CUI C09.0 Attachment J-2 USS JACKSONVILLE - Work Item Package (Errata 3 Rev 1).pdf

PDF 307 KB Posted

Attached to
USS Jacksonville Non-SUBSAFE Repair Work
Solicitation number
N4523A21R0800
Issued by

About this file

This document contains a work item package and related federal contract opportunity. The work item package outlines non-SUBSAFE repair work to be performed on the USS Jacksonville, including interference removals of cabling and special hull tile, blanking of main ballast tanks and exterior tanks. The repairs are to be done in accordance with Navy standards and shipyard quality and environmental requirements. The related federal contract opportunity is a solicitation seeking proposals for the outlined non-SUBSAFE repair work, with a period of performance from September 1, 2021 to December 20, 2021. Offerors must be registered in the System for Award Management and proposals will be evaluated using lowest price technically acceptable basis. The Naval Supply Systems Command Department of the Navy intends to award a firm-fixed-price contract to support the USS Jacksonville Propulsion Plant Deactivation Availability.

View the file

Other files

File Type Posted
CUI C03.0 Answer to Bidder's Questions 022.pdf PDF
CUI C03.0 Answer to Bidder's Questions 023.pdf PDF
CUI C03.0 Answer to Bidder's Questions 021.pdf PDF
CUI C03.0 Answer to Bidder's Questions 019.pdf PDF
CUI C03.0 Answer to Bidder's Questions 017.pdf PDF
CUI C03.0 Answer to Bidder's Questions 018.pdf PDF
CUI C03.0 Answer to Bidder's Questions 013.pdf PDF
CUI C03.0 Answer to Bidder's Questions 015.pdf PDF
CUI C03.0 Answer to Bidder's Questions 014.pdf PDF
CUI C09.0 Solicitation N4523A21R0800 Amendment 0004.pdf PDF
CUI C03.0 Answer to Bidder's Questions 020.pdf PDF
CUI C03.0 Answer to Bidder's Questions 016.pdf PDF
CUI C03.0 Answer to Bidder's Questions 012.pdf PDF
CUI C03.0 Answer to Bidder's Questions 011.pdf PDF
CUI C09.0 Attachment J-2 USS JACKSONVILLE - Work Item Package (Errata 5).pdf PDF
CUI C03.0 Answer to Bidder's Questions 008.pdf PDF
CUI C03.0 Answer to Bidder's Questions 006.pdf PDF
CUI C03.0 Answer to Bidder's Questions 007.pdf PDF
CUI C03.0 Answer to Bidder's Questions 004.pdf PDF
CUI C03.0 Answer to Bidder's Questions 005.pdf PDF
CUI C09.0 Attachment J-2 USS JACKSONVILLE - Work Item Package (Errata 4).pdf PDF
CUI C03.0 Answer to Bidder's Questions 009.pdf PDF
CUI C03.0 Answer to Bidder's Questions 010.pdf PDF
CUI C03.0 Answer to Bidder's Questions 003.pdf PDF
CUI C04.0 Attachment J-7 Request for Clarification (Rev 1).pdf PDF
CUI C09.0 Solicitation N4523A21R0800 Amendment 0003.pdf PDF
CUI C09.0 Solicitation N4523A21R0800 Amendment 0002.pdf PDF
CUI C03.0 Answer to Bidder's Questions 002.pdf PDF
CUI C09.0 Solicitation N4523A21R0800 Amendment 0001.pdf PDF
CUI C03.0 Answer to Bidder's Questions.pdf PDF
CUI C09.0 Attachment J-2 USS JACKSONVILLE - Work Item Package (Errata 3).pdf PDF
CUI C04.0 Attachment J-1 GFPN4523A21R0800_1.pdf PDF
CUI C04.0 Attachment J-2 USS JACKSONVILLE - Work Item Package.pdf PDF
CUI C04.0 Attachment J-7 Request for Clarification.pdf PDF
CUI C04.0 Attachment J-5 Previous Efforts Form.pdf PDF
CUI C04.0 Attachment J-6 SER 440_220 Contractor Travel and ROM.pdf PDF
CUI C04.0 N4523A21R0800 USS JACKSONVILLE.pdf PDF
CUI C04.0 Attachment J-4 Pricing Proposal Worksheet.xlsx XLSX spreadsheet
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE NAVY

NWRMC (NMD)

ERRATA - 3

USS JACKSONVILLE (SSN 699)

SPECIFICATIONS FOR WORK TO BE ACCOMPLISHED

SPECIFICATION NUMBER: NWRMC-502-21

INCLUDES ALL CHANGES THROUGH 4/5/2021

THIS PERMANENT CHANGE UPDATES THE SPECIFICATION BID PACKAGE.

SHIP: USS JACKSONVILLE (SSN 699)

NWRMC-502-21

ERRATA NUMBER:

SPECIFICATION NUMBER:

THE FOLLOWING ITEMS ARE REPLACED:

NSI 009-111 (Removed) 123-00-002

DATED: 4/7/2021 3:41:10PMPage 1 of 1

INDEX

SHIP: USS JACKSONVILLE (SSN 699) NWRMC-502-21

ITEMS THAT ARE STRUCK OUT IN THIS INDEX DO NOT APPLY TO THIS CONTRACT.

CATEGORY I. FY-21 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE.

ITEM_NO. TITLE CHANGE DATE CHANGE

009-01 General Criteria; accomplish 10/01/2019 Original

009-02 Environmental Compliance Report for Material Usage; accomplish 10/01/2019 Original

009-03 Toxic and Hazardous Substance; control 10/01/2019 Original

009-04 Quality Management System; provide 10/01/2019 Original

009-06 Maintaining Protection and Cleanliness from Non-Radioactive Operations;

accomplish

03/06/2020 CH-2

009-07 Confined Space Entry, Certification, Fire Prevention and Housekeeping;

accomplish

07/24/2019 Original

009-08 Shipboard Fire Protection and Fire Prevention; accomplish 10/01/2019 Original

009-10 Asbestos-Containing Material (ACM); control 10/01/2019 Original

009-18 Mine Warfare Ships Magnetic Material; control 04/30/2018 Original

009-19 Provisioning Technical Documentation (PTD); provide 10/01/2018 Original

009-20 Government Property; control 10/01/2017 Original

009-21 Logistics and Technical Data; provide 10/01/2018 Original

009-23 Interference; remove and install 10/01/2018 Original

009-24 Authorization, Control, Isolation, Blanking, Tagging, and Cleanliness;

accomplish

10/01/2019 Original

009-34 Fire Protection of Unmanned Vessel at Contractor Facility; accomplish 10/01/2018 Original

009-39 Technical Manual Contract Requirement (TMCR) for a New Technical Manual for Commercial Equipment/Component; accomplish

10/01/2018 Original

009-40 Contractor Crane, Multi-Purpose Machine and Material Handling Equipment at a Naval Facility; provide

10/01/2019 Original

009-60 Schedule and Associated Reports for Availabilities Over 9 Weeks in Duration;

provide and manage

01/14/2020 CH-1

009-61 Shipboard Use of Fluorocarbons; control 07/18/2014 Original

009-67 Integrated Total Ship Testing; manage 04/30/2018 Original

009-69 Heavy Weather/Mooring Plan; provide 04/30/2018 Original

009-70 Confined Space Entry, Certification, Fire Protection, Fire Prevention and

Housekeeping for Unmanned Vessels; accomplish

10/01/2019 Original

009-72 Physical Security at a Private Contractor Facility; accomplish 10/01/2019 Original

009-73 Shipboard Electrical/Electronic Cable Procedure; inspect, test, install, remove, and repair

10/01/2018 Original

009-74 Occupational, Safety and Health Plan; accomplish 01/14/2020 CH-1

009-80 Ship Facilities; maintain 11/18/2016 Original

009-81 Compartment Closeout; accomplish 10/01/2019 Original

009-82 Installation of Equal Component Vice Specified Component; report 03/26/2018 Original

009-84 Threaded Fastener Requirements; accomplish 03/06/2020 CH-2

009-93 Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution

Prevention Act (PPA) Information; provide

03/06/2018 Original

009-99 Ship Departure Report; provide 07/18/2014 Original

009-100 Ship's Stability; maintain 03/06/2018 Original

Page 1 of 5 EXECUTING WORK

ITEM_NO. TITLE CHANGE DATE CHANGE

009-101 Ship Transit and Berthing; accomplish 03/26/2018 Original

009-106 Work Authorization Form Coordinator (WAFCOR); provide 10/01/2017 Original

009-109 Non-SUBSAFE Work on SUBSAFE-Certified Vessel; accomplish 10/01/2017 Original

009-110 Non-Nuclear Work on a Nuclear Vessel; accomplish 11/18/2016 Original

009-111 Schedule and Associated Reports for Availabilities 9 Weeks or Less in

Duration; provide and manage

04/30/2018 (E3) Original

009-117 Combat Systems, Light-Off Suport; provide 10/01/2019 Original

009-118 CG Deck Loading; accomplish 07/18/2014 Original

009-120 Fact Finding and Critique of Unplanned Event; manage 03/06/2018 Original

009-122 Temporary Padeye; install and remove 10/01/2018 Original

009-125 Boats Less Than 65 Feet Long; accomplish 07/11/2020 CH-3

099-01NW General Occupational Safety and Health Requirements for the Bremerton

Naval Complex (BNC); accomplish

04/19/2019 Original

099-02NW General Contractor Environmental Protection Requirements for Bremerton

Naval Complex (BNC); accomplish

07/01/2016 Original

099-03NW General Contractor Air Pollution Control and Reporting Requirements for

Bremerton Naval Complex (BNC); accomplish

09/11/2018 Original

099-04NW General Contractor Hazardous Material Requirements for Bremerton Naval

Complex (BNC); accomplish

01/11/2017 Original

099-05NW General Contractor Water Pollution and Spill Prevention Requirements for

Bremerton Naval Complex (BNC); accomplish

06/24/2018 Original

099-06NW General Contractor Waste Management Requirements for Bremerton Naval

Complex (BNC); accomplish

01/11/2017 Original

099-07NW General Contractor Solid Waste Management Requirements for Bremerton

Naval Complex (BNC); accomplish

01/11/2017 Original

099-08NW Schedule and Associated Reports for Availabilities at Puget Sound Naval

Shipyard Over 9 Weeks in Duration; provide and manage

06/24/2018 Original

099-09NW Schedule and Associated Reports for Availabilities 9 Weeks or Less in

Duration; provide and manage

06/24/2018 Original

099-10NW Maintaining Protection and Cleanliness from Non-Radioactive Operations;

accomplish

04/19/2019 Original

099-11NW Compartment Closeout; accomplish 06/24/2018 Original

099-12NW General Requirements for Service Contracts; accomplish 04/19/2019 Original

Page 2 of 5 EXECUTING WORK

CHANGE DATETITLEITEM NO.

CATEGORY II. FY-21 STANDARD ITEMS WHICH MAY BE INVOKED IN THE WORK ITEMS OF THIS JOB ORDER

CHANGE

009-103 Weight and Moment Change Data; provide 04/30/2018 Original

Page 3 of 5 EXECUTING WORK

GAS FREE CERTIFICATION REQUIRED

SHIP: USS JACKSONVILLE (SSN 699) ITEM NO: 123-00-002 (E3)

COAR: 40 PCN: SSPS-L021

CMP: NONE

PLANNER: LEWIS, ANNA

COOPER, DANIEL

SSP: NWRMC-502-21 1 of 2 ITEM NO: 123-00-002

ERRATA NO. 3

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Main Ballast Tank (MBT) 3B; interference remove

1.2 Location of Work:

1.2.1 MBT3-23

1.2.2 MBT3-24

1.3 Identification:

1.3.1 (MBT3-23) AN-WLR9 HYDROPHONE (FDN DT-592 ITEM #2 DET 1-6A)

1.3.2 (MBT3-24) AN-WLR9 HYDROPHONE (FDN DT-511B ITEM #3 DET 1-6A)

2. REFERENCES:

2.1 Standard Items, FY 21

2.2 IPI 0770-903 Rev -, HOT WORK PRECAUTIONS

2.3 VAR-6772233 Rev -, SSN688CL DEMILITARIZATION GUIDELINES BY SWAB FOR

SUBMARINE RECYCLE

2.4 113-6159663 Rev F, RIPOUT & INSTALLATION FDN – HYDROPHONES (E3)

2.5 100-6159662 Rev D, PENETRATIONS FOR HYDROPHONES MBT FWD

2.6 100-4637545 Rev G, NON PRESSURE HULL FRAMES 11-1/2 – 32-1/2

2.7 100-8779866 Rev -, USS JACKSONVILLE (SSN 699) NON-NUCLEAR HULL

BLANKING INACTIVATION

3. REQUIREMENTS:

3.1 Accomplish the requirement of 2.2 Enclosure (2) for blank locations listed in 1.2.

3.2 Remove interferences identified in 1.3 using 2.1 through 2.7, for blank locations listed in 1.2.

3.2.1 Grind attachment welds flush with the non-pressure hull (or grind smooth within 1/16").

3.2.2 Accomplish the requirements of 009-103 of 2.1 for all

interferences removed.

3.3 Dispose of materials removed in 3.2, in accordance with 2.3.

3.3.1 Submit one legible copy, in approved transferrable media, of a report listing the results of 3.2.2 to the SUPERVISOR within 72 hours after completion of interference removal.

4. NOTES:

SHIP: USS JACKSONVILLE (SSN 699)

SSP: NWRMC-502-21 2 of 2 ITEM NO: 123-00-002

ERRATA NO. 3

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

5.3 KITTED MATERIAL:

1. None.