CUI C04.0 Attachment J-4 Pricing Proposal Worksheet.xlsx

XLSX spreadsheet 34 KB Posted

Attached to
USS Jacksonville Non-SUBSAFE Repair Work
Solicitation number
N4523A21R0800
Issued by

About this file

This document includes a pricing proposal worksheet and description for a federal contract opportunity to perform non-SUBSAFE pipe and structural welding, interference removals, blanking of main ballast tanks, and work on exterior tanks for the USS Jacksonville.

The pricing proposal worksheet is a template for offerors to provide pricing details for various work items such as work place requirements, hazardous waste control, and contractor facilities. It includes spaces for labor hours, rates, material costs and pricing for individual work items and an overall total proposed price. The related federal contract opportunity is being issued by the Naval Supply Systems Command to award a firm-fixed-price contract for the USS Jacksonville work from September 2021 to December 2021 at Puget Sound Naval Shipyard. The work will include pipe and structural welding, cable and tile removal, tank blanking, and cleaning in accordance with Navy specifications and quality standards. Offerors must be registered in the System for Award Management to receive the award.

View the file

Other files

File Type Posted
CUI C03.0 Answer to Bidder's Questions 022.pdf PDF
CUI C03.0 Answer to Bidder's Questions 023.pdf PDF
CUI C03.0 Answer to Bidder's Questions 021.pdf PDF
CUI C03.0 Answer to Bidder's Questions 019.pdf PDF
CUI C03.0 Answer to Bidder's Questions 017.pdf PDF
CUI C03.0 Answer to Bidder's Questions 018.pdf PDF
CUI C03.0 Answer to Bidder's Questions 013.pdf PDF
CUI C03.0 Answer to Bidder's Questions 015.pdf PDF
CUI C03.0 Answer to Bidder's Questions 014.pdf PDF
CUI C09.0 Solicitation N4523A21R0800 Amendment 0004.pdf PDF
CUI C03.0 Answer to Bidder's Questions 020.pdf PDF
CUI C03.0 Answer to Bidder's Questions 016.pdf PDF
CUI C03.0 Answer to Bidder's Questions 012.pdf PDF
CUI C03.0 Answer to Bidder's Questions 011.pdf PDF
CUI C09.0 Attachment J-2 USS JACKSONVILLE - Work Item Package (Errata 5).pdf PDF
CUI C03.0 Answer to Bidder's Questions 008.pdf PDF
CUI C03.0 Answer to Bidder's Questions 006.pdf PDF
CUI C03.0 Answer to Bidder's Questions 007.pdf PDF
CUI C03.0 Answer to Bidder's Questions 004.pdf PDF
CUI C03.0 Answer to Bidder's Questions 005.pdf PDF
CUI C09.0 Attachment J-2 USS JACKSONVILLE - Work Item Package (Errata 4).pdf PDF
CUI C03.0 Answer to Bidder's Questions 009.pdf PDF
CUI C03.0 Answer to Bidder's Questions 010.pdf PDF
CUI C03.0 Answer to Bidder's Questions 003.pdf PDF
CUI C04.0 Attachment J-7 Request for Clarification (Rev 1).pdf PDF
CUI C09.0 Solicitation N4523A21R0800 Amendment 0003.pdf PDF
CUI C09.0 Solicitation N4523A21R0800 Amendment 0002.pdf PDF
CUI C09.0 Attachment J-2 USS JACKSONVILLE - Work Item Package (Errata 3 Rev 1).pdf PDF
CUI C03.0 Answer to Bidder's Questions 002.pdf PDF
CUI C09.0 Solicitation N4523A21R0800 Amendment 0001.pdf PDF
CUI C03.0 Answer to Bidder's Questions.pdf PDF
CUI C09.0 Attachment J-2 USS JACKSONVILLE - Work Item Package (Errata 3).pdf PDF
CUI C04.0 Attachment J-1 GFPN4523A21R0800_1.pdf PDF
CUI C04.0 Attachment J-2 USS JACKSONVILLE - Work Item Package.pdf PDF
CUI C04.0 Attachment J-7 Request for Clarification.pdf PDF
CUI C04.0 Attachment J-5 Previous Efforts Form.pdf PDF
CUI C04.0 Attachment J-6 SER 440_220 Contractor Travel and ROM.pdf PDF
CUI C04.0 N4523A21R0800 USS JACKSONVILLE.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Total Price

USS JACKSONVILLE Blanking - Total Price Rollup
QTYUNITSUNIT PriceTotal Price
Base Package1JOB$ - 0$ - 0
Total Evaluated Price$ - 0

Summary Sheet

USS JACKSONVILLE - Blanking Contract - N4523A21R08000.00%0.00%
Work Item #TitleSquare FootageSquare InchesLabor HoursLabor RateDirect Labor Total PriceCFM/Equipment & Material Total PriceOther Direct CostsSub Contractor Direct Man HoursSub Contractor Labor RateSub Contractor Direct Labor Total PriceSUB Contractor Equipment & Material Total PriceSUBTOTALG&AProfitWork Item Total
042-00-002Work Place Requirements; accomplishN/AN/A$ - 0$ - 0$ - 0$ - 0$ - 0
077-11-001Hazardous Waste Produced on Naval Vessels; controlN/AN/A$ - 0$ - 0$ - 0$ - 0$ - 0
992-10-001Contractor Facilities; provideN/AN/A$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
123-00-001Main Ballast Tank (MBT) 3A; interference removeN/AN/A$ - 0$ - 0$ - 0$ - 0$ - 0
123-00-002Main Ballast Tank (MBT) 3B; interference removeN/AN/A$ - 0$ - 0$ - 0$ - 0$ - 0
123-01-001Main Ballast Tank (MBT) 1; electrical interference removeN/AN/A$ - 0$ - 0$ - 0$ - 0$ - 0
123-01-002Main Ballast Tank (MBT) 2; electrical interference removeN/AN/A$ - 0$ - 0$ - 0$ - 0$ - 0
123-01-003Main Ballast Tank (MBT) 3; electrical interference removeN/AN/A$ - 0$ - 0$ - 0$ - 0$ - 0
123-10-001Main Ballast Tank (MBT) 1A; welded cap installN/AN/A$ - 0$ - 0$ - 0$ - 0$ - 0
123-10-002Main Ballast Tank (MBT) 1B; welded cap installN/AN/A$ - 0$ - 0$ - 0$ - 0$ - 0
123-10-003Main Ballast Tank (MBT) 2A; welded cap installN/AN/A$ - 0$ - 0$ - 0$ - 0$ - 0
123-10-004Main Ballast Tank (MBT) 2B; welded cap installN/AN/A$ - 0$ - 0$ - 0$ - 0$ - 0
123-11-001Main Ballast Tank (MBT) 1A; blank installN/AN/A$ - 0$ - 0$ - 0$ - 0$ - 0
123-11-002Main Ballast Tank (MBT) 1B; blank installN/AN/A$ - 0$ - 0$ - 0$ - 0$ - 0
123-11-003Main Ballast Tank (MBT) 2A; blank installN/AN/A$ - 0$ - 0$ - 0$ - 0$ - 0
123-11-004Main Ballast Tank (MBT) 2B; blank installN/AN/A$ - 0$ - 0$ - 0$ - 0$ - 0
123-11-005Main Ballast Tank (MBT) 3A; blank installN/AN/A$ - 0$ - 0$ - 0$ - 0$ - 0
123-11-006Main Ballast Tank (MBT) 3B; blank installN/AN/A$ - 0$ - 0$ - 0$ - 0$ - 0
SUB TOTALS$ - 0$ - 0$ - 0
PROPOSAL TOTAL PRICE$ - 0
1. Only insert information in the highlighted cells: blue for prime, yellow for subcontractor, green for G&A and Profit rates (as appropriate).
2. WORK ITEM TOTAL COLUMNS ARE FORMULAS. DO NOT ENTER INFORMATION OR ALTER THIS FORMULA.
3. Proposal Total Price, gray shaded at bottom of sheet, is also a FORMULA - DO NOT ENTER INFORMATION or ALTER THIS FORMULA.
4. ODC-Defined as anything not directly attributable to a final cost or production objective (i.e., labor, subcontracts, and/or material). Examples include rental charges and travel etc.
5. Enter data to TWO DECIMAL POINTS.

CFM Equip & Mat'l

USS JACKSONVILLE - Contractor Furnished Equipment & Material (WI 992-10-001)
Equipment/Material RequiredQtyUnit PriceCFM/Equipment & Material Total PriceQtyUnit PriceSUB Contractor Equipment & Material Total PriceTOTAL
3.1.2 Office Trailers, approximately 10 X 20 feet, stackable$ - 0$ - 0$ - 0
3.1.3 Connex box 8 feet x 10 feet for tool room$ - 0$ - 0$ - 0
3.1.4 Forklift (propane)$ - 0$ - 0$ - 0
3.1.5 Materials for a 45/90 Hazardous Waste/Material Storage Area measuring no greater than 10 feet x 10 feet.$ - 0$ - 0$ - 0
3.1.6 Materials for building all work site containments and protection that meets the requirements 2.1.$ - 0$ - 0$ - 0
3.1.7 Explosion Proof Lighting$ - 0$ - 0$ - 0
3.1.8 Flammable Storage Locker$ - 0$ - 0$ - 0
3.1.9 Weld machines and welding support equipment$ - 0$ - 0$ - 0
CONTRACTOR FURNISHED EQUPMENT & MATERIAL SUBTOTAL PRICE$ - 0$ - 0$ - 0
CONTRACTOR FURNISHED EQUPMENT & MATERIAL TOTAL PRICE$ - 0
1. Only insert information in the highlighted cells: blue for prime, yellow for subcontractor (as appropriate), ODC/G&A/Profit, Growth Rates.
2. WORK ITEM TOTAL COLUMN is a FORMULA. DO NOT ENTER INFORMATION OR ALTER THIS FORMULA.
3. Total Price, gray shaded at bottom of sheet, is also a FORMULA - DO NOT ENTER INFORMATION or ALTER THIS FORMULA.
4. Enter data to TWO DECIMAL POINTS.

Other Direct Costs (ODCs)

USS JACKSONVILLE - Other Direct Costs (ODCs)
ODCs RequiredQtyUnit PriceTOTAL
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
CONTRACTOR FURNISHED EQUPMENT & MATERIAL TOTAL PRICE$ - 0
1. Only insert information in the highlighted cells: blue for prime, yellow for subcontractor (as appropriate), ODC/G&A/Profit, Growth Rates.
2. WORK ITEM TOTAL COLUMN is a FORMULA. DO NOT ENTER INFORMATION OR ALTER THIS FORMULA.
3. Total Price, gray shaded at bottom of sheet, is also a FORMULA - DO NOT ENTER INFORMATION or ALTER THIS FORMULA.
4. Enter data to TWO DECIMAL POINTS.