This document provides details for a federal solicitation seeking non-SUBSAFE repair work on the USS Jacksonville. The Regional Maintenance Center at Puget Sound Naval Shipyard and Intermediate Maintenance Facility intends to award a firm-fixed-price contract to accomplish non-SUBSAFE pipe and structural welding, interference removals including cabling and sound damping tile removal, and blanking of main ballast tanks and exterior tanks. The contractor shall provide management, material support services, labor, supplies, and equipment to perform this work at Puget Sound Naval Shipyard in Bremerton, Washington, derived from work item package PSNS&IMF100-8779866 and using NAVSEA Standard Items, SUBMEPP standards, MIL-STD-1689A, and PSNS&IMF quality and environmental requirements. The period of performance is from September 1, 2021 to December 20, 2021. The government anticipates awarding a firm-fixed-price contract in August 2021 to the responsible contractor with the lowest price and technically acceptable proposal in accordance with FAR 15.101-2. Offerors must register in the System for Award Management to receive award.

View the file

Other files

File Type Posted
CUI C03.0 Answer to Bidder's Questions 022.pdf PDF
CUI C03.0 Answer to Bidder's Questions 023.pdf PDF
CUI C03.0 Answer to Bidder's Questions 021.pdf PDF
CUI C03.0 Answer to Bidder's Questions 019.pdf PDF
CUI C03.0 Answer to Bidder's Questions 017.pdf PDF
CUI C03.0 Answer to Bidder's Questions 018.pdf PDF
CUI C03.0 Answer to Bidder's Questions 013.pdf PDF
CUI C03.0 Answer to Bidder's Questions 015.pdf PDF
CUI C03.0 Answer to Bidder's Questions 014.pdf PDF
CUI C09.0 Solicitation N4523A21R0800 Amendment 0004.pdf PDF
CUI C03.0 Answer to Bidder's Questions 020.pdf PDF
CUI C03.0 Answer to Bidder's Questions 016.pdf PDF
CUI C03.0 Answer to Bidder's Questions 012.pdf PDF
CUI C03.0 Answer to Bidder's Questions 011.pdf PDF
CUI C09.0 Attachment J-2 USS JACKSONVILLE - Work Item Package (Errata 5).pdf PDF
CUI C03.0 Answer to Bidder's Questions 008.pdf PDF
CUI C03.0 Answer to Bidder's Questions 006.pdf PDF
CUI C03.0 Answer to Bidder's Questions 007.pdf PDF
CUI C03.0 Answer to Bidder's Questions 004.pdf PDF
CUI C03.0 Answer to Bidder's Questions 005.pdf PDF
CUI C03.0 Answer to Bidder's Questions 009.pdf PDF
CUI C03.0 Answer to Bidder's Questions 010.pdf PDF
CUI C03.0 Answer to Bidder's Questions 003.pdf PDF
CUI C04.0 Attachment J-7 Request for Clarification (Rev 1).pdf PDF
CUI C09.0 Solicitation N4523A21R0800 Amendment 0003.pdf PDF
CUI C09.0 Solicitation N4523A21R0800 Amendment 0002.pdf PDF
CUI C09.0 Attachment J-2 USS JACKSONVILLE - Work Item Package (Errata 3 Rev 1).pdf PDF
CUI C03.0 Answer to Bidder's Questions 002.pdf PDF
CUI C09.0 Solicitation N4523A21R0800 Amendment 0001.pdf PDF
CUI C03.0 Answer to Bidder's Questions.pdf PDF
CUI C09.0 Attachment J-2 USS JACKSONVILLE - Work Item Package (Errata 3).pdf PDF
CUI C04.0 Attachment J-1 GFPN4523A21R0800_1.pdf PDF
CUI C04.0 Attachment J-2 USS JACKSONVILLE - Work Item Package.pdf PDF
CUI C04.0 Attachment J-7 Request for Clarification.pdf PDF
CUI C04.0 Attachment J-5 Previous Efforts Form.pdf PDF
CUI C04.0 Attachment J-6 SER 440_220 Contractor Travel and ROM.pdf PDF
CUI C04.0 N4523A21R0800 USS JACKSONVILLE.pdf PDF
CUI C04.0 Attachment J-4 Pricing Proposal Worksheet.xlsx XLSX spreadsheet
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

THIS PERMANENT CHANGE UPDATES THE SPECIFICATION BID PACKAGE.

SHIP: USS JACKSONVILLE (SSN 699)

NWRMC-502-21

ERRATA NUMBER:

SPECIFICATION NUMBER:

THE FOLLOWING ITEMS ARE REPLACED:

123-00-001

123-01-001

123-01-002

123-10-002

123-10-003

123-10-004

DATED: 4/16/2021 11:17:33AMPage 1 of 1

GAS FREE CERTIFICATION REQUIRED

SHIP: USS JACKSONVILLE (SSN 699) ITEM NO: 123-00-001 (E4)

COAR: 40 PCN: SSPS-L020

BWST FILE NO: 000-001 CMP: NONE

REVISED: 05 Apr 2019 PLANNER: LEWIS, ANNA

SSP: NWRMC-502-21 1 of 2 ITEM NO: 123-00-001

ERRATA NO. 4

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Main Ballast Tank (MBT) 3A; interference remove

1.2 Location of Work:

1.2.1 MBT 3A

1.2.1.1 MBT3-39

1.2.1.2 MBT3-47

1.2.1.3 MBT3-48

1.2.1.4 MBT3-49

1.2.1.5 MBT3-54

1.3 Identification:

1.3.1 AN/BQQ-5 cover foundations PC No. 8,9 and 10

1.3.2 Sheave foundation PC No. 13

1.3.3 Electrical cable hanger PC No. 11

2. REFERENCES:

2.1 Standard Items

2.2 IPI 0770-903 Rev -, HOT WORK PRECAUTIONS

2.3 VAR-6772233 Rev -, SSN688CL DEMILITARIZATION GUIDELINES BY SWAB FOR

SUBMARINE RECYCLE

2.4 5202199 Rev C, ENCLOSURE & FDN TOWED SONAR ARRAY CABLE SHEAVE &

FLUSHING WATER PRESS SENSOR

2.5 100-4637545 Rev G, NON PRESSURE HULL FR 11-1/2 - 32-1/2

2.6 123-4637629 Rev C, ACCESS HATCH FLUSH 15X23 IN NON PRESSURE HULL

2.7 100-8779866 Rev -, USS JACKSONVILLE (SSN 699) NON-NUCLEAR HULL

BLANKING INACTIVATION

3. REQUIREMENTS:

3.1 Accomplish the requirement of 2.2 Enclosure (2) for blank locations listed in 1.2.

3.2 Remove interferences identified in 1.3 using 2.1 through 2.7, for blank locations listed in 1.2.

3.2.1 Remove MBT 3-54 Hatch Cover by unbolting at the hinge or cutting the swing arms that attach the cover to the hinge.

(E4)

3.2.1.1 Place the cover inside the recess in preparation for

blanking.

(E4)

SSP: NWRMC-502-21 2 of 2 ITEM NO: 123-00-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

3.2.2 Accomplish the requirements of 009-103 of 2.1 for all

interferences removed.

(E4)

3.2.2.1 Submit one legible copy, in approved transferrable

media, of a report listing the results of 3.2.1 to the SUPERVISOR within 72 hours after completion of interference removal.

(E4)

3.3 Dispose of materials removed in 3.2, in accordance with 2.3.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

5.3 KITTED MATERIAL:

1. None.

SHIP: USS JACKSONVILLE (SSN 699) ITEM NO: 123-01-001 (E4)

COAR: 40 PCN: SSPS-L017

SSPS-L016

BWST FILE NO: 000-001 CMP: NONE

REVISED: 05 Apr 2019 PLANNER: LEWIS, ANNA

COOPER, DANIEL

KOURLIS, MARINA

SSP: NWRMC-502-21 1 of 3 ITEM NO: 123-01-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Main Ballast Tank (MBT) 1 electrical interference; remove

1.2 Location of Work:

1.2.1 MBT 1A

1.2.2 MBT 1B

1.3 Identification:

1.3.1 (MBT1-2) MBT 1A Electrical Tank Fitting T21

1.3.1.1 R-SB/SHL/SLL-14

1.3.1.2 Gland ring, grommet plates, and grommet

1.3.2 (MBT1-3) MBT 1A Electrical Tank Fitting T22

1.3.2.1 R-SB/SHL/SLL-13, R-SB/SHL/SLL-15, and R-BS/SHL/SLL-1

1.3.2.2 Gland ring, grommet plates, and grommet

1.3.3 (MBT1-6) MBT 1A Electrical Tank Fitting T25

1.3.3.1 R-SK/SLL-30A, R-SK/SLL-30B, R-SK/SLL-31A, R-SK/SLL-31B,

R-SK/SLL-32A, R-SK/SLL-32B, and R-SK/SLL-33B

1.3.3.2 Gland ring, grommet plates, and grommet

1.3.4 (MBT1-1) MBT 1B Electrical Tank Fitting T20

1.3.4.1 R-SM/SLL-1, R-SM/SLL-3, R-SL/SLL-8A, R-SL/SLL-9A, and

SCT/SLL-3

1.3.4.2 Gland ring, grommet plates, and grommet

1.3.5 (MBT1-4) MBT 1B Electrical Tank Fitting T23

1.3.5.1 R-SM/SLL-2, R-SK/SLL-24A, R-SK/SLL-24B, R-SK/SLL-25A, R-

SK/SLL-25B, R-SK/SLL-26A, R-SK/SLL-26B, R-SK/SLL-27A, R-SK/SLL-

27B, R-SK/SLL-28A, R-SK/SLL-28B, R-SK/SLL-29A, R-SK/SLL-29B

1.3.5.2 Gland ring, grommet plates, and grommet

1.3.6 (MBT1-5) MBT 1B Electrical Tank Fitting T24

1.3.6.1 R-SK/SLL-20B, R-SK/SLL-21A, R-SK/SLL-21B, R-SK/SLL-22A,

R-SK/SLL-22B, R-SK/SLL-23A, and R-SK/SLL-23B

1.3.6.2 Gland ring, grommet plates, and grommet

1.3.7 (MBT1-4)MBT1-7) MBT 1A/1B Electrical Tank Fitting T40 (E4)

SSP: NWRMC-502-21 2 of 3 ITEM NO: 123-01-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1.3.7.1 R-SK/SLL-27A, R-SK/SLL-27B, R-SK/SLL-28A, R-SK/SLL-28B,

R-SK/SLL-29A, and R-SK/SLL-29B

1.3.7.2 Gland ring, grommet plates, and grommet

1.3.8 (MBT1-20) AN/BQN-17 Window 13-1/2” Aft of FR 15, 23” Port of Centerline

1.3.8.1 (AN/BQN-17) BQN-17 Unit 4 Window, BQN-17 Unit 4 TR-302 Transducer, and cable R-SS/SHL/SLL-10

2. REFERENCES:

2.1 Standard Items

2.2 100-8779866 Rev -, USS JACKSONVILLE (SSN-699) NON-NUCLEAR HULL

BLANKING INACTIVATION

2.3 302-4454471 Rev T, EXTERNAL WIREWAYS FORWARD

2.4 113-4454492 Rev AH, ASSIGNMENT OF ELECTRICAL HOLES IN HULL AND TANKS

2.5 302-4456068 Rev G, 60 HERTZ AC POWER DIST WDD

2.6 302-4454512 Rev J, DC AND 400HZ PWR DIST WDD

2.7 412-4456937 Rev J, SONAR PERFORMANCE COMPUTER SYS AN/BQA-8B CKT R-SM

CD

2.8 302-6226086 Rev E, S/A SSN3164K SSN 688CL AN/BQH-5(V)4 DATA

GATHERING SET MODS TO EXT W/W

2.9 412-4456939 Rev E, UNDRWTR COMM SYS AN/WQC-2 CKT R-SB CD

2.10 412-5202783 Rev E, REMOVAL OF AN/BQN-20 INTERROGATOR ALT 2382D

2.11 412-6294611 Rev B, S/A 3439K SSN688 CL AN/BQQ-5 TO AN/BQQ-5D(V)1

CKT R-SK INSTALLATION CABLING DIAG

2.12 412-4637493 Rev E, ECHO SOUNDING SET CKT. R-SS AN/BQN-17 CABLING

DIAGRAM

2.13 302-5202773 Rev C, AN/BQN-17 RIPOUT/INSTL IN-LINE CONNECTOR

2.14 412-4557382 Rev C, BQS-15 & BQN-17 ACOUSTIC WINDOWS

2.15 TM-NUWC-NPT TECH MEMO 05-046 Rev E, IN-SERVICE ENGINEERING

HANDBOOK FOR SONAR DOMES AND WINDOWS

2.16 VAR-6772233, SSN688CL DEMILITARIZATION GUIDELINES BY SWAB FOR

SUBMARINE RECYCLE

3. REQUIREMENTS:

3.1 Remove interferences identified in paragraph 1.3.1 for locations listed in 1.2.1 using 2.2, 2.3 and 2.9.

3.2 Remove interferences identified in paragraph 1.3.2 for locations listed in 1.2.1 using 2.2, 2.3, 2.9, and 2.10.

3.3 Remove interferences identified in paragraph 1.3.3 for locations listed in 1.2.1 using 2.2, 2.3 and 2.11.

3.4 Remove interferences identified in paragraph 1.3.4 for locations listed in 1.2.2 using 2.2, 2.3, 2.7, and 2.8.

SSP: NWRMC-502-21 3 of 3 ITEM NO: 123-01-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

3.5 Remove interferences identified in paragraph 1.3.5 for locations listed in 1.2.2 using 2.2, 2.3, 2.7, and 2.11.

3.6 Remove interferences identified in paragraph 1.3.6 for locations listed in 1.2.2 using 2.2, 2.3 and 2.11

3.7 Remove interferences identified in paragraph 1.3.7 for locations listed in 1.2.1 and 1.2.2 using 2.2, 2.3 and 2.11.

3.8 Remove interferences identified in paragraph 1.3.8 for locations listed in 1.2.1 using 2.2 and 2.15 section 5.1 as guidance.

3.8.1 MX-12313 hull window and rubber material contain hazmat, see reference 2.15 section 5.1 for details.

3.8.1.1 Remove window and camping ring from the foundation and scrap using 2.12 through 2.15.

3.8.2 Disconnect cable R-SS/SHL/SLL-10 from the transducer. Cut cable up to tank fitting T-69.

3.8.3 Remove transducer from the foundation.

3.8.3.1 Tag transducer and turn over to the Supervisor after

removal.

3.9 Install Foreign Material Exclusion (FME) on cut ends of all cable.

3.10 Dispose of materials removed in 3.8, in accordance with 2.16.

3.11 Accomplish the requirements of 009-103 of 2.1 for all interferences removed.

3.11.1 Submit one legible copy, in approved transferrable media, of a report listing the results of 3.11 to the SUPERVISOR within 72 hours after completion of interference removal.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: USS JACKSONVILLE (SSN 699) ITEM NO: 123-01-002 (E4)

COAR: 40 PCN: SSPS-L019

SSPS-L018

CMP: NONE

PLANNER: LEWIS, ANNA

KOURLIS, MARINA

SSP: NWRMC-502-21 1 of 3 ITEM NO: 123-01-002

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Main Ballast Tank (MBT) 2 electrical interference; remove

1.2 Location of Work:

1.2.1 MBT 2A

1.2.2 MBT 2B

1.3 Identification:

1.3.1 (MBT2-10) MBT 2A Electrical Tank Fitting T28

1.3.1.1 R-SK/SLL-27A, R-SK/SLL-27B, R-SK/SLL-28A, R-SK/SLL-28B,

R-SK/SLL-29A, R-SK/SLL-29B, R-SK/SLL-30A, R-SK/SLL-30B, R-SK/SLL-

31A, R-SK/SLL-31B, R-SK/SLL-32A, R-SK/SLL-32B, R-SK/SLL-33A, R-

SK/SLL-33B, R-SK/SLL-34A, R-SK/SLL-34B, R-SK/SLL-35A, R-SK/SLL-

35B, R-SK/SLL-36A, R-SK/SLL-36B, R-SK/SLL-37A, and R-SK/SLL-37B

1.3.1.2 Gland ring, grommet plates, and grommet

1.3.2 (MBT2-12) MBT 2A Electrical Tank Fitting T30

1.3.2.1 R-SK/SLL-27A, R-SK/SLL-27B, R-SK/SLL-28A, R-SK/SLL-28B,

R-SK/SLL-29A, R-SK/SLL-29B, R-SK/SLL-30A, R-SK/SLL-30B, R-SK/SLL-

31A, R-SK/SLL-31B, R-SK/SLL-32A, R-SK/SLL-32B, R-SK/SLL-33A, R-

SK/SLL-33B, R-SK/SLL-34A, R-SK/SLL-34B, R-SK/SLL-35A, R-SK/SLL-

35B, R-SK/SLL-36A, R-SK/SLL-36B, R-SK/SLL-37A, and R-SK/SLL-37B

1.3.2.2 Gland ring, grommet plates, and grommet

1.3.3 (MBT2-14) MBT 2A Electrical Tank Fitting T32

1.3.3.1 R-BS/SHL/SLL-1, R-SB/SHL/SLL-13, R-SB/SHL/SLL-14, and R-

SB/SHL/SLL-15

1.3.3.2 Gland ring, grommet plates, and grommet

1.3.4 (MBT2-9) MBT 2B Electrical Tank Fitting T27

1.3.4.1 R-SK/SLL-16A, R-SK/SLL-16B, R-SK/SLL-17A, R-SK/SLL-17B,

R-SK/SLL-18A, R-SK/SLL-18B, R-SK/SLL-19A, R-SK/SLL-19B, R-SK/SLL-

20A, R-SK/SLL-20B, R-SK/SLL-21A, R-SK/SLL-21B, R-SK/SLL-22A, R-

SK/SLL-22B, R-SK/SLL-23A, R-SK/SLL-23B, R-SK/SLL-24A, R-SK/SLL-

24B, R-SK/SLL-25A, R-SK/SLL-25B, R-SK/SLL-26A, and R-SK/SLL-26B

1.3.4.2 Gland ring, grommet plates, and grommet

1.3.5 (MBT2-11) MBT 2B Electrical Tank Fitting T29

1.3.5.1 R-SK/SLL-16A, R-SK/SLL-16B, R-SK/SLL-17A, R-SK/SLL-17B,

R-SK/SLL-18A, R-SK/SLL-18B, R-SK/SLL-19A, R-SK/SLL-19B, R-SK/SLL-

20A, R-SK/SLL-20B, R-SK/SLL-21A, R-SK/SLL-21B, R-SK/SLL-22A, R-

SSP: NWRMC-502-21 2 of 3 ITEM NO: 123-01-002

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

SK/SLL-22B, R-SK/SLL-23A, R-SK/SLL-23B, R-SK/SLL-24A, R-SK/SLL-

24B, R-SK/SLL-25A, R-SK/SLL-25B, R-SK/SLL-26A, and R-SK/SLL-26B

1.3.5.2 Gland ring, grommet plates, and grommet

1.3.6 (MBT2-13) MBT 2B Electrical Tank Fitting T31

1.3.6.1 R-SS/SHL/SLL-10

1.3.6.2 Gland ring, grommet plates, and grommet

1.3.6.3 Transducer

1.3.7 (MBT2-17) AN/BQS-15 Window

1.3.7.1 MX-7533 acoustic window and clamping ring

1.3.7.2 R-SF/SHL/SLL-42 from the BQS-15 Unit 13 – TR-281

Transducer.

2. REFERENCES:

2.1 Standard Items

2.2 100-8779866 Rev -, USS JACKSONVILLE (SSN-699) NON-NUCLEAR HULL

BLANKING INACTIVATION

2.3 302-4454471 Rev T, EXTERNAL WIREWAYS FORWARD

2.4 113-4454492 Rev AH, ASSIGNMENT OF ELECTRICAL HOLES IN HULL AND TANKS

2.5 302-4456068 Rev G, 60 HERTZ AC POWER DIST WDD

2.6 302-4454512 Rev J, DC AND 400HZ PWR DIST WDD

2.7 412-6294611 Rev B, S/A 3439K SSN688 CL AN/BQQ-5 TO AN/BQQ-5D(V)1 CKT

R-SK INSTALLATION CABLING DIAG

2.8 412-4637493 Rev E, ECHO SOUNDING SET CKT. R-SS AN/BQN-17 CABLING

DIAGRAM

2.9 412-4456939 Rev E, UNDRWTR COMM SYS AN/WQC-2 CKT R-SB CD

2.10 412-5202783 Rev E, REMOVAL OF AN/BQN-20 INTERROGATOR ALT 2382D

2.11 412-4456943 Rev D, BEACON SET AN/BQN-13 CKT R-SU CABLING DIAGRAM

2.12 412-4456962 Rev H, UNDER ICE & CLOSE CONTACT AVOIDANCE SONAR SYS

AN/BQS-15 CKT R-SF CD

2.13 114-4403274 Rev S, BHD 15" AFT OF FRAMES 9,15 AND 20

2.14 412-4557382 Rev C, BQS-15 & BQN-17 ACOUSTIC WINDOWS

2.15 TM-NUWC-NPT TECH MEMO 05-046 Rev E, IN-SERVICE ENGINEERING

HANDBOOK FOR SONAR DOMES AND WINDOWS

2.16 VAR-6772233, SSN688CL DEMILITARIZATION GUIDELINES BY SWAB FOR

SUBMARINE RECYCLE

3. REQUIREMENTS:

3.1 Remove interferences identified in paragraph 1.3.1 and 1.3.2 for locations listed in 1.2.1 using 2.2, 2.3 and 2.7.

3.2 Remove interferences identified in paragraph 1.3.3 for locations

SSP: NWRMC-502-21 3 of 3 ITEM NO: 123-01-002

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

listed in 1.2.1 using 2.2, 2.3, 2.9 and 2.10.

3.3 Remove interferences identified in paragraph 1.3.4 and 1.3.5 for locations listed in 1.2.1 2 using 2.2, 2.3 and 2.7.

(E4)

3.4 Remove interferences identified in paragraph 1.3.5 for locations listed in 1.2.2 using 2.2, 2.3 and 2.8.

3.5 Remove interferences identified in paragraph 1.3.6 for locations listed in 1.2.2 using 2.2, 2.3 and 2.8.

3.6 Remove interferences identified in paragraph 1.3.7 for locations listed in 1.2.1 and 1.2.2 using 2.2, 2.12 through 2.15.

3.6.1 Remove, identify and tag the BQS-15 Unit 13 – TR-281

Transducer from the foundation and turn over to the SUPERVISOR.

3.7 Install Foreign Material Exclusion (FME) on cut ends of all cable.

3.8 Dispose of materials removed in 3.5 and 3.6, in accordance with 2.16.

3.9 Accomplish the requirements of 009-103 of 2.1 for all interferences removed.

3.9.1 Submit one legible copy, in approved transferrable media, of a report listing the results of 3.8 to the SUPERVISOR within 72 hours after completion of interference removal.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: USS JACKSONVILLE (SSN 699) ITEM NO: 123-10-002 (E4)

COAR: 40 PCN: SSPS-L031

CMP: NONE

PLANNER: LEWIS, ANNA

SSP: NWRMC-502-21 1 of 2 ITEM NO: 123-10-002

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Main Ballast Tank (MBT) 1B; welded cap install

1.2 Location of Work:

1.2.1 MBT 1B, Blank No. MBT2-5

1.3 Identification:

1.3.1 MBT-1B Emergency Blow Pipe P27J of reference 2.7 Elevation “3- A”

1.3.2 Cu-Ni weld-cap PC 17 of reference 2.5

2. REFERENCES:

2.1 Standard Items, FY 21

2.2 IPI 0770-903, Chg -, HOT WORK PRECAUTIONS

2.3 VAR-6772233 Rev -, SSN688CL DEMILITARIZATION GUIDELINES BY SWAB FOR

SUBMARINE RECYCLE

2.4 100-7097815 Rev -, FABRICATION, WELDING AND INSPECTION FOR

INACTIVATED SUBMARINES AND SURFACE SHIPS

2.5 100-8779866 Rev -, USS JACKSONVILLE (SSN-699) NON-NUCLEAR HULL

BLANKING INACTIVATION

2.6 MIL-STD-1689A, FABRICATION, WELDING, AND INSPECTION OF SHIP’S

STRUCTURE

2.7 513-4638021 Rev D, PPG ARR HP AIR & EMBT FWD MBT ELEV

2.8 513-4638020 Rev D, PIP HP AIR & EMER BLOW IN FWD MBT PLAN

3. REQUIREMENTS:

3.1 Accomplish the requirement of 2.2 Enclosure (2) for blank locations listed in 1.3.

3.2 Remove interferences identified in 1.3.1 using 2.1 through 2.8, for cap locations listed in 1.2.

3.3 Install caps identified in 1.3.2 for locations in 1.2 in accordance with 2.1 through 2.6 using 2.7 and 2.8 for guidance.

3.3.1 Cap shall be Class 400# 70/30 Cu-Ni socket-weld caps using a PT1S.1 (1/8”) installation weld joint.

3.3.2 The piping is considered to be structural tube for the purpose of welding, however the weld-joint must be water tight.

3.4 Accomplish the requirements of 009-103 of 2.1 for all

SSP: NWRMC-502-21 2 of 2 ITEM NO: 123-10-002

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

interferences removed.

3.4.1 Submit one legible copy, in approved transferrable media, of a report listing the results of 3.4 to the SUPERVISOR within 72 hours after completion of interference removal.

3.5 Dispose of materials removed in accordance with 2.3.

(I) "NONDESTRUCTIVE TESTING VISUAL INSPECTION"

3.6 Accomplish nondestructive visual inspection in accordance with 2.5 and 2.6 as implemented by 2.4 Vol II, after installation of caps identified in 1.3.

(I) "NONDESTRUCTIVE TESTING 5X VISUAL INSPECTION"

3.7 Accomplish nondestructive 5X visual inspection in accordance with

2.6 as implemented by 2.5 for caps identified in 1.3.

3.8 Submit one legible copy, in approved transferrable media, any Objective Quality Evidence (OQE), required by 2.4 Vol I, to the SUPERVISOR within 72 hours after completion of cap installation.

4. NOTES:

4.1 Pipe P-11D P-27J has a 1/4" low point drain hole drilled into the pipe, ensure when making pipe cut and installing cap that the low point drain is not within the blanking boundary.

(E4)

4.2 CAUTION: Damping tile and epoxy adhesives contain crystalline silicas which are hazardous.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

5.3 KITTED MATERIAL:

TOTAL

QUANTITY

PROVIDED NAME Of PART

PIECE

NO.

REF

NO.

NATIONAL

STOCK

NO.

REQ

PARA NO.

1. 1 AY

(MBT2-5) Install Welded Cap on MBT-1B Emergency Blow Pipe JML

03364031 PC 17 2.5

SHIP: USS JACKSONVILLE (SSN 699) ITEM NO: 123-10-003 (E4)

COAR: 40 PCN: SSPS-L032

CMP: NONE

PLANNER: LEWIS, ANNA

SSP: NWRMC-502-21 1 of 2 ITEM NO: 123-10-003

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Main Ballast Tank (MBT) 2A; welded cap install

1.2 Location of Work:

1.2.1 MBT 2A, Blank No. MBT3-9

1.3 Identification:

1.3.1 MBT-2A Emergency Blow Pipe P14S of reference 2.7 Elevation “7- A”

1.3.2 Cu-Ni weld-cap PC 17 of reference 2.5

2. REFERENCES:

2.1 Standard Items, FY 21

2.2 IPI 0770-903, Chg -, HOT WORK PRECAUTIONS

2.3 VAR-6772233 Rev -, SSN688CL DEMILITARIZATION GUIDELINES BY SWAB FOR

SUBMARINE RECYCLE

2.4 100-7097815 Rev -, FABRICATION, WELDING AND INSPECTION FOR

INACTIVATED SUBMARINES AND SURFACE SHIPS

2.5 100-8779866 Rev -, USS JACKSONVILLE (SSN-699) NON-NUCLEAR HULL

BLANKING INACTIVATION

2.6 MIL-STD-1689A, FABRICATION, WELDING, AND INSPECTION OF SHIP’S

STRUCTURE

2.7 513-4638021 Rev D, PPG ARR HP AIR & EMBT FWD MBT ELEV

2.8 513-4638020 Rev D, PIP HP AIR & EMER BLOW IN FWD MBT PLAN

3. REQUIREMENTS:

3.1 Accomplish the requirement of 2.2 Enclosure (2) for blank locations listed in 1.3.

3.2 Remove interferences identified in 1.3.1 using 2.1 through 2.8, for cap locations listed in 1.2.

3.3 Install caps identified in 1.3.2 for locations in 1.2 in accordance with 2.1 through 2.6 using 2.7 and 2.8 for guidance.

3.3.1 Cap shall be Class 400# 70/30 Cu-Ni socket-weld caps using a PT1S.1 (1/8”) installation weld joint.

3.3.2 The piping is considered to be structural tube for the purpose of welding, however the weld-joint must be water tight.

3.4 Accomplish the requirements of 009-103 of 2.1 for all interferences removed.

SSP: NWRMC-502-21 2 of 2 ITEM NO: 123-10-003

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

3.4.1 Submit one legible copy, in approved transferrable media, of a report listing the results of 3.4 to the SUPERVISOR within 72 hours after completion of interference removal.

3.5 Dispose of materials removed in accordance with 2.3.

(I) "NONDESTRUCTIVE TESTING VISUAL INSPECTION"

3.6 Accomplish nondestructive visual inspection in accordance with 2.5 and 2.6 as implemented by 2.4 Vol II, after installation of caps identified in 1.3.

(I) "NONDESTRUCTIVE TESTING 5X VISUAL INSPECTION"

3.7 Accomplish nondestructive 5X visual inspection in accordance with

2.6 as implemented by 2.5 for caps identified in 1.3.

3.8 Submit one legible copy, in approved transferrable media, any Objective Quality Evidence (OQE), required by 2.4 Vol I, to the SUPERVISOR within 72 hours after completion of cap installation.

4. NOTES:

4.1 Pipe P-11D P-14S has a 1/4" low point drain hole drilled into the pipe, ensure when making pipe cut and installing cap that the low point drain is not within the blanking boundary.

(E4)

4.2 CAUTION: Damping tile and epoxy adhesives contain crystalline silicas which are hazardous.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

5.3 KITTED MATERIAL:

TOTAL

QUANTITY

PROVIDED NAME Of PART

PIECE

NO.

REF

NO.

NATIONAL

STOCK

NO.

REQ

PARA NO.

1. 1 AY

(MBT3-9) Install Welded Cap on MBT-2A Emergency Blow Pipe JML

03364032 PC 17 2.5

SHIP: USS JACKSONVILLE (SSN 699) ITEM NO: 123-10-004 (E4)

COAR: 40 PCN: SSPS-L033

CMP: NONE

PLANNER: LEWIS, ANNA

SSP: NWRMC-502-21 1 of 2 ITEM NO: 123-10-004

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Main Ballast Tank (MBT) 2B; welded cap install

1.2 Location of Work:

1.2.1 Tank MBT-2B, Blank No. MBT3-11

1.3 Identification:

1.3.1 MBT-2B Emergency Blow Pipe P30M of reference 2.7 Elevation “3- A”

1.3.2 Cu-Ni weld-cap PC 17 of reference 2.5

2. REFERENCES:

2.1 Standard Items, FY 21

2.2 IPI 0770-903, Chg -, HOT WORK PRECAUTIONS

2.3 VAR-6772233 Rev -, SSN688CL DEMILITARIZATION GUIDELINES BY SWAB FOR

SUBMARINE RECYCLE

2.4 100-7097815 Rev -, FABRICATION, WELDING AND INSPECTION FOR

INACTIVATED SUBMARINES AND SURFACE SHIPS

2.5 100-8779866 Rev -, USS JACKSONVILLE (SSN-699) NON-NUCLEAR HULL

BLANKING INACTIVATION

2.6 MIL-STD-1689A, FABRICATION, WELDING, AND INSPECTION OF SHIP’S

STRUCTURE

2.7 513-4638021 Rev D, PPG ARR HP AIR & EMBT FWD MBT ELEV

2.8 513-4638020 Rev D, PIP HP AIR & EMER BLOW IN FWD MBT PLAN

3. REQUIREMENTS:

3.1 Accomplish the requirement of 2.2 Enclosure (2) for blank locations listed in 1.3.

3.2 Remove interferences identified in 1.3.1 using 2.1 through 2.8, for cap locations listed in 1.2.

3.3 Install caps identified in 1.3.2 for locations in 1.2 in accordance with 2.1 through 2.6 using 2.7 and 2.8 for guidance.

3.3.1 Cap shall be Class 400# 70/30 Cu-Ni socket-weld caps using a PT1S.1 (1/8”) installation weld joint.

3.3.2 The piping is considered to be structural tube for the purpose of welding, however the weld-joint must be water tight.

3.4 Accomplish the requirements of 009-103 of 2.1 for all interferences

SSP: NWRMC-502-21 2 of 2 ITEM NO: 123-10-004

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

removed.

3.4.1 Submit one legible copy, in approved transferrable media, of a report listing the results of 3.4 to the SUPERVISOR within 72 hours after completion of interference removal.

3.5 Dispose of materials removed in accordance with 2.3.

(I) "NONDESTRUCTIVE TESTING VISUAL INSPECTION"

3.6 Accomplish nondestructive visual inspection in accordance with 2.5 and 2.6 as implemented by 2.4 Vol II, after installation of caps identified in 1.3.

(I) "NONDESTRUCTIVE TESTING 5X VISUAL INSPECTION"

3.7 Accomplish nondestructive 5X visual inspection in accordance with

2.6 as implemented by 2.5 for caps identified in 1.3.

3.8 Submit one legible copy, in approved transferrable media, any Objective Quality Evidence (OQE), required by 2.4 Vol I, to the SUPERVISOR within 72 hours after completion of cap installation.

4. NOTES:

4.1 Pipe P-11D P-30M has a 1/4" low point drain hole drilled into the pipe, ensure when making pipe cut and installing cap that the low point drain is not within the blanking boundary.

(E4)

4.2 CAUTION: Damping tile and epoxy adhesives contain crystalline silicas which are hazardous.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

5.3 KITTED MATERIAL:

TOTAL

QUANTITY

PROVIDED NAME Of PART

PIECE

NO.

REF

NO.

NATIONAL

STOCK

NO.

REQ

PARA NO.

1. 1 AY

(MBT3-11)

Install Welded Cap on MBT-2B Emergency Blow Pipe JML

03364033 PC 17 2.5