FTE_Spreadsheet_Amend_07.xlsx XLSX spreadsheet
N62470-16-R-5008_Annapolis_BOS_RFP_Amendment_0006.pdf PDF
J-0200000-02_SCA_DBA_Amendment_06.pdf PDF
N62470-16-R-5008_Annapolis_BOS_RFP_Amendment_0005.pdf PDF
Attachment_J-13_Site_Visit_Attendees.pdf PDF
N62470-16-R-5008_Annapolis_BOS_RFP_Amendment_0004.pdf PDF
Attachment_J-12_Pre-Proposal_Presentation_Slides.pptx PPTX presentation
N62470-16-R-5008_Annapolis_BOS_RFP_Amendment_0003.pdf PDF
N62470-16-R-5008_Annapolis_BOS_RFP_Amendment_0002.pdf PDF
Attachment_J-11_Site_Visit_Security_SECNAV_5512-1_Fillable_Form.pdf PDF
Attachment_J-10_Site_Visit_Parking_Information.pdf PDF
Attachment_J-1_Site_Visit_Registration.pdf PDF
N62470-16-R-5008_Annapolis_BOS_RFP_Amendment_0001.pdf PDF
N62470-16-R-5008_Annapolis_BOS_RFP.pdf PDF
Attachment_J-3_Section_B_CLINS.pdf PDF
Attachment_J-4_Small_Business_Subcontracting_Plan_Template.docx DOCX document
Attachment_J-2_Pre-Award_Inquiry_Form.xlsx XLSX spreadsheet
N6247016R5008_Annapolis_BOS_Pre-Sol_Notice___Mod3.docx DOCX document
N6247016R5008_N62470-16-R-5008_Annapolis_BOS_Pre-Solitication_Notice___Mod2.pdf PDF
N6247016R5008_N62470-16-R-5008_Annapolis_BOS_Pre-Solitication_Notice___Mod1.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ELINs-Base Period-Recurring

ATTACHMENT J-0200000-16
EXHIBIT LINE ITEM NUMBERS
SOLICITATION NO. N62470-16-R-5008
EXHIBIT A - BASE PERIOD - RECURRING WORK
CLIN 0001
Recurring Work Price - Base Period
PROVIDE PRICES TO PERFORMING FACILITY SERVICES RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3
ELINs A001 through A042
ELIN / Sub ELINDescriptionQuantityUnit of IssueUnit PriceTotal
Region (Naval District Washington) - Recurring Work (ELINs A001 through A005)
A001Region - Specification 1501000 Facility Management (FP), Spec Item 3
A001AAInfrastructure Condition Assessment Program (ICAP), Spec Item 3.1, 3.1.1, 3.1.212MO$ - 0
A001ABControl Systems, Spec Item 3.2, 3.2.112MO$ - 0
A002Region - Specification 1502000 Facility Investment (ST), Spec Item 3
Service Orders, Spec Item 3.1
A002AAEmergency Service Orders, Spec Item 3.1.112MO$ - 0
A002ABUrgent Service Orders, Spec Item 3.1.212MO$ - 0
A002ACRoutine Service Orders, Spec Item 3.1.312MO$ - 0
Project Work Orders, Spec Item 3.2
A002ADProject Work Order Level 1, Spec Item 3.2.112MO$ - 0
A002AEProject Work Order Level 2, Spec Item 3.2.212MO$ - 0
Preventive Maintenance Program (PM), Spec Item 3.3
A002AFPM for HVAC and Refrigeration Systems, Spec Item 3.3.112MO$ - 0
A002AGPM for Interior and Exterior Lighting Systems, Spec Item 3.3.212MO$ - 0
A002AHConversion for Interior and Exterior Lighting Systems to LED, Spec Item 3.3.212MO$ - 0
A002AJPM for Boilers and Unfired Pressure Vessels (UPVs), Spec Item 3.3.312MO$ - 0
A002AKPM for Weight Handling Equipment (WHE), Spec Item 3.3.412MO$ - 0
A002ALPM for Fire Protection Systems, Spec Item 3.3.612MO$ - 0
A002AMPM for Vertical Transportation Equipment (VTE), Spec Item 3.3.712MO$ - 0
A002ANPM for POL System Facilities and Distribution Systems, Spec Item 3.3.812MO$ - 0
A002APPM for Emergency Eyewash Stations, Spec Item 3.3.912MO$ - 0
A002AQPM for Swimming Pools and Ornamental Fountains, Spec Item 3.3.1012MO$ - 0
A002ARPM for Food Service Equipment, Spec Item 3.3.1112MO$ - 0
A002ASPM for Chapel Organs, Spec Item 3.3.1212MO$ - 0
A002ATPM for Uninterrupted Power Systems (UPS), Spec Item 3.3.1312MO$ - 0
A002AUPM for Motorized Gates, Spec Item 3.3.1412MO$ - 0
A002AVPM for Roll up Doors and Windows, Spec Item 3.3.1512MO$ - 0
A002AWPM for Emergency and Exit Lighting, Spec Item 3.3.1612MO$ - 0
A002AXPM for Automated Doors, Spec Item 3.3.1712MO$ - 0
A002AYPM for Cathodic Protection Systems, Spec Item 3.3.1812MO$ - 0
A002AZPM for Baler Equipment, Spec Item 3.3.1912MO$ - 0
A002BAPM for Pumps, Spec Item 3.3.2312MO$ - 0
A002BBPM for Auxiliary Generators , Spec Item 3.3.2412MO$ - 0
A002BCPM for Direct Digital Control (DDC) Systems, Spec Item 3.3.2612MO$ - 0
A002BDPM for Compressed Air Systems, Spec Item 3.3.2712MO$ - 0
A002BEPM for Keyless Entry Systems, Spec Item 3.3.2812MO$ - 0
Inspection, Testing and Certification, Spec Item 3.5
A002BFInspection, Testing and Certification for Boilers and UPVs, Spec Item 3.5.112MO$ - 0
A002BGInspection, Testing and Certification for Weight Handling Equipment (WHE), Spec Item 3.5.212MO$ - 0
A002BHInspection, Testing and Certification for Roof Inspection, Spec Item 3.5.412MO$ - 0
A002BJInspection, Testing and Certification for Vertical Transportation Equipment (VTE), Spec Item 3.5.512MO$ - 0
A002BKInspection, Testing and Certification for Emergency and Exit Lighting, Spec Item 3.5.612MO$ - 0
A002BLInspection, Testing and Certification for Fire Doors and Fire Walls Inspections, Spec Item 3.5.712MO$ - 0
A002BMInspection, Testing and Certification for POL System Facilities and Distribution Systems, Spec Item 3.5.121312MO$ - 0
Other Recurring Services, Spec Item 3.6
A002BNOther Recurring Services for Grease and Plaster Traps, Spec Item 3.6.112MO$ - 0
A002BPOther Recurring Services for Exhaust Hoods and Ducts, Spec Item 3.6.212MO$ - 0
A002BQOther Recurring Services for HVAC Seasonal Start-Up and Shutdown, Spec Item 3.6.312MO$ - 0
A002BROther Recurring Services for HVAC Water Testing and Treatment Services, Spec Item 3.6.412MO$ - 0
A002BSOther Recurring Services for Boiler Seasonal Start-Up and Shutdown, Spec Item 3.6.512MO$ - 0
A002BTOther Recurring Services for Boiler Water Testing and Treatment Services, Spec Item 3.6.612MO$ - 0
A002BUOther Recurring Services for Fountain Seasonal Start-Up and Shutdown, Spec Item 3.6.712MO$ - 0
A002BVOther Recurring Services for Roof Drainage Systems, Spec Item 3.6.812MO$ - 0
A002BWOther Recurring Services for Dryer Vent Cleaning, Spec Item 3.6.1012MO$ - 0
A002BXOther Recurring Services for Mechanical Equipment Room Monitoring, Spec Item 3.6.1112MO$ - 0
A002BYOther Recurring Services for Oil Water Separators, Spec Item 3.6.1212MO$ - 0
A002BZOther Recurring Services for Mechanical Space Cleaning and Maintenance, Spec Item 3.6.1812MO$ - 0
A002CAOther Recurring Services for Storm Drainage Systems, Spec Item 3.6.2412MO$ - 0
A002CBOther Recurring Services for Maintain Stormwater Best Management Practices (BMP), Spec Item 3.6.2512MO$ - 0
A003Region - Specification 1503020 Pest Control (FX), COL 3 Base Measures, Spec Item 3
A003AAScheduled Pest Control Services, Spec Item 3.112MO$ - 0
A003ABUnscheduled Pest Control Services, Spec Item 3.212MO$ - 0
A003ACPest Management Reporting, Spec Item 3.312MO$ - 0
A004Region - Specification 1503030 Integrated Solid Waste Management (ISWM) (FX), Spec Item 3
A004AASolid Waste Collection, Spec Item 3.112MO$ - 0
A005Region - Specification 1503060 Pavement Clearance (FX), Spec Item 3
A005AAPavement Sweeping Services, Spec Item 3.112MO$ - 0
A005ABSnow and Ice Removal, Spec Item 3.212MO$ - 0
A006-A009Reserved
Region SUBTOTAL:$ - 0
Naval Academy (USNA) - Recurring Work (ELINs A010 through A012)
A010Naval Academy - Specification 1502000 Facility Investment (ST), Spec Item 3
Service Orders, Spec Item 3.1
A010AAEmergency Service Orders, Spec Item 3.1.112MO$ - 0
A010ABUrgent Service Orders, Spec Item 3.1.212MO$ - 0
A010ACRoutine Service Orders, Spec Item 3.1.312MO$ - 0
Project Work Orders, Spec Item 3.2
A010ADProject Work Order Level 1, Spec Item 3.2.112MO$ - 0
Preventive Maintenance Program (PM), Spec Item 3.3
A010AEPM for Weight Handling Equipment (WHE), Spec Item 3.3.412MO$ - 0
A010AFPM for Lightning Arrestors and Grounding Devices, Spec Item 3.3.512MO$ - 0
A010AGPM for Food Service Equipment, Spec Item 3.3.1112MO$ - 0
A010AHPM for Sports Nets, Spec Item 3.3.2112MO$ - 0
A010AJPM for Rifle, Pistol and Pellet Ranges, Spec Item 3.3.2512MO$ - 0
Inspection, Testing and Certification, Spec Item 3.5
A010AKInspection, Testing and Certification for Weight Handling Equipment (WHE), Spec Item 3.5.212MO$ - 0
Other Recurring Services, Spec Item 3.6
A010ALOther Recurring Services for Fountain Seasonal Start-Up and Shutdown, Spec Item 3.6.712MO$ - 0
A010AMOther Recurring Services for Flood Control, Spec Item 3.6.912MO$ - 0
A010ANOther Recurring Services for Class of “32” Monument maintenance, Spec Item 3.6.1312MO$ - 0
A010APOther Recurring Services for Sports Nets and Wind Screens, Spec Item 3.6.1412MO$ - 0
A010AQOther Recurring Services for Skylight Cleaning, Spec Item 3.6.1512MO$ - 0
A010AROther Recurring Services for Inspect and Repair Bird Screens, Spec Item 3.6.1612MO$ - 0
A010ASOther Recurring Services for Exterior Surface Cleaning, Spec Item 3.6.1712MO$ - 0
A010ATOther Recurring Services for Park Bench Maintenance, Spec Item 3.6.1912MO$ - 0
A010AUOther Recurring Services for Rowing Tank Cleaning, Spec Item 3.6.2112MO$ - 0
A010AVOther Recurring Services for Irrigation System Seasonal Start-Up and Shutdown, Spec Item 3.6.2612MO$ - 0
A011Naval Academy - Specification 1503070 Special Events, Spec Item 3
A011AASpecial Event Categories, Spec Item 3.1.112MO$ - 0
A011ABSpecial Event Service Orders, Spec Item 3.1.212MO$ - 0
A011ACPort-A-Pot Rental Services, Spec Item 3.1.312MO$ - 0
A012Naval Academy - Specification 1700000 Transportation, Spec Item 3
A012AATow Truck Services, Spec Item 3.1.212MO$ - 0
A012ABShuttle and School Bus Service, Spec Item 3.1.312MO$ - 0
A012ACWHE Services, Spec Item 3.1.412MO$ - 0
A013-A015Reserved
NAVAL ACADEMY SUBTOTAL:$ - 0
BUMED - Recurring Work (ELINs A016 through A019)
A016BUMED - Specification 1501000 Facility Management (FP), Spec Item 3
A016AAInfrastructure Condition Assessment Program (ICAP), Spec Item 3.1, 3.1.1, 3.1.212MO$ - 0
A016ABControl Systems, Spec Item 3.2, 3.2.112MO$ - 0
A017BUMED - Specification 1502000 Facility Investment (ST), Spec Item 3
Service Orders, Spec Item 3.1
A017AAEmergency Service Orders, Spec Item 3.1.112MO$ - 0
A017ABUrgent Service Orders, Spec Item 3.1.212MO$ - 0
A017ACRoutine Service Orders, Spec Item 3.1.312MO$ - 0
Project Work Orders, Spec Item 3.2
A017ADProject Work Order Level 1, Spec Item 3.2.112MO$ - 0
A017AEProject Work Order Level 2, Spec Item 3.2.212MO$ - 0
Preventive Maintenance Program (PM), Spec Item 3.3
A017AFPM for Interior and Exterior Lighting Systems, Spec Item 3.3.212MO$ - 0
A017AGPM for Uninterrupted Power Systems (UPS), Spec Item 3.3.1312MO$ - 0
A017AHPM for Roll up Doors and Windows, Spec Item 3.3.1512MO$ - 0
A017AJPM for Emergency and Exit Lighting, Spec Item 3.3.1612MO$ - 0
A017AKPM for Automated Doors, Spec Item 3.3.1712MO$ - 0
A017ALPM for Photovoltaic Energy Systems, Spec Item 3.3.2012MO$ - 0
A017AMPM for Solar Water Heating System, Spec Item 3.3.2212MO$ - 0
A017ANPM for Pumps, Spec Item 3.3.2312MO$ - 0
Integrated Maintenance Program (IMP), Spec Item 3.4
A017APIMP for HVAC and Refrigeration Systems, Spec Item 3.4.112MO$ - 0
A012AQ
A017AQIMP for Boilers and UPVs, Spec Item 3.4.212MO$ - 0
A012AR
A017ARIMP for Closed Circuit Security Surveillance Systems, Spec Item 3.4.312MO$ - 0
A017ASIMP for Fire Protection Systems, Spec Item 3.4.412MO$ - 0
A017ATIMP for Compressed Air and Medical Air, Gas & Vacuum Systems, Spec Item 3.4.512MO$ - 0
A017AUIMP for Vertical Transportation Equipment (VTE), Spec Item 3.4.612MO$ - 0
A017AVIMP for Automated Doors, Spec Item 3.4.712MO$ - 0
A017AWIMP for Chillers and Distribution System, Spec Item 3.4.812MO$ - 0
A017AXIMP for Isolation Rooms, Spec Item 3.4.912MO$ - 0
A017AYIMP for Keyless Entry Systems, Spec Item 3.4.1012MO$ - 0
A017AZIMP for Roll-up Doors and Windows, Spec Item 3.4.1112MO$ - 0
A017BAIMP for Motorized Gates, Spec Item 3.4.1212MO$ - 0
A017BBIMP for Public Announcement (PA) System, Spec Item 3.4.1312MO$ - 0
Inspection, Testing and Certification, Spec Item 3.5
A017BCInspection, Testing and Certification for Boilers and UPVs, Spec Item 3.5.112MO$ - 0
A017BDInspection, Testing and Certification for Backflow Prevention Devices, Spec Item 3.5.312MO$ - 0
A017BEInspection, Testing and Certification for Roof Inspection, Spec Item 3.5.412MO$ - 0
A017BFInspection, Testing and Certification for Vertical Transportation Equipment (VTE), Spec Item 3.5.512MO$ - 0
A017BGInspection, Testing and Certification for Emergency and Exit Lighting, Spec Item 3.5.612MO$ - 0
A017BHInspection, Testing and Certification for Fire Doors and Fire Walls Inspections, Spec Item 3.5.712MO$ - 0
A017BJInspection, Testing and Certification for Public Announcement (PA) System, Spec Item 3.5.812MO$ - 0
A017BKInspection, Testing and Certification for Medical Air, Gas & Vacuum Systems, Spec Item 3.5.912MO$ - 0
A017BLInspection, Testing and Certification for Air Flow Monitoring, Spec Item 3.5.1012MO$ - 0
A017BMInspection, Testing and Certification for Electrical Receptacles, Spec Item 3.5.1112MO$ - 0
Other Recurring Services, Spec Item 3.6
A017BNOther Recurring Services for Grease and Plaster Traps, Spec Item 3.6.112MO$ - 0
A017BPOther Recurring Services for Exhaust Hoods and Ducts, Spec Item 3.6.212MO$ - 0
A017BQOther Recurring Services for HVAC Seasonal Start-Up and Shutdown, Spec Item 3.6.312MO$ - 0
A017BROther Recurring Services for HVAC Water Testing and Treatment Services, Spec Item 3.6.412MO$ - 0
A017BSOther Recurring Services for Boiler Seasonal Start-Up and Shutdown, Spec Item 3.6.512MO$ - 0
A017BTOther Recurring Services for Boiler Water Testing and Treatment Services, Spec Item 3.6.612MO$ - 0
A017BUOther Recurring Services for Roof Drainage Systems, Spec Item 3.6.812MO$ - 0
A017BVOther Recurring Services for Mechanical Equipment Room Monitoring, Spec Item 3.6.1112MO$ - 0
A017BWOther Recurring Services for Plans, Files and Drawing Updates, Spec Item 3.6.2212MO$ - 0
A017BXOther Recurring Services for Controlled Inspection Program, Spec Item 3.6.2312MO$ - 0
A017BYOther Recurring Services for Irrigation System Seasonal Start-Up and Shutdown, Spec Item 3.6.2612MO$ - 0
A018BUMED - Specification 1503020 Pest Control (FX), COL 3 Base Measures, Spec Item 3
A018AAScheduled Pest Control Services, Spec Item 3.112MO$ - 0
A018ABUnscheduled Pest Control Services, Spec Item 3.212MO$ - 0
A018ACPest Management Reporting, Spec Item 3.312MO$ - 0
A019BUMED - Specification 1503060 Pavement Clearance (FX), Spec Item 3
A019AAPavement Sweeping Services, Spec Item 3.112MO$ - 0
A019ABSnow and Ice Removal, Spec Item 3.212MO$ - 0
A020-A023Reserved
BUMED SUBTOTAL:$ - 0
NAVFAC Utilities - Recurring Work (ELINs A024 through A033)
A024NAVFAC Utilities - Specification 1501000 Facility Management (FP), Spec Item 3
A024AAInfrastructure Condition Assessment Program (ICAP), Spec Item 3.1, 3.1.1, 3.1.212MO$ - 0
A024ABControl Systems, Spec Item 3.2, 3.2.112MO$ - 0
A025NAVFAC Utilities - Specification 1502000 Facility Investment (ST), Spec Item 3
Service Orders, Spec Item 3.1
A025AAEmergency Service Orders, Spec Item 3.1.112MO$ - 0
A025ABUrgent Service Orders, Spec Item 3.1.212MO$ - 0
A025ACRoutine Service Orders, Spec Item 3.1.312MO$ - 0
Project Work Orders, Spec Item 3.2
A025ADProject Work Order Level 1, Spec Item 3.2.112MO$ - 0
A025AEProject Work Order Level 2, Spec Item 3.2.212MO$ - 0
Preventive Maintenance Program (PM), Spec Item 3.3
A025AFPM for HVAC and Refrigeration Systems, Spec Item 3.3.112MO$ - 0
A025AGPM for Interior and Exterior Lighting Systems, Spec Item 3.3.212MO$ - 0
A025AHProvide Conversion for Interior and Exterior Lighting Systems to LED, Spec Item 3.3.212MO$ - 0
A025AJPM for Boilers and UPVs, Spec Item 3.3.312MO$ - 0
A025AKPM for Lightning Arrestors and Grounding Devices, Spec Item 3.3.512MO$ - 0
A025ALPM for Fire Protection Systems, Spec Item 3.3.612MO$ - 0
A025AMPM for Vertical Transportation Equipment (VTE), Spec Item 3.3.712MO$ - 0
A025ANPM for POL System Facilities and Distribution Systems, Spec Item 3.3.812MO$ - 0
A025APPM for Emergency Eyewash Stations, Spec Item 3.3.912MO$ - 0
A025AQPM for Motorized Gates, Spec Item 3.3.1412MO$ - 0
A025ARPM for Roll up Doors and Windows, Spec Item 3.3.1512MO$ - 0
A025ASPM for Emergency and Exit Lighting, Spec Item 3.3.1612MO$ - 0
A025ATPM for Cathodic Protection Systems, Spec Item 3.3.1812MO$ - 0
A025AUPM for Pumps, Spec Item 3.3.2312MO$ - 0
A025AVPM for Auxiliary Generators , Spec Item 3.3.2412MO$ - 0
A025AWPM for Direct Digital Control (DDC) Systems, Spec Item 3.3.2612MO$ - 0
A025AXPM for Compressed Air Systems, Spec Item 3.3.2712MO$ - 0
Inspection, Testing and Certification, Spec Item 3.5
A025AYInspection, Testing and Certification for Boilers and UPVs, Spec Item 3.5.112MO$ - 0
A025AZInspection, Testing and Certification for Roof Inspection, Spec Item 3.5.412MO$ - 0
A025BAInspection, Testing and Certification for Vertical Transportation Equipment (VTE), Spec Item 3.5.512MO$ - 0
A025BBInspection, Testing and Certification for Emergency and Exit Lighting, Spec Item 3.5.612MO$ - 0
A025BCInspection, Testing and Certification for POL Systems, Spec Item 3.5.1212MO$ - 0
Other Recurring Services, Spec Item 3.6
A025BDOther Recurring Services for Exhaust Hoods and Ducts, Spec Item 3.6.212MO$ - 0
A025BEOther Recurring Services for HVAC Seasonal Start-Up and Shutdown, Spec Item 3.6.312MO$ - 0
A025BFOther Recurring Services for HVAC Water Testing and Treatment Services, Spec Item 3.6.412MO$ - 0
A025BGOther Recurring Services for Boiler Seasonal Start-Up and Shutdown, Spec Item 3.6.512MO$ - 0
A025BHOther Recurring Services for Boiler Water Testing and Treatment Services, Spec Item 3.6.612MO$ - 0
A025BJOther Recurring Services for Roof Drainage Systems, Spec Item 3.6.812MO$ - 0
A025BKOther Recurring Services for Mechanical Equipment Room Monitoring, Spec Item 3.6.1112MO$ - 0
A025BLOther Recurring Services for Remove Debris and Trash From Utility Tunnels, Spec Item 3.6.2012MO$ - 0
A026NAVFAC Utilities - Specification 1601000 Utility Management (UT), Spec Item 3
Utility Service Orders, Spec Item 3.1
A026AAEmergency Service Orders, Spec Item 3.1.112MO$ - 0
A026ABUrgent Service Orders, Spec item 3.1.212MO$ - 0
A026ACRoutine Service Orders, Spec Item 3.1.312MO$ - 0
Project Work Orders, Spec Item 3.2
A026ADProject Work Order Level 1, Spec Item 3.2.112MO$ - 0
A026AEProject Work Order Level 2, Spec Item 3.2.212MO$ - 0
A026AFProject Work Order Level 3, Spec Item 3.2.312MO$ - 0
Utility Operations Support, Spec Item 3.3
A026AGUtilities Mapping, Spec Item 3.3.112MO$ - 0
A026AHMeter Reading, Spec Item 3.3.212MO$ - 0
A026AJUtility Location Services, Spec Item 3.3.312MO$ - 0
Utility Infrastructure Condition Assessment (UICAP) Support, Spec Item 3.4
A026AKInventory Management, Spec Item 3.4.112MO$ - 0
A026ALCondition Assessment, Spec Item 3.4.212MO$ - 0
Utility Control Systems, Spec Item 3.5
A026AMUtility Control Systems, Spec Item 3.512MO$ - 0
A027NAVFAC Utilities - Specification 1602000 Electrical (UT), Spec Item 3
Recurring Work, Spec Item 3
A027AAOperate Electrical Power Distribution Systems, Spec Item 3.112MO$ - 0
A027ABPerform Integrated Maintenance Plan (IMP), Spec Item 3.212MO$ - 0
A028NAVFAC Utilities - Specification 1603000 Natural Gas (UT), Spec Item 3
Recurring Work, Spec Item 3
A028AAPerform Integrated Maintenance Program (IMP), Spec Item 3.112MO$ - 0
A029NAVFAC Utilities - Specification 1604000 Wastewater (UT), Spec Item 3
Recurring Work, Spec Item 3
A029AAOperate Wastewater Treatment Plant, Spec Items 3.1, 3.1.1, 3.1.2, 3.1.3, 3.1.412MO$ - 0
A029ABPerform Integrated Maintenance Program (IMP), Spec Item 3.2, 3.2.1, 3.2.2, 3.2.3, 3.2.412MO$ - 0
A029ACPerform Inspection Program for Manholes, Spec Item 3.3, 3.3.112MO$ - 0
A029ADPerform Inspection Program for Wet Wells, Spec Item 3.3, 3.3.212MO$ - 0
A029AEOther Recurring Services for Cleaning of Sewer Pipeline, Spec Item 3.4, 3.4.112MO$ - 0
A029AFOther Recurring Services for Wet Well Services, Spec Item 3.4, 3.4.2, 3.4.2.1, 3.4.2.212MO$ - 0
A030NAVFAC Utilities - Specification 1605000 Steam (UT), Spec Item 3
Recurring Work, Spec Item 3
A030AAOperate Steam Systems, Spec Item 3.1, 3.1.1, 3.1.2, 3.1.3, 3.1.4, 3.1.5, 3.1.612MO$ - 0
A030ABPerform Integrated Maintenance Program (IMP), Spec Item 3.2, 3.2.112MO$ - 0
A030ACPerform Certification Program for Power Boiler, HRSG’s and Unfired Pressure Vessels (UPV’s) Certification, Spec Item 3.3, 3.3.112MO$ - 0
A030ADOther Recurring Services for Boiler Bi-Annual Start-Up and Shutdown, Spec Item 3.4, 3.4.112MO$ - 0
A031NAVFAC Utilities - Specification 1606000 Water (UT), Spec Item 3
Recurring Work, Spec Item 3
A031AAOperate Water Treatment Plant, Spec Item 3.1, 3.1.1, 3.1.2, 3.1.312MO$ - 0
A031ABProvide PM for Water Storage and Distribution Systems, Spec Item 3.2, 3.2.112MO$ - 0
A031ACProvide PM for Fire Hydrants, Spec Item 3.2, 3.2.212MO$ - 0
A031ADProvide IMP for Water Treatment Plant, Spec Item 3.3, 3.3.112MO$ - 0
A032NAVFAC Utilities - Specification 1607000 Chiller Plant (UT), Spec Item 3
Recurring Work, Spec Item 3
A032AAOperate Chiller Plant, Spec Item 3.1, 3.1.1, 3.1.2, 3.1.3, 3.1.412MO$ - 0
A032ABProvide IMP for Chiller Plant, Spec Item 3.212MO$ - 0
A032ACProvide Other Recurring Services for Cooling Tower Water Testing and Treatment Services, Spec Item 3.3.112MO$ - 0
A032ADProvide Other Recurring Services for Eddy Current Test, Spec Item 3.3.212MO$ - 0
A033NAVFAC Utilities - Specification 1700000 Transportation (TR), Spec Item 3
A033AAFuel Delivery Services, Spec Item 3.1.512MO$ - 0
A034-A037Reserved
NAVFAC Utilities SUBTOTAL:$ - 0
NAVFAC Transportation - Recurring Work (ELIN A038)
A038NAVFAC Transportation - Specification 1700000 Transportation (TR), Spec Item 3
A038AABilling Services, Spec Item 3.112MO$ - 0
A038ABSupport Services, Spec Item 3.2, 3.2.1, 3.2.2, 3.2.2.1, 3.2.2.212MO$ - 0
A039-A041Reserved
NAVFAC Transportation SUBTOTAL:$ - 0
Naval Academy Business Services Division (NABSD) - Recurring Work (ELIN A042)
A042NABSD - Specification 1502000 Facility Investment (ST), Spec Item 3
A042AAEmergency Service Orders, Spec Item 3.1.112MO$ - 0
A042ABUrgent Service Orders, Spec Item 3.1.212MO$ - 0
A042ACRoutine Service Orders, Spec Item 3.1.312MO$ - 0
Project Work Orders, Spec Item 3.2
A042ADProject Work Order Level 1, Spec Item 3.2.112MO$ - 0
Other Recurring Services, Spec Item 3.6
A042AEOther Recurring Services for Exhaust Hoods and Ducts, Spec Item 3.6.212MO$ - 0
A042AFOther Recurring Services for Dryer Vent Cleaning, Spec Item 3.6.1012MO$ - 0

Naval Academy Business Services Division (NABSD) SUBTOTAL: $ - 0

TOTAL FOR LINE ITEM 0001 - BASE PERIOD - RECURRING WORK (ELINs A001 THROUGH A042) $ - 0

SECTION J

EXHIBIT A

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Fence Board Height of 6'

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.

PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.

IN ACCORDANCE WITH SECTION C, C.10.1.l

ELIN A001EW through A001FI

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.

Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.

Posts Set in Concrete/Asphalt.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.

Surface Depth to Match Surrounding.

Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.

Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.

Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered

Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.

IN ACCORDANCE WITH SECTION C, C.10.2

ELIN A001FJ

Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.

SECTION J

EXHIBIT A

PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.

IN ACCORDANCE WITH SECTION C, C.10.3

ELIN A001FK THROUGH A001FP

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Temporary Chain link Fence.

6' Fence Height Driven Posts

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, 6' Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, 6' Height, Free-Standing

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

With Barbwire, 7' Fence Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, With Barbwire, 7' Height

Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.

12' Panel, With Barbwire, 7' Height, Free-Standing

ELINs-Base Period-Non-Recurring

ATTACHMENT J-0200000-16
EXHIBIT LINE ITEM NUMBERS
SOLICITATION NO. N62470-16-R-5008
EXHIBIT A - BASE PERIOD - NON-RECURRING WORK
CLIN 0002
Non-Recurring Work Price - Base Period
PROVIDE PRICES TO PERFORMING NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4
ELINs A700 through A905
Part Number (ELIN)Part Name (Product) (120 Characters)ARO DaysPSC CodeLong Description (NTE 2,048)Unit PriceUnit of IssueEstimated QuantityExtended Price (Col. G x Col. I = Col. J)IMAP CAC
Specification 1502000 - Facility Investment
A700Interior Painting5Z1EBThe Contractor shall provide all labor, materials and equipment required to perform surface preparation, pre-painting, sanding, etching and finish painting of all interior surfaces specified. Surface preparation includes, but is not limited to wood, metal, sheetrock, concrete, and plaster. Related services shall include wall-papering, plastering, and dry-wall repair. The Contractor shall collect and dispose of all paint chips, dust, sand, and other waste paint materials resulting from any part of the painting process, IAW the Resource Conservation and Recovery Act and associated Federal, State, and local laws and regulations. All hazardous waste disposal shall be coordinated through the Government Representative. Work shall be ordered and priced in increments of 200 square feet (SF). Work shall be completed within the timeframe specified on the task order.
$0.00EA625$0.00
A701Furniture Move Incidental to Interior Painting5Z1EBThe Contractor shall provide all labor, materials, and equipment required to move furniture incidental to interior painting. Provide unit pricing such that each unit consists of five (5) pieces of furniture. A cubical shall be considered a single piece of furniture. Work shall be completed within the timeframe specified on the task order.
$0.00EA200$0.00
A702Exterior Painting5Z1EBThe Contractor shall provide all labor, materials and equipment required to perform surface preparation, pre-painting, sanding, etching and finish painting of all exterior surfaces specified. Surface preparation includes, but is not limited to wood, metal, concrete, and plaster. The Contractor shall collect and dispose of all paint chips, dust, sand, and other waste paint materials resulting from any part of the painting process, IAW the Resource Conservation and Recovery Act and associated Federal, State, and local laws and regulations. All hazardous waste disposal shall be coordinated through the Government Representative. Work shall be ordered with a minimum of 200 sf. Work shall be completed within the timeframe specified on the task order.$0.00SF200,000$0.00
A703Painting of Swimming Pools and Ornamental Fountains5Z1EBThe Contractor shall provide all labor, materials and equipment required to perform surface preparation, pre-painting, sanding, etching and finish painting of all surfaces specified. The Contractor shall collect and dispose of all paint chips, dust, sand, and other waste paint materials resulting from any part of the painting process, IAW the Resource Conservation and Recovery Act and associated Federal, State, and local laws and regulations. All hazardous waste disposal shall be coordinated through the Government Representative. Work shall be ordered per square foot (sf). Work shall be completed within the timeframe specified on the task order.$0.00SF12,000$0.00
A704Asbestos Material RemovalZ1EBThe Contractor shall provide all labor, materials and equipment required to perform asbestos material removal in accordance with State and Federal regulations, this includes an abatement plan that must be approved by the Government Representative. License and certification requirements are listed in Annex 1502000, Spec Item 2.2.1. Work shall be ordered per square feet (sf). Work shall be completed with the timeframe specified on the task order.
$0.00SF975$0.00
A705Lead Material RemovalZ1EBThe Contractor shall provide all labor, materials and equipment required to perform lead abatement in accordance with State and Federal regulations, this includes an abatement plan that must be approved by the Government Representative. License and certification requirements are listed in Annex 1502000, Spec Item 2.2.1. Work shall be ordered per square feet (sf). Work shall be completed with the timeframe specified on the task order.
$0.00SF750$0.00
A706Replace Suspended Ceiling Tile (2'x2')3Z1EBThe Contractor shall provide all labor, materials and equipment required to replace 2’x2’ lay-in suspended ceiling tiles for ceiling height up to 10 feet. The Contractor shall collect and dispose of all waste materials resulting from ceiling tile replacement. Work shall be ordered per tile, with a minimum of 16 ceiling tiles. Work shall be completed within the timeframe specified on the task order.
$0.00EA2,000$0.00
A707Replace Suspended Ceiling Tile (2'x4')3Z1EBThe Contractor shall provide all labor, materials and equipment required to replace 2’x4’ lay-in suspended ceiling tiles for ceiling height up to 10 feet. The Contractor shall collect and dispose of all waste materials resulting from ceiling tile replacement. Work shall be ordered per tile, with a minimum of 8 ceiling tiles. Work shall be completed within the timeframe specified on the task order.
$0.00EA2,000$0.00
A708Replace Suspended Ceiling Grid, Cross Tee 4'3Z1EBThe Contractor shall provide all labor, materials and equipment required to replace suspended ceiling grid cross tee for ceiling height up to 10 feet. The Contractor shall collect and dispose of all waste materials resulting from suspended grid replacement. Work shall be completed within the timeframe specified on the task order.$0.00EA2,000$0.00
A709Replace Suspended Ceiling Grid, Cross Tee 2'3Z1EBThe Contractor shall provide all labor, materials and equipment required to replace suspended ceiling grid cross tee for ceiling height up to 10 feet. The Contractor shall collect and dispose of all waste materials resulting from suspended grid replacement. Work shall be completed within the timeframe specified on the task order.$0.00EA2,000$0.00
A710Replace Suspended Ceiling Grid, Main Runner3Z1EBThe Contractor shall provide all labor, materials and equipment required to replace suspended ceiling grid main runner for ceiling height up to 10 feet. The Contractor shall collect and dispose of all waste materials resulting from suspended grid replacement. Work shall be completed within the timeframe specified on the task order.
$0.00EA2,000$0.00
A711Carpet Replacement (26oz)10Z1EBThe Contractor shall provide all labor, materials and equipment required to install 26oz carpet for the areas designated in the task order. Carpet shall be replaced with the same quality, style, and color as currently installed unless otherwise designated in the task order. Work shall include removal and proper disposal of old carpet (including any padding, residual glue, tack strips, etc.) and proper installation of new carpet per manufacturer's instructions. Work shall be ordered per square yard (SY), with a minimum of 10 SY. Work shall be completed within the timeframe specified on the task order.$0.00SY4,000$0.00
A712Carpet Replacement (32oz)10Z1EBhe Contractor shall provide all labor, materials and equipment required to install 32oz carpet for the areas designated in the task order. Carpet shall be replaced with the same quality, style, and color as currently installed unless otherwise designated in the task order. Work shall include removal and proper disposal of old carpet (including any padding, residual glue, tack strips, etc.) and proper installation of new carpet per manufacturer's instructions. Work shall be ordered per square yard (SY), with a minimum of 10 SY. Work shall be completed within the timeframe specified on the task order.$0.00SY2,000$0.00
A713Carpet Replacement (45oz)10Z1EBThe Contractor shall provide all labor, materials and equipment required to install 45oz carpet for the areas designated in the task order. Carpet shall be replaced with the same quality, style, and color as currently installed unless otherwise designated in the task order. Work shall include removal and proper disposal of old carpet (including any padding, residual glue, tack strips, etc.) and proper installation of new carpet per manufacturer's instructions. Work shall be ordered per square yard (SY), with a minimum of 10 SY. Work shall be completed within the timeframe specified on the task order$0.00SY1,500$0.00
A714Furniture Move Incidental to Carpet Replacement5Z1EBThe Contractor shall provide all labor, materials, and equipment required to move furniture incidental to carpet replacement. Provide unit pricing such that each unit consists of five (5) pieces of furniture. A cubical shall be considered a single piece of furniture. Work shall be completed within the timeframe specified on the task order.
$0.00EA200$0.00
A715Replace Vinyl Floor Tile5Z1EBThe Contractor shall provide all labor, materials and equipment required to install vinyl tile flooring for the areas designated in the task order. Vinyl shall be replaced with the same quality, style, and color as currently installed unless otherwise designated in the task order. Work shall include removal and proper disposal of old vinyl and proper installation of new vinyl per manufacturer's instructions. Work shall be ordered per square feet (sf), with a minimum of 50 sf. Work shall be completed within the timeframe specified on the task order.$0.00SF8,000$0.00
A716Replace 4" Vinyl Cove Base5Z1EBThe Contractor shall provide all labor, materials and equipment required to install 4” vinyl cove base for the areas designated in the task order. Cove base shall be replaced with the same quality, style, and color as currently installed unless otherwise designated in the task order. Work shall include removal and proper disposal of old cove base, patching or repair of any damaged wall surface, and proper installation of new cove base per manufacturer's instructions. Work shall be ordered with a minimum of 30 LF. Work shall be completed within the timeframe specified on the task order.$0.00LF5,000$0.00
A717Replace 6" Vinyl Cove Base5Z1EBThe Contractor shall provide all labor, materials and equipment required to install 6” vinyl cove base for the areas designated in the task order. Cove base shall be replaced with the same quality, style, and color as currently installed unless otherwise designated in the task order. Work shall include removal and proper disposal of old cove base, patching or repair of any damaged wall surface, and proper installation of new cove base per manufacturer's instructions. Work shall be ordered with a minimum of 30 LF. Work shall be completed within the timeframe specified on the task order.$0.00LF5,000$0.00
A718Repair Backflow Preventer:
1/4 Inch5S114The Contractor shall provide all labor, materials and equipment required to repair and test failed 1/4 Inch backflow preventer, to include material, test report and testing form. Work shall be completed within the timeframe specified on the task order.
$0.00EA20$0.00
A719Repair Backflow Preventer:
3/8 Inch5S114The Contractor shall provide all labor, materials and equipment required to repair and test failed 3/8 Inch backflow preventer, to include material, test report and testing form. Work shall be completed within the timeframe specified on the task order.
$0.00EA20$0.00
A720Repair Backflow Preventer:
1/2 Inch5S114The Contractor shall provide all labor, materials and equipment required to repair and test failed 1/2 Inch backflow preventer, to include material, test report and testing form. Work shall be completed within the timeframe specified on the task order.
$0.00EA20$0.00
A721Repair Backflow Preventer:
3/4 Inch5S114The Contractor shall provide all labor, materials and equipment required to repair and test failed 3/4 Inch backflow preventer, to include material, test report and testing form. Work shall be completed within the timeframe specified on the task order.
$0.00EA20$0.00
A722Repair Backflow Preventer:
1 Inch5S114The Contractor shall provide all labor, materials and equipment required to repair and test failed 1 Inch backflow preventer, to include material, test report and testing form. Work shall be completed within the timeframe specified on the task order.
$0.00EA20$0.00
A723Repair Backflow Preventer:
1-1/4 Inch5S114The Contractor shall provide all labor, materials and equipment required to repair and test failed 1-1/4 Inch backflow preventer, to include material, test report and testing form. Work shall be completed within the timeframe specified on the task order.
$0.00EA20$0.00
A724Repair Backflow Preventer:
1-1/2 Inch5S114The Contractor shall provide all labor, materials and equipment required to repair and test failed 1-1/2 Inch backflow preventer, to include material, test report and testing form. Work shall be completed within the timeframe specified on the task order.
$0.00EA20$0.00
A725Repair Backflow Preventer:
2 Inch5S114The Contractor shall provide all labor, materials and equipment required to repair and test failed 2 Inch backflow preventer, to include material, test report and testing form. Work shall be completed within the timeframe specified on the task order.
$0.00EA20$0.00
A726Repair Backflow Preventer:
2-1/2 Inch5S114The Contractor shall provide all labor, materials and equipment required to repair and test failed 2-1/2 Inch backflow preventer, to include material, test report and testing form. Work shall be completed within the timeframe specified on the task order.
$0.00EA20$0.00
A727Repair Backflow Preventer:
3 Inch5S114The Contractor shall provide all labor, materials and equipment required to repair and test failed 3 Inch backflow preventer, to include material, test report and testing form. Work shall be completed within the timeframe specified on the task order.
$0.00EA20$0.00
A728Repair Backflow Preventer:
4 Inch5S114The Contractor shall provide all labor, materials and equipment required to repair and test failed 4 Inch backflow preventer, to include material, test report and testing form. Work shall be completed within the timeframe specified on the task order.
$0.00EA20$0.00
A729Repair Backflow Preventer:
6 Inch5S114The Contractor shall provide all labor, materials and equipment required to repair and test failed 6 Inch backflow preventer, to include material, test report and testing form. Work shall be completed within the timeframe specified on the task order.
$0.00EA20$0.00
A730Repair Backflow Preventer:
8 Inch5S114The Contractor shall provide all labor, materials and equipment required to repair and test failed 8 Inch backflow preventer, to include material, test report and testing form. Work shall be completed within the timeframe specified on the task order.
$0.00EA20$0.00
A731Repair Backflow Preventer:
10 Inch5S114The Contractor shall provide all labor, materials and equipment required to repair and test failed 10 Inch backflow preventer, to include material, test report and testing form. Work shall be completed within the timeframe specified on the task order.
$0.00EA20$0.00
A732Replace Backflow Preventer:
1/4 Inch5S114The Contractor shall provide all labor, materials and equipment required to replace and test failed 1/4 Inch backflow preventer, after repair attempt, to include materials, acceptable replacement, test report and testing form. Work shall be completed within the timeframe specified on the task order.
$0.00EA20$0.00
A733Replace Backflow Preventer:
3/8 Inch5S114The Contractor shall provide all labor, materials and equipment required to replace and test failed 3/8 Inch backflow preventer, after repair attempt, to include materials, acceptable replacement, test report and testing form. Work shall be completed within the timeframe specified on the task order.
$0.00EA20$0.00
A734Replace Backflow Preventer:
1/2 Inch5S114The Contractor shall provide all labor, materials and equipment required to replace and test failed 1/2 Inch backflow preventer, after repair attempt, to include materials, acceptable replacement, test report and testing form. Work shall be completed within the timeframe specified on the task order.
$0.00EA20$0.00
A735Replace Backflow Preventer:
3/4 Inch5S114The Contractor shall provide all labor, materials and equipment required to replace and test failed 3/4 Inch backflow preventer, after repair attempt, to include materials, acceptable replacement, test report and testing form. Work shall be completed within the timeframe specified on the task order.
$0.00EA20$0.00
A736Replace Backflow Preventer:
1 Inch5S114The Contractor shall provide all labor, materials and equipment required to replace and test failed 1 Inch backflow preventer, after repair attempt, to include materials, acceptable replacement, test report and testing form. Work shall be completed within the timeframe specified on the task order.
$0.00EA20$0.00
A737Replace Backflow Preventer:
1-1/4 Inch5S114The Contractor shall provide all labor, materials and equipment required to replace and test failed 1-1/4 Inch backflow preventer, after repair attempt, to include materials, acceptable replacement, test report and testing form. Work shall be completed within the timeframe specified on the task order.
$0.00EA20$0.00
A738Replace Backflow Preventer:
1-1/2 Inch5S114The Contractor shall provide all labor, materials and equipment required to replace and test failed 1-1/2 Inch backflow preventer, after repair attempt, to include materials, acceptable replacement, test report and testing form. Work shall be completed within the timeframe specified on the task order.
$0.00EA20$0.00
A739Replace Backflow Preventer:
2 Inch5S114The Contractor shall provide all labor, materials and equipment required to replace and test failed 2 Inch backflow preventer, after repair attempt, to include materials, acceptable replacement, test report and testing form. Work shall be completed within the timeframe specified on the task order.
$0.00EA20$0.00
A740Replace Backflow Preventer:
2-1/2 Inch5S114The Contractor shall provide all labor, materials and equipment required to replace and test failed 2-1/2 Inch backflow preventer, after repair attempt, to include materials, acceptable replacement, test report and testing form. Work shall be completed within the timeframe specified on the task order.
$0.00EA20$0.00
A741Replace Backflow Preventer:
3 Inch5S114The Contractor shall provide all labor, materials and equipment required to replace and test failed 3 Inch backflow preventer, after repair attempt, to include materials, acceptable replacement, test report and testing form. Work shall be completed within the timeframe specified on the task order.
$0.00EA20$0.00
A742Replace Backflow Preventer:
4 Inch5S114The Contractor shall provide all labor, materials and equipment required to replace and test failed 4 Inch backflow preventer, after repair attempt, to include materials, acceptable replacement, test report and testing form. Work shall be completed within the timeframe specified on the task order.
$0.00EA20$0.00
A743Replace Backflow Preventer:
6 Inch5S114The Contractor shall provide all labor, materials and equipment required to replace and test failed 6 Inch backflow preventer, after repair attempt, to include materials, acceptable replacement, test report and testing form. Work shall be completed within the timeframe specified on the task order.
$0.00EA20$0.00
A744Replace Backflow Preventer:
8 Inch5S114The Contractor shall provide all labor, materials and equipment required to replace and test failed 8 Inch backflow preventer, after repair attempt, to include materials, acceptable replacement, test report and testing form. Work shall be completed within the timeframe specified on the task order.
$0.00EA20$0.00
A745Replace Backflow Preventer:
10 Inch5S114The Contractor shall provide all labor, materials and equipment required to replace and test failed 10 Inch backflow preventer, after repair attempt, to include materials, acceptable replacement, test report and testing form. Work shall be completed within the timeframe specified on the task order.
$0.00EA20$0.00
A746Replace Sprinkler Heads - Dry Pipe System5S216The Contractor shall provide all labor, materials and equipment required to remove and replace sprinkler heads and escutcheon plates of the dry pipe system (fire suppression system) in accordance with UFC 3-601-02, EM-385-1-1, NFPA 25, and NFPA 101. The Contractor shall also replace the accelerator and trim on the dry system. The Contractor shall provide for daily outage communications with the installation Fire Department and shall complete a final hydrostatic inspection with the installation Fire Marshall. The Contractor supply manuals, instructions, and literature accompanying equipment upon job completion. Work shall be priced for 10 dry type sprinkler heads to be replaced per order. Work shall be completed within the timeframe specified on the task order.
$0.00EA100$0.00

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .