This document contains a request for clarification and the related technical review response pertaining to a solicitation for non-SUBSAFE repair work on the USS Jacksonville. The request seeks clarification on interferences to be removed in various main ballast tank locations. The technical review response indicates that removing an interference in one location allows for blanking of adjacent locations, and refers to an errata item for guidance on another task.
The related solicitation seeks proposals for non-SUBSAFE welding, interference removal including cabling and tiles, blanking of main ballast tanks and exterior tanks aboard USS Jacksonville at Puget Sound Naval Shipyard. The firm-fixed price contract would have a period of performance from September to December 2021. Proposals are due on a lowest price technically acceptable basis from contractors registered in the System for Award Management. The Navy intends to award in August 2021 to perform work in accordance with standard items and requirements.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR CLARIFICATION
N4523A21R0800 USS Jacksonville Blanking Attachment J-7
DATE OF REQUEST:
REQUIREMENT: USS Jacksonville Blanking
QUESTION NO: 011
REQUISITION NO.: N4523A21R0800
ITEM NO:
TITLE: Main Ballast Tank (MBT) 3A; interference remove
PSNS&IMF CONTRACTS POC & PHONE:
See POCs listed on RFP.
PARA. NO: PAGE NO:
PLANNER’S NAME: ATTACH. NO:
CONTRACTOR QUESTION: (ONE QUESTION PER PAGE)
DO NOT WRITE BELOW THIS LINE
SPEC CHG: Y/N DWG/REF CHG. Y/N RQMTS CHG: Y/N MAT'L CHG: Y/N
TECHNICAL REVIEW: SERIAL NO:
ALL BIDDER’S QUESTIONS MUST BE RECEIVED NO LATER THAN 12:00 P.M.
(PST),
21 April 2021
| ITEM NO: 123-00-001 |
| PARA NO: 3.2 |
| PAGE NO: 1 |
| CONTRACTOR QUESTION ONE QUESTION PER PAGE: This is to correct the submitter errors to RFC #7. |
Paragraph 3.2 directs removal of interference identified in 1.3 for locations in 1.2. All items identified in 1.3 for removal are associated with location 1.2.1.1.
What interferences are being removed for locations 1.2.1.2 through 1.2.1.5?
| TECHNICAL REVIEW: Anna Lewis |
| SERIAL NO: |
| ALL BIDDERS QUESTIONS MUST BE RECEIVED NO LATER THAN 1200 PM: Removing the interference for MBT3-39, allows for the blanking of MBT3-47, MBT3-48, MBT3-49 and is the same interference. |
See errata 4 for MBT3-54 tasking.
| Date: 4/14/21 |
| Text3: Y |
| Text4: N |
| Text5: Y |
| Text6: N |