CUI C03.0 Answer to Bidder's Questions 017.pdf
PDF 184 KB Posted
- Attached to
- USS Jacksonville Non-SUBSAFE Repair Work
- Solicitation number
- N4523A21R0800
About this file
This document contains a federal contract opportunity solicitation for non-SUBSAFE repair work on the USS Jacksonville. The Regional Maintenance Center at Puget Sound Naval Shipyard and Intermediate Maintenance Facility intends to award a firm-fixed-price contract to accomplish non-SUBSAFE pipe and structural welding, interference removals including cabling and special hull tile removal, blanking of main ballast tanks and exterior tanks. The work will be derived from PSNS&IMF100-8779866 Rev - and may include base metal build-up, structural member removal and replacement. Sound damping work will include inspection and removal of sound damping tile. The period of performance is from 1 September 2021 to 20 December 2021. The government anticipates awarding a firm-fixed-price, stand-alone contract in August 2021 to the responsible contractor on a lowest price technically acceptable basis in accordance with FAR 15.101-2. Offerors must be registered in the System for Award Management to receive award.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR CLARIFICATION
N4523A21R0800 USS Jacksonville Blanking Attachment J-7
DATE OF REQUEST: QUESTION NO:
REQUIREMENT: USS Jacksonville Blanking REQUISITION NO.: N4523A21R0800
ITEM NO:
TITLE: GFP & Fabrication Clarification PSNS&IMF CONTRACTS POC & PHONE:
See POCs listed on RFP.
PARA. NO: PAGE NO:
PLANNER’S NAME: ATTACH. NO:
CONTRACTOR QUESTION: (ONE QUESTION PER PAGE)
DO NOT WRITE BELOW THIS LINE
SPEC CHG: Y/N DWG/REF CHG. Y/N RQMTS CHG: Y/N MAT'L CHG: Y/N
TECHNICAL REVIEW: SERIAL NO:
ALL BIDDER’S QUESTIONS MUST BE RECEIVED NO LATER THAN 12:00 P.M.
(PST),
21 April 2021
| ITEM NO: Various |
| PARA NO: |
| PAGE NO: |
| ATTACH NO: |
| CONTRACTOR QUESTION ONE QUESTION PER PAGE: • Request clarification between J-1 (GFP Attachment) & J-2 (Work Item Package) as they relate to fabricated welding blanks. J-2 “F” Phases 38Z99-17601-F01 & 38Z99-17601-F02 make it appear that the blanks were manufactured by the SY separate from this effort but the J-1 lists large sheets of metal to be provided as GFP and identifies that the blanks are to be manufactured under one of the 4 following CU Phases: 38Z99-17601-F01, 38Z99-17601-F02, 38Z99-02801-F01 & 38Z99-02801-F02. Is the SY providing blanks or sheets of metal to have blanks manufactured by KTR? |
| TECHNICAL REVIEW: Anna Lewis |
| SERIAL NO: |
| ALL BIDDERS QUESTIONS MUST BE RECEIVED NO LATER THAN 1200 PM: The blanks will be provided as stated in the J2 "F" Phases and will be manufactured by the SY. |
| Name 1: |
| Date: 4/20/21 |
| Text3: N |
| Text4: N |
| Text5: N |
| Text6: N |