This performance work statement outlines requirements for flight simulation training devices to support the TH-73A Aircrew Training Services contract at Naval Air Station Whiting Field in Florida. The contractor must provide twelve Level 7 flight training devices and six Level 6 devices with specified visual, motion, and instructor station capabilities. The contractor is also responsible for installing and removing the devices, providing maintenance and operator support during 16.5 operational hours per day between 0600-2230 Monday through Friday. Annual evaluations will assess compliance, and performance will be measured using a contractor performance factor calculating chargeable downtime. Payment will be reduced according to a schedule if the performance factor is less than 100% for any period.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum B – TH-73A ATS PWS FSTD i
TH-73A AIRCREW TRAINING SERVICES (ATS)
PERFORMANCE WORK STATEMENT (PWS)
Addendum B
FLIGHT SIMULATION TRAINING DEVICES (FSTD)
At
Naval Air Station (NAS) Whiting Field, Milton, FL
Prepared By:
NAVAL AIR WARFARE CENTER
TRAINING SYSTEMS DIVISION
Orlando, FL 32826 ii
TABLE OF CONTENTS
CONTRACTOR-PROVIDED FSTD REQUIREMENTS
FSTD TASKS
SPECIFIC TYPE AND NUMBER OF REQUIRED FSTDS
Level 7 Flight Training Devices (FTDs) Level 6 FTDs Instructor Operator Station (IOS) Functionality Central Control Station (CCS) Brief / Debrief Station FTD Commonality Additional FTD Requirements
GOVERNMENT FACILITY SUMMARY
BUILDING 3005
BUILDING 2946
TEMPORARY FACILITY
BUILDING INTERCONNECTION
GOVERNMENT FSTD EVALUATION
GOVERNMENT EVALUATION CARD DESCRIPTIONS
PERFORMANCE ISSUES
FACTORY EVALUATION
Method Time
SITE EVALUATION
CCS EVALUATION
Method Time
“GOLDEN ARM”
INSTALLATION/REMOVAL OF CONTRACTOR-PROVIDED FSTDS
INSTALLATION OF CONTRACTOR-PROVIDED FSTDS
Grounding Installation Process Disposal of Hazardous Material Facility Repairs Disposal of Debris Product Installation Support Safety Requirements
REMOVAL OF CONTRACTOR-PROVIDED FSTDS
Contractor Equipment
FSTD OPERATION
FSTD CONTRACTED TRAINING TIME (CTT)
FSTD CTT OPERATIONAL HOURS PER DAY / OPERATIONAL HOURS PER WEEK
ADJUSTMENT OF CTT
MAKE-UP OF LOST TRAINING
CONTRACTOR TRAINING DEVICE OPERATIONS RESPONSIBILITIES
iii
WALK-IN STUDENTS
UNSCHEDULED PERIODS
ANNUAL FSTD EVALUATIONS
TRAINING COMMENT/UTILIZATION FORM (TCUF)
CONTRACTOR FSTD PERFORMANCE
GOVERNMENT SURVEILLANCE
Surveillance Methods
PERFORMANCE REQUIREMENTS SUMMARY (PRS) COLUMNS DEFINITIONS
CONTRACTOR PAYMENT
Payment at Unit Price
CONTRACTOR PERFORMANCE FACTOR (CPF)
CPF Formula Downtime Determination CPF Calculation
EXAMPLE OF PAYMENT COMPUTATIONS
FSTD CTT PERFORMANCE REQUIREMENTS SUMMARY (PRS)
Performance Work Statement
For TH-73A ATS
Flight Simulation Training Devices (FSTDs)
CONTRACTOR-PROVIDED FSTD REQUIREMENTS
This PWS Addendum B specifies the baseline functionality requirements of the contractor-provided FSTDs for TH-73A ATS. Additional detailed requirements are specified in
Appendix C.
FSTD Tasks
The contractor is required to provide FSTDs necessary to support Chief of Naval Air Training
(CNATRA) rotary wing training. CNATRA has determined, specifically, that a mixture of
Federal Aviation Administration (FAA) Level 6 and Level 7 Flight Training Devices (FTDs) will provide a cost effective blend of functionality and inherent fidelity as the most appropriate
FSTD to teach the required learning objectives, tasks, malfunctions and flight skills in accordance with (IAW) TH-73A Naval Air Training Operating Procedures Standardization
(NATOPS) manual, associated curricula and Flight Training Instructions (FTIs). The training tasks to be accomplished include, but are not limited to the following:
a. Cockpit procedural training
b. Radio procedures
c. Course rules
d. Ground operations
e. Flight operations
f. Emergency procedures
g. Engine Failure and Autorotation skills
h. Basic instruments
i. Radio instruments
j. Low Level Navigation
k. Night-Unaided and Night Vision Goggle (NVG) operations
l. Tactics/Confined Area Landings (CALs)/Pinnacle/and Slope Landings/Reduced
Visibility Landings
m. High Altitude Mountainous Terrain and High Temperature Desert Terrain Operations
n. Search and rescue (Hoist Operations)
o. External load operations
p. Ship operations to include shipboard landing (visual and instrument)
q. Formation flight including NVG Formation
r. Instructor under training procedures
s. Sortie brief/debrief
Specific Type and Number of Required FSTDs
CNATRA validated requirements dictate that the following are the type and number of contractor-provided FSTDs that are required as part of the training services at NAS Whiting
Field to meet its training throughput requirement long-term forecast:
Level 7 Flight Training Devices (FTDs)
Twelve (12) TH-73A Level 7 FTDs shall have:
a. A short-throw, 6-Degree of Freedom (6-DOF) Motion System to provide motion cuing with a minimum 60hz response rate and realistic, platform based, low-frequency correlated vibration IAW 14 CFR Part 60, achieving 50ms or better transport delay performance.
b. A Visual System capable of displaying a minimum of 240˚ h x 70˚ v (approx. +30˚,-40˚)
Field of View (FOV), with a pilot and copilot direct view chin window, and a
“Greenhouse” overhead look-through ability via direct view visuals or expanded vertical field of view, that facilitate high-angle-of-bank and nose pitch maneuvers, capable of displaying Visual Meteorological Conditions (VMC), Instrument Meteorological
Conditions (IMC), day, and night conditions with real spectrum NVG stimulation.
The contractor shall obtain from the FAA a Technical Letter of Equivalency for the first Level 7
FTD with a short throw motion system to ensure all requirements of the 14 CFR Part 60, Appendix D, and PWS are met. This Level 7 FTD with FAA Technical Letter of Equivalency will be considered the “parent” FTD for follow-on Level 7 FTDs and all Level 6 FTDs.
CNATRA pilots will act as the contractor’s “Sponsor” Subject Matter Expert (SME) pilots during the FAA evaluation process.
Level 6 FTDs
Six (6) TH-73A Level 6 FTDs shall have:
a. A Visual System capable of displaying a minimum of 180˚ h x 55˚ v (approx. +15˚, -40˚)
FOV with a pilot and copilot direct view chin window, and a “Greenhouse” overhead look-through ability via direct view visuals or expanded vertical field of view, that facilitate high-angle-of-bank and nose pitch maneuvers, capable of displaying VMC, IMC, day, and night conditions with real spectrum NVG stimulation.
b. At a minimum, a single channel (correlated) base-vibration system with appropriate low-speed aerodynamics model match IAW 14 CFR Part 60.
Instructor Operator Station (IOS) Functionality
The FTDs shall have an IOS which is the primary way to start up, control, interact with, and shut down the FTDs. The functionality, location, and layout of the IOS is paramount in the effectiveness and usefulness of the training device. The specific requirements for IOS functionality are provided in Appendix C.
1.2.3.1 Remote IOS Tablet
The tablet shall be accessible from either the pilot or the copilot seat and not interfere with flight controls, the monitoring of any flight instruments, nor adversely block the visual scene when stowed.
The tablet shall be able to control the device in the same manner and extent as the IOS, including, but not limited to, the ability to start an event, control recording functions, initiate malfunctions, change environmental settings, create and modify traffic, create and control
Landing Signal Enlisted (LSE), initiate scenarios, adjust position of aircraft via slewing or repositioning, and any other functions necessary to conduct all training events from the cockpit.
Video feed is not necessary for the tablet. The contractor shall be responsible for all connectivity requirements for the remote tablet regardless of configuration.
Central Control Station (CCS)
The contractor shall provide the following type and number of CCS in order to maximize the training effectiveness of the installed FSTDs:
a. The CCS shall be a remote IOS and Air Traffic Control (ATC) station that has the ability to affect and control any of the IOS functionality and communication functions of any of the individual FTDs, with the additional capability of being able to link, control, and communicate with FTDs in combined scenarios for training.
b. Two CCS, each having a minimum of two operator stations for two Contract Instructors
(CIs) who can conduct training operations across multiple groups of linked simulators, simultaneously. The CCS shall include the ability to selectively transmit to the right seat, left seat, IOS station, all positions, all instructors or all students for one or more linked groups of FTDs. The CCS shall allow an instructor to link and control as many as 18
FTDs simultaneously, with any size and number of linked simulator groups. Aircraft crashes shall not freeze the entire linked group. Instructors shall be able to restart crashed aircraft individually at a desired user selectable point in space and flight parameters. The desired state shall provide a minimum three standard reposition states that are selectable by the user following a crash. The three standard repositions are: a time selectable reset able to select a time location down to hour, minute, second (0:00:01) level detail for the event, a location selectable reset based upon flight prior to the crash allowing selection as far back as the beginning of the event, and a geographic location reset not based on previous flight path. The instructor shall have the ability to restart the simulation for an individual FTD without adversely affecting other FTDs in the group.
c. Additional requirements for CCS functionality are listed in Appendix C.
Brief / Debrief Station
The contractor shall provide the capability to brief and debrief flight events using flight information and graphics, in a location other than the FTD. This system shall have the ability to import and display pertinent route, instrument and performance data from a flight event and display it in a user friendly format for analysis during the pre-flight and post-flight briefings. The requirements for brief/debrief functionality are provided in Appendix C.
FTD Commonality
Level 7 and Level 6 FTDs shall share the same aerodynamics, engine model, blade element model, control loading (feel), visual database, and cockpit configuration to prevent negative training when moving between the devices. Cockpits for the devices shall reflect the current cockpit configuration of the TH-73A aircraft (as shown in Appendix B) and include all associated avionics equipment, circuit breakers, switches and knobs to ensure tactile learning transfer. Simulated equipment is satisfactory; Aircraft Common Operational Equipment
(ACOE) need not be installed.
Additional FTD Requirements
In accordance with commercial ordering practices, the Government requires the FTDs to conform to FAA Qualification Performance Standards for Level 7 and Level 6 qualification in replicating actual aircraft performance. The FTDs shall replicate the necessary training environment(s) as described below.
1.2.7.1 Visual System Requirements
The visual scene generated shall demonstrate physical scene special effects such as weather and atmosphere, flares, fire, smoke, shadows, and dust clouds. It shall include tessellation incrementally accurate for each operating area. The visual system of all devices shall have visual effects to include a true particle-based volumetric cloud set, generated as real time fluid dynamics and reacting as a function of aircraft load, attitude, cyclic, collective, and relative wind speed. Terrestrial features such as trees, grass, and dust (for brownout) shall appropriately and proportionally respond to the effects of the physics-based particle movement. The Government accepts that in the direct view of the chin bubble area there will be significant parallax error when viewed cross cockpit. Additionally, the visual system shall include the following requirements:
a. Eye point selectability - Each device display shall have easily selectable eye points (pilot, co-pilot, center) from the IOS.
b. Night and NVG Scene – NVG visuals shall be provided via a multi-channel projector solution capable of projecting energy across the visual and near infrared bands of the electromagnetic spectrum. The Government considers a tuned visible light solution that simulates NVG conditions to be below performance objectives. Night and NVG scene shall be created via a combined visible and near infrared light solution, with sufficient dynamic range capable of depriving pilots of all visible light while maintaining a high fidelity NVG scene. NVG training requirements are outlined in Appendix C, paragraph
7.l.1.
The FTD shall have a light-tight and light pollution controlled (i.e. minimal extraneous light from computer monitors, status indicators, server racks, etc.)
enclosure to enable NVG training. To ensure maximum detail and fidelity, the night and NVG visual scene(s) shall be generated from the employment of true
GeoSpecific multispectral data and material albedos at texel level.
c. Hover training – In order to provide hover training to Student Naval Aviators (SNAs), there shall be a hover training feature/course, similar to that described in ADS-33E-PRF, paragraph 3.11.1 and figure 24, that gives intuitive out-the-window indications to train a
5’ skid height, stable hover. The out-the-window feature shall enable the SNA to simultaneously gauge aircraft skid height, forward/aft/lateral drift, and yaw.
d. 3D visuals - The visual system shall display both moving and static realistic 3D visual models to include: Naval air capable ships, ground vehicles on roads, ground vehicles on airports and navy ships, static aircraft and taxiing aircraft on airports and navy ships, LSE personnel at airport and on navy ships, and other air traffic, as described in Appendix C.
e. Detailed visual database requirements to include airfields and low-level routes requirements are provided in Appendix C, paragraph 10.c.1. The Government anticipates that due to timeline constraints, the delivery of the visual database may need to be done in phases, and that multiple working groups will be required for verification of quality and accuracy. The phased delivery requirements are:
Initial FTD delivery: A sufficiently developed database, shall include all airfields and course rules points to include hover training course, and at least one low level navigation route within the TRAWING 5 local operating area, and one ship model capable of supporting shipboard training, as listed in the Rotary-
Wing Operating Procedures (RWOP) Manual, this PWS and Appendix C with full rendering across the day/night/NVG specified capability modes.
Level 7 FTD (3) delivery: The fully developed visual database, delivered with the third Level 7 FTD IAW Section F of this Request for Proposal (RFP), shall include all airfields, navigation routes, and models, as described in this PWS and Appendix C.
1.2.7.2 Other Requirements
a. Stability dampening - The stability of the simulated TH-73A shall be controllable to allow dampening of SNA control inputs (over controlling) by artificially increasing aircraft stability. The variable stability setting shall be selectable from the IOS within a range from 'no added stability' (as compared to the TH-73A) to 'highly stable.'
Additionally, an adaptive mode shall be available where the computer incrementally removes (or adds) dampening as student performance dictates without instructor intervention.
b. Edge-of-Envelope performance – The FTDs shall have the capabilities to train realistic
“edge of the envelope” NATOPS emergency procedures (i.e. the flight model shall use physics based blade element/fluid dynamics and aerodynamic affects to include true particle-based, real time fluid dynamics simulation, reacting as a function of aircraft load, attitude, control position, engine power output, and environment derived relative wind and environmental conditions) that provide realistic system and aerodynamic response beyond the normal “red screen” termination. The Government will require, for certain flight situations, that the simulation continue beyond the objective data for simulation.
Specific requirements are defined in Appendix C.
c. The FTDs shall have a fully functioning avionics suite matching TH-73A aircraft systems. The FTDs avionics suite, and associated software, shall be updated in accordance with the TH-73A aircraft system to include navigation database, avionics software, and associated license or subscription agreements with Original Equipment
Manufacturers (OEMs). When a change to the TH-73A avionics suite software is required, the Government will notify the contractor of the timeline for the aircraft update.
Concurrency update of first FTD shall be completed no later than one month after delivery of the first aircraft cockpit update. Subsequent FTDs shall be updated proportionally to the aircraft update schedule to ensure standardization can be maintained for training.
d. Background radio traffic - The instructor shall be capable of controlling the presence, volume and density of background radio chatter to adequately simulate realistic flight operations at civilian airports, NAS Pensacola, NAS Whiting, at the Outlying Landing
Fields (OLFs), and in the local ATC environment. Live feed (receive only) is acceptable.
In addition to live feed, recordings are required of actual radio chatter with a minimum repeat loop time for recordings of 45 minutes. An Automated Terminal Information
System (ATIS) module shall be provided that simulates ATIS transmitters which may be received by the pilot via radio frequencies. Messages shall be creatable in one of three ways: automatically based on current environmental conditions for an airport selected by the operator, manually entered by the operator, or recorded with a microphone. Radio
Traffic shall also be selectable in pre-built scenarios.
GOVERNMENT FACILITY SUMMARY
The Government will provide existing and temporary Government facilities to house the type and number of FSTDs required at NAS Whiting Field, FL. Facility drawings are provided in
Appendix A. Installation plan will be IAW Government provided transition plan.
Building 3005
Building 3005 has three bays with dimensions of approximately 73’x34’x30’h. Existing TH-57
Level 7 FTDs will be removed concurrent with installation of contractor-provided TH-73A Level
7 FTDs. Proposed FTDs shall have to comply (dimensionally) with clearances for building fire code.
One CCS shall be located on the mezzanine. It shall be installed concurrently with Level 7 FTD installations as specified in Section F of contract.
Building 2946
Building 2946 has bay dimensions of approximately 93’x28’x12’h. The 12’ height is measured from floor to bottom of drop ceiling. Existing TH-57 Level 6 FTDs will be removed concurrent with installation of contractor-provided TH-73A Level 6 FTDs. Proposed FTDs shall have to comply (dimensionally) with clearances for building fire code.
Temporary Facility
A temporary simulator building capable of housing eight TH-73A Level 7 FTDs, as well as corresponding briefing stations is currently designed and funded to provide the required amount of space throughout the transition period. The dimensions of the temporary simulator building are approximately 163’x89x20’h. Proposed FTDs shall have to comply (dimensionally) with clearances for building fire code.
The second CCS shall be located in the temporary facility.
Building Interconnection
The Government will provide the contractor access to one underground cable conduit approximately 4 inches in diameter for connections between buildings 2946 and 3005. This conduit has approximately 60% capacity available for use.
Additionally, the Government will provide two underground cable conduits, each approximately
4 inches in diameter between the temporary simulator building and building 3005. As an alternate option, the Government will provide sufficient fiber pathways between building 2946 and the temporary simulator building, via a connection to building 3125.
GOVERNMENT FSTD EVALUATION
Government Evaluation Card Descriptions
Evaluation cards will be created by the Government for each training area and requirement category (Familiarization, Instruments, IOS, Debrief Station, CCS, etc.) and will follow
Appendix C Subjective Requirements. The Subjective Requirements are derived from and intended to amplify the 14 CFR Part 60, Appendix D, Table D1B “Minimum FTD
Requirements” and Table D3A “Table of Functions and Subjective Tests Level 7 FTD.” Sample evaluation cards are provided in Appendix D.
There is no limit or constraint to the length and level of detail for the evaluation cards. All evaluation items shall be in accordance with this PWS. The capability of the CCS shall be confirmed with scenarios that use various environmental, communications, and aircraft configurations. The evaluation cards shall be completed and signed by the Government SME, and a copy will be maintained by the Government, and provided to the contractor showing the results of the evaluation. Evaluated items may be assessed as meeting the Government’s requirement or not meeting the Government’s requirements.
Performance Issues
The evaluation cards shall be the primary documentation for issues discovered during the evaluation. The Government will compile all performance issues discovered during the evaluation and provide them to the contractor within one week of completing the evaluation.
Issues that do not meet PWS requirements shall be corrected prior to a device being considered
Ready for Training (RFT).
Factory Evaluation
A Government evaluation will be conducted at the contractor’s facility to evaluate the first contractor-provided Level 7 and Level 6 FTDs and the CCS prior to delivery.
Method
The Government will provide a select number of SMEs to conduct an evaluation of the device and all required capabilities. The SMEs will use evaluation cards generated by the Government and provided to the contractor no later than two weeks prior to the evaluation. The SME names and required information for conducting the evaluation will be provided to the contractor no later than 1 week prior to the evaluation. Changes to the SMEs due to mission requirements will be communicated as soon as possible, and will not change the conduct or content of the evaluation.
Time
The Government will have 10 business days to complete the evaluation. Devices shall be made available in a fully operational state for the Government evaluation. Contractor support shall be available throughout the evaluation. The Government shall be provided no less than 12 working hours per day on each of the 10 business days to conduct the evaluation. Issues with the devices, or associated supporting systems that prevent the Government from continuing or completing the evaluation will not be counted against the 10 day evaluation period, and additional time shall be afforded for any delays in the evaluation. Delays associated with Government availability due to travel issues, lack of SME support, or other non-contractor related issues will not increase the 10 business day period for the Government evaluation. Changes to the evaluation timeline are authorized if both parties agree, in writing, to the change.
Site Evaluation
The onsite NAS Whiting Field evaluation shall be conducted upon installation completion by the contractor and prior to each device being RFT. The evaluation will be conducted in the same manner as the factory evaluation. Issues that do not meet PWS requirements shall be corrected prior to a device being considered RFT.
CCS Evaluation
The CCS shall be evaluated using evaluation cards. The devices shall be available for use during the evaluation period. Contractor support for the evaluation using all devices and the CCS shall be present. The evaluation of the CCS shall focus on the ability of the station to conduct control of scenarios, devices, and individual training events from the CCS. The evaluation of the ATC station shall focus on the ability of the station to conduct air traffic control during scenarios involving one or more devices conducting training where controlling agencies would be present.
This includes, but is not limited to tower controlled airfields, controlled airspace, Instrument training, Shipboard training, and mission scenario control.
Method
The Government will provide SMEs to conduct an evaluation of the CCS and all required capabilities. The SMEs will use evaluation cards generated by the Government and provided to the contractor no later than two weeks prior to the evaluation. The evaluation will be conducted using SMEs in the devices and at the stations to conduct the scenarios. Contractor support shall be available at each IOS station for devices being used, and at the CCS.
Time
The Government shall have four business days to complete the evaluation. Devices shall be made available in a fully operational state for the Government evaluation. Contractor support shall be available throughout the evaluation. The Government shall be provided no less than 12 working hours per day on each of the four business days to conduct the evaluation. Issues with the devices, or associated supporting systems that prevent the Government from continuing or completing the evaluation shall not be counted against the four day evaluation period, and additional time shall be afforded for any delays in the evaluation. Delays associated with
Government availability due to travel issues, lack of SME support, or other non-contractor related issues will not increase the four business day period for the Government evaluation.
Changes to the evaluation timeline are authorized if both parties agree, in writing, to the change.
“Golden Arm”
The Procuring Contracting Officer (PCO) will notify the contractor of the Government identified
“golden arm” who will be a CNATRA SME. The golden arm will serve as the primary point of contact for simulator issues and will make all final determinations for in-scope decisions regarding the technical adequacy for training of the devices and established contract support throughout the Technical Interchange Period and FTD evaluations. SMEs assisting with simulator production, and conducting evaluations will provide inputs to the golden arm. The golden arm is not a contracting officer and will not have authority to change or modify the contract, and is not authorized to commit the Government to anything beyond the scope of the contract. Any issues considered out of scope, or that will require additional funding from the
Government require PCO approval, and cannot be authorized by the golden arm. Changes to the golden arm will be communicated to the contractor as soon as a change is required.
INSTALLATION/REMOVAL OF CONTRACTOR-PROVIDED FSTDS
The Government will provide the required facilities capable of housing, operating, and securing required contractor-provided training devices. Office space (as available) will be provided for support personnel.
Installation of Contractor-provided FSTDs
The location, placement, and set up of all contractor-provided FSTDs shall require Government approval. The Government will work with the contractor to establish a staging area to support the contracted efforts, but space is limited and the Government makes no warranty at this time with regard to its ability to provide such an area.
The Government will provide all electrical power required for device operations without “bill back” to the contractor. The Government will not provide backup power generation in the simulator facilities. The contractor is responsible for any additional power requirements beyond that supplied with the building, including uninterruptible power supply (UPS) units or backup power generation. In the event of an electrical power failure, the Government requires that FTDs be returned to service within 1.5 hours following the return of power. In the event of an extended power loss situation the Government is not responsible for loss of device structural or data integrity, caused by interruption to electrical power.
The simulator bays in buildings 2946 and 3005 have cooling capacity that supported the operation of previous Government simulators. If the contractor’s devices require augmented cooling, the contractor will be responsible to provide that additional cooling. No facility modifications will be approved by the Government to facilitate additional cooling.
Grounding
The contractor shall ensure that the training system is grounded per NFPA 70, Article 250. The contractor shall conform to Occupational Safety and Health Administration (OSHA), Naval
Facilities Engineering Command (NAVFAC) Unified Facilities Criteria (UFC), and NAS
Whiting Field, FL Safety requirements for construction throughout the time the work is being performed.
Installation Process
The contractor shall deliver, off-load, assemble, install, and test the training device equipment and support systems to the Government provided facility. All connection cables supplied by the contractor shall be plenum rated. During the installation, the contractor shall be responsible for opening, safeguarding, and controlling access into the training facility area and training device equipment.
Disposal of Hazardous Material
The contractor shall ensure that the disposal of materials removed or replaced as a result of device removal, installation, or modification that are defined as hazardous materials by Navy
Occupational Safety & Health (NAVOSH), OSHA and the Environmental Protection Agency
(EPA), conforms to all base, local, state, and federal regulations.
Facility Repairs
The contractor shall repair facility or equipment damage, caused by the contractor during the installation and integration of the training device to a like new condition, at no additional cost to the Government.
Disposal of Debris
The contractor shall remove any dirt, spills, debris, and dispose of all waste resulting from contractor actions related to this effort, IAW base safety and environmental management policies and procedures.
Product Installation Support
The contractor shall provide all the support equipment, special handling equipment, to include lifting and off-loading equipment, data, and qualified personnel needed to support the training device installation effort. The contractor shall repair damages caused by the contractor to the equipment and the facility area during transportation, off-loading, installation, and test.
Safety Requirements
In performing the contract, the contractor shall provide for protecting the lives and health of employees and other persons, and for preventing damage to property, materials, supplies, and equipment IAW the latest revision of the U.S. Army Corps of Engineers "Safety and Health
Requirements Manuals" (EM 385 1 1) and 29 CFR 1910.147. Prior to commencement of the work, the contractor shall meet in conference with representatives of the Base Safety Officer to discuss and develop mutual understandings relative to the administration of safety. All OSHA work standards shall be followed including Lockout/Tagout procedures. Electrical Safety Code and 29 CFR 1910.147 shall be specifically followed.
Removal of Contractor-provided FSTDs
Contractor Equipment
The contractor shall, within thirty calendar days after the expiration of this contract, remove contractor-provided items from the Government site. All teardown, packaging and transportation of devices and equipment shall be at the expense of the contractor. Government spaces shall be left clean and free of debris. Any facility damage caused by the contractor during contract performance, or during removal of contractor-provided items, shall be repaired at contractor expense.
FSTD OPERATION
FSTD Contracted Training Time (CTT)
FSTD operation will normally be scheduled during CTT. If scheduling outside CTT is required, the Contractor will be given twenty-four hours notice.
FSTD CTT Operational Hours Per Day / Operational Hours Per Week
FSTD CTT – OPERATIONAL HOURS PER DAY (OHPD)
16.5 OHPD (M-F)/
10.5 OHPD (Sat)
18 OHPD (M-F)/
12 OHPD (Sat)
19.5 OHPD (M-F)/
13.5 OHPD (Sat)
0600-2230 (M-F)
0700-1730 (Sat)
0600-2400 (M-F)
0700-1900 (Sat)
0430-2400 (M-F)/
0600-1930 (Sat)
*NOTES:
1. Operational hours per day (OHPD) support, while defined generically as a number of
OHPD over a Monday-Saturday period, shall be adaptive to variability in planned, scheduled and actual utilization requirements.
2. Extension of training hours to make up for lost training may be performed as coordinated with the Contracting Officer's Representative (COR).
3. All training services shall be in accordance with the applicable CNATRA Syllabi;
NATOPS manual or Navy Standard Operating /Supplemental Procedures.
Adjustment of CTT
Adjustment of CTT will usually be constrained to movement of the standard time block to a different part of the day, but in unusual cases, may include expansion of the standard time block.
The Government will consider shift cycles in making adjustments and provide a 24 hours minimum notice (regular duty days) of changes to CTT.
Make-up of Lost Training
Make-up of lost training due to Chargeable Down Time (CDT) can, at the discretion of the COR and Government scheduling authority, and commensurate with the urgency of the training need, be accomplished outside of CTT. This make-up of lost training will be at no additional cost to the Government and will result in no CDT being charged to the Contractor. Except where precluded by the proximity of the scheduled training period to the end of CTT (e.g., last period for each day), the Contractor will be given three hours minimum notice of make-up training requirements. Make-up of lost training shall be completed within 5 days of CDT.
Contractor Training Device Operations Responsibilities
Prior to the daily CTT, the contractor will ensure training devices are fully operational and ready at the commencement of each training day. This will include the insertion of initial conditions and parameters in response to published schedules (including revisions) without specific instructor/user direction. Contractor support personnel are not responsible for providing instruction to students.
a. Contractor maintenance personnel shall respond within five minutes of notification of device failure for all training events during CTT, make-up, and additional training periods. Failure of the Contractor to restore device to fully operational condition within
15 minutes may result in CDT for the entire period, at the discretion of the COR.
b. Contractor support personnel shall respond to specific direction from the Government for required/desired initial conditions/settings of controls/indicators at the trainer and instructor stations and for peripheral/auxiliary equipment to include remote IOS tablet.
As defined here, "the Government" refers to anyone the United States Government establishes as authorized to utilize the training device for scheduled utilization, to include
U.S. military personnel, other U.S. Government personnel, and Government authorized foreign military personnel, contractor instructor personnel, and others as the Government establishes.
Walk-in Students
The training devices shall be available for walk-ins during CTT. Contractor support personnel shall be available to assist but shall not provide instruction to a trainee (other than for safety related to using the training device).
Unscheduled Periods
During unscheduled periods during CTT, when no walk-ins are present, the Contractor may perform maintenance, in coordination with the COR. The COR may direct the Contractor to have the training device ready for use.
Annual FSTD Evaluations
The Contractor shall participate in annual FSTD evaluations by the Government. Annual FSTD evaluations shall consist of repeating the evaluation cards from factory evaluation. The
Contractor shall maintain the FSTDs to a standard that allows evaluation compliance at all times.
Contractor time spent performing evaluations will be considered scheduled training unless otherwise directed by the COR. Reporting of evaluation discrepancies will be IAW Contract
Data Requirements List (CDRL) A003.
Training Comment/Utilization Form (TCUF)
The Contractor shall provide a TCUF that can be completed by the student/device instructor for each scheduled training period.
CONTRACTOR FSTD PERFORMANCE
Government Surveillance
Surveillance Methods
The Government will use the following surveillance method to evaluate the Contractor's FSTD performance:
a. Periodic surveillance of output items (daily, weekly, monthly, quarterly, semiannually, or annually) as determined necessary to assure a sufficient evaluation of Contractor performance, up to 100% surveillance.
Performance Requirements Summary (PRS) Columns Definitions
The PRS charts are provided in paragraphs 6.6 below. The columns of the PRS chart are identified as follows:
a. Column (1), Required Service. Identifies those PWS requirements for which the
Government may take a deduction for nonperformance. The absence from this PRS of any contract requirement, however, shall not detract from its enforceability or limit the rights or remedies of the Government under any other provision of the contract, including the clauses entitled "Inspection of Services" and "Default."
b. Column (2), Standard. Defines the standard of performance for each listed service.
c. Column (3), Maximum Allowable Degree of Deviation from Requirement AQL.
Provides the Acceptable Quality Level (AQL) for each listed service.
d. Column (4), Lot Size. Defines the lot size used as the basis for surveillance or for payment computation purposes.
e. Column (5), Method of Surveillance. Identifies the primary surveillance methods the Government will use to evaluate the Contractor's performance in meeting the contract requirement.
f. Column (6), Maximum Payment % for Meeting AQL. Provides the percentage of the contract price less supply support allowance, if applicable, that each Required
Service represents of a specific FFP requirement.
Contractor Payment
This section does not limit the Government's rights under FAR 52.249-8 (Default - Fixed - Price
Supply and Service) referenced in Section I of this contract. The Government may find the contractor in default for any deficiencies in services. In addition, the Government may withhold some or all payments pursuant to FAR 52.246-4 (Inspection of Services – Fixed-Priced) referenced in Section E of this contract.
Payment at Unit Price
Performance of a listed service will be accepted and paid for at the maximum payment percentage specified in Column 6 of the PRS when the number of defectives found by the
Government during contract surveillance does not exceed the number of defectives allowed by the AQL in Column 3. If performance of a required service exceeds the AQL shown, payment for that service shall be reduced.
6.3.1.1 Schedule of Deductions
Reductions in payment shall be made in accordance with the following Schedule of Deductions
(monthly):
Contractor Performance
Factor (%)
% Deducted from Preset
Amount*
Contractor Performance
Factor (%)
% Deducted from Preset
Amount*
100 0 91 - 91.9 25
99 – 99.9 2 90 - 90.9 30
98 – 98.9 4 89 - 89.9 35
97 – 97.9 6 88 - 88.9 40
96 – 96.9 8 87 - 87.9 45
95 – 95.9 10 86 - 86.9 50
94 - 94.9 12 85 - 85.9 55
93 - 93.9 15 Below 85 60
92 - 92.9 20
* NOTE: “% Deducted from Preset Amount” will be based on Column 6 percentage of CLIN.
Contractor Performance Factor (CPF)
CPF Formula
CPF shall be measured in terms of CTT and CDT. As a percentage, CPF is defined as:
CPF = [CTT - CDT] X 100
CTT
CTT = Contracted Training Time
CDT = Chargeable Downtime
Downtime Determination
Determination as to whether downtime is chargeable or non-chargeable will be made by the COR based upon the discrepancy forms completed by the instructor or by other appropriate means.
Downtime for aircraft cockpit concurrency upgrades will be non-chargeable downtime.
6.4.2.1 Degraded FSTD Definition
Degraded mode, is defined as an FSTD that meets the basic training requirements in accordance with the Master Curriculum Guide (MCG) for the specific event, but has discrepancies that prevent the device from being used for all MCG training events. If training requirements for a specific event are met, there will not be CDT.
CPF Calculation
The CPF is calculated as follows:
STEP 1: Determine the CDT. This is a summation of that portion of CTT during the reporting period in which the entire device was not available for training (or degraded to a level that the device could not support the training goals) due to Contractor responsibility for factors other than those designated non-chargeable.
STEP 2: Determine the CTT. This is a summation of the CTT including any additional training time for the reporting period.
STEP 3: Calculate CPF. The calculation of CPF can now be accomplished by using the formula in section 6.4.1 above.
Example of Payment Computations
The contractor shall be paid the unit price for a 100% CPF for each requirement separately priced in the contract. Failure to achieve a weekly CPF of 100% shall result in a reduction of the weekly payment amount for non-performance of services. The percent to be deducted for non-performance of services for deficient CPF are set forth above in section 6.3.1.1.
Example (CTT):
Known Data: CPF of 91% for CTT - Obtained from Weekly FSTD Contractor Performance Summary
Report (CPSR).
Calculation:
(1) Weekly FFP $10,000
(2) Maximum Payment (%) for services (Col. 6 of PRS Chart in Section 6.6) 100%
(3) Payment for acceptable service ($10,000 x 100%) $ 10,000
(4) Deduction 25% (See para 6.3.1.1 for 91%) ($10,000 x 0.25) $ 2,500
(5) Weekly Payment ($10,000-$2,500) $ 7,500
FSTD CTT Performance Requirements Summary (PRS)
Required Service Standard
Maximum
Allowable Degree of Deviation from
Requirement AQL
Lot Size Method of
Surveillance
Maximum Payment
% for Meeting the
AQL *
Column No. 1 Column No. 2 Column No. 3 Column No. 4 Column No. 5 Column No. 6
1. Contractor Performance
Factor (CPF)
CPF at 100% during each period
0% Total number of contracted training time hours specified for each trainer for the period being inspected.
100% Inspection 100%
Note *: See Schedule of Deductions in paragraph 6.3.1.1.