This solicitation seeks proposals for non-SUBSAFE pipe and structural welding, interference removals including cabling and sound damping tile removal, blanking of main ballast tanks and exterior tanks to support the USS Jacksonville Propulsion Plant Deactivation Availability. The work will be performed at Puget Sound Naval Shipyard and Intermediate Maintenance Facility in Bremerton, Washington from September 1, 2021 to December 20, 2021. The Navy intends to award a firm-fixed-price standalone contract in August 2021 to the responsible contractor with the lowest price technically acceptable proposal in accordance with FAR 15.101-2. Prospective offerors must be registered in the System for Award Management to be eligible for award.

View the file

Other files

File Type Posted
CUI C03.0 Answer to Bidder's Questions 022.pdf PDF
CUI C03.0 Answer to Bidder's Questions 023.pdf PDF
CUI C03.0 Answer to Bidder's Questions 021.pdf PDF
CUI C03.0 Answer to Bidder's Questions 019.pdf PDF
CUI C03.0 Answer to Bidder's Questions 017.pdf PDF
CUI C03.0 Answer to Bidder's Questions 018.pdf PDF
CUI C03.0 Answer to Bidder's Questions 013.pdf PDF
CUI C03.0 Answer to Bidder's Questions 015.pdf PDF
CUI C03.0 Answer to Bidder's Questions 014.pdf PDF
CUI C03.0 Answer to Bidder's Questions 020.pdf PDF
CUI C03.0 Answer to Bidder's Questions 016.pdf PDF
CUI C03.0 Answer to Bidder's Questions 012.pdf PDF
CUI C03.0 Answer to Bidder's Questions 011.pdf PDF
CUI C09.0 Attachment J-2 USS JACKSONVILLE - Work Item Package (Errata 5).pdf PDF
CUI C03.0 Answer to Bidder's Questions 008.pdf PDF
CUI C03.0 Answer to Bidder's Questions 006.pdf PDF
CUI C03.0 Answer to Bidder's Questions 007.pdf PDF
CUI C03.0 Answer to Bidder's Questions 004.pdf PDF
CUI C03.0 Answer to Bidder's Questions 005.pdf PDF
CUI C09.0 Attachment J-2 USS JACKSONVILLE - Work Item Package (Errata 4).pdf PDF
CUI C03.0 Answer to Bidder's Questions 009.pdf PDF
CUI C03.0 Answer to Bidder's Questions 010.pdf PDF
CUI C03.0 Answer to Bidder's Questions 003.pdf PDF
CUI C04.0 Attachment J-7 Request for Clarification (Rev 1).pdf PDF
CUI C09.0 Solicitation N4523A21R0800 Amendment 0003.pdf PDF
CUI C09.0 Solicitation N4523A21R0800 Amendment 0002.pdf PDF
CUI C09.0 Attachment J-2 USS JACKSONVILLE - Work Item Package (Errata 3 Rev 1).pdf PDF
CUI C03.0 Answer to Bidder's Questions 002.pdf PDF
CUI C09.0 Solicitation N4523A21R0800 Amendment 0001.pdf PDF
CUI C03.0 Answer to Bidder's Questions.pdf PDF
CUI C09.0 Attachment J-2 USS JACKSONVILLE - Work Item Package (Errata 3).pdf PDF
CUI C04.0 Attachment J-1 GFPN4523A21R0800_1.pdf PDF
CUI C04.0 Attachment J-2 USS JACKSONVILLE - Work Item Package.pdf PDF
CUI C04.0 Attachment J-7 Request for Clarification.pdf PDF
CUI C04.0 Attachment J-5 Previous Efforts Form.pdf PDF
CUI C04.0 Attachment J-6 SER 440_220 Contractor Travel and ROM.pdf PDF
CUI C04.0 N4523A21R0800 USS JACKSONVILLE.pdf PDF
CUI C04.0 Attachment J-4 Pricing Proposal Worksheet.xlsx XLSX spreadsheet
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this modification is to correct paragraph L1.b.8 so that it states the Small Business Subcontracting Plan is to be included in Volume III.

This amendment also increases the page limit for the price proposal cover letter from 2 pages to 50 pages.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 10

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 22-Apr-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N4523A21R0800

X 9B. DATED (SEE ITEM 11)

26-Mar-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

22-Apr-2021

CODE

PUGET SOUND NAVAL SHIPYARD CODE 400

1400 FARRAGUT

CONTRACTING CODE 440

BREMERTON WA 98314

N4523A 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4523A21R0800

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been modified:

INST., COND. & NOTICES

SECTION L

1. GENERAL:

a) Instructions:

1. Offerors shall submit their proposal in accordance with the following preparation instructions. The Government will consider any failure on the part of an offeror to comply with these instructions to be an indication of the quality of performance it can expect during contract performance. Therefore, the Government encourages offerors to contact the Contracting Officer in writing in order to request an explanation of any aspect of these instructions.

2. Each Offeror may submit only one proposal. No alternate proposals will be accepted and submission of multiple proposals will result in disqualification of any Offeror submitting multiple proposals. The Offeror’s proposal submission should contain the Offeror’s best terms from a price and technical standpoint.

3. A proposal should not simply rephrase or restate the Government’s requirements but rather provide convincing rationale to address how the offeror meets these requirements. Offerors shall assume that the Government has no prior knowledge of their facilities and experience and will base its evaluation on the information presented in the offeror’s proposal.

4. The Government may contact any, all, or a limited number of Offerors with questions concerning their proposals as permitted under FAR Part 15.

5. The overall security classification of the proposal shall be UNCLASSIFIED. If the offeror needs to provide classified material, it shall be separated from the unclassified material and submitted as a supplement to the appropriate volume, and handled in accordance with appropriate security procedures. Any classified supplement will be considered a part of the stated page limitations of the appropriate volume. NO classified material is expected for this solicitation. Please contact the Contract Specialist administering this RFP, before any classified material is submitted.

6. If an offeror believes that the requirements in these instructions contain an error, omission, or are otherwise unsound, the offeror shall immediately notify the Contracting Officer in writing with supporting rationale as well as the remedies the offeror is asking the Contracting Officer to consider as related to the omission or error.

7. Relationship between Instructions and Evaluation: Your attention is directed to the functional relationship between Sections L and M of this solicitation. Section L provides information for the purpose of organizing the proposal and is not intended to be all inclusive. Section M describes evaluation factors for award. Since the Government evaluation of proposals will cover areas identified in Section M, proposals should address all such areas of evaluation.

8. ALL INQUIRIES shall be made via email and directed to Alex Stutzman at alexander.stutzman@navy.mil, and Loren Frei at loren.frei@navy.mil. To ensure the Government is able to adequately address and respond to offeror requests for clarification (RFCs) via amendment, if applicable, it is requested questions be submitted no later than 21 APRIL 2021 at 12:00 PM (PT). The Government reserves the right to not answer any requests received after 21 APRIL 2021 at 12:00 PM (PT). Furthermore, offerors should note that the proposal due date will not be extended solely on the basis of requests received. RFCs shall reference the solicitation and specification page and paragraph number and be submitted on a request for clarification form (Attachment J-7) provided with this solicitation. A request for clarification form (Attachment J-7) shall be submitted for each question.

9. “Pricing information,” is defined as facts, statistics, or data describing the consideration an offeror will receive in exchange for furnishing the supplies and services described in this solicitation. Pricing information may only be included within Volume III: Legal/Price Offer. Inclusion of pricing information within any other Volume will likely result in rejection of the Offeror’s proposal, as well as the Offeror being determined ineligible for award. If doubt exists as to what constitutes pricing information, Offeror’s are strongly encouraged to submit a request for clarification in accordance with paragraph 6 of this section.

10. Offerors are reminded past performance information is proprietary source selection information. The

Government will only discuss past performance information directly with the prospective prime or sub-contractor that is being reviewed. If there is a problem with a proposed subcontractor’s past performance the prime may be notified of a problem, but no details will be discussed without the subcontractor’s permission.

11. Each Offeror must submit all information required by this solicitation. The Offeror’s proposal shall be based on the requirements contained in this solicitation (including those documents, exhibits, and other attachments to the solicitation identified in Section J). Failure to comply with the terms and conditions of the solicitation and/or failure to provide all of the requested information may result in the Offeror’s proposal being rejected and may result in the Offeror being determined ineligible for award.

12. The solicitation will be announced through the Government wide point of entry (GPE) at:

https://beta.sam.gov. The Government may post additional information to the GPE relating to this solicitation (e.g. a solicitation amendment responding to submitted Offeror requests for clarification). It is the Offeror’s responsibility to check the GPE for any such information.

b. Proposal Submission Instructions:

1) Electronic Delivery of Proposals: Delivery submissions shall only accepted electronically. Offerors must submit electronic copy of their proposal in accordance with Table 1 below. Proposals shall be submitted via DoD SAFE.

Table 1- Required Submission Process Transmission Process Complete action by Point of Contact Email POC’s to request a Drop off on DoD SAFE.

**Drop off link is only valid for 14 days.** Request Drop off link no later than 27 APRIL 2021 at 12:00 PM (Pacific Time)

Include all POC’s in ALL Electronic communications to include SAFE upload.

Alex Stutzman

Alexander.stutzman@navy.mil

Loren Frei

Loren.frei@navy.mil

POC will send email confirmation back with safe request code.

Close of business

28 APRIL 2021

Upload Electronic response via https://safe.apps.mil/

**SAFE uploads are only available for 7 days**

No later than 30 APRIL 2021 at 12:00 PM (Pacific Time)

******OFFERORS MUST REQUEST A DROP OFF IN DOD SAFE VIA THE POC’S LISTED

ABOVE. PROPOSALS ARE NOT ABLE TO BE SUBMITTED DIRECTLY TO SAFE WITHOUT

A DROP OFF REQUEST******

2) Proposals are DUE NOT LATER THAN 12:00 PM (Pacific Time), 30 April 2021. Late proposals will not be considered. The timeliness of proposals will be determined in accordance with (IAW) FAR 52.215- 1(c)(3)(ii)(A).

3) For an electronic document to be considered as part of the proposal, it must be uploaded to SAFE prior to the closing deadline. Electronic files not uploaded to DoD SAFE prior to the closing deadline will not be considered as part of the proposal. If any portion of the uploaded proposal is unreadable or contains corrupted files, re-submission of such portions shall be handled IAW FAR 15.207(c). IAW FAR 15.208(b)(1)(i), it is highly recommended that offerors upload their proposal to DoD SAFE at least twenty-four (24) hours prior to the solicitation deadline as well as read and become familiar with DoD SAFE located at https://safe.apps.mil/about.php.

4) Proposals submitted via the DoD SAFE tool may be downloaded upon receipt by the Government but will not be opened for evaluation until the solicitation closes.

5) Electronic File Format:

Only the following extensions shall be used:

.docx for Microsoft® Word™ files .xlsx for Microsoft® Excel™ files .pdf for Adobe® Acrobat™ files

Offeror shall not embed sound or video files into submittals. Graphics, tables, photographs, and other data beyond the capability of Microsoft® Word™, Microsoft® Excel™. Programs not currently NMCI-supported applications may be submitted in Adobe Acrobat™ format. Any submission document that requires a “wet signature” or other data input by hand shall be scanned and formatted in Adobe Acrobat™

(PDF).

All spreadsheets shall be in Microsoft® Excel™ format such that each mathematical equation is obvious. No fields shall be password protected.

6) Volume Layout and Page Limitations: The solicitation response shall be contained in three (3) separate volumes. The Offeror’s company name, proposal number, and RFP number (N4523A-21-R-0800)) shall appear at the top of each page in the header section (from left to right). For each volume, the number of copies required and page limit are shown in the table below. To maximize efficiency and minimize the time for proposal evaluation, it is required that all offerors submit their proposals in accordance with the format and content specified below and with the specified page/time limit constraints. Failure to provide the requested information may adversely affect the Government’s evaluation of the offeror.

Proposals shall be submitted in the following quantities and volume layout. At a minimum, each section as outlined below shall constitute a separate file.

Volume Section Title Page Limitations

I

Factor 1 – Technical Capability w/Table of Contents and Glossary

I 2 Subfactor 1.a – Technical Certifications 75

Subfactor 1.b – Management Plan

Subfactor 1.c – Schedule Performance

II

Factor 2 – Previous Contracting Efforts Narrative Form (Attachment J-5)

III

Factor 3 – Price Proposal Cover Letter

Standard For 33 (Solicitation, Offer and Award)

Price Proposal Worksheet (Attachment J-4)

III 4 Small Business Subcontracting Plan 10

Page Format and Size: The narrative text material in the all volumes shall be typed or printed in a font with the type no smaller than size 10 using not less than standard single line spacing. All margins shall be not less than 1 inch. The company name of the offeror and the solicitation number shall appear at the top of each page and may be included in the 1-inch margin. Pages shall be numbered at the bottom, either at the center or edge opposite the binding. The margin space may be used for document identification, page numbering or the offeror’s legend regarding disclosure of data in the proposal. A page is defined as one side of a standard 8 1/2” by 11” paper sheet. Oversized pages are to be fold-out format, with each fold-out counted as a single page. Fold-out pages may be used for diagrams, charts or graphic material only and shall not exceed 11” by 17”. Fold-outs may not be used for narrative text pages. Photo reductions are not permitted for narrative text material. If the proposal exceeds the page limit identified in Table 1, the Government will remove all pages exceeding the specified page count from the back of the proposal prior to the evaluation.

A date shall be placed on each page of the proposal corresponding to the date of the initial proposal. Any pages that may be revised as a result of discussions (if required) shall contain revision numbers and dates and shall be identified by redline.

Drawings, Schematics, Etc.: All drawings shall be “B” sized (as defined by ANSI Y14.1 dated 1995) or reduced to 11” by 17” and included as an attachment to the Technical Volume. Only one copy of any drawing, calculation, or schematic may be submitted with each copy of the proposal. If the offeror believes that more than one factor requires submission of the same documentation, then the proposal should cross-reference the submission in discussions of the successive factor(s).

The overall security classification of the proposal shall be UNCLASSIFIED. If the offeror needs to provide classified material, it shall be separated from the unclassified material and submitted as a supplement to the appropriate volume, and handled in accordance with appropriate security procedures.

Any classified supplement will be considered a part of the stated page limitations of the appropriate volume. NO classified material is expected for this solicitation. Please contact Alexander Stutzman, Contract Specialist, before any classified material is submitted.

NOTE: The Government’s strong preference is for clear, concise proposals that support the evaluation criteria listed in section M of the solicitation.

7) Subcontract Information: In requesting proposals from prospective subcontractors, offerors should provide all necessary information for the contemplated purchase. The Government will not advise prospective subcontractors as to the requirements of their transactions with offerors, nor will the Government respond to direct inquiries from prospective subcontractors concerning clarifications of specification or solicitation requirements. ALL SUCH REQUESTS FOR CLARIFICATION MUST BE SUBMITTED TO THE

GOVERNMENT THROUGH THE PRIME CONTRACTOR (OFFEROR)

8) Small Business Subcontracting Plan. The Offeror’s attention is directed to Section I clauses FAR 52.219-9 and DFARS 252.219-7003 entitled “Small Business Subcontracting Plan.” As prescribed in FAR 19.708, Offerors other than small business concerns shall submit a subcontracting plan and that plan, once approved, shall be made part of any contract resulting from this solicitation. A copy shall be provided in Volume III.

2. VOLUME I – Technical Capabilities Proposal (Factor 1)

Organization: Volume I shall be organized conforming to the required proposal content. Volume I shall be clearly labeled. At a minimum, each section as outlined below shall constitute a separate file. Volume I shall not include pricing information. The Technical Capabilities Proposal shall enable Government technical/engineering personnel to thoroughly evaluate an Offeror’s proposal and arrive at a sound determination of whether or not the proposal is technically acceptable. To this end, the Technical Proposal Volume shall be specific, detailed, and complete. The technical proposal must be sufficient to show how the Offeror proposes to comply with the Government's requirements and include a full explanation of the methodology and procedures to be followed. The technical proposal shall discretely address each of the following sub-factors.

The Technical volume shall be organized in the following manner:

Section 1 Table of Contents & Glossary Section 2 Sub-factor 1.a, Technical Certifications Section 3 Sub-factor 1.b, Management Plan Section 4 Sub-factor 1.c, Schedule Performance

Submission Requirements:

Evaluated Subfactor Submission Requirement Subfactor 1.a Technical Certifications

The contractor must maintain a weld program that meets the requirements S9074-AR-GIB-010/248, "Requirements for Welding and Brazing Procedure and Performance Qualification".

Provide objective quality evidence (OQE) of NAVSEA certification verifying that the contractor has a weld program that meets the requirements S9074-AQ-GIB-010/248, “Requirements for Welding and Brazing Procedure and Performance Qualification.”

The contractor must maintain a nondestructive test program that meets the requirements of T9074-AS-GIB-010/271, "Requirements for Nondestructive Testing Methods".

Qualification of Contractor Nondestructive testing (NDT) Personnel in accordance with NAVSEA Clause HQ C-211-H008 as stated in the solicitation. Specifically, provide list of personnel to be assigned to this requirement for NDT work that possess NDT certificates current as of award date.

The contractor shall maintain a Government accepted Quality Management System (QMS) that complies with the requirements of NAVSEA Standard Item 009-04 (current QM Plan or contractor equivalent) as stated in the solicitation. Specifically, provide current certification.

Subfactor 1.b Management Plan

The plan shall describe the approach for maintaining the contract schedule, operating within approved budgets, meeting milestones, early notification of potential problems, utilizing management metrics to track progress and trends, providing deliverables on-time, and maintaining ongoing operations in an effective manner. The Offeror shall describe within the plan how it will ensure deliveries will meet schedule and quality requirements.

Provide a written description or plan that delineates or demonstrates the ability to:

a) Integrate subcontractors into the project to include schedule and awareness of the overall project;

b) Manage the progress of each subcontractor to ensure timely completion of its work.

Subfactor 1.c Schedule Performance

Provide a written description or plan on how the offeror will staff to accomplish the scope of work as defined by the solicitation, including a detailed breakdown of all trades.

3. VOLUME II – PAST PERFORMANCE (Factor 2)

The offeror shall provide a completed copy of the Previous Contracting Efforts Narrative Form found in Section J, Attachment J-5.

Offerors shall complete Previous Contracting Efforts Narrative Form (Attachment J-5) for at least two but not more than three (3) of their most recently completed contracts (not to exceed three years since completion) for supplies/services that are similar in scope, magnitude and complexity to this procurement. Offerors are encouraged to submit brief and concise responses but may expand the form to provide sufficient explanation. Data submitted other than that requested on Attachment J-5 will not be considered. Failure to submit Attachment J-5 shall be considered certification that the contractor has no past performance for the Government to evaluate.

The Offeror shall provide information which depicts their depth of past performance and qualification under contracts which have helped to establish their management and technical capability for the scope of work and variety of skill categories and manning levels proposed to perform the work consistent with the size and scope of work specified in this solicitation.

The offeror shall provide information for at least two (2) but no more than three (3) previous contracts (to include task orders or delivery orders) completed with a Contractor Performance Assessment Reporting System (CPARS) record (if accomplished) where work was performed by the offeror as either the prime or a significant subcontractor whose effort was relevant. To be considered a significant subcontractor, the offeror’s submitted previous contract documentation must demonstrate evidence of exceeding 10% of the total contract price. To be considered recent, the contract(s) provided should be performed within the three (3) years from issuance date of this solicitation.

To be considered relevant, the offeror’s submitted contracts shall provide documented experience demonstrating the ability to accomplish the requirement presented in the SOW and this request for proposal (RFP).

“SUMMARY LISTS OF CONTRACTS OR INCOMPLETE DATA WILL NOT BE CONSIDERED”.

If your firm has no past performance, affirmatively state this fact in your proposal.

The Government may verify past performance information from any source, to include past performance for contracts not submitted by the offeror. The Government may contact some or all of the references provided, as appropriate, and may collect information through questionnaires, telephone interviews, information on hand, and existing data sources to include but not limited to CPARS.

Note:

o It is incumbent upon offerors to ensure they are providing valid names, phone numbers and e-mail addresses. References that cannot be contacted may result in a neutral rating;

o The references must be customer personnel most familiar with your performance on each of these contracts. The references should be persons involved in performance under the contracts such as: project managers, contracting officer’s representatives, and marine surveyors. (Do not list the Contracting Officer).

o Offerors shall provide a narrative explanation on each of the proposed past performance efforts describing how they are similar in scope, magnitude or complexity to the type of work being solicited, or that your firm has no relevant experience.

4. VOLUME III – LEGAL/PRICE OFFER (Factor 3)

A. Organization: Volume III shall be organized conforming to the required proposal content. Volume III shall be clearly labeled. At a minimum, each section as outlined below shall constitute a separate file.

The price volume shall be organized in the following manner:

Section 1 Cover Letter

Section 2 Completed price proposal worksheet, Attachment J-4

B. Cover Letter: The cover letter must include the following:

o The solicitation number; acknowledgement of applicable amendments;

o The name, address, telephone number, and emails of the offeror;

o Indication of Contractor need of Government Furnished Property (GFP), if applicable.

o A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item;

o Names, titles, telephone numbers and email address of persons authorized to negotiate on the offeror’s behalf with the Government in connection with this solicitation;

o Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent’s authority, unless that evidence has been previously furnished to the issuing office.

o Identification of all separate files included in the proposal package.

o CAGE and Data Universal Numbering System (DUNS) numbers for the prime contractor.

o Period for acceptance of offer. The offeror agrees to hold its offer for 90 calendar days from the date specified for receipt of proposals, unless another time period is specified in an amendment to the solicitation.

C. Standard Form SF33 :

The Standard Form SF 33(s), “Solicitation, Offer, and Award” (SF33), must be completed entirely by the Offeror.

Common mistakes include: (1) failing to complete all of blocks 12-18 on the first page, (2) failing to list pricing for all Contract Line Items (CLINs) and stepladder quantities in Section B, and (3) failing to fully complete SF 33, Section K. To be considered for award, the Offeror must insert 90 days in Block 12 of the SF 33 to ensure adequate time for proposal evaluation and contract award.

If the Offeror’s Representations, Certifications, and Other Statements of Offerors are available, active, and valid in the System for Award Management (SAM) (https://www.sam.gov); the Offeror may reference them in the Cover Letter and decline to complete the portions of Section K of the SF 33 which are already present in SAM. The Offeror bears the burden of: (1) ensuring all information referenced in SAM is current, accurate, and complete; and

(2) ensuring any necessary information not present in SAM is provided within the Offeror’s proposal.

D. Price Worksheet Attachment J-4:

The Cost/Price volume shall demonstrate a complete understanding of the effort necessary to perform this work.

Sufficient supporting data shall be provided to permit the Government to perform a review and analysis of the pricing. The Cost/Price volume of the proposal will present the offeror’s understanding of the solicitation requirements and the offeror’s ability to organize and perform efficiently.

The offeror shall complete and return the Price Proposal Worksheet, Attachment J-4, in the original Microsoft Excel format. The offeror shall propose, for each work item contained in Attachment J-2, labor hours with associated labor costs along with any materials, equipment, subcontracting costs, other direct costs (ODCs), necessary to complete the work outlined in each work item. The proposed labor cost per work item shall be burdened with consideration to any consumables expended during production. Only production labor shall be proposed on individual work items associated with production work. All supervisory and administrative labor costs shall be proposed on the 042-00- 001; “Workplace Requirements” work item. The offeror shall provide a detailed breakout of the Contractor Furnished Material (CFM), and Equipment listed in the 992-10-001; “Contractor Facilities; provide” work item on the CFM Equip & Mat’l tab of Attachment J-4.

If ODC’s are included as part of the price proposal, the Offeror shall provide a detailed breakdown of the costs proposed for any applicable work item on the ODC tab of Attachment J-4.

The offeror shall propose a G&A and Profit rate in the green highlighted cells to be applied to all material and subcontracting costs proposed.

The formulas in Attachment J-4 provide the Proposal Total. Unit prices to be completed by offeror on Attachment J- 4 are indicated by highlight. The rates will be based on the unburdened production labor as proposed in the summary sheet tab of Attachment J-4.

Note: The total proposed dollar amount calculated on the summary sheet tab of the referenced attachment should equal the total proposed amount in Section B of the contract.

Detailed Basis of Estimates (BOE) identifies all underlying assumptions with respect to the technical aspects of the work to be performed, the functional breakout of the efforts within the offeror’s organization and to include any subcontracting efforts. The BOE’s shall include copies of pricing guides, reports from any referenced historical information, be provided for each work item and any other information the offeror believe will assist the Government in its review to adequately delineate the efforts required.

DO NOT submit protected or in a read-only form. Only enter numbers to two decimal points. DO NOT round estimates.

CLIN 0002, Contract Data Requirements Lists (CDRLS) is Not Separately Priced.

E. Notification/Exceptions: The proper completion and submission to the Government of the above items will constitute an offer. Any exception to any of the terms and conditions may constitute a deficiency which may make the offer unacceptable.

F. Release of Pricing Information: All pricing information submitted is for the exclusive use of Government representatives, and will be treated as business confidential and will not be publicly disclosed, provided that, where a request for disclosure of such cost information is submitted to the Government pursuant to the Freedom of Information Act (FOIA) (5 U.S.C. 552a), the Government will not disclose the offeror’s pricing information if public disclosure of such information would substantially harm the offeror in its competitive position. In order to help ensure non-disclosure, the title page of the cost proposal and other sheets of proposal data should be marked with a restrictive legend stating that the price information is proprietary.

(End of Summary of Changes)