J-0200000-16_Exhibit_Line_Item_Numbers_Amend_12.xlsx
XLSX spreadsheet 300 KB Posted
- Solicitation number
- N6247016R5008
About this file
This document is an exhibit to a solicitation for base operations support (BOS) services at Naval Support Activity Annapolis, Maryland, including services at the United States Naval Academy. The solicitation requires a range of facility services including facility management, facility investment, pest control, solid waste management, pavement clearance, special events, transportation, and unit priced labor. Recurring services include infrastructure assessment, control systems, various types of service orders and project work orders, preventive maintenance programs, inspections and certifications. Non-recurring work includes tasks such as interior and exterior painting, carpet replacement, backflow preventer repairs and replacements, variable frequency drive replacements, direct digital control system component replacements, and water main installations and replacements. Pricing is line item based with estimated quantities provided for evaluation purposes.
J-0200000-16_Exhibit_Line_Item_Numbers_Amend_12.xlsx
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ELINs-Base Period-Recurring
| ATTACHMENT J-0200000-16_Amendment 0012 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION NO. N62470-16-R-5008 |
| EXHIBIT A - BASE PERIOD - RECURRING WORK |
| CLIN 0001 |
| Recurring Work Price - Base Period | |||||
| PROVIDE PRICES TO PERFORMING FACILITY SERVICES RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 3 | |||||
| ELINs A001 through A042 | |||||
| ELIN / Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Total |
| Region (Naval District Washington) - Recurring Work (ELINs A001 through A005) | |||||
| A001 | Region - Specification 1501000 Facility Management (FP), Spec Item 3 | ||||
| A001AA | Infrastructure Condition Assessment Program (ICAP), Spec Item 3.1, 3.1.1, 3.1.2 | 12 | MO | $ - 0 | |
| A001AB | Control Systems, Spec Item 3.2, 3.2.1 | 12 | MO | $ - 0 | $ - 0 |
| A002 | Region - Specification 1502000 Facility Investment (ST), Spec Item 3 | ||||
| Service Orders, Spec Item 3.1 | |||||
| A002AA | Emergency Service Orders, Spec Item 3.1.1 | 12 | MO | $ - 0 | $ - 0 |
| A002AB | Urgent Service Orders, Spec Item 3.1.2 | 12 | MO | $ - 0 | $ - 0 |
| A002AC | Routine Service Orders, Spec Item 3.1.3 | 12 | MO | $ - 0 | $ - 0 |
| Project Work Orders, Spec Item 3.2 | |||||
| A002AD | Project Work Order Level 1, Spec Item 3.2.1 | 12 | MO | $ - 0 | $ - 0 |
| A002AE | Project Work Order Level 2, Spec Item 3.2.2 | 12 | MO | $ - 0 | $ - 0 |
| Preventive Maintenance Program (PM), Spec Item 3.3 | |||||
| A002AF | PM for HVAC and Refrigeration Systems, Spec Item 3.3.1 | 12 | MO | $ - 0 | $ - 0 |
| A002AG | PM for Interior and Exterior Lighting Systems, Spec Item 3.3.2 | 12 | MO | $ - 0 | $ - 0 |
| A002AH | Conversion for Interior and Exterior Lighting Systems to LED, Spec Item 3.3.2 | 12 | MO | $ - 0 | $ - 0 |
| A002AJ | PM for Boilers and Unfired Pressure Vessels (UPVs), Spec Item 3.3.3 | 12 | MO | $ - 0 | $ - 0 |
| A002AK | PM for Weight Handling Equipment (WHE), Spec Item 3.3.4 | 12 | MO | $ - 0 | $ - 0 |
| A002AL | PM for Fire Protection Systems, Spec Item 3.3.6 | 12 | MO | $ - 0 | $ - 0 |
| A002AM | PM for Vertical Transportation Equipment (VTE), Spec Item 3.3.7 | 12 | MO | $ - 0 | $ - 0 |
| A002AN | PM for POL System Facilities and Distribution Systems, Spec Item 3.3.8 | 12 | MO | $ - 0 | $ - 0 |
| A002AP | PM for Emergency Eyewash Stations, Spec Item 3.3.9 | 12 | MO | $ - 0 | $ - 0 |
| A002AQ | PM for Swimming Pools and Ornamental Fountains, Spec Item 3.3.10 | 12 | MO | $ - 0 | $ - 0 |
| A002AR | PM for Food Service Equipment, Spec Item 3.3.11 | 12 | MO | $ - 0 | $ - 0 |
| A002AS | PM for Chapel Organs, Spec Item 3.3.12 | 12 | MO | $ - 0 | $ - 0 |
| A002AT | PM for Uninterrupted Power Systems (UPS), Spec Item 3.3.13 | 12 | MO | $ - 0 | $ - 0 |
| A002AU | PM for Motorized Gates, Spec Item 3.3.14 | 12 | MO | $ - 0 | $ - 0 |
| A002AV | PM for Roll up Doors and Windows, Spec Item 3.3.15 | 12 | MO | $ - 0 | $ - 0 |
| A002AW | PM for Emergency and Exit Lighting, Spec Item 3.3.16 | 12 | MO | $ - 0 | $ - 0 |
| A002AX | PM for Automated Doors, Spec Item 3.3.17 | 12 | MO | $ - 0 | $ - 0 |
| A002AY | PM for Cathodic Protection Systems, Spec Item 3.3.18 | 12 | MO | $ - 0 | $ - 0 |
| A002AZ | PM for Baler Equipment, Spec Item 3.3.19 | 12 | MO | $ - 0 | $ - 0 |
| A002BA | PM for Pumps, Spec Item 3.3.23 | 12 | MO | $ - 0 | $ - 0 |
| A002BB | PM for Auxiliary Generators , Spec Item 3.3.24 | 12 | MO | $ - 0 | $ - 0 |
| A002BC | PM for Direct Digital Control (DDC) Systems, Spec Item 3.3.26 | 12 | MO | $ - 0 | $ - 0 |
| A002BD | PM for Compressed Air Systems, Spec Item 3.3.27 | 12 | MO | $ - 0 | $ - 0 |
| A002BE | PM for Keyless Entry Systems, Spec Item 3.3.28 | 12 | MO | $ - 0 | $ - 0 |
| Inspection, Testing and Certification, Spec Item 3.5 | |||||
| A002BF | Inspection, Testing and Certification for Boilers and UPVs, Spec Item 3.5.1 | 12 | MO | $ - 0 | $ - 0 |
| A002BG | Inspection, Testing and Certification for Weight Handling Equipment (WHE), Spec Item 3.5.2 | 12 | MO | $ - 0 | $ - 0 |
| A002BH | Inspection, Testing and Certification for Roof Inspection, Spec Item 3.5.4 | 12 | MO | $ - 0 | $ - 0 |
| A002BJ | Inspection, Testing and Certification for Vertical Transportation Equipment (VTE), Spec Item 3.5.5 | 12 | MO | $ - 0 | $ - 0 |
| A002BK | Inspection, Testing and Certification for Emergency and Exit Lighting, Spec Item 3.5.6 | 12 | MO | $ - 0 | $ - 0 |
| A002BL | Inspection, Testing and Certification for Fire Doors and Fire Walls Inspections, Spec Item 3.5.7 | 12 | MO | $ - 0 | $ - 0 |
| A002BM | Inspection, Testing and Certification for POL System Facilities and Distribution Systems, Spec Item 3.5.12 | 12 | MO | $ - 0 | $ - 0 |
| Other Recurring Services, Spec Item 3.6 | |||||
| A002BN | Other Recurring Services for Grease and Plaster Traps, Spec Item 3.6.1 | 12 | MO | $ - 0 | $ - 0 |
| A002BP | Other Recurring Services for Exhaust Hoods and Ducts, Spec Item 3.6.2 | 12 | MO | $ - 0 | $ - 0 |
| A002BQ | Other Recurring Services for HVAC Seasonal Start-Up and Shutdown, Spec Item 3.6.3 | 12 | MO | $ - 0 | $ - 0 |
| A002BR | Other Recurring Services for HVAC Water Testing and Treatment Services, Spec Item 3.6.4 | 12 | MO | $ - 0 | $ - 0 |
| A002BS | Other Recurring Services for Boiler Seasonal Start-Up and Shutdown, Spec Item 3.6.5 | 12 | MO | $ - 0 | $ - 0 |
| A002BT | Other Recurring Services for Boiler Water Testing and Treatment Services, Spec Item 3.6.6 | 12 | MO | $ - 0 | $ - 0 |
| A002BU | Other Recurring Services for Fountain Seasonal Start-Up and Shutdown, Spec Item 3.6.7 | 12 | MO | $ - 0 | $ - 0 |
| A002BV | Other Recurring Services for Roof Drainage Systems, Spec Item 3.6.8 | 12 | MO | $ - 0 | $ - 0 |
| A002BW | Other Recurring Services for Dryer Vent Cleaning, Spec Item 3.6.10 | 12 | MO | $ - 0 | $ - 0 |
| A002BX | Other Recurring Services for Mechanical Equipment Room Monitoring, Spec Item 3.6.11 | 12 | MO | $ - 0 | $ - 0 |
| A002BY | Other Recurring Services for Oil Water Separators, Spec Item 3.6.12 | 12 | MO | $ - 0 | $ - 0 |
| A002BZ | Other Recurring Services for Mechanical Space Cleaning and Maintenance, Spec Item 3.6.18 | 12 | MO | $ - 0 | $ - 0 |
| A002CA | Other Recurring Services for Storm Drainage Systems, Spec Item 3.6.24 | 12 | MO | $ - 0 | $ - 0 |
| A002CB | Other Recurring Services for Maintain Stormwater Best Management Practices (BMP), Spec Item 3.6.25 | 12 | MO | $ - 0 | $ - 0 |
| A003 | Region - Specification 1503020 Pest Control (FX), COL 3 Base Measures, Spec Item 3 | ||||
| A003AA | Scheduled Pest Control Services, Spec Item 3.1 | 12 | MO | $ - 0 | $ - 0 |
| A003AB | Unscheduled Pest Control Services, Spec Item 3.2 | 12 | MO | $ - 0 | $ - 0 |
| A003AC | Pest Management Reporting, Spec Item 3.3 | 12 | MO | $ - 0 | $ - 0 |
| A004 | Region - Specification 1503030 Integrated Solid Waste Management (ISWM) (FX), Spec Item 3 | ||||
| A004AA | Solid Waste Collection, Spec Item 3.1 | 12 | MO | $ - 0 | $ - 0 |
| A005 | Region - Specification 1503060 Pavement Clearance (FX), Spec Item 3 | ||||
| A005AA | Pavement Sweeping Services, Spec Item 3.1 | 12 | MO | $ - 0 | $ - 0 |
| A005AB | Snow and Ice Removal, Spec Item 3.2 | 12 | MO | $ - 0 | $ - 0 |
| A006-A009 | Reserved | ||||
| Region SUBTOTAL: | $ - 0 |
| Naval Academy (USNA) - Recurring Work (ELINs A010 through A012) | |||||
| A010 | Naval Academy - Specification 1502000 Facility Investment (ST), Spec Item 3 | ||||
| Service Orders, Spec Item 3.1 | |||||
| A010AA | Emergency Service Orders, Spec Item 3.1.1 | 12 | MO | $ - 0 | $ - 0 |
| A010AB | Urgent Service Orders, Spec Item 3.1.2 | 12 | MO | $ - 0 | $ - 0 |
| A010AC | Routine Service Orders, Spec Item 3.1.3 | 12 | MO | $ - 0 | $ - 0 |
| Project Work Orders, Spec Item 3.2 | |||||
| A010AD | Project Work Order Level 1, Spec Item 3.2.1 | 12 | MO | $ - 0 | $ - 0 |
| Preventive Maintenance Program (PM), Spec Item 3.3 | |||||
| A010AE | PM for Weight Handling Equipment (WHE), Spec Item 3.3.4 | 12 | MO | $ - 0 | $ - 0 |
| A010AF | PM for Lightning Arrestors and Grounding Devices, Spec Item 3.3.5 | 12 | MO | $ - 0 | $ - 0 |
| A010AG | PM for Food Service Equipment, Spec Item 3.3.11 | 12 | MO | $ - 0 | $ - 0 |
| A010AH | PM for Sports Nets, Spec Item 3.3.21 | 12 | MO | $ - 0 | $ - 0 |
| A010AJ | PM for Rifle, Pistol and Pellet Ranges, Spec Item 3.3.25 | 12 | MO | $ - 0 | $ - 0 |
| Inspection, Testing and Certification, Spec Item 3.5 | |||||
| A010AK | Inspection, Testing and Certification for Weight Handling Equipment (WHE), Spec Item 3.5.2 | 12 | MO | $ - 0 | $ - 0 |
| Other Recurring Services, Spec Item 3.6 | |||||
| A010AL | Other Recurring Services for Flood Control, Spec Item 3.6.9 | 12 | MO | $ - 0 | $ - 0 |
| A010AM | Other Recurring Services for Class of “32” Monument maintenance, Spec Item 3.6.13 | 12 | MO | $ - 0 | $ - 0 |
| A010AN | Other Recurring Services for Sports Nets and Wind Screens, Spec Item 3.6.14 | 12 | MO | $ - 0 | $ - 0 |
| A010AP | Other Recurring Services for Skylight Cleaning, Spec Item 3.6.15 | 12 | MO | $ - 0 | $ - 0 |
| A010AQ | Other Recurring Services for Inspect and Repair Bird Screens, Spec Item 3.6.16 | 12 | MO | $ - 0 | $ - 0 |
| A010AR | Other Recurring Services for Exterior Surface Cleaning, Spec Item 3.6.17 | 12 | MO | $ - 0 | $ - 0 |
| A010AS | Other Recurring Services for Park Bench Maintenance, Spec Item 3.6.19 | 12 | MO | $ - 0 | $ - 0 |
| A010AT | Other Recurring Services for Rowing Tank Cleaning, Spec Item 3.6.21 | 12 | MO | $ - 0 | $ - 0 |
| A010AU | Other Recurring Services for Irrigation System Seasonal Start-Up and Shutdown, Spec Item 3.6.26 | 12 | MO | $ - 0 | $ - 0 |
| A011 | Naval Academy - Specification 1503070 Special Events, Spec Item 3 | ||||
| A011AA | Special Event Categories, Spec Item 3.1.1 | 12 | MO | $ - 0 | $ - 0 |
| A011AB | Special Event Service Orders, Spec Item 3.1.2 | 12 | MO | $ - 0 | $ - 0 |
| A011AC | Port-A-Pot Rental Services, Spec Item 3.1.3 | 12 | MO | $ - 0 | $ - 0 |
| A012 | Naval Academy - Specification 1700000 Transportation, Spec Item 3 | ||||
| A012AA | Tow Truck Services, Spec Item 3.1.2 | 12 | MO | $ - 0 | $ - 0 |
| A012AB | Shuttle and School Bus Service, Spec Item 3.1.3 | 12 | MO | $ - 0 | $ - 0 |
| A012AC | WHE Services, Spec Item 3.1.4 | 12 | MO | $ - 0 | $ - 0 |
| A013-A015 | Reserved | ||||
| NAVAL ACADEMY SUBTOTAL: | $ - 0 |
| BUMED - Recurring Work (ELINs A016 through A019) | |||||
| A016 | BUMED - Specification 1501000 Facility Management (FP), Spec Item 3 | ||||
| A016AA | Infrastructure Condition Assessment Program (ICAP), Spec Item 3.1, 3.1.1, 3.1.2 | 12 | MO | $ - 0 | $ - 0 |
| A016AB | Control Systems, Spec Item 3.2, 3.2.1 | 12 | MO | $ - 0 | $ - 0 |
| A017 | BUMED - Specification 1502000 Facility Investment (ST), Spec Item 3 | ||||
| Service Orders, Spec Item 3.1 | |||||
| A017AA | Emergency Service Orders, Spec Item 3.1.1 | 12 | MO | $ - 0 | $ - 0 |
| A017AB | Urgent Service Orders, Spec Item 3.1.2 | 12 | MO | $ - 0 | $ - 0 |
| A017AC | Routine Service Orders, Spec Item 3.1.3 | 12 | MO | $ - 0 | $ - 0 |
| Project Work Orders, Spec Item 3.2 | |||||
| A017AD | Project Work Order Level 1, Spec Item 3.2.1 | 12 | MO | $ - 0 | $ - 0 |
| A017AE | Project Work Order Level 2, Spec Item 3.2.2 | 12 | MO | $ - 0 | $ - 0 |
| Preventive Maintenance Program (PM), Spec Item 3.3 | |||||
| A017AF | PM for Interior and Exterior Lighting Systems, Spec Item 3.3.2 | 12 | MO | $ - 0 | $ - 0 |
| A017AG | PM for Uninterrupted Power Systems (UPS), Spec Item 3.3.13 | 12 | MO | $ - 0 | $ - 0 |
| A017AH | PM for Roll up Doors and Windows, Spec Item 3.3.15 | 12 | MO | $ - 0 | $ - 0 |
| A017AJ | PM for Emergency and Exit Lighting, Spec Item 3.3.16 | 12 | MO | $ - 0 | $ - 0 |
| A017AK | PM for Automated Doors, Spec Item 3.3.17 | 12 | MO | $ - 0 | $ - 0 |
| A017AL | PM for Photovoltaic Energy Systems, Spec Item 3.3.20 | 12 | MO | $ - 0 | $ - 0 |
| A017AM | PM for Solar Water Heating System, Spec Item 3.3.22 | 12 | MO | $ - 0 | $ - 0 |
| A017AN | PM for Pumps, Spec Item 3.3.23 | 12 | MO | $ - 0 | $ - 0 |
| Integrated Maintenance Program (IMP), Spec Item 3.4 | |||||
| A017AP | IMP for HVAC and Refrigeration Systems, Spec Item 3.4.1 | 12 | MO | $ - 0 | $ - 0 |
| A017AQ | IMP for Boilers and UPVs, Spec Item 3.4.2 | 12 | MO | $ - 0 | $ - 0 |
| A017AR | IMP for Closed Circuit Security Surveillance Systems, Spec Item 3.4.3 | 12 | MO | $ - 0 | $ - 0 |
| A017AS | IMP for Fire Protection Systems, Spec Item 3.4.4 | 12 | MO | $ - 0 | $ - 0 |
| A017AT | IMP for Compressed Air and Medical Air, Gas & Vacuum Systems, Spec Item 3.4.5 | 12 | MO | $ - 0 | $ - 0 |
| A017AU | IMP for Vertical Transportation Equipment (VTE), Spec Item 3.4.6 | 12 | MO | $ - 0 | $ - 0 |
| A017AV | IMP for Automated Doors, Spec Item 3.4.7 | 12 | MO | $ - 0 | $ - 0 |
| A017AW | IMP for Chillers and Distribution System, Spec Item 3.4.8 | 12 | MO | $ - 0 | $ - 0 |
| A017AX | IMP for Isolation Rooms, Spec Item 3.4.9 | 12 | MO | $ - 0 | $ - 0 |
| A017AY | IMP for Keyless Entry Systems, Spec Item 3.4.10 | 12 | MO | $ - 0 | $ - 0 |
| A017AZ | IMP for Roll-up Doors and Windows, Spec Item 3.4.11 | 12 | MO | $ - 0 | $ - 0 |
| A017BA | IMP for Motorized Gates, Spec Item 3.4.12 | 12 | MO | $ - 0 | $ - 0 |
| A017BB | IMP for Public Announcement (PA) System, Spec Item 3.4.13 | 12 | MO | $ - 0 | $ - 0 |
| Inspection, Testing and Certification, Spec Item 3.5 | |||||
| A017BC | Inspection, Testing and Certification for Boilers and UPVs, Spec Item 3.5.1 | 12 | MO | $ - 0 | $ - 0 |
| A017BD | Inspection, Testing and Certification for Backflow Prevention Devices, Spec Item 3.5.3 | 12 | MO | $ - 0 | $ - 0 |
| A017BE | Inspection, Testing and Certification for Roof Inspection, Spec Item 3.5.4 | 12 | MO | $ - 0 | $ - 0 |
| A017BF | Inspection, Testing and Certification for Vertical Transportation Equipment (VTE), Spec Item 3.5.5 | 12 | MO | $ - 0 | $ - 0 |
| A017BG | Inspection, Testing and Certification for Emergency and Exit Lighting, Spec Item 3.5.6 | 12 | MO | $ - 0 | $ - 0 |
| A017BH | Inspection, Testing and Certification for Fire Doors and Fire Walls Inspections, Spec Item 3.5.7 | 12 | MO | $ - 0 | $ - 0 |
| A017BJ | Inspection, Testing and Certification for Public Announcement (PA) System, Spec Item 3.5.8 | 12 | MO | $ - 0 | $ - 0 |
| A017BK | Inspection, Testing and Certification for Medical Air, Gas & Vacuum Systems, Spec Item 3.5.9 | 12 | MO | $ - 0 | $ - 0 |
| A017BL | Inspection, Testing and Certification for Air Flow Monitoring, Spec Item 3.5.10 | 12 | MO | $ - 0 | $ - 0 |
| A017BM | Inspection, Testing and Certification for Electrical Receptacles, Spec Item 3.5.11 | 12 | MO | $ - 0 | $ - 0 |
| Other Recurring Services, Spec Item 3.6 | |||||
| A017BN | Other Recurring Services for Grease and Plaster Traps, Spec Item 3.6.1 | 12 | MO | $ - 0 | $ - 0 |
| A017BP | Other Recurring Services for Exhaust Hoods and Ducts, Spec Item 3.6.2 | 12 | MO | $ - 0 | $ - 0 |
| A017BQ | Other Recurring Services for HVAC Seasonal Start-Up and Shutdown, Spec Item 3.6.3 | 12 | MO | $ - 0 | $ - 0 |
| A017BR | Other Recurring Services for HVAC Water Testing and Treatment Services, Spec Item 3.6.4 | 12 | MO | $ - 0 | $ - 0 |
| A017BS | Other Recurring Services for Boiler Seasonal Start-Up and Shutdown, Spec Item 3.6.5 | 12 | MO | $ - 0 | $ - 0 |
| A017BT | Other Recurring Services for Boiler Water Testing and Treatment Services, Spec Item 3.6.6 | 12 | MO | $ - 0 | $ - 0 |
| A017BU | Other Recurring Services for Roof Drainage Systems, Spec Item 3.6.8 | 12 | MO | $ - 0 | $ - 0 |
| A017BV | Other Recurring Services for Mechanical Equipment Room Monitoring, Spec Item 3.6.11 | 12 | MO | $ - 0 | $ - 0 |
| A017BW | Other Recurring Services for Plans, Files and Drawing Updates, Spec Item 3.6.22 | 12 | MO | $ - 0 | $ - 0 |
| A017BX | Other Recurring Services for Controlled Inspection Program, Spec Item 3.6.23 | 12 | MO | $ - 0 | $ - 0 |
| A017BY | Other Recurring Services for Irrigation System Seasonal Start-Up and Shutdown, Spec Item 3.6.26 | 12 | MO | $ - 0 | $ - 0 |
| A018 | BUMED - Specification 1503020 Pest Control (FX), COL 3 Base Measures, Spec Item 3 | ||||
| A018AA | Scheduled Pest Control Services, Spec Item 3.1 | 12 | MO | $ - 0 | $ - 0 |
| A018AB | Unscheduled Pest Control Services, Spec Item 3.2 | 12 | MO | $ - 0 | $ - 0 |
| A018AC | Pest Management Reporting, Spec Item 3.3 | 12 | MO | $ - 0 | $ - 0 |
| A019 | BUMED - Specification 1503060 Pavement Clearance (FX), Spec Item 3 | ||||
| A019AA | Pavement Sweeping Services, Spec Item 3.1 | 12 | MO | $ - 0 | $ - 0 |
| A019AB | Snow and Ice Removal, Spec Item 3.2 | 12 | MO | $ - 0 | $ - 0 |
| A020-A023 | Reserved | ||||
| BUMED SUBTOTAL: | $ - 0 |
| NAVFAC Utilities - Recurring Work (ELINs A024 through A033) | |||||
| A024 | NAVFAC Utilities - Specification 1501000 Facility Management (FP), Spec Item 3 | ||||
| A024AA | Infrastructure Condition Assessment Program (ICAP), Spec Item 3.1, 3.1.1, 3.1.2 | 12 | MO | $ - 0 | $ - 0 |
| A024AB | Control Systems, Spec Item 3.2, 3.2.1 | 12 | MO | $ - 0 | $ - 0 |
| A025 | NAVFAC Utilities - Specification 1502000 Facility Investment (ST), Spec Item 3 | ||||
| Service Orders, Spec Item 3.1 | |||||
| A025AA | Emergency Service Orders, Spec Item 3.1.1 | 12 | MO | $ - 0 | $ - 0 |
| A025AB | Urgent Service Orders, Spec Item 3.1.2 | 12 | MO | $ - 0 | $ - 0 |
| A025AC | Routine Service Orders, Spec Item 3.1.3 | 12 | MO | $ - 0 | $ - 0 |
| Project Work Orders, Spec Item 3.2 | |||||
| A025AD | Project Work Order Level 1, Spec Item 3.2.1 | 12 | MO | $ - 0 | $ - 0 |
| A025AE | Project Work Order Level 2, Spec Item 3.2.2 | 12 | MO | $ - 0 | $ - 0 |
| Preventive Maintenance Program (PM), Spec Item 3.3 | |||||
| A025AF | PM for HVAC and Refrigeration Systems, Spec Item 3.3.1 | 12 | MO | $ - 0 | $ - 0 |
| A025AG | PM for Interior and Exterior Lighting Systems, Spec Item 3.3.2 | 12 | MO | $ - 0 | $ - 0 |
| A025AH | Provide Conversion for Interior and Exterior Lighting Systems to LED, Spec Item 3.3.2 | 12 | MO | $ - 0 | $ - 0 |
| A025AJ | PM for Boilers and UPVs, Spec Item 3.3.3 | 12 | MO | $ - 0 | $ - 0 |
| A025AK | PM for Lightning Arrestors and Grounding Devices, Spec Item 3.3.5 | 12 | MO | $ - 0 | $ - 0 |
| A025AL | PM for Fire Protection Systems, Spec Item 3.3.6 | 12 | MO | $ - 0 | $ - 0 |
| A025AM | PM for Vertical Transportation Equipment (VTE), Spec Item 3.3.7 | 12 | MO | $ - 0 | $ - 0 |
| A025AN | PM for POL System Facilities and Distribution Systems, Spec Item 3.3.8 | 12 | MO | $ - 0 | $ - 0 |
| A025AP | PM for Emergency Eyewash Stations, Spec Item 3.3.9 | 12 | MO | $ - 0 | $ - 0 |
| A025AQ | PM for Motorized Gates, Spec Item 3.3.14 | 12 | MO | $ - 0 | $ - 0 |
| A025AR | PM for Roll up Doors and Windows, Spec Item 3.3.15 | 12 | MO | $ - 0 | $ - 0 |
| A025AS | PM for Emergency and Exit Lighting, Spec Item 3.3.16 | 12 | MO | $ - 0 | $ - 0 |
| A025AT | PM for Cathodic Protection Systems, Spec Item 3.3.18 | 12 | MO | $ - 0 | $ - 0 |
| A025AU | PM for Pumps, Spec Item 3.3.23 | 12 | MO | $ - 0 | $ - 0 |
| A025AV | PM for Auxiliary Generators , Spec Item 3.3.24 | 12 | MO | $ - 0 | $ - 0 |
| A025AW | PM for Direct Digital Control (DDC) Systems, Spec Item 3.3.26 | 12 | MO | $ - 0 | $ - 0 |
| A025AX | PM for Compressed Air Systems, Spec Item 3.3.27 | 12 | MO | $ - 0 | $ - 0 |
| Inspection, Testing and Certification, Spec Item 3.5 | |||||
| A025AY | Inspection, Testing and Certification for Boilers and UPVs, Spec Item 3.5.1 | 12 | MO | $ - 0 | $ - 0 |
| A025AZ | Inspection, Testing and Certification for Roof Inspection, Spec Item 3.5.4 | 12 | MO | $ - 0 | $ - 0 |
| A025BA | Inspection, Testing and Certification for Vertical Transportation Equipment (VTE), Spec Item 3.5.5 | 12 | MO | $ - 0 | $ - 0 |
| A025BB | Inspection, Testing and Certification for Emergency and Exit Lighting, Spec Item 3.5.6 | 12 | MO | $ - 0 | $ - 0 |
| A025BC | Inspection, Testing and Certification for POL Systems, Spec Item 3.5.12 | 12 | MO | $ - 0 | $ - 0 |
| Other Recurring Services, Spec Item 3.6 | |||||
| A025BD | Other Recurring Services for Exhaust Hoods and Ducts, Spec Item 3.6.2 | 12 | MO | $ - 0 | $ - 0 |
| A025BE | Other Recurring Services for HVAC Seasonal Start-Up and Shutdown, Spec Item 3.6.3 | 12 | MO | $ - 0 | $ - 0 |
| A025BF | Other Recurring Services for HVAC Water Testing and Treatment Services, Spec Item 3.6.4 | 12 | MO | $ - 0 | $ - 0 |
| A025BG | Other Recurring Services for Boiler Seasonal Start-Up and Shutdown, Spec Item 3.6.5 | 12 | MO | $ - 0 | $ - 0 |
| A025BH | Other Recurring Services for Boiler Water Testing and Treatment Services, Spec Item 3.6.6 | 12 | MO | $ - 0 | $ - 0 |
| A025BJ | Other Recurring Services for Roof Drainage Systems, Spec Item 3.6.8 | 12 | MO | $ - 0 | $ - 0 |
| A025BK | Other Recurring Services for Mechanical Equipment Room Monitoring, Spec Item 3.6.11 | 12 | MO | $ - 0 | $ - 0 |
| A025BL | Other Recurring Services for Remove Debris and Trash From Utility Tunnels, Spec Item 3.6.20 | 12 | MO | $ - 0 | $ - 0 |
| A026 | NAVFAC Utilities - Specification 1601000 Utility Management (UT), Spec Item 3 | ||||
| Utility Service Orders, Spec Item 3.1 | |||||
| A026AA | Emergency Service Orders, Spec Item 3.1.1 | 12 | MO | $ - 0 | $ - 0 |
| A026AB | Urgent Service Orders, Spec item 3.1.2 | 12 | MO | $ - 0 | $ - 0 |
| A026AC | Routine Service Orders, Spec Item 3.1.3 | 12 | MO | $ - 0 | $ - 0 |
| Project Work Orders, Spec Item 3.2 | |||||
| A026AD | Project Work Order Level 1, Spec Item 3.2.1 | 12 | MO | $ - 0 | $ - 0 |
| A026AE | Project Work Order Level 2, Spec Item 3.2.2 | 12 | MO | $ - 0 | $ - 0 |
| A026AF | Project Work Order Level 3, Spec Item 3.2.3 | 12 | MO | $ - 0 | $ - 0 |
| Utility Operations Support, Spec Item 3.3 | |||||
| A026AG | Utilities Mapping, Spec Item 3.3.1 | 12 | MO | $ - 0 | $ - 0 |
| A026AH | Meter Reading, Spec Item 3.3.2 | 12 | MO | $ - 0 | $ - 0 |
| A026AJ | Utility Location Services, Spec Item 3.3.3 | 12 | MO | $ - 0 | $ - 0 |
| Utility Infrastructure Condition Assessment (UICAP) Support, Spec Item 3.4 | |||||
| A026AK | Inventory Management, Spec Item 3.4.1 | 12 | MO | $ - 0 | $ - 0 |
| A026AL | Condition Assessment, Spec Item 3.4.2 | 12 | MO | $ - 0 | $ - 0 |
| Utility Control Systems, Spec Item 3.5 | |||||
| A026AM | Utility Control Systems, Spec Item 3.5 | 12 | MO | $ - 0 | $ - 0 |
| A027 | NAVFAC Utilities - Specification 1602000 Electrical (UT), Spec Item 3 | ||||
| Recurring Work, Spec Item 3 | |||||
| A027AA | Operate Electrical Power Distribution Systems, Spec Item 3.1 | 12 | MO | $ - 0 | $ - 0 |
| A027AB | Perform Integrated Maintenance Plan (IMP), Spec Item 3.2 | 12 | MO | $ - 0 | $ - 0 |
| A028 | NAVFAC Utilities - Specification 1603000 Natural Gas (UT), Spec Item 3 | ||||
| Recurring Work, Spec Item 3 | |||||
| A028AA | Perform Integrated Maintenance Program (IMP), Spec Item 3.1 | 12 | MO | $ - 0 | $ - 0 |
| A029 | NAVFAC Utilities - Specification 1604000 Wastewater (UT), Spec Item 3 | ||||
| Recurring Work, Spec Item 3 | |||||
| A029AA | Operate Wastewater Treatment Plant, Spec Items 3.1, 3.1.1, 3.1.2, 3.1.3, 3.1.4 | 12 | MO | $ - 0 | $ - 0 |
| A029AB | Perform Integrated Maintenance Program (IMP), Spec Item 3.2, 3.2.1, 3.2.2, 3.2.3, 3.2.4 | 12 | MO | $ - 0 | $ - 0 |
| A029AC | Perform Inspection Program for Manholes, Spec Item 3.3, 3.3.1 | 12 | MO | $ - 0 | $ - 0 |
| A029AD | Perform Inspection Program for Wet Wells, Spec Item 3.3, 3.3.2 | 12 | MO | $ - 0 | $ - 0 |
| A029AE | Other Recurring Services for Cleaning of Sewer Pipeline, Spec Item 3.4, 3.4.1 | 12 | MO | $ - 0 | $ - 0 |
| A029AF | Other Recurring Services for Wet Well Services, Spec Item 3.4, 3.4.2, 3.4.2.1, 3.4.2.2 | 12 | MO | $ - 0 | $ - 0 |
| A030 | NAVFAC Utilities - Specification 1605000 Steam (UT), Spec Item 3 | ||||
| Recurring Work, Spec Item 3 | |||||
| A030AA | Operate Steam Systems, Spec Item 3.1, 3.1.1, 3.1.2, 3.1.3, 3.1.4, 3.1.5, 3.1.6 | 12 | MO | $ - 0 | $ - 0 |
| A030AB | Perform Integrated Maintenance Program (IMP), Spec Item 3.2 | 12 | MO | $ - 0 | $ - 0 |
| A030AC | Perform Certification Program for Power Boiler, HRSG’s and Unfired Pressure Vessels (UPV’s) Certification, Spec Item 3.3, 3.3.1 | 12 | MO | $ - 0 | $ - 0 |
| A030AD | Other Recurring Services for Boiler Bi-Annual Start-Up and Shutdown, Spec Item 3.4, 3.4.1 | 12 | MO | $ - 0 | $ - 0 |
| A031 | NAVFAC Utilities - Specification 1606000 Water (UT), Spec Item 3 | ||||
| Recurring Work, Spec Item 3 | |||||
| A031AA | Operate Water Treatment Plant, Spec Item 3.1, 3.1.1, 3.1.2, 3.1.3 | 12 | MO | $ - 0 | $ - 0 |
| A031AB | Provide PM for Water Storage and Distribution Systems, Spec Item 3.2, 3.2.1 | 12 | MO | $ - 0 | $ - 0 |
| A031AC | Provide PM for Fire Hydrants, Spec Item 3.2, 3.2.2 | 12 | MO | $ - 0 | $ - 0 |
| A031AD | Provide IMP for Water Treatment Plant, Spec Item 3.3, 3.3.1 | 12 | MO | $ - 0 | $ - 0 |
| A032 | NAVFAC Utilities - Specification 1607000 Chiller Plant (UT), Spec Item 3 | ||||
| Recurring Work, Spec Item 3 | |||||
| A032AA | Operate Chiller Plant, Spec Item 3.1, 3.1.1, 3.1.2, 3.1.3, 3.1.4 | 12 | MO | $ - 0 | $ - 0 |
| A032AB | Provide IMP for Chiller Plant, Spec Item 3.2 | 12 | MO | $ - 0 | $ - 0 |
| A032AC | Provide Other Recurring Services for Cooling Tower Water Testing and Treatment Services, Spec Item 3.3.1 | 12 | MO | $ - 0 | $ - 0 |
| A032AD | Provide Other Recurring Services for Eddy Current Test, Spec Item 3.3.2 | 12 | MO | $ - 0 | $ - 0 |
| A033 | NAVFAC Utilities - Specification 1700000 Transportation (TR), Spec Item 3 | ||||
| A033AA | Fuel Delivery Services, Spec Item 3.1.5 | 12 | MO | $ - 0 | $ - 0 |
| A034-A037 | Reserved | ||||
| NAVFAC Utilities SUBTOTAL: | $ - 0 |
| NAVFAC Transportation - Recurring Work (ELIN A038) | |||||
| A038 | NAVFAC Transportation - Specification 1700000 Transportation (TR), Spec Item 3 | ||||
| A038AA | Billing Services, Spec Item 3.1 | 12 | MO | $ - 0 | $ - 0 |
| A038AB | Support Services, Spec Item 3.2, 3.2.1, 3.2.2, 3.2.2.1, 3.2.2.2 | 12 | MO | $ - 0 | $ - 0 |
| A039-A041 | Reserved | ||||
| NAVFAC Transportation SUBTOTAL: | $ - 0 |
| Naval Academy Business Services Division (NABSD) - Recurring Work (ELIN A042) | |||||
| A042 | NABSD - Specification 1502000 Facility Investment (ST), Spec Item 3 | ||||
| A042AA | Emergency Service Orders, Spec Item 3.1.1 | 12 | MO | $ - 0 | $ - 0 |
| A042AB | Urgent Service Orders, Spec Item 3.1.2 | 12 | MO | $ - 0 | $ - 0 |
| A042AC | Routine Service Orders, Spec Item 3.1.3 | 12 | MO | $ - 0 | $ - 0 |
| Project Work Orders, Spec Item 3.2 | |||||
| A042AD | Project Work Order Level 1, Spec Item 3.2.1 | 12 | MO | $ - 0 | $ - 0 |
| Other Recurring Services, Spec Item 3.6 | |||||
| A042AE | Other Recurring Services for Exhaust Hoods and Ducts, Spec Item 3.6.2 | 12 | MO | $ - 0 | $ - 0 |
| A042AF | Other Recurring Services for Dryer Vent Cleaning, Spec Item 3.6.10 | 12 | MO | $ - 0 | $ - 0 |
Naval Academy Business Services Division (NABSD) SUBTOTAL: $ - 0
TOTAL FOR LINE ITEM 0001 - BASE PERIOD - RECURRING WORK (ELINs A001 THROUGH A042) $ - 0
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6'
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C, C.10.1.l
ELIN A001EW through A001FI
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Posts Set in Concrete/Asphalt.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.
Surface Depth to Match Surrounding.
Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.
IN ACCORDANCE WITH SECTION C, C.10.2
ELIN A001FJ
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
6' Fence Height Driven Posts
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, 6' Height, Free-Standing
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
With Barbwire, 7' Fence Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
12' Panel, With Barbwire, 7' Height, Free-Standing
ELINs-Base Period-Non-Recurring
| ATTACHMENT J-0200000-16_Amendment 0012 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION NO. N62470-16-R-5008 |
| EXHIBIT A - BASE PERIOD - NON-RECURRING WORK |
| CLIN 0002 |
| Non-Recurring Work Price - Base Period | |||||||||
| PROVIDE PRICES TO PERFORMING NON-RECURRING WORK - IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | |||||||||
| ELINs A700 through A905 | |||||||||
| Part Number (ELIN) | Part Name (Product) (120 Characters) | ARO Days | PSC Code | Long Description (NTE 2,048) | Unit Price | Unit of Issue | Estimated Quantity | Extended Price | IMAP CAC |
| Specification 1502000 - Facility Investment | |||||||||
| A700 | Interior Painting | 5 | Z1EB | The Contractor shall provide all labor, materials and equipment required to perform surface preparation, pre-painting, sanding, etching and finish painting of all interior surfaces specified. Surface preparation includes, but is not limited to wood, metal, sheetrock, concrete, and plaster. Related services shall include wall-papering, plastering, and dry-wall repair. The Contractor shall collect and dispose of all paint chips, dust, sand, and other waste paint materials resulting from any part of the painting process, IAW the Resource Conservation and Recovery Act and associated Federal, State, and local laws and regulations. All hazardous waste disposal shall be coordinated through the Government Representative. Work shall be ordered and priced in increments of 200 square feet (SF). Work shall be completed within the timeframe specified on the task order. | |||||
| $0.00 | EA | 625 | $0.00 | ||||||
| A701 | Furniture Move Incidental to Interior Painting | 5 | Z1EB | The Contractor shall provide all labor, materials, and equipment required to move furniture incidental to interior painting. Provide unit pricing such that each unit consists of five (5) pieces of furniture. A cubical shall be considered a single piece of furniture. Work shall be completed within the timeframe specified on the task order. | |||||
| $0.00 | EA | 200 | $0.00 | ||||||
| A702 | Exterior Painting | 5 | Z1EB | The Contractor shall provide all labor, materials and equipment required to perform surface preparation, pre-painting, sanding, etching and finish painting of all exterior surfaces specified. Surface preparation includes, but is not limited to wood, metal, concrete, and plaster. The Contractor shall collect and dispose of all paint chips, dust, sand, and other waste paint materials resulting from any part of the painting process, IAW the Resource Conservation and Recovery Act and associated Federal, State, and local laws and regulations. All hazardous waste disposal shall be coordinated through the Government Representative. Work shall be ordered with a minimum of 200 sf. Work shall be completed within the timeframe specified on the task order. | $0.00 | SF | 200,000 | $0.00 | |
| A703 | Painting of Swimming Pools and Ornamental Fountains | 5 | Z1EB | The Contractor shall provide all labor, materials and equipment required to perform surface preparation, pre-painting, sanding, etching and finish painting of all surfaces specified. The Contractor shall collect and dispose of all paint chips, dust, sand, and other waste paint materials resulting from any part of the painting process, IAW the Resource Conservation and Recovery Act and associated Federal, State, and local laws and regulations. All hazardous waste disposal shall be coordinated through the Government Representative. Work shall be ordered per square foot (sf). Work shall be completed within the timeframe specified on the task order. | $0.00 | SF | 12,000 | $0.00 | |
| A704 | Asbestos Material Removal | Z1EB | The Contractor shall provide all labor, materials and equipment required to perform asbestos material removal in accordance with State and Federal regulations, this includes an abatement plan that must be approved by the Government Representative. License and certification requirements are listed in Annex 1502000, Spec Item 2.2.1. Work shall be ordered per square feet (sf). Work shall be completed with the timeframe specified on the task order. | ||||||
| $0.00 | SF | 975 | $0.00 | ||||||
| A705 | Lead Material Removal | Z1EB | The Contractor shall provide all labor, materials and equipment required to perform lead abatement in accordance with State and Federal regulations, this includes an abatement plan that must be approved by the Government Representative. License and certification requirements are listed in Annex 1502000, Spec Item 2.2.1. Work shall be ordered per square feet (sf). Work shall be completed with the timeframe specified on the task order. | ||||||
| $0.00 | SF | 750 | $0.00 | ||||||
| A706 | Replace Suspended Ceiling Tile (2'x2') | 3 | Z1EB | The Contractor shall provide all labor, materials and equipment required to replace 2’x2’ lay-in suspended ceiling tiles for ceiling height up to 10 feet. The Contractor shall collect and dispose of all waste materials resulting from ceiling tile replacement. Work shall be ordered per tile, with a minimum of 16 ceiling tiles. Work shall be completed within the timeframe specified on the task order. | |||||
| $0.00 | EA | 2,000 | $0.00 | ||||||
| A707 | Replace Suspended Ceiling Tile (2'x4') | 3 | Z1EB | The Contractor shall provide all labor, materials and equipment required to replace 2’x4’ lay-in suspended ceiling tiles for ceiling height up to 10 feet. The Contractor shall collect and dispose of all waste materials resulting from ceiling tile replacement. Work shall be ordered per tile, with a minimum of 8 ceiling tiles. Work shall be completed within the timeframe specified on the task order. | |||||
| $0.00 | EA | 2,000 | $0.00 | ||||||
| A708 | Replace Suspended Ceiling Grid, Cross Tee 4' | 3 | Z1EB | The Contractor shall provide all labor, materials and equipment required to replace suspended ceiling grid cross tee for ceiling height up to 10 feet. The Contractor shall collect and dispose of all waste materials resulting from suspended grid replacement. Work shall be completed within the timeframe specified on the task order. | $0.00 | EA | 2,000 | $0.00 | |
| A709 | Replace Suspended Ceiling Grid, Cross Tee 2' | 3 | Z1EB | The Contractor shall provide all labor, materials and equipment required to replace suspended ceiling grid cross tee for ceiling height up to 10 feet. The Contractor shall collect and dispose of all waste materials resulting from suspended grid replacement. Work shall be completed within the timeframe specified on the task order. | $0.00 | EA | 2,000 | $0.00 | |
| A710 | Replace Suspended Ceiling Grid, Main Runner | 3 | Z1EB | The Contractor shall provide all labor, materials and equipment required to replace suspended ceiling grid main runner for ceiling height up to 10 feet. The Contractor shall collect and dispose of all waste materials resulting from suspended grid replacement. Work shall be completed within the timeframe specified on the task order. | |||||
| $0.00 | EA | 2,000 | $0.00 | ||||||
| A711 | Carpet Replacement (26oz) | 10 | Z1EB | The Contractor shall provide all labor, materials and equipment required to install 26oz carpet for the areas designated in the task order. Carpet shall be replaced with the same quality, style, and color as currently installed unless otherwise designated in the task order. Work shall include removal and proper disposal of old carpet (including any padding, residual glue, tack strips, etc.) and proper installation of new carpet per manufacturer's instructions. Work shall be ordered per square yard (SY), with a minimum of 10 SY. Work shall be completed within the timeframe specified on the task order. | $0.00 | SY | 4,000 | $0.00 | |
| A712 | Carpet Replacement (32oz) | 10 | Z1EB | he Contractor shall provide all labor, materials and equipment required to install 32oz carpet for the areas designated in the task order. Carpet shall be replaced with the same quality, style, and color as currently installed unless otherwise designated in the task order. Work shall include removal and proper disposal of old carpet (including any padding, residual glue, tack strips, etc.) and proper installation of new carpet per manufacturer's instructions. Work shall be ordered per square yard (SY), with a minimum of 10 SY. Work shall be completed within the timeframe specified on the task order. | $0.00 | SY | 2,000 | $0.00 | |
| A713 | Carpet Replacement (45oz) | 10 | Z1EB | The Contractor shall provide all labor, materials and equipment required to install 45oz carpet for the areas designated in the task order. Carpet shall be replaced with the same quality, style, and color as currently installed unless otherwise designated in the task order. Work shall include removal and proper disposal of old carpet (including any padding, residual glue, tack strips, etc.) and proper installation of new carpet per manufacturer's instructions. Work shall be ordered per square yard (SY), with a minimum of 10 SY. Work shall be completed within the timeframe specified on the task order | $0.00 | SY | 1,500 | $0.00 | |
| A714 | Furniture Move Incidental to Carpet Replacement | 5 | Z1EB | The Contractor shall provide all labor, materials, and equipment required to move furniture incidental to carpet replacement. Provide unit pricing such that each unit consists of five (5) pieces of furniture. A cubical shall be considered a single piece of furniture. Work shall be completed within the timeframe specified on the task order. | |||||
| $0.00 | EA | 200 | $0.00 | ||||||
| A715 | Replace Vinyl Floor Tile | 5 | Z1EB | The Contractor shall provide all labor, materials and equipment required to install vinyl tile flooring for the areas designated in the task order. Vinyl shall be replaced with the same quality, style, and color as currently installed unless otherwise designated in the task order. Work shall include removal and proper disposal of old vinyl and proper installation of new vinyl per manufacturer's instructions. Work shall be ordered per square feet (sf), with a minimum of 50 sf. Work shall be completed within the timeframe specified on the task order. | $0.00 | SF | 8,000 | $0.00 | |
| A716 | Replace 4" Vinyl Cove Base | 5 | Z1EB | The Contractor shall provide all labor, materials and equipment required to install 4” vinyl cove base for the areas designated in the task order. Cove base shall be replaced with the same quality, style, and color as currently installed unless otherwise designated in the task order. Work shall include removal and proper disposal of old cove base, patching or repair of any damaged wall surface, and proper installation of new cove base per manufacturer's instructions. Work shall be ordered with a minimum of 30 LF. Work shall be completed within the timeframe specified on the task order. | $0.00 | LF | 5,000 | $0.00 | |
| A717 | Replace 6" Vinyl Cove Base | 5 | Z1EB | The Contractor shall provide all labor, materials and equipment required to install 6” vinyl cove base for the areas designated in the task order. Cove base shall be replaced with the same quality, style, and color as currently installed unless otherwise designated in the task order. Work shall include removal and proper disposal of old cove base, patching or repair of any damaged wall surface, and proper installation of new cove base per manufacturer's instructions. Work shall be ordered with a minimum of 30 LF. Work shall be completed within the timeframe specified on the task order. | $0.00 | LF | 5,000 | $0.00 | |
| A718 | Repair Backflow Preventer: | ||||||||
| 1/4 Inch | 5 | S114 | The Contractor shall provide all labor, materials and equipment required to repair and test failed 1/4 Inch backflow preventer, to include material, test report and testing form. Work shall be completed within the timeframe specified on the task order. | ||||||
| $0.00 | EA | 20 | $0.00 | ||||||
| A719 | Repair Backflow Preventer: | ||||||||
| 3/8 Inch | 5 | S114 | The Contractor shall provide all labor, materials and equipment required to repair and test failed 3/8 Inch backflow preventer, to include material, test report and testing form. Work shall be completed within the timeframe specified on the task order. | ||||||
| $0.00 | EA | 20 | $0.00 | ||||||
| A720 | Repair Backflow Preventer: | ||||||||
| 1/2 Inch | 5 | S114 | The Contractor shall provide all labor, materials and equipment required to repair and test failed 1/2 Inch backflow preventer, to include material, test report and testing form. Work shall be completed within the timeframe specified on the task order. | ||||||
| $0.00 | EA | 20 | $0.00 | ||||||
| A721 | Repair Backflow Preventer: | ||||||||
| 3/4 Inch | 5 | S114 | The Contractor shall provide all labor, materials and equipment required to repair and test failed 3/4 Inch backflow preventer, to include material, test report and testing form. Work shall be completed within the timeframe specified on the task order. | ||||||
| $0.00 | EA | 20 | $0.00 | ||||||
| A722 | Repair Backflow Preventer: | ||||||||
| 1 Inch | 5 | S114 | The Contractor shall provide all labor, materials and equipment required to repair and test failed 1 Inch backflow preventer, to include material, test report and testing form. Work shall be completed within the timeframe specified on the task order. | ||||||
| $0.00 | EA | 20 | $0.00 | ||||||
| A723 | Repair Backflow Preventer: | ||||||||
| 1-1/4 Inch | 5 | S114 | The Contractor shall provide all labor, materials and equipment required to repair and test failed 1-1/4 Inch backflow preventer, to include material, test report and testing form. Work shall be completed within the timeframe specified on the task order. | ||||||
| $0.00 | EA | 20 | $0.00 | ||||||
| A724 | Repair Backflow Preventer: | ||||||||
| 1-1/2 Inch | 5 | S114 | The Contractor shall provide all labor, materials and equipment required to repair and test failed 1-1/2 Inch backflow preventer, to include material, test report and testing form. Work shall be completed within the timeframe specified on the task order. | ||||||
| $0.00 | EA | 20 | $0.00 | ||||||
| A725 | Repair Backflow Preventer: | ||||||||
| 2 Inch | 5 | S114 | The Contractor shall provide all labor, materials and equipment required to repair and test failed 2 Inch backflow preventer, to include material, test report and testing form. Work shall be completed within the timeframe specified on the task order. | ||||||
| $0.00 | EA | 20 | $0.00 | ||||||
| A726 | Repair Backflow Preventer: | ||||||||
| 2-1/2 Inch | 5 | S114 | The Contractor shall provide all labor, materials and equipment required to repair and test failed 2-1/2 Inch backflow preventer, to include material, test report and testing form. Work shall be completed within the timeframe specified on the task order. | ||||||
| $0.00 | EA | 20 | $0.00 | ||||||
| A727 | Repair Backflow Preventer: | ||||||||
| 3 Inch | 5 | S114 | The Contractor shall provide all labor, materials and equipment required to repair and test failed 3 Inch backflow preventer, to include material, test report and testing form. Work shall be completed within the timeframe specified on the task order. | ||||||
| $0.00 | EA | 20 | $0.00 | ||||||
| A728 | Repair Backflow Preventer: | ||||||||
| 4 Inch | 5 | S114 | The Contractor shall provide all labor, materials and equipment required to repair and test failed 4 Inch backflow preventer, to include material, test report and testing form. Work shall be completed within the timeframe specified on the task order. | ||||||
| $0.00 | EA | 20 | $0.00 | ||||||
| A729 | Repair Backflow Preventer: | ||||||||
| 6 Inch | 5 | S114 | The Contractor shall provide all labor, materials and equipment required to repair and test failed 6 Inch backflow preventer, to include material, test report and testing form. Work shall be completed within the timeframe specified on the task order. | ||||||
| $0.00 | EA | 20 | $0.00 | ||||||
| A730 | Repair Backflow Preventer: | ||||||||
| 8 Inch | 5 | S114 | The Contractor shall provide all labor, materials and equipment required to repair and test failed 8 Inch backflow preventer, to include material, test report and testing form. Work shall be completed within the timeframe specified on the task order. | ||||||
| $0.00 | EA | 20 | $0.00 | ||||||
| A731 | Repair Backflow Preventer: | ||||||||
| 10 Inch | 5 | S114 | The Contractor shall provide all labor, materials and equipment required to repair and test failed 10 Inch backflow preventer, to include material, test report and testing form. Work shall be completed within the timeframe specified on the task order. | ||||||
| $0.00 | EA | 20 | $0.00 | ||||||
| A732 | Replace Backflow Preventer: | ||||||||
| 1/4 Inch | 5 | S114 | The Contractor shall provide all labor, materials and equipment required to replace and test failed 1/4 Inch backflow preventer, after repair attempt, to include materials, acceptable replacement, test report and testing form. Work shall be completed within the timeframe specified on the task order. | ||||||
| $0.00 | EA | 20 | $0.00 | ||||||
| A733 | Replace Backflow Preventer: | ||||||||
| 3/8 Inch | 5 | S114 | The Contractor shall provide all labor, materials and equipment required to replace and test failed 3/8 Inch backflow preventer, after repair attempt, to include materials, acceptable replacement, test report and testing form. Work shall be completed within the timeframe specified on the task order. | ||||||
| $0.00 | EA | 20 | $0.00 | ||||||
| A734 | Replace Backflow Preventer: | ||||||||
| 1/2 Inch | 5 | S114 | The Contractor shall provide all labor, materials and equipment required to replace and test failed 1/2 Inch backflow preventer, after repair attempt, to include materials, acceptable replacement, test report and testing form. Work shall be completed within the timeframe specified on the task order. | ||||||
| $0.00 | EA | 20 | $0.00 | ||||||
| A735 | Replace Backflow Preventer: | ||||||||
| 3/4 Inch | 5 | S114 | The Contractor shall provide all labor, materials and equipment required to replace and test failed 3/4 Inch backflow preventer, after repair attempt, to include materials, acceptable replacement, test report and testing form. Work shall be completed within the timeframe specified on the task order. | ||||||
| $0.00 | EA | 20 | $0.00 | ||||||
| A736 | Replace Backflow Preventer: | ||||||||
| 1 Inch | 5 | S114 | The Contractor shall provide all labor, materials and equipment required to replace and test failed 1 Inch backflow preventer, after repair attempt, to include materials, acceptable replacement, test report and testing form. Work shall be completed within the timeframe specified on the task order. | ||||||
| $0.00 | EA | 20 | $0.00 | ||||||
| A737 | Replace Backflow Preventer: | ||||||||
| 1-1/4 Inch | 5 | S114 | The Contractor shall provide all labor, materials and equipment required to replace and test failed 1-1/4 Inch backflow preventer, after repair attempt, to include materials, acceptable replacement, test report and testing form. Work shall be completed within the timeframe specified on the task order. | ||||||
| $0.00 | EA | 20 | $0.00 | ||||||
| A738 | Replace Backflow Preventer: | ||||||||
| 1-1/2 Inch | 5 | S114 | The Contractor shall provide all labor, materials and equipment required to replace and test failed 1-1/2 Inch backflow preventer, after repair attempt, to include materials, acceptable replacement, test report and testing form. Work shall be completed within the timeframe specified on the task order. | ||||||
| $0.00 | EA | 20 | $0.00 | ||||||
| A739 | Replace Backflow Preventer: | ||||||||
| 2 Inch | 5 | S114 | The Contractor shall provide all labor, materials and equipment required to replace and test failed 2 Inch backflow preventer, after repair attempt, to include materials, acceptable replacement, test report and testing form. Work shall be completed within the timeframe specified on the task order. | ||||||
| $0.00 | EA | 20 | $0.00 | ||||||
| A740 | Replace Backflow Preventer: | ||||||||
| 2-1/2 Inch | 5 | S114 | The Contractor shall provide all labor, materials and equipment required to replace and test failed 2-1/2 Inch backflow preventer, after repair attempt, to include materials, acceptable replacement, test report and testing form. Work shall be completed within the timeframe specified on the task order. | ||||||
| $0.00 | EA | 20 | $0.00 | ||||||
| A741 | Replace Backflow Preventer: | ||||||||
| 3 Inch | 5 | S114 | The Contractor shall provide all labor, materials and equipment required to replace and test failed 3 Inch backflow preventer, after repair attempt, to include materials, acceptable replacement, test report and testing form. Work shall be completed within the timeframe specified on the task order. | ||||||
| $0.00 | EA | 20 | $0.00 | ||||||
| A742 | Replace Backflow Preventer: | ||||||||
| 4 Inch | 5 | S114 | The Contractor shall provide all labor, materials and equipment required to replace and test failed 4 Inch backflow preventer, after repair attempt, to include materials, acceptable replacement, test report and testing form. Work shall be completed within the timeframe specified on the task order. | ||||||
| $0.00 | EA | 20 | $0.00 | ||||||
| A743 | Replace Backflow Preventer: | ||||||||
| 6 Inch | 5 | S114 | The Contractor shall provide all labor, materials and equipment required to replace and test failed 6 Inch backflow preventer, after repair attempt, to include materials, acceptable replacement, test report and testing form. Work shall be completed within the timeframe specified on the task order. | ||||||
| $0.00 | EA | 20 | $0.00 | ||||||
| A744 | Replace Backflow Preventer: | ||||||||
| 8 Inch | 5 | S114 | The Contractor shall provide all labor, materials and equipment required to replace and test failed 8 Inch backflow preventer, after repair attempt, to include materials, acceptable replacement, test report and testing form. Work shall be completed within the timeframe specified on the task order. | ||||||
| $0.00 | EA | 20 | $0.00 | ||||||
| A745 | Replace Backflow Preventer: | ||||||||
| 10 Inch | 5 | S114 | The Contractor shall provide all labor, materials and equipment required to replace and test failed 10 Inch backflow preventer, after repair attempt, to include materials, acceptable replacement, test report and testing form. Work shall be completed within the timeframe specified on the task order. | ||||||
| $0.00 | EA | 20 | $0.00 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .