This document is a Quality Assurance Surveillance Plan (QASP) for a firm fixed-price competitive contract to provide Aircrew Training Services (ATS) for the TH-73A helicopter at Naval Air Station Whiting Field in Milton, Florida. The contractor will provide ground-based pilot training using flight simulators, classrooms, part-task trainers, and other methods to produce Naval Aviators. The contractor is responsible for instructors, flight simulator training devices installed at the government facility, and other personnel to supervise training and administration. The government provides facilities, required course curriculum and materials, and the contract period of performance is seven years. The QASP describes quality standards, the roles of government resources like the contracting officer and project manager in implementation and oversight, surveillance methods including an annual CPARS evaluation, documentation requirements, and enclosures covering areas of assessment, performance standards, and a surveillance activity checklist.

View the file

Other files

File Type Posted
AHTS RFP Release Questions 0070.pdf PDF
AHTS RFP Questions Amendment 04.pdf PDF
N6134019R0096 SF30 Amendment 03.pdf PDF
AHTS RFP Questions Amendment 03.pdf PDF
N6134019R0096 Conformed Amendment 03.pdf PDF
TH-73A ATS _ FSTD PWS Addendum B _ A02.pdf PDF
Attachment 6(d) Sample WD Corrected Copy.pdf PDF
Attachment 6(c) Sample WD CBA - CI.pdf PDF
N6134019R0096-0002_Conformed.pdf PDF
Attachment L-4 Vol 4 Pricing Spreadsheet.xlsx XLSX spreadsheet
Attachment 6(a) WD 2015-4562 Rev 13.docx DOCX document
AHTS RFP Release Questions Amendment 02.pdf PDF
Attachment 8 SAAR Form.pdf PDF
N6134019R0096-0002.pdf PDF
Attachment 6(e) Sample WD CBA 2019 12881.pdf PDF
Sec L Att L-2 Vol 2 T-1 CRM.xlsx XLSX spreadsheet
AHTS RFP Release Questions 0001 - 0013.pdf PDF
AHTS GBTS N6134019R0096 SF30 Amendment 01.pdf PDF
AHTS GBTS N6134019R0096 Conformed Amendment 01.pdf PDF
Industry Day Brief Final_13 JAN 2020.pptx PPTX presentation
AHTS GBTS Sections A-M N6134019R0096.pdf PDF
A001_CIS CPSR.pdf PDF
Sec L Att L-2 Vol 2 T-2 CRM.xlsx XLSX spreadsheet
AHTS GBTS Pre-Solicitation Conference Sign Sheet.pdf PDF
B002_IPMR.pdf PDF
TH-73A ATS _ PWS Appendix B -- Malfunctions and Systems Requirements.pdf PDF
TH-73A ATS _ CIS PWS Addendum A.pdf PDF
TH-73A ATS _ QASP.pdf PDF
TH-73A ATS _ PWS Appendix C -- Subjective Requirements.pdf PDF
Sec J Att 3 Supplement CDRL Submission Govt IDE.pdf PDF
A006_Mobilization Plan.pdf PDF
TH-73A ATS _ PWS Appendix D -- Sample FSTD Evaluation Cards.pdf PDF
A003_FTD CPSR.pdf PDF
AHTS GBTS Pre-Soliciation Industry Questions.pdf PDF
A004_Presentation.pdf PDF
TH-57 Whiting Field CBA Sample.pdf PDF
Sec L Att L-3 Vol 3 CE-1 Instructions.xlsx XLSX spreadsheet
TH-73A ATS _ PWS.pdf PDF
TH-73A ATS _ PWS Appendix E -- Acronym List.pdf PDF
A005_Meeting Minutes.pdf PDF
Sec L Att L-1 Vol 1 ES Tables.xlsx XLSX spreadsheet
Sec J Att 5 Add Instruction Request-Authorization-Completion.doc DOC document
TH-73A ATS _ FSTD PWS Addendum B.pdf PDF
A002_Quality Control Plan.pdf PDF
WD 2015-4562 Rev 12.pdf PDF
Sec J Att 2 Data Item Transmittal (DIT) Sheet.pdf PDF
Sec J Att 4 Additional Instruction Hours Log.xls XLS spreadsheet
TH-73A ATS _ PWS Appendix F -- Definition List.pdf PDF
TH-73A ATS _ PWS Appendix A -- Facility Drawings.pdf PDF
B001_CFSR.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QASP

N61340-19-R-0096

TH-73A ATS

Attachment (7)

Source Selection Information – See FAR 2.101 and 3.104 For Official Use Only

ATTACHMENT (7)

QUALITY ASSURANCE SURVEILLANCE PLAN

(QASP)

1. Purpose

This Quality Assurance Surveillance Plan (QASP) is a Government developed and applied document used to make sure that systematic quality assurance methods are used in the administration of the TH-73A Aircrew Training

Services (ATS) performance-based contract. The intent is to ensure that the contractor performs in accordance with the Performance Work Statement (PWS) and meets Acceptable Quality Level (AQL) performance metrics and that the Government receives the quality of services called for in the contract.

The contract requirement is to provide ATS for TH-73A Helicopter Pilot Training. The Contractor shall provide ground-based helicopter pilot training performed by Contract Instructors (CIs) at Naval Air Station Whiting Field, FL. CIs shall utilize contractor-provided Flight Simulator Training Devices (FSTDs), associated classrooms, and other training methods such as avionics suite part-task trainers, virtual reality devices, and videoos, to produce a US

(or other Nation) Naval Aviator. This service shall include instruction, operation, and curriculum support as required by the Government.

Additionally, the contractor shall provide:

• FSTDs necessary to support training as detailed in the PWS

• All support personnel required to install, operate and maintain the contractor-provided FSTDs in the Government facilities described in the PWS

• Any additional personnel required for supervising and administering the required training, and any other personnel as needed

The Government will provide:

• Facilities capable of housing contractor-provided FSTDs

• All required course curriculum/syllabi

• Any additional Government-specific courseware/materials needed for the training of TH-73A pilots

The resulting contract will be issued as a Firm Fixed-Price competitive stand-alone contract. The contract period of performance will be for a total of seven years. A properly executed QASP will assist the Government in achieving the objectives of this procurement.

2. Authority

Authority for issuance of this QASP is provided under Contract Section E – Inspection and Acceptance, which provides for inspections and acceptance of the services and documentation called for in the requirements, to be executed by the Contracting Officer or a duly authorized representative.

3. Scope

To fully understand the roles and responsibilities of the parties, it is important to first define the distinction in terminology between Quality Control Plan (QCP) and the QASP. The Contractor shall be responsible for management and QCP and actions necessary to meet the quality standards set forth by the contract. The QASP is put in place by the Government to provide surveillance oversight of the Contractor’s efforts assuring those efforts are timely and effective and are delivering the results specified in the contract.

4. Government Resources

The following definitions for Government resources are applicable to this plan:

Contracting Officer – An individual duly appointed with the authority to enter into (Procuring Contracting Officer

(PCO) or administer (Administrative Contracting Officer (ACO)) contracts and make related determination and findings on behalf of the Government. The PCO for this contract is NAWCTSD GT27000. Contracting Officers are designated via a written warrant, which sets forth limitations of authority.

Contracting Officer Representative (COR) - An individual appointed in writing by the PCO to act as their authorized representative to assist in administering the contract. The site location as described in the PWS will have an appointed COR in the resulting contract. The limitations of authority are contained in a written letter of appointment from the PCO.

Project Manager (PJM) – An individual who is in charge of all aspects of the requirements for the assigned project.

5. Responsibilities

The following Government personnel shall have responsibility for the implementation of the QASP:

Contracting Officer – The Contracting Officer ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the contract and safeguards the interests of the United States in the contractual relationship. It is the Contracting Officer that assures that the Contractor receives impartial, fair and equitable treatment under the contract. The Contracting Officer is ultimately responsible for the final determination of the adequacy of the Contractor’s performance.

COR – The COR is responsible for technical administration of the contract and assures proper Government surveillance of the contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the contractor deems may affect contract price, terms or conditions shall be referred to the Contracting Officer for action.

PJM - Project Manager is responsible for leading the project from its inception to planning and execution, managing the Integrated Product Team (IPT) and resources and scope of the project along with the costs, schedule, requirements and funding.

6. Methods of Quality Assurance

a. Contractor Performance Assessment Report System (CPARS) – The market place for training system services is very competitive. As such, the awardees have a vested interest in the Government generated

CPARS rating under the resultant contract. An evaluation using the CPARS format will be performed by the Government annually. This evaluation will be one determinant in exercising an option. The

Government will address the quality of product or service, schedule, cost control, management, regulatory and other areas. As this information may affect future source selections throughout the Department of Defense (DoD), and the exercise of options, the annual Government assessment will be used as an additional performance oversight and communication tool with the QASP.

b. QASP - The below listed methods of surveillance shall be used by the COR in the technical administration of this QASP. In addition to the below instructions, the form to be used for documentation of quality assurance surveillance is the Surveillance Activity Checklist provided as Enclosure (4) herein.

7. Surveillance Methods

The COR will perform a monthly assessment of Quality, Schedule, Management Responsiveness, and Other Areas as applicable by inspection. Enclosures (1) and (2) set forth the performance standards and surveillance methods for the contractor and COR. Enclosure (3) provides a checklist and means for the COR to document on a monthly basis the results of the Government surveillance activities to be reported via the DoD Contracting Officer Representative

Tracking Tool (CORT Tool) system.

8. Documentation

The COR will maintain a complete QASP file. The file will contain copies of all surveillance activity, reports, evaluations, recommendations, and any actions related to the Government’s performance of the QASP, including the originals of the QASP Surveillance Activity Checklist. All such records will be maintained for the life of the contract. The COR shall forward these records to the Contracting Officer at termination or completion of each contract period.

9. Enclosures

(1) Standards

(2) Areas of Assessment and Definitions

(3) Surveillance Activity Checklist

Enclosure (1) --- Standards

Required

Service

Standard

Maximum

Allowable

Degree of

Deviation from Requirement AQL

Lot Size

Method of Surveillance

1. CIS Instruction

Factor (IF)

CIS IF at 100% during each period

0%

The total number of instruction units scheduled for the peiod being inspected.

100% Inspection

2. FSTD Contractor

Performance Factor

(CPF)

CPF at 100% during each period

0% The total number of contracted training time hours specified for each trainer for the period being inspected.

100% Inspection

3. Records, CDRLS and reports

Required requisitions, records, and reports accurate and legible.

0% The total number of records, reports and requisitions submitted during the period being inspected.

Random

Enclosure (2) --- Areas of Assessment and Definitions

All tasks will be assessed focusing on the following:

Quality – Assess the contractor’s effort to provide quality products and/or services in meeting the PWS requirements. This shall include activities to meet cost, performance, and schedule objectives. Assess how successfully the contractor meets program quality.

Schedule – Assess the contractor’s adherence to the required delivery schedule by assessing the contractor’s efforts during the assessment period that contribute to or effect the schedule variance. Also address significance of scheduled events, discuss causes, and assess the effectiveness of contractor corrective actions.

Management – Assess the timeliness, completeness and quality of problem identification, corrective action plans, proposal submittals (especially responses to over and above work requests and requests for proposals), the contractor's history of reasonable and cooperative behavior, effective business relations, and customer satisfaction.

Consider the contractor’s responsiveness to the program as it relates to meeting contract requirements during the period covered by the report.

Regulatory - Assess compliance with all terms and conditions in the contract or order relating to applicable regulations and codes. Consider aspects of performance such as compliance with financial, environmental (example:

Clean Air Act, Clean Water Act), safety, and labor regulations, as well as any other reporting requirements in the contract.

Other areas – Assess additional evaluation areas unique to the contract or that cannot be captured elsewhere.

The evaluation ratings are as follows:

Exceptional – Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the task and sub-task being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.

Very Good - Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the task and sub-task being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

Satisfactory - Performance meets contractual requirements. The contractual performance of the task and sub-task contain some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

Marginal - Performance does not meet contractual requirements. The contractual performance of the task and sub-task being assessed reflect a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.

Unsatisfactory – Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the task or sub-task contains a serious problem(s) for which the contractor’s actions appear or were ineffective.

Enclosure (3) --- SURVEILLANCE ACTIVITY CHECKLIST

Monthly Surveillance:

The COR will perform a monthly assessment of Quality, Schedule, Management Responsiveness, and Other Areas as applicable utilizing the CPARS evaluation rating definitions listed in Enclosure 2.

Method/

Measure

Date

Planned

Date

Completed Quality Schedule

Mgmt.

Regulatory Other

Areas

CI IF 100%

Inspection

TBD

FSTD CPF 100%

Inspection

TBD

Records, CDRLSs and

Reports

100%

TBD

Enclosure (3) cont. --- SURVEILLANCE ACTIVITY CHECKLIST

Monthly Summary of Ratings:

Quality Schedule Number of Exceptional ____ Number of Exceptional ____

Number of Very Good ____ Number of Very Good ____

Number of Satisfactory ____ Number of Satisfactory ____

Number of Marginal ____ Number of Marginal ____

Number of Unsatisfactory ____ Number of Unsatisfactory ____

Management Regulatory Number of Exceptional ____ Number of Exceptional ____

Number of Very Good ____ Number of Very Good ____

Number of Satisfactory ____ Number of Satisfactory ____

Number of Marginal ____ Number of Marginal ____

Number of Unsatisfactory ____ Number of Unsatisfactory ____

Other Areas Number of Exceptional ____ Number of Very Good ____

Number of Satisfactory ____

Number of Marginal ____

Number of Unsatisfactory ____

Enclosure (3) cont. --- SURVEILLANCE ACTIVITY CHECKLIST

Annual Surveillance:

The COR(s) and Logistics Manager will perform annual assessments of their respective areas and overall contract performance utilizing the CPARS evaluation rating definitions listed in Enclosure 2 and the monthly summary of ratings. This annual assessment will cover the previous 12 months.

Description

Method/

Measure

Date Planned Date Completed Summary

Rating/Results

Quality Review of

Monthly Ratings.

Schedule

Monthly Ratings.

Management

Monthly Ratings

Regulatory

Other Areas