TH-73A ATS _ PWS.pdf
PDF 901 KB Posted
- Attached to
- Advanced Helicopter Training System Program for Ground Based Training System (N61340-19-R-0096)
- Solicitation number
- N6134019R0096
About this file
This performance work statement specifies the requirements for providing aircrew training services for the TH-73A helicopter at Naval Air Station Whiting Field in Florida. The contractor shall provide instructor pilots and flight simulation training devices to conduct ground-based rotary wing training. The contractor must also provide program management, curriculum support, and maintenance for the training devices. The Navy will provide facilities, training syllabi, course materials, and instructor pilots as needed. The contractor must attend regular meetings and reviews to coordinate the transition and installation of training devices. Key personnel and staffing plans are required. The contractor will be responsible for operator and maintenance support for training devices installed at the government facility.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
i
TH-73A AIRCREW TRAINING SERVICES (ATS)
PERFORMANCE WORK STATEMENT (PWS)
At
Naval Air Station (NAS) Whiting Field, Milton, FL
Prepared By:
NAVAL AIR WARFARE CENTER
TRAINING SYSTEMS DIVISION
Orlando, FL 32826
TH-73A ATS PWS
ii
TABLE OF CONTENTS
GENERAL DESCRIPTION
PURPOSE
ADDENDUM A
ADDENDUM B
PWS APPENDICES
APPLICABLE DOCUMENTS
Government Documents Non-Government Documents/Industry Standards
CONTRACTOR-PROVIDED FSTD INSTALLATION
MOBILIZATION
ADMINISTRATION
PROGRAM MEETINGS
Post Award Conference (PAC) In-Process Reviews (IPR) Technical Interchange Period Pre-Contractor Support Date (CSD) Meeting Annual Contractor Program Management Review (PMR)
CONTRACTOR PERSONNEL
Program Manager Contractor-Provided FSTD Support Responsibilities CIS Personnel
CONTRACT DATA REQUIREMENTS LIST
ADDENDUM A – Contractor Instructional Services (CIS)
ADDENDUM B – Flight Simulation Training Devices (FSTDs)
APPENDICES
Appendix A – TH-73A ATS Facility Drawings
Appendix B – TH-73A Malfunctions and Systems Requirements
Appendix C – TH-73A ATS Subjective Requirements
Appendix D – Sample FSTD Evaluation Cards
Appendix E – Acronym List
Appendix F – Definition List
Performance Work Statement (PWS)
For TH-73A Aircrew Training Services (ATS)
GENERAL DESCRIPTION
Purpose
This PWS specifies the requirements to provide Aircrew Training Services (ATS) for the TH-
73A located at NAS Whiting Field, Milton, FL. Ground-based rotary wing training will be performed by Contract Instructors (CIs) and Training Air Wing Five (TRAWING 5) Instructor
Pilots (IPs). CIs and IPs shall utilize contractor-provided Flight Simulation Training Devices
(FSTDs), associated classrooms, and other training methods to produce and evaluate a US (or other Nation) Naval Aviator. This service shall include instruction, operation, and curriculum support as required by the Government.
The contractor shall provide:
CIs to provide instruction and curriculum support
FSTDs necessary to support training as detailed in this PWS
All support personnel required to install, operate and maintain the contractor-provided
FSTDs in the Government facilities described in this PWS
Any additional personnel required for supervising and administering the required training, and any other personnel as needed
The Government will provide:
Facilities capable of housing contractor-provided FSTDs o No modification to existing facilities shall be required or allowed
All required course curriculum/syllabi
Any additional Government-specific courseware/materials needed for the training of
TH-73A pilots
TRAWING 5 IPs as necessary to facilitate training in contractor-provided FSTDs
Addendum A
PWS Addendum A details the TH-73A Contractor Instructional Services (CIS) requirements.
Addendum B
PWS Addendum B details the TH-73A FSTD requirements.
PWS Appendices
Appendix A TH-73A ATS Facility Drawings
Appendix B TH-73A ATS Malfunctions and Systems Requirements
Appendix C TH-73A ATS Subjective Requirements
Appendix D Sample FSTD Evaluation Cards
Appendix E Acronym List
Appendix F Definition List
Applicable Documents
The following is a list of documents that form a part of this contract to the extent specified herein. In the event of a conflict between documents referenced herein and the contents of this contract, the contents of this contract take precedence. Nothing in this contract, however, supersedes applicable laws and regulations, unless a specific exemption has been obtained.
Government Documents
Commander, Naval Air Forces (CNAF), Naval Air Systems Command (NAVAIR), Chief of Naval Air Training (CNATRA), and Commander, Training Wing FIVE
(COMTRAWINGFIVE) instructions. The Government will provide Government created training and aircraft publications as they become available.
CNATRAINST 1300.2H CNATRA Policies and Support of the Flight
Instructor Training Course
CNATRAINST 1500.4J Naval Flight Student Training Administration
Manual
CNATRAINST 1542.156D Advanced Helicopter Multi-Service Pilot
Training System (MPTS) Curriculum
CNATRAINST 1542.161 Intermediate Tiltrotor Helicopter MPTS
Curriculum
CNATRAINST 1542.91J Advanced Helicopter Flight Instructor Under
Training (IUT) MPTS Curriculum
CNATRAINST 1542.41F Helicopter Transition MPTS Curriculum
CNATRAINST 1550.6 SERIES Training Improvement Program
CNATRAINST 3710.13 SERIES Flight Instructor Standardization And Training
Program
PAT PUB SERIES TH-57 Flight Training Instructions
COMTRAWINGFIVEINST 3710.8 series
CH-1
Rotary-Wing Operating Procedures (RWOP)
Manual
Federal Aviation Administration (FAA)
Title 14 of the Code of Federal Regulations (14 CFR) Part 60 https://www.ecfr.gov/
Non-Government Documents/Industry Standards
International Organization for Standardization/International Electro-technical Commission
(ISO/IEC)
ISO 9001:2015 Quality Management
ISO/IEC 27002:2005 Information technology - Security techniques - Code of practice for information security management (Re-designation of ISO/IEC
17799:2005)
CONTRACTOR-PROVIDED FSTD INSTALLATION
FSTDs will be installed as specified in Section F of this Request for Proposal (RFP). An
Integrated Master Schedule (IMS) shall be provided in accordance with (IAW) Contract Data
Requirements List (CDRL) B002. The schedule is a critical factor associated with the successful transition to TH-73A. The contractor shall minimize impact to TH-57 training throughout the installation of TH-73A FSTDs, and throughout the transition of students to TH-73A FSTD training.
MOBILIZATION
3.1 RESPONSIBILITIES. During the CIS Mobilization Phase, the contractor shall be responsible for performing all tasks necessary to assume full performance responsibility at
Contractor Support Date (CSD). Mobilization Phase shall begin two months before the first CI is required. A Mobilization Plan shall be submitted IAW CDRL A006. The contractor shall be responsible for assuming the performance responsibilities at CSD. The CSD schedule is provided in Section F of this RFP. The contractor is to prepare CDRL A001, CIS Contractor
Performance Summary Report (CPSR) as directed.
ADMINISTRATION
Program Meetings
Post Award Conference (PAC)
The contractor shall conduct a PAC within 30 days after contract award at NAS Whiting Field, FL. The purpose of the PAC shall be to establish the framework of contractor and Government interaction during the performance of the contract. PAC presentation materials shall be provided
IAW CDRL A004. Topics to include but not limited to:
a. Introduction and contract overview
b. Review of PWS requirements
c. Contractor’s Mobilization Plan and respective responsibilities of all parties
d. Review of contractor-provided FSTD evaluation and installation schedule (IMS CDRL
B002)
e. CDRL delivery schedule and status
The PAC shall be coordinated with the Government Program Manager (PM) and Contracting
Officer’s Representative (COR). Conference minutes shall be recorded (IAW CDRL A005) and follow-up reviews shall be held as necessary to address specific problems.
In-Process Reviews (IPR)
The purpose of the IPRs shall be to discuss the status of contractor-provided FSTD construction, evaluation, and installation. IPRs will normally be conducted via teleconference (hosted at NAS
Whiting Field) but may be conducted on-site at NAS Whiting Field or via other means as directed by the Government IPRs will be conducted as required by the Government (at least monthly). The specific method, dates, and duration of the IPRs shall be agreed upon between the
Government PM and contractor PM. IPR presentation materials shall be provided (IAW CDRL
A004). IPR minutes shall be recorded (IAW CDRL A005) and follow-up reviews shall be held as necessary to address specific problems. All IPRs shall include the following topics:
a. Previous action items – Review of the Government and contractor action items from the previous conference, using an action item list
b. Project schedules – Major milestones
c. CDRL status report – Contract status report
d. Problem areas – Areas that have been problematic requiring Government decision and resolution
e. Program risks – Personnel, schedule, supplier issues, etc.
f. New action items – Preparation and finalization of new action items as a result of conference discussions
Technical Interchange Period
Continuous Technical Interchange between the contractor and TRAWING 5 Subject Matter
Experts (SMEs) is required in order to ensure that provided FSTDs meet TRAWING 5 training needs. Meeting minutes to include action items shall be recorded (IAW CDRL A005). The
Government will make SMEs available to conduct factory site visits to support the development and production of the FSTDs. The Government recommends no less than five site visits of five business days each over the course of the building of the first FSTD. The contractor shall provide an initial estimate of desired site visits at the PAC. Changes to the desired number and duration of site visits shall be communicated no later than 60 days prior to the changed site visit.
Pre-Contractor Support Date (CSD) Meeting.
A joint meeting shall be conducted approximately two weeks prior to CSD to discuss the contractor’s readiness and capability to assume full responsibility. Presentation materials shall be provided (IAW CDRL A004). Action Items shall be recorded (CDRL A005) and follow-up reviews shall be held as necessary to address specific problems.
Annual Contractor Program Management Review (PMR).
The contractor shall prepare and present annual PMR briefings to the Government representatives and COR at NAS Corpus Christi and NAS Whiting Field addressing the status of each area of responsibility under the PWS and associated CDRLs. The two meetings shall be held within a one-month period and the agenda and briefing materials shall be identical (IAW
CDRL A004). Special focus shall be on problem areas and their resolution.
Thirty-days advance notice will be given to allow the contractor adequate preparation time. The review will be coordinated with the COR. Presentation materials shall be provided (IAW
CDRL A004). Action Items shall be recorded and follow-up reviews will be held as necessary to address specific problems identified during the annual meeting. The method of presentation
(e.g., slides.) shall be at contractor discretion. The contractor shall be responsible to record, prepare, and submit meeting minutes. Action Items shall be recorded and follow-up reviews will be held as necessary to address specific problems identified during the annual meeting. The contractor’s presentation shall be included as an attachment (IAW CDRL A005).
Contractor Personnel
Program Manager
The contractor shall designate a PM, in writing, to the Procuring Contracting Officer (PCO) and the COR. The PM will be responsible for contract performance specific to managing the installation of the contractor-provided FSTDs. The contractor PM is responsible for ensuring open communications between contractor and Government. The contractor PM position is required until the last FSTD is Ready for Training (RFT).
Contractor-Provided FSTD Support Responsibilities
The contractor shall provide all required support (to include operation and maintenance personnel) for its contractor-provided FSTDs in the Government’s facilities. The contractor shall maintain its FSTDs in accordance with industry best practices, and federal, state and military base laws and policies. The support personnel shall not provide instruction to a trainee
(other than for safety related to using the FSTD).
CIS Personnel
For the purpose of Addendum A, the Site Manager (SM) and Alternate Site Managers (ASM) and all CI personnel are considered to be Key Personnel. Résumés for all Key Personnel are required to be submitted to the PCO, COR, CNATRA, Administrative Contracting Officer
(ACO), and Government PM within 30 days after start of Mobilization for review and determination of acceptability.
The contractor shall have SM, ASM and necessary CI personnel on-board NAS Whiting Field, qualified, no later than ten working days prior to CSD. If the contractor uses contingent personnel, evidence of planned employment can be demonstrated by providing the planned employee’s Acceptance Letter (or candidate employee signed Offer Letter).
CONTRACT DATA REQUIREMENTS LIST
All CDRL reports shall be delivered IAW Attachment 3 “Supplement to the Exhibits: Contract
Data Requirements List (CDRL) data submission, Government Integrated Data Environment
(IDE) instructions.”
File details come from the government source that posted it. Updated .