CUI C03.0 Answer to Bidder's Questions 020.pdf

PDF 185 KB Posted

Attached to
USS Jacksonville Non-SUBSAFE Repair Work
Solicitation number
N4523A21R0800
Issued by

About this file

This document contains a request for clarification regarding a solicitation for non-SUBSAFE repair work on the USS Jacksonville. The contractor will be required to perform non-SUBSAFE pipe and structural welding, interference removals including cabling and special hull tile, blanking of main ballast tanks and exterior tanks. The work will be performed at Puget Sound Naval Shipyard and Intermediate Maintenance Facility in Bremerton, Washington according to the specifications. One question is answered confirming that a certain cable may be discarded rather than retained. The period of performance is scheduled from September 1, 2021 to December 20, 2021. The Navy intends to award a firm-fixed-price contract on a lowest price technically acceptable basis to a responsible contractor in August 2021.

View the file

Other files

File Type Posted
CUI C03.0 Answer to Bidder's Questions 022.pdf PDF
CUI C03.0 Answer to Bidder's Questions 023.pdf PDF
CUI C03.0 Answer to Bidder's Questions 021.pdf PDF
CUI C03.0 Answer to Bidder's Questions 019.pdf PDF
CUI C03.0 Answer to Bidder's Questions 017.pdf PDF
CUI C03.0 Answer to Bidder's Questions 018.pdf PDF
CUI C03.0 Answer to Bidder's Questions 013.pdf PDF
CUI C03.0 Answer to Bidder's Questions 015.pdf PDF
CUI C03.0 Answer to Bidder's Questions 014.pdf PDF
CUI C09.0 Solicitation N4523A21R0800 Amendment 0004.pdf PDF
CUI C03.0 Answer to Bidder's Questions 016.pdf PDF
CUI C03.0 Answer to Bidder's Questions 012.pdf PDF
CUI C03.0 Answer to Bidder's Questions 011.pdf PDF
CUI C09.0 Attachment J-2 USS JACKSONVILLE - Work Item Package (Errata 5).pdf PDF
CUI C03.0 Answer to Bidder's Questions 008.pdf PDF
CUI C03.0 Answer to Bidder's Questions 006.pdf PDF
CUI C03.0 Answer to Bidder's Questions 007.pdf PDF
CUI C03.0 Answer to Bidder's Questions 004.pdf PDF
CUI C03.0 Answer to Bidder's Questions 005.pdf PDF
CUI C09.0 Attachment J-2 USS JACKSONVILLE - Work Item Package (Errata 4).pdf PDF
CUI C03.0 Answer to Bidder's Questions 009.pdf PDF
CUI C03.0 Answer to Bidder's Questions 010.pdf PDF
CUI C03.0 Answer to Bidder's Questions 003.pdf PDF
CUI C04.0 Attachment J-7 Request for Clarification (Rev 1).pdf PDF
CUI C09.0 Solicitation N4523A21R0800 Amendment 0003.pdf PDF
CUI C09.0 Solicitation N4523A21R0800 Amendment 0002.pdf PDF
CUI C09.0 Attachment J-2 USS JACKSONVILLE - Work Item Package (Errata 3 Rev 1).pdf PDF
CUI C03.0 Answer to Bidder's Questions 002.pdf PDF
CUI C09.0 Solicitation N4523A21R0800 Amendment 0001.pdf PDF
CUI C03.0 Answer to Bidder's Questions.pdf PDF
CUI C09.0 Attachment J-2 USS JACKSONVILLE - Work Item Package (Errata 3).pdf PDF
CUI C04.0 Attachment J-1 GFPN4523A21R0800_1.pdf PDF
CUI C04.0 Attachment J-2 USS JACKSONVILLE - Work Item Package.pdf PDF
CUI C04.0 Attachment J-7 Request for Clarification.pdf PDF
CUI C04.0 Attachment J-5 Previous Efforts Form.pdf PDF
CUI C04.0 Attachment J-6 SER 440_220 Contractor Travel and ROM.pdf PDF
CUI C04.0 N4523A21R0800 USS JACKSONVILLE.pdf PDF
CUI C04.0 Attachment J-4 Pricing Proposal Worksheet.xlsx XLSX spreadsheet
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR CLARIFICATION

N4523A21R0800 USS Jacksonville Blanking Attachment J-7

DATE OF REQUEST: QUESTION NO:

REQUIREMENT: USS Jacksonville Blanking REQUISITION NO.: N4523A21R0800

ITEM NO:

TITLE: Final Disposition of Cabling PSNS&IMF CONTRACTS POC & PHONE:

See POCs listed on RFP.

PARA. NO: PAGE NO:

PLANNER’S NAME: ATTACH. NO:

CONTRACTOR QUESTION: (ONE QUESTION PER PAGE)

DO NOT WRITE BELOW THIS LINE

SPEC CHG: Y/N DWG/REF CHG. Y/N RQMTS CHG: Y/N MAT'L CHG: Y/N

TECHNICAL REVIEW: SERIAL NO:

ALL BIDDER’S QUESTIONS MUST BE RECEIVED NO LATER THAN 12:00 P.M.

(PST),

21 April 2021

ITEM NO: 123-01-002
PARA NO: 1.3.3.1
PAGE NO: 1
ATTACH NO:
CONTRACTOR QUESTION ONE QUESTION PER PAGE: SPEC Item appears to indicate all cables are to be cut and disposed of rather than being turned over to the SUPERVISOR. From SPEC Item Paragraph 1.3.3.1, Cable R-BS/SHL/SLL-1 is to be retained IAW Note 12 of DWG 5202783 REV E. Is this to be retained or discarded?
TECHNICAL REVIEW: Anna Lewis
SERIAL NO:
ALL BIDDERS QUESTIONS MUST BE RECEIVED NO LATER THAN 1200 PM: Cable R-BS/SHL/SLL-1 may be discarded. The retention from note 12 of DWG 5202783 Rev E was to retain the cable on the ship for testing equipment connection and does not apply for interference removal for an INACT
Name 1:
Date: 4/20/21
Text3: N
Text4: N
Text5: N
Text6: N

File details come from the government source that posted it. Updated .