CUI C04.0 Attachment J-4 Pricing Proposal Worksheet.xlsx
XLSX spreadsheet 34 KB Posted
- Attached to
- USS Jacksonville Non-SUBSAFE Repair Work
- Solicitation number
- N4523A21R0800
About this file
This document includes a pricing proposal worksheet and description for a federal contract opportunity to perform non-SUBSAFE pipe and structural welding, interference removals, blanking of main ballast tanks, and work on exterior tanks for the USS Jacksonville.
The pricing proposal worksheet is a template for offerors to provide pricing details for various work items such as work place requirements, hazardous waste control, and contractor facilities. It includes spaces for labor hours, rates, material costs and pricing for individual work items and an overall total proposed price. The related federal contract opportunity is being issued by the Naval Supply Systems Command to award a firm-fixed-price contract for the USS Jacksonville work from September 2021 to December 2021 at Puget Sound Naval Shipyard. The work will include pipe and structural welding, cable and tile removal, tank blanking, and cleaning in accordance with Navy specifications and quality standards. Offerors must be registered in the System for Award Management to receive the award.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Total Price
| USS JACKSONVILLE Blanking - Total Price Rollup | ||||
| QTY | UNITS | UNIT Price | Total Price | |
| Base Package | 1 | JOB | $ - 0 | $ - 0 |
| Total Evaluated Price | $ - 0 |
Summary Sheet
| USS JACKSONVILLE - Blanking Contract - N4523A21R0800 | 0.00% | 0.00% | ||||||||||||||
| Work Item # | Title | Square Footage | Square Inches | Labor Hours | Labor Rate | Direct Labor Total Price | CFM/Equipment & Material Total Price | Other Direct Costs | Sub Contractor Direct Man Hours | Sub Contractor Labor Rate | Sub Contractor Direct Labor Total Price | SUB Contractor Equipment & Material Total Price | SUBTOTAL | G&A | Profit | Work Item Total |
| 042-00-002 | Work Place Requirements; accomplish | N/A | N/A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||
| 077-11-001 | Hazardous Waste Produced on Naval Vessels; control | N/A | N/A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||
| 992-10-001 | Contractor Facilities; provide | N/A | N/A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||
| 123-00-001 | Main Ballast Tank (MBT) 3A; interference remove | N/A | N/A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||
| 123-00-002 | Main Ballast Tank (MBT) 3B; interference remove | N/A | N/A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||
| 123-01-001 | Main Ballast Tank (MBT) 1; electrical interference remove | N/A | N/A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||
| 123-01-002 | Main Ballast Tank (MBT) 2; electrical interference remove | N/A | N/A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||
| 123-01-003 | Main Ballast Tank (MBT) 3; electrical interference remove | N/A | N/A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||
| 123-10-001 | Main Ballast Tank (MBT) 1A; welded cap install | N/A | N/A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||
| 123-10-002 | Main Ballast Tank (MBT) 1B; welded cap install | N/A | N/A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||
| 123-10-003 | Main Ballast Tank (MBT) 2A; welded cap install | N/A | N/A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||
| 123-10-004 | Main Ballast Tank (MBT) 2B; welded cap install | N/A | N/A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||
| 123-11-001 | Main Ballast Tank (MBT) 1A; blank install | N/A | N/A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||
| 123-11-002 | Main Ballast Tank (MBT) 1B; blank install | N/A | N/A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||
| 123-11-003 | Main Ballast Tank (MBT) 2A; blank install | N/A | N/A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||
| 123-11-004 | Main Ballast Tank (MBT) 2B; blank install | N/A | N/A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||
| 123-11-005 | Main Ballast Tank (MBT) 3A; blank install | N/A | N/A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||
| 123-11-006 | Main Ballast Tank (MBT) 3B; blank install | N/A | N/A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||
| SUB TOTALS | $ - 0 | $ - 0 | $ - 0 | |||||||||||||
| PROPOSAL TOTAL PRICE | $ - 0 | |||||||||||||||
| 1. Only insert information in the highlighted cells: blue for prime, yellow for subcontractor, green for G&A and Profit rates (as appropriate). | ||||||||||||||||
| 2. WORK ITEM TOTAL COLUMNS ARE FORMULAS. DO NOT ENTER INFORMATION OR ALTER THIS FORMULA. | ||||||||||||||||
| 3. Proposal Total Price, gray shaded at bottom of sheet, is also a FORMULA - DO NOT ENTER INFORMATION or ALTER THIS FORMULA. | ||||||||||||||||
| 4. ODC-Defined as anything not directly attributable to a final cost or production objective (i.e., labor, subcontracts, and/or material). Examples include rental charges and travel etc. | ||||||||||||||||
| 5. Enter data to TWO DECIMAL POINTS. |
CFM Equip & Mat'l
| USS JACKSONVILLE - Contractor Furnished Equipment & Material (WI 992-10-001) | |||||||
| Equipment/Material Required | Qty | Unit Price | CFM/Equipment & Material Total Price | Qty | Unit Price | SUB Contractor Equipment & Material Total Price | TOTAL |
| 3.1.2 Office Trailers, approximately 10 X 20 feet, stackable | $ - 0 | $ - 0 | $ - 0 | ||||
| 3.1.3 Connex box 8 feet x 10 feet for tool room | $ - 0 | $ - 0 | $ - 0 | ||||
| 3.1.4 Forklift (propane) | $ - 0 | $ - 0 | $ - 0 | ||||
| 3.1.5 Materials for a 45/90 Hazardous Waste/Material Storage Area measuring no greater than 10 feet x 10 feet. | $ - 0 | $ - 0 | $ - 0 | ||||
| 3.1.6 Materials for building all work site containments and protection that meets the requirements 2.1. | $ - 0 | $ - 0 | $ - 0 | ||||
| 3.1.7 Explosion Proof Lighting | $ - 0 | $ - 0 | $ - 0 | ||||
| 3.1.8 Flammable Storage Locker | $ - 0 | $ - 0 | $ - 0 | ||||
| 3.1.9 Weld machines and welding support equipment | $ - 0 | $ - 0 | $ - 0 | ||||
| CONTRACTOR FURNISHED EQUPMENT & MATERIAL SUBTOTAL PRICE | $ - 0 | $ - 0 | $ - 0 | ||||
| CONTRACTOR FURNISHED EQUPMENT & MATERIAL TOTAL PRICE | $ - 0 | ||||||
| 1. Only insert information in the highlighted cells: blue for prime, yellow for subcontractor (as appropriate), ODC/G&A/Profit, Growth Rates. | |||||||
| 2. WORK ITEM TOTAL COLUMN is a FORMULA. DO NOT ENTER INFORMATION OR ALTER THIS FORMULA. | |||||||
| 3. Total Price, gray shaded at bottom of sheet, is also a FORMULA - DO NOT ENTER INFORMATION or ALTER THIS FORMULA. | |||||||
| 4. Enter data to TWO DECIMAL POINTS. |
Other Direct Costs (ODCs)
| USS JACKSONVILLE - Other Direct Costs (ODCs) | |||
| ODCs Required | Qty | Unit Price | TOTAL |
| $ - 0 | |||
| $ - 0 | |||
| $ - 0 | |||
| $ - 0 | |||
| $ - 0 | |||
| $ - 0 | |||
| $ - 0 | |||
| $ - 0 | |||
| CONTRACTOR FURNISHED EQUPMENT & MATERIAL TOTAL PRICE | $ - 0 | ||
| 1. Only insert information in the highlighted cells: blue for prime, yellow for subcontractor (as appropriate), ODC/G&A/Profit, Growth Rates. | |||
| 2. WORK ITEM TOTAL COLUMN is a FORMULA. DO NOT ENTER INFORMATION OR ALTER THIS FORMULA. | |||
| 3. Total Price, gray shaded at bottom of sheet, is also a FORMULA - DO NOT ENTER INFORMATION or ALTER THIS FORMULA. | |||
| 4. Enter data to TWO DECIMAL POINTS. |
File details come from the government source that posted it. Updated .