CUI C04.0 Attachment J-2 USS JACKSONVILLE - Work Item Package.pdf
PDF 1 MB Posted
- Attached to
- USS Jacksonville Non-SUBSAFE Repair Work
- Solicitation number
- N4523A21R0800
About this file
This solicitation seeks proposals for non-SUBSAFE repair work on the USS Jacksonville. The Regional Maintenance Center at Puget Sound Naval Shipyard and Intermediate Maintenance Facility intends to award a firm-fixed-price contract to accomplish non-SUBSAFE pipe and structural welding, interference removals including cabling and special hull tile removal, blanking of main ballast tanks and exterior tanks. The contractor shall provide management, material support services, labor, supplies and equipment to perform this work at Puget Sound Naval Shipyard from September 2021 to December 2021. The government will award on a lowest-price, technically acceptable basis in accordance with FAR 15.101-2. Offerors must be registered in SAM to receive award.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE NAVY
NWRMC (NMD)
USS JACKSONVILLE (SSN 699)
SPECIFICATIONS FOR WORK TO BE ACCOMPLISHED
SPECIFICATION NUMBER: NWRMC-502-21
INCLUDES ALL CHANGES THROUGH 3/2/2021
INDEX
SHIP: USS JACKSONVILLE (SSN 699) NWRMC-502-21
ITEMS THAT ARE STRUCK OUT IN THIS INDEX DO NOT APPLY TO THIS CONTRACT.
CATEGORY I. FY-21 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE.
ITEM_NO. TITLE CHANGE DATE CHANGE
009-01 General Criteria; accomplish 10/01/2019 Original
009-02 Environmental Compliance Report for Material Usage; accomplish 10/01/2019 Original
009-03 Toxic and Hazardous Substance; control 10/01/2019 Original
009-04 Quality Management System; provide 10/01/2019 Original
009-06 Maintaining Protection and Cleanliness from Non-Radioactive Operations;
accomplish
03/06/2020 CH-2
009-07 Confined Space Entry, Certification, Fire Prevention and Housekeeping;
accomplish
07/24/2019 Original
009-08 Shipboard Fire Protection and Fire Prevention; accomplish 10/01/2019 Original
009-10 Asbestos-Containing Material (ACM); control 10/01/2019 Original
009-18 Mine Warfare Ships Magnetic Material; control 04/30/2018 Original
009-19 Provisioning Technical Documentation (PTD); provide 10/01/2018 Original
009-20 Government Property; control 10/01/2017 Original
009-21 Logistics and Technical Data; provide 10/01/2018 Original
009-23 Interference; remove and install 10/01/2018 Original
009-24 Authorization, Control, Isolation, Blanking, Tagging, and Cleanliness;
accomplish
10/01/2019 Original
009-34 Fire Protection of Unmanned Vessel at Contractor Facility; accomplish 10/01/2018 Original
009-39 Technical Manual Contract Requirement (TMCR) for a New Technical Manual for Commercial Equipment/Component; accomplish
10/01/2018 Original
009-40 Contractor Crane, Multi-Purpose Machine and Material Handling Equipment at a Naval Facility; provide
10/01/2019 Original
009-60 Schedule and Associated Reports for Availabilities Over 9 Weeks in Duration;
provide and manage
01/14/2020 CH-1
009-61 Shipboard Use of Fluorocarbons; control 07/18/2014 Original
009-67 Integrated Total Ship Testing; manage 04/30/2018 Original
009-69 Heavy Weather/Mooring Plan; provide 04/30/2018 Original
009-70 Confined Space Entry, Certification, Fire Protection, Fire Prevention and
Housekeeping for Unmanned Vessels; accomplish
10/01/2019 Original
009-72 Physical Security at a Private Contractor Facility; accomplish 10/01/2019 Original
009-73 Shipboard Electrical/Electronic Cable Procedure; inspect, test, install, remove, and repair
10/01/2018 Original
009-74 Occupational, Safety and Health Plan; accomplish 01/14/2020 CH-1
009-80 Ship Facilities; maintain 11/18/2016 Original
009-81 Compartment Closeout; accomplish 10/01/2019 Original
009-82 Installation of Equal Component Vice Specified Component; report 03/26/2018 Original
009-84 Threaded Fastener Requirements; accomplish 03/06/2020 CH-2
009-93 Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution
Prevention Act (PPA) Information; provide
03/06/2018 Original
009-99 Ship Departure Report; provide 07/18/2014 Original
009-100 Ship's Stability; maintain 03/06/2018 Original
Page 1 of 5 EXECUTING WORK
ITEM_NO. TITLE CHANGE DATE CHANGE
009-101 Ship Transit and Berthing; accomplish 03/26/2018 Original
009-106 Work Authorization Form Coordinator (WAFCOR); provide 10/01/2017 Original
009-109 Non-SUBSAFE Work on SUBSAFE-Certified Vessel; accomplish 10/01/2017 Original
009-110 Non-Nuclear Work on a Nuclear Vessel; accomplish 11/18/2016 Original
009-111 Schedule and Associated Reports for Availabilities 9 Weeks or Less in
Duration; provide and manage
04/30/2018 Original
009-117 Combat Systems, Light-Off Suport; provide 10/01/2019 Original
009-118 CG Deck Loading; accomplish 07/18/2014 Original
009-120 Fact Finding and Critique of Unplanned Event; manage 03/06/2018 Original
009-122 Temporary Padeye; install and remove 10/01/2018 Original
009-125 Boats Less Than 65 Feet Long; accomplish 07/11/2020 CH-3
099-01NW General Occupational Safety and Health Requirements for the Bremerton
Naval Complex (BNC); accomplish
04/19/2019 Original
099-02NW General Contractor Environmental Protection Requirements for Bremerton
Naval Complex (BNC); accomplish
07/01/2016 Original
099-03NW General Contractor Air Pollution Control and Reporting Requirements for
Bremerton Naval Complex (BNC); accomplish
09/11/2018 Original
099-04NW General Contractor Hazardous Material Requirements for Bremerton Naval
Complex (BNC); accomplish
01/11/2017 Original
099-05NW General Contractor Water Pollution and Spill Prevention Requirements for
Bremerton Naval Complex (BNC); accomplish
06/24/2018 Original
099-06NW General Contractor Waste Management Requirements for Bremerton Naval
Complex (BNC); accomplish
01/11/2017 Original
099-07NW General Contractor Solid Waste Management Requirements for Bremerton
Naval Complex (BNC); accomplish
01/11/2017 Original
099-08NW Schedule and Associated Reports for Availabilities at Puget Sound Naval
Shipyard Over 9 Weeks in Duration; provide and manage
06/24/2018 Original
099-09NW Schedule and Associated Reports for Availabilities 9 Weeks or Less in
Duration; provide and manage
06/24/2018 Original
099-10NW Maintaining Protection and Cleanliness from Non-Radioactive Operations;
accomplish
04/19/2019 Original
099-11NW Compartment Closeout; accomplish 06/24/2018 Original
099-12NW General Requirements for Service Contracts; accomplish 04/19/2019 Original
Page 2 of 5 EXECUTING WORK
CHANGE DATETITLEITEM NO.
CATEGORY II. FY-21 STANDARD ITEMS WHICH MAY BE INVOKED IN THE WORK ITEMS OF THIS JOB ORDER
CHANGE
009-103 Weight and Moment Change Data; provide 04/30/2018 Original
Page 3 of 5 EXECUTING WORK
ITEM NO. TITLE
WORKPLACE REQUIREMENTS042-10-001
Hazardous Waste Produced on Naval Vessels; control077-11-001
Pressure Hull FWD-PORT & STBD; interference remove (DESCOPED)111-00-001
Pressure Hull FWD-PORT & STBD; cable interference remove
(DESCOPED)
111-01-001
Pressure Hull; blank install (DESCOPED)111-11-001
Sonar Sphere Tunnel; interference remove (DESCOPED)112-00-001
TEP port and Starboard Interferences; remove (DESCOPED)112-00-002
Torpedo Tube interferences; remove (DESCOPED)112-00-003
Sonar Sphere Tunnel, electrical interference; remove (DESCOPED)112-01-001
Main Ballast Tank (MBT) 3A; interference remove123-00-001
Main Ballast Tank (MBT) 3B; interference remove123-00-002
Main Ballast Tank (MBT) 5A; interference remove (DESCOPED)123-00-003
Main Ballast Tank (MBT) 1 electrical interference; remove123-01-001
Main Ballast Tank (MBT) 2 electrical interference; remove123-01-002
Main Ballast Tank (MBT) 3; electrical&mechanical interference123-01-003
Main Ballast Tank (MBT) 4 electrical interference; remove (DESCOPED)123-01-004
Main Ballast Tank (MBT) 5 electrical interference; remove (DESCOPED)123-01-005
Main Ballast Tank (MBT) 1A; welded cap install123-10-001
Main Ballast Tank (MBT) 1B; welded cap install123-10-002
Main Ballast Tank (MBT) 2A; welded cap install123-10-003
Main Ballast Tank (MBT) 2B; welded cap install123-10-004
Main Ballast Tank (MBT) 5A; welded cap install (DESCOPED)123-10-005
Main Ballast Tank (MBT) 1A; blank install123-11-001
Main Ballast Tank (MBT) 1B; blank install123-11-002
Main Ballast Tank (MBT) 2A; blank install123-11-003
Main Ballast Tank (MBT) 2B; blank install123-11-004
Main Ballast Tank (MBT) 3A; blank install123-11-005
Main Ballast Tank (MBT) 3B; blank install123-11-006
Main Ballast Tank (MBT) 4A; blank install(DESCOPED)123-11-007
Page 4 of 5 EXECUTING WORK daniel.d.cooper Cross-Out daniel.d.cooper Cross-Out daniel.d.cooper Cross-Out daniel.d.cooper Cross-Out daniel.d.cooper Cross-Out daniel.d.cooper Cross-Out daniel.d.cooper Cross-Out daniel.d.cooper Cross-Out daniel.d.cooper Cross-Out daniel.d.cooper Cross-Out daniel.d.cooper Cross-Out daniel.d.cooper Cross-Out daniel.d.cooper Cross-Out daniel.d.cooper Cross-Out
Main Ballast Tank (MBT) 4B; blank install (DESCOPED)123-11-008
Main Ballast Tank (MBT) 5A; blank install (DESCOPE)123-11-009
Main Ballast Tank (MBT) 5B; blank install (DESCOPED)123-11-010
Contractor Facilities; provide992-10-001
Page 5 of 5 EXECUTING WORK daniel.d.cooper Cross-Out daniel.d.cooper Cross-Out daniel.d.cooper Cross-Out
SHIP: USS JACKSONVILLE (SSN 699) ITEM NO: 042-10-001 (E2)
COAR: 40 PCN: SSPS-L001
CMP: NONE
PLANNER: LEWIS, ANNA
COOPER, DANIEL
SSP: NWRMC-502-21 1 of 5 ITEM NO: 042-10-001
ERRATA NO. 2
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: WORKPLACE REQUIREMENTS
1.2 Location of Work:
1.2.1 USS JACKSONVILLE (SSN-699), Puget Sound Naval Shipyard and Intermediate Maintenance Facility(PSNS & IMF)
1.3 Identification:
1.3.1 Not Applicable
2. REFERENCES:
2.1 Standard Items , (FY21)
3. REQUIREMENTS:
3.1 Accomplish the requirements of 2.1 for schedule and associated reports.
3.2 Contractor work schedule and work breakdown structure shall coincide with PSNS & IMF work specified in Attachment A.
3.2.1 Provide daily updates to the SUPERVISOR and Work Integration Team (WIT), progressing and updating the Shipyard schedule, prior to 10 am. These updates will include the following functions:
3.2.1.1 Report all claimed starts and finishes, via WIT, to be processed for Completion (CPL).
3.2.1.2 Managing remaining durations (RDU) to work items. If
additional RDU is required, the Shipyard schedulers shall be notified, via the WIT, to analyze.
3.2.1.3 Provide to the SUPERVISOR daily updates to each
Contractor work item listed in the Daily Priority List (DPL).
3.2.1.4 Provide to the SUPERVISOR weekly updates to each
Contractor work item listed in the Short Range View (SRV).
3.2.2 Accomplish the requirements of section C-1.5 of the contract for project management and execution/ planning.
3.3 Project Work Place Requirements:
3.3.1 Each contractor employee requiring access to the ship shall be required to attend a mandatory project indoctrination briefing approximately 2 hours long.
3.3.1.1 Contact SUPERVISOR for times and locations. Briefing
includes Project Introduction, Environmental Safety & Health, Gas Free/Confined Space Briefing, Submarine Orientation, Shipboard Fire Safety Control, Cleanliness and Material Tracking. Employees shall sign the Employee Introduction Training Roster after
SHIP: USS JACKSONVILLE (SSN 699)
SSP: NWRMC-502-21 2 of 5 ITEM NO: 042-10-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
completion of the training.
3.3.2 Notify the SUPERVISOR via email, 72 hours before vehicle escort is required.
3.3.2.1 Email shall include company name, drivers name, phone number, estimated arrival date, estimated arrival time and what is being delivered.
3.3.3 Accomplish the requirements of section C-2.5 of the contract, for the Work Authorization Form Coordinator (WAFCOR) to be qualified to obtain a RED shipyard ID badge.
4. NOTES:
4.1 The term "SUPERVISOR" is defined as CODE 400 Project Maintenance Team.
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
5.3 KITTED MATERIAL:
1. None.
SSP: NWRMC-502-21 3 of 5 ITEM NO: 042-10-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S. International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
ICN KO CU Phase Title Component Name Start Date Completion
Date 38Z9917612 U18 KTR - (MBT 1-6) Remove INTF cable and BTF T-25 to support blank CONTRACTOR MBT 1A 9/3/2021 9/7/2021 38Z9917612 R82 KTR - MBT 1A (STBD) Install blast protection / containment CONTRACTOR MBT 1A 9/3/2021 9/7/2021 38Z9917612 U19 KTR - (MBT 1-1) Remove INTF cable and BTF T-20 to support blank CONTRACTOR MBT 1B 9/3/2021 9/7/2021 38Z9917612 R83 KTR - MBT 1B (PORT) Install blast protection / containment CONTRACTOR MBT 1B 9/3/2021 9/7/2021 38Z9917612 S01 KTR - Provide Firewatch Services for MBT 1 FIREWATCH SERVICES 9/7/2021 12/21/2021 38Z9917612 S06 KTR - Provide Gas Free Services for MBT 1 GAS FREE SERVICES 9/7/2021 12/21/2021 38Z9917612 U17 KTR - (MBT 1-3) Remove INTF cable and BTF T-22 to support blank CONTRACTOR MBT 1A 9/8/2021 9/9/2021 38Z9917612 U03 KTR - MBT 1A (STBD) Remove Paint/Damping/SHT CONTRACTOR MBT 1A 9/8/2021 9/10/2021 38Z9917612 U20 KTR - (MBT 1-4) Remove INTF cable and BTF T-23 to support blank CONTRACTOR MBT 1B 9/8/2021 9/9/2021 38Z9917612 U04 KTR - MBT 1B (PORT) Remove Paint/Damping/SHT CONTRACTOR MBT 1B 9/8/2021 9/10/2021 38Z9917612 U16 KTR - (MBT 1-2) Remove INTF cable and BTF T-21 to support blank CONTRACTOR MBT 1A 9/9/2021 9/10/2021 38Z9917612 U21 KTR - (MBT 1-5) Remove INTF cable and BTF T-24 to support blank CONTRACTOR MBT 1B 9/9/2021 9/10/2021 38Z9917612 R22 KTR - (MBT 1-14) Install MBT 1A Vent Valve Blank CONTRACTOR MBT 1A 9/10/2021 9/14/2021 38Z9917612 R20 KTR - (MBT 1-9) Install MBT 1A Flood Hole Blank FR 12-14 OUTBD CONTRACTOR MBT 1A 9/10/2021 9/14/2021 38Z9917612 R30 KTR - (MBT 1-15) Install MBT 1B Vent Valve Blank CONTRACTOR MBT 1B 9/10/2021 9/14/2021 38Z9917612 R28 KTR - (MBT 1-12) Install MBT 1B Flood Hole Blank FR 12-14 OUTBD CONTRACTOR MBT 1B 9/10/2021 9/14/2021 38Z9917612 U22 KTR - (MBT 1-4) Remove INTF cable and BTF T-40 to support blank CONTRACTOR MBT 1B 9/13/2021 9/14/2021 38Z9917612 U23 KTR - (MBT 1-20) Remove INTF to support AN/BQN-17 Window blank CONTRACTOR MBT 1B 9/14/2021 9/15/2021 38Z9917612 R21 KTR - (MBT 1-10) Install MBT 1A Flood Hole Blank FR 14-15 CONTRACTOR MBT 1A 9/15/2021 9/17/2021 38Z9917612 R19 KTR - (MBT 1-8) Install MBT 1A Flood Hole Blank FR 12/14 INBD CONTRACTOR MBT 1A 9/15/2021 9/17/2021 38Z9917612 R32 KTR - (MBT 1-21) Install AN/BQN-17 Recess Drain Blank CONTRACTOR MBT 1B 9/15/2021 9/16/2021 38Z9917612 R27 KTR - (MBT 1-11) Install MBT 1B Flood Hole Blank FR 12-14 INBD CONTRACTOR MBT 1B 9/15/2021 9/17/2021 38Z9917612 R29 KTR - (MBT 1-13) Install MBT 1B Flood Hole Blank FR 14-15 CONTRACTOR MBT 1B 9/16/2021 9/20/2021 38Z9917612 R18 KTR - (MBT 1-6) Install Electrical Tank Fitting T25 Blank CONTRACTOR MBT 1A 9/17/2021 9/21/2021 38Z9917612 R17 KTR - (MBT 1-3) Install Electrical Tank Fitting T22 Blank CONTRACTOR MBT 1A 9/17/2021 9/21/2021 38Z9917612 R23 KTR - (MBT 1-1) Install Electrical Tank Fitting T20 Blank CONTRACTOR MBT 1B 9/17/2021 9/21/2021 38Z9917612 R26 KTR - (MBT 1-7) Install Electrical Tank Fitting T40 Blank CONTRACTOR MBT 1B 9/21/2021 9/23/2021 38Z9917612 R90 KTR - (MBT-1A) Install Welded Cap on MBT-1A Emergency Blow Pipe CONTRACTOR MBT 1A 9/22/2021 9/24/2021 38Z9917612 R24 KTR - (MBT 1-4) Install Electrical Tank Fitting T23 Blank CONTRACTOR MBT 1B 9/22/2021 9/24/2021 38Z9917612 R91 KTR - (MBT-1B) Install Welded Cap on MBT-1B Emergency Blow Pipe CONTRACTOR MBT 1B 9/23/2021 9/27/2021 38Z9917612 R16 KTR - (MBT 1-2) Install Electrical Tank Fitting T21 Blank CONTRACTOR MBT 1A 9/24/2021 9/28/2021 38Z9917612 R25 KTR - (MBT 1-5) Install Electrical Tank Fitting T24 Blank CONTRACTOR MBT 1B 9/24/2021 9/28/2021 38Z9917612 R31 KTR - (MBT 1-20) Install AN/BQN-17 Window Blank CONTRACTOR MBT 1B 9/28/2021 9/30/2021 38Z9917612 U29 KTR - (MBT 2-17) Remove INTF to support AN/BQN-15 Window blank CONTRACTOR MBT 2A 9/29/2021 9/30/2021 38Z9917612 U27 KTR - (MBT 2-14) Remove INTF cable and BTF T-32 to support blank CONTRACTOR MBT 2A 9/29/2021 9/30/2021 38Z9917612 R84 KTR - MBT 2A (STBD) Install blast protection / containment CONTRACTOR MBT 2A 9/29/2021 9/30/2021 38Z9917612 U25 KTR - (MBT 2-10/ MBT 2-12) Remove INTF cable and BTF T-28/T-30 to support blank CONTRACTOR MBT 2A 10/1/2021 10/4/2021 38Z9917612 U05 KTR - MBT 2A (STBD) Remove Paint/Damping/SHT CONTRACTOR MBT 2A 10/1/2021 10/5/2021 38Z9917612 U24 KTR - (MBT 2-9/ MBT 2-11) Remove INTF cables and BTF T-27/T-29 to support blanks CONTRACTOR MBT 2B 10/1/2021 10/4/2021 38Z9917612 R85 KTR - MBT 2B (PORT) Install blast protection / containment CONTRACTOR MBT 2B 10/1/2021 10/4/2021 38Z9917612 R39 KTR - (MBT 2-26) Install MBT 2A Vent Valve Blank CONTRACTOR MBT 2A 10/5/2021 10/7/2021 38Z9917612 R37 KTR - (MBT 2-18) Install AN/BQN-15 Recess Drain Blank CONTRACTOR MBT 2A 10/5/2021 10/7/2021 38Z9917612 U06 KTR - MBT 2B (PORT) Remove Paint/Damping/SHT CONTRACTOR MBT 2B 10/5/2021 10/7/2021 38Z9917612 U26 KTR - (MBT 2-13) Remove INTF cable sand BTF T-31 to support blank CONTRACTOR MBT 2B 10/6/2021 10/7/2021 38Z9917612 R45 KTR - (MBT 2-23, 2-24, 2-25) Install MBT 2B Flood Hole Blanks CONTRACTOR MBT 2B 10/7/2021 10/14/2021 38Z9917612 R43 KTR - (MBT 2-15) Install DT-705-CTD Duct Inlet Blank CONTRACTOR MBT 2B 10/7/2021 10/12/2021 38Z9917612 R38 KTR - (MBT 2-20, 2-21, 2-22) Install MBT 2A Flood Hole Blanks CONTRACTOR MBT 2A 10/8/2021 10/15/2021 38Z9917612 R35 KTR - (MBT 2-14) Install Electrical Tank Fitting T32 Blank CONTRACTOR MBT 2A 10/8/2021 10/13/2021 38Z9917612 R34 KTR - (MBT 2-12) Install Electrical Tank Fitting T30 Blank CONTRACTOR MBT 2A 10/13/2021 10/15/2021 38Z9917612 R93 KTR - (MBT 2B) Install Welded Cap on MBT-2B Emergency Blow Pipe CONTRACTOR MBT 2B 10/13/2021 10/19/2021 38Z9917612 R92 KTR - (MBT 2A) Install Welded Cap on MBT-2A Emergency Blow Pipe CONTRACTOR MBT 2A 10/15/2021 10/19/2021 38Z9917612 R46 KTR - (MBT 2-27) Install MBT 2B Vent Valve Blank CONTRACTOR MBT 2B 10/15/2021 10/18/2021 38Z9917612 R33 KTR - (MBT 2-10) Install Electrical Tank Fitting T28 Blank CONTRACTOR MBT 2A 10/18/2021 10/20/2021 38Z9917612 R40 KTR - (MBT 2-9) Install Electrical Tank Fitting T27 Blank CONTRACTOR MBT 2B 10/18/2021 10/20/2021 38Z9917612 R42 KTR - (MBT 2-13) Install Electrical Tank Fitting T31 Blank CONTRACTOR MBT 2B 10/19/2021 10/21/2021 38Z9917612 R36 KTR - (MBT 2-17) Install AN/BQN-15 Window Blank CONTRACTOR MBT 2A 10/20/2021 10/22/2021 38Z9917612 R41 KTR - (MBT 2-11) Install Electrical Tank Fitting T29 Blank CONTRACTOR MBT 2B 10/21/2021 10/25/2021 38Z9917612 U38 KTR - (MBT 3-39, MBT 3-48, MBT 3-49) Remove INTF to support AN/BQQ-5 blanks CONTRACTOR MBT 3A 10/25/2021 10/27/2021 38Z9917612 R86 KTR - MBT 3A (STBD) Install blast protection / containment CONTRACTOR MBT 3A 10/25/2021 10/26/2021
SSP: NWRMC-502-21 4 of 5 ITEM NO: 042-10-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S. International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
38Z9917612 U37 KTR - (MBT 3-28) Remove INTF cable from BTF T-50 to support blank CONTRACTOR MBT 3A 10/26/2021 10/27/2021 38Z9917612 U07 KTR - MBT 3A (STBD) Remove Paint/Damping/SHT CONTRACTOR MBT 3A 10/26/2021 10/28/2021 38Z9917612 U09 KTR - (MBT 3-23) Remove WLR-9 foundation flush with non-pressure hull CONTRACTOR MBT 3B 10/26/2021 10/28/2021 38Z9917612 R87 KTR - MBT 3B (PORT) Install blast protection / containment CONTRACTOR MBT 3B 10/26/2021 10/27/2021 38Z9917612 U11 KTR - Remove AN/BQQ-5 Cover Foundation/Sheave Foundation/Electrical Cable Hanger CONTRACTOR MBT 3A 10/27/2021 10/29/2021 38Z9917612 U47 KTR - (MBT 3-39, MBT 3-47, MBT 3-48, MBT 3-49, MBT 3-54) Remove AN/BQQ-5 STRUC I CONTRACTOR MBT 3A 10/28/2021 11/1/2021 38Z9917612 U32 KTR - (MBT 3-18) Remove INTF cable and BTF T-38 to support blank CONTRACTOR MBT 3B 10/28/2021 10/29/2021 38Z9917612 U08 KTR - MBT 3B (PORT) Remove Paint/Damping/SHT CONTRACTOR MBT 3B 10/28/2021 11/1/2021 38Z9917612 R71 KTR - (MBT 3-50) Install MBT 3A Vent Valve Blank CONTRACTOR MBT 3A 10/29/2021 11/2/2021 38Z9917612 U34 KTR - (MBT 3-23) Remove INTF to support AN-WLR9 Hydrophone BCL blank CONTRACTOR MBT 3B 10/29/2021 11/2/2021
SSP: NWRMC-502-21 5 of 5 ITEM NO: 042-10-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S. International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
38Z9917612 U10 KTR - (MBT 3-24) Remove WLR-9 foundation flush with non-pressure hull CONTRACTOR MBT 3B 10/29/2021 11/2/2021 38Z9917612 U33 KTR - (MBT 3-19) Remove INTF cable and BTF T-39 to support blank CONTRACTOR MBT 3A 11/1/2021 11/2/2021
38Z9917612 U12 KTR - (MBT 3-54) Remove Hatch Cover CONTRACTOR MBT 3A 11/1/2021 11/3/2021
38Z9917612 R56 KTR - (MBT 3-51) Install MBT 3B Vent Valve Blank CONTRACTOR MBT 3B 11/1/2021 11/3/2021
38Z9917612 R52 KTR - (MBT 3-28) Install PORT Torpedo Recess Electrical Tank Fitting Blank CONTRACTOR MBT 3B 11/1/2021 11/3/2021
38Z9917612 R73 KTR - (MBT 3-58) Install STBD 1" Diameter Vent Hole Blank CONTRACTOR MBT 3A 11/2/2021 11/4/2021
38Z9917612 U35 KTR - (MBT 3-24) Remove INTF to support AN-WLR9 Hydrophone TCL blank CONTRACTOR MBT 3B 11/2/2021 11/3/2021
38Z9917612 U31 KTR - (MBT 3-15/ MBT 3-17) Remove INTF cable and BTF T-35/T-37 to support blank CONTRACTOR MBT 3A 11/3/2021 11/4/2021
38Z9917612 U36 KTR - (MBT 3-27) Remove INTF cable from BTF T-51 to support blank CONTRACTOR MBT 3A 11/4/2021 11/5/2021
38Z9917612 U30 KTR - (MBT 3-14/ MBT 3-16) Remove INTF cable and BTF T-34/T-36 to support blank CONTRACTOR MBT 3B 11/4/2021 11/5/2021
38Z9917612 R58 KTR - (MBT 3-59) Install PORT 1" Dia Drain Hole Blank CONTRACTOR MBT 3B 11/4/2021 11/8/2021
38Z9917612 R53 KTR - (MBT 3-32, 3-33, 3-34) Install MBT 3B Flood Hole Blanks CONTRACTOR MBT 3B 11/4/2021 11/8/2021
38Z9917612 U48 KTR - (MBT 3-21) Remove INTF to support Sonar Window Blank CONTRACTOR MBT 3B 11/5/2021 11/5/2021
38Z9917612 R63 KTR - (MBT 3-21) Install Sonar Window Blank CONTRACTOR MBT 3A 11/8/2021 11/9/2021
38Z9917612 R50 KTR - (MBT 3-23) Install AN-WLR9 Hydrophone BCL Blank CONTRACTOR MBT 3B 11/8/2021 11/10/2021
38Z9917612 R49 KTR - (MBT 3-18) Install Electrical Tank Fitting T38 Blank CONTRACTOR MBT 3B 11/8/2021 11/10/2021
38Z9917612 R66 KTR - (MBT 3-39) Install AN/BQQ-5 Sheave Recess Blank CONTRACTOR MBT 3A 11/9/2021 11/12/2021
38Z9917612 R55 KTR - (MBT 3-42) Install PORT Rodmeter and Vent Blank CONTRACTOR MBT 3B 11/12/2021 11/16/2021
38Z9917612 R51 KTR - (MBT 3-24) Install AN-WLR9 Hydrophone TCL Blank CONTRACTOR MBT 3B 11/12/2021 11/16/2021
38Z9917612 R67 KTR - (MBT 3-41) Install STBD Rodmeter and Vent Blank CONTRACTOR MBT 3A 11/15/2021 11/17/2021
38Z9917612 R48 KTR - (MBT 3-16) Install Electrical Tank Fitting T36 Blank CONTRACTOR MBT 3B 11/16/2021 11/18/2021
38Z9917612 R69 KTR - (MBT 3-48) Install AN/BQQ-5 Pump Recess Blank CONTRACTOR MBT 3A 11/17/2021 11/19/2021
38Z9917612 R47 KTR - (MBT 3-14) Install Electrical Tank Fitting T34 Blank CONTRACTOR MBT 3B 11/19/2021 11/23/2021
38Z9917612 R70 KTR - (MBT 3-49) Install AN/BQQ-5 Pump Recess Blank CONTRACTOR MBT 3A 11/22/2021 11/24/2021
38Z9917612 R65 KTR - (MBT 3-29, 3-30, 3-31) Install MBT 3A Flood Hole Blanks CONTRACTOR MBT 3A 11/24/2021 11/29/2021
38Z9917612 R68 KTR - (MBT 3-43) Install AN/BQQ-5 Flushing Pipe Blank CONTRACTOR MBT 3A 11/30/2021 12/2/2021
38Z9917612 R62 KTR - (MBT 3-19) Install Electrical Tank Fitting T39 Blank CONTRACTOR MBT 3A 12/2/2021 12/6/2021
38Z9917612 R61 KTR - (MBT 3-17) Install Electrical Tank Fitting T37 Blank CONTRACTOR MBT 3A 12/7/2021 12/9/2021
38Z9917612 R64 KTR - (MBT 3-27) Install STBD Torpedo Recess Electrical Tank Fitting Blank CONTRACTOR MBT 3A 12/9/2021 12/13/2021
38Z9917612 R60 KTR - (MBT 3-15) Install Electrical Tank Fitting T35 Blank CONTRACTOR MBT 3A 12/14/2021 12/16/2021 38Z9917612 R72 KTR - (MBT 3-54) Install Access Hatch Blank CONTRACTOR MBT 3A 12/16/2021 12/20/2021
HAZMAT
SHIP: USS JACKSONVILLE (SSN 699) ITEM NO: 077-11-001 (E1)
COAR: 40 PCN: SSPS-L002
CMP: NONE
PLANNER: LEWIS, ANNA
COOPER, DANIEL
KOURLIS, MARINA
SSP: NWRMC-502-21 1 of 4 ITEM NO: 077-11-001 ERRATA NO. One
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Hazardous Waste Produced on Naval Vessels; control
1.2 Location of Work:
1.2.1 USS-JACKSONVILLE (SSN-699), Puget Sound Naval Shipyard and Intermediate
Maintenance Facility (PSNS & IMF)
1.3 Identification:
1.3.1 Not Applicable
2. REFERENCES:
2.1 Standard Items , (FY19)FY21) (E1)
2.2 Resource Conservation and Recovery Act, (RCRA)
2.3 49 U.S.C. 5103, Federal Hazardous Materials Transportation Act
2.4 Applicable Hazardous Waste, Manifest Form
2.5 10 U.S.C., 7311
3. REQUIREMENTS:
3.1 Manage and dispose of all hazardous waste listed in 3.5 in accordance with 2.1 through 2.5.
3.1.1 When a Navy generator number is required by this Work Item, submit the original of 2.5 to the SUPERVISOR for assignment of Environmental Protection Agency (EPA) or delegated state environmental agency identification number.
3.1.2 Manage and transport for Navy disposal, Navy-generated
hazardous waste listed in 3.5 in accordance with 2.2 and 2.4, as designated by the SUPERVISOR.
3.2 Complete documentation required by 2.2 and 2.4, using EPA or delegated state environmental agency identification number in accordance with 2.5.
3.2.1 Documentation related to hazardous waste generated solely by the physical actions of contractor personnel (termed Contractor- Generated Hazardous Waste) shall bear a generator identification number issued to the contractor pursuant to applicable law.
Regardless of the presence of other material in or on the shipboard systems or structure which may have qualified a waste stream as hazardous, where the contractor performs work on a system or
SSP: NWRMC-502-21 2 of 4 ITEM NO: 077-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
structure using materials (whether or not the use of such materials was specified by the Navy) which by themselves would cause the waste from such work to be a hazardous waste, documentation related to such waste shall only bear a generator number issued to the contractor.
3.2.2 Documentation related to hazardous waste generated by the combined physical actions of Navy and contractor personnel (termed Co-Generated Hazardous Waste) shall bear a generator identification number issued to the contractor pursuant to applicable law and shall also cite in the remarks block a generator identification number issued to the Navy pursuant to applicable law. When the contractor merely drains a system and such drainage creates hazardous waste or the contractor performs work on system or structure using materials which by themselves would not cause the waste from such work to be hazardous waste but such work nonetheless creates a hazardous waste, documentation related to such waste shall bear a generator identification number issued to the contractor and shall also cite in the remarks block a generator identification number issued to the Navy. The contractor shall sign the generator certification on the Uniform Hazardous Waste Manifest whenever use of the manifest is required for disposal. The contractor shall obtain SUPERVISOR's concurrence with the categorization of the wastes as co-generated before completion of the manifest. Manifests prepared shall be presented to the SUPERVISOR for completion after the hazardous waste has been identified.
3.3 Obtaining approval of the SUPERVISOR, the contractor shall use the Navy site generator identification number and insert in the remarks block the contractor generator identification number issued for the site where his main facilities are located.
3.4 Hazardous waste, as identified in 2.2, expected to be produced during performance of this Job Order:
AMOUNT
TYPE NAVY CO-GENERATED CONTRACTOR
Acid Solutions (may include _____ ____________ __________ spent sulfamic, citric, chromic, nitric, sulfuric, hydrochloric, etc.)
Ethylene Glycol (Antifreeze) _____ ____________ __________
Sodium Hydroxide _____ ____________ __________
Cleaning Solvents _____ ____________ ____150 Gal______
Sodium Phosphates (Tri, Bi, _____ ____________ __________ or Mono)
Fluorocarbons _____ ____________ __________
Morpholine _____ ____________ __________
SSP: NWRMC-502-21 3 of 4 ITEM NO: 077-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
Sodium Chromates _____ ____________ __________
Hydrazine _____ ____________ __________
Carbohydrazide _____ ____________ __________
Methyl Ethyl Ketone _____ ____________ _________
Spent Abrasive Blast Material _____ ____________ __________
(contaminated with a known hazardous waste)
Trichloroethane _____ ____________ __________
Miscellaneous Chemicals _____ ____________ __________
(Ignitable)
Miscellaneous Chemicals _____ ____________ __________
(Corrosive)
Miscellaneous Chemicals _____ ____________ __________
(TCLP Toxic)
Miscellaneous Chemicals _____ ____________ __________
(Reactive)
Oil (Synthetic) _____ ____________ __________
Paints (Enamel, Latex, _____ ____________ ________
Epoxy, thinners, oil based, rubber paint, nonskid, lacquer, remover, varnishes)
Paints (May include lead, cadmium, or chrome)
Paint Strippers (phenols, _____ ____________ __________ lead, chromium)
Sludge (Contaminated with _____ ____________ __________ a known hazardous waste)
Wool Felt (contaminated _____ ____________ __________ with chromium and PCB's)
Ventilation Debris/Residue
(heavy metals, e.g., cadmium, chromium) _____ ____________ __________
3.5 Notify the SUPERVISOR at least one working day prior to shipment of hazardous waste for disposal.
3.6 Submit one legible copy, in hard copy or approved transferrable media, of a report identifying type, amount of waste listed in 3.5 that
SSP: NWRMC-502-21 4 of 4 ITEM NO: 077-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
was removed during the performance of this Job Order to the SUPERVISOR.
3.6.1 The report shall include analysis or other method used to identify the waste and state whether each listed waste was hazardous (with generator assignment), non-hazardous, or did not exist.
3.6.1.1 Chemical analysis shall be accomplished by laboratories with state or EPA approved quality assurance programs.
3.6.2 The contractor shall make an effort to minimize hazardous waste generation by reducing the volume or toxicity by neutralizing, recycling, or otherwise removing it from the requirements of Subtitle C of 2.1 and include a description of such efforts in the report.
3.7 Nothing contained in this Work Item shall relieve the contractor from complying with applicable federal, state, and local laws, codes, ordinances, and regulations, including the obtaining of licenses and permits in connection with hazardous waste handlingsposal in the performance of this contract.
4. NOTES:
4.1 None.
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
GAS FREE CERTIFICATION REQUIRED
SHIP: USS JACKSONVILLE (SSN 699) ITEM NO: 123-00-001
COAR: 40 PCN: SSPS-L020
BWST FILE NO: 000-001 CMP: NONE
REVISED: 05 Apr 2019 PLANNER: LEWIS, ANNA
SSP: NWRMC-502-21 1 of 2 ITEM NO: 123-00-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Main Ballast Tank (MBT) 3A; interference remove
1.2 Location of Work:
1.2.1 MBT 3A
1.2.1.1 MBT3-39
1.2.1.2 MBT3-47
1.2.1.3 MBT3-48
1.2.1.4 MBT3-49
1.2.1.5 MBT3-54
1.3 Identification:
1.3.1 AN/BQQ-5 cover foundations PC No. 8,9 and 10
1.3.2 Sheave foundation PC No. 13
1.3.3 Electrical cable hanger PC No. 11
2. REFERENCES:
2.1 Standard Items
2.2 IPI 0770-903 Rev -, HOT WORK PRECAUTIONS
2.3 VAR-6772233 Rev -, SSN688CL DEMILITARIZATION GUIDELINES BY SWAB FOR
SUBMARINE RECYCLE
2.4 5202199 Rev C, ENCLOSURE & FDN TOWED SONAR ARRAY CABLE SHEAVE &
FLUSHING WATER PRESS SENSOR
2.5 100-4637545 Rev G, NON PRESSURE HULL FR 11-1/2 - 32-1/2
2.6 123-4637629 Rev C, ACCESS HATCH FLUSH 15X23 IN NON PRESSURE HULL
2.7 100-8779866 Rev -, USS JACKSONVILLE (SSN 699) NON-NUCLEAR HULL
BLANKING INACTIVATION
3. REQUIREMENTS:
3.1 Accomplish the requirement of 2.2 Enclosure (2) for blank locations listed in 1.2.
3.2 Remove interferences identified in 1.3 using 2.1 through 2.7, for blank locations listed in 1.2.
3.2.1 Accomplish the requirements of 009-103 of 2.1 for all
interferences removed.
3.2.1.1 Submit one legible copy, in approved transferrable
media, of a report listing the results of 3.2.1 to the SUPERVISOR within 72 hours after completion of interference removal.
SSP: NWRMC-502-21 2 of 2 ITEM NO: 123-00-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
3.3 Dispose of materials removed in 3.2, in accordance with 2.3.
4. NOTES:
4.1 None.
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
SHIP: USS JACKSONVILLE (SSN 699) ITEM NO: 123-00-002
COAR: 40 PCN: SSPS-L021
CMP: NONE
PLANNER: LEWIS, ANNA
SSP: NWRMC-502-21 1 of 2 ITEM NO: 123-00-002
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Main Ballast Tank (MBT) 3B; interference remove
1.2 Location of Work:
1.2.1 MBT3-23
1.2.2 MBT3-24
1.3 Identification:
1.3.1 (MBT3-23) AN-WLR9 HYDROPHONE (FDN DT-592 ITEM #2 DET 1-6A)
1.3.2 (MBT3-24) AN-WLR9 HYDROPHONE (FDN DT-511B ITEM #3 DET 1-6A)
2. REFERENCES:
2.1 Standard Items, FY 21
2.2 IPI 0770-903 Rev -, HOT WORK PRECAUTIONS
2.3 VAR-6772233 Rev -, SSN688CL DEMILITARIZATION GUIDELINES BY SWAB FOR
SUBMARINE RECYCLE
2.4 100-6159663 Rev F, RIPOUT & INSTALLATION FDN – HYDROPHONES
2.5 100-6159662 Rev D, PENETRATIONS FOR HYDROPHONES MBT FWD
2.6 100-4637545 Rev G, NON PRESSURE HULL FRAMES 11-1/2 – 32-1/2
2.7 100-8779866 Rev -, USS JACKSONVILLE (SSN 699) NON-NUCLEAR HULL
BLANKING INACTIVATION
3. REQUIREMENTS:
3.1 Accomplish the requirement of 2.2 Enclosure (2) for blank locations listed in 1.2.
3.2 Remove interferences identified in 1.3 using 2.1 through 2.7, for blank locations listed in 1.2.
3.2.1 Grind attachment welds flush with the non-pressure hull (or grind smooth within 1/16").
3.2.2 Accomplish the requirements of 009-103 of 2.1 for all
interferences removed.
3.3 Dispose of materials removed in 3.2, in accordance with 2.3.
3.3.1 Submit one legible copy, in approved transferrable media, of a report listing the results of 3.2.2 to the SUPERVISOR within 72 hours after completion of interference removal.
4. NOTES:
4.1 None.
5. GOVERNMENT FURNISHED MATERIAL(GFM):
SSP: NWRMC-502-21 2 of 2 ITEM NO: 123-00-002
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
SHIP: USS JACKSONVILLE (SSN 699) ITEM NO: 123-01-001
COAR: 40 PCN: SSPS-L017
SSPS-L016
BWST FILE NO: 000-001 CMP: NONE
REVISED: 05 Apr 2019 PLANNER: LEWIS, ANNA
KOURLIS, MARINA
SSP: NWRMC-502-21 1 of 3 ITEM NO: 123-01-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Main Ballast Tank (MBT) 1 electrical interference; remove
1.2 Location of Work:
1.2.1 MBT 1A
1.2.2 MBT 1B
1.3 Identification:
1.3.1 (MBT1-2) MBT 1A Electrical Tank Fitting T21
1.3.1.1 R-SB/SHL/SLL-14
1.3.1.2 Gland ring, grommet plates, and grommet
1.3.2 (MBT1-3) MBT 1A Electrical Tank Fitting T22
1.3.2.1 R-SB/SHL/SLL-13, R-SB/SHL/SLL-15, and R-BS/SHL/SLL-1
1.3.2.2 Gland ring, grommet plates, and grommet
1.3.3 (MBT1-6) MBT 1A Electrical Tank Fitting T25
1.3.3.1 R-SK/SLL-30A, R-SK/SLL-30B, R-SK/SLL-31A, R-SK/SLL-31B,
R-SK/SLL-32A, R-SK/SLL-32B, and R-SK/SLL-33B
1.3.3.2 Gland ring, grommet plates, and grommet
1.3.4 (MBT1-1) MBT 1B Electrical Tank Fitting T20
1.3.4.1 R-SM/SLL-1, R-SM/SLL-3, R-SL/SLL-8A, R-SL/SLL-9A, and
SCT/SLL-3
1.3.4.2 Gland ring, grommet plates, and grommet
1.3.5 (MBT1-4) MBT 1B Electrical Tank Fitting T23
1.3.5.1 R-SM/SLL-2, R-SK/SLL-24A, R-SK/SLL-24B, R-SK/SLL-25A, R-
SK/SLL-25B, R-SK/SLL-26A, R-SK/SLL-26B, R-SK/SLL-27A, R-SK/SLL-
27B, R-SK/SLL-28A, R-SK/SLL-28B, R-SK/SLL-29A, R-SK/SLL-29B
1.3.5.2 Gland ring, grommet plates, and grommet
1.3.6 (MBT1-5) MBT 1B Electrical Tank Fitting T24
1.3.6.1 R-SK/SLL-20B, R-SK/SLL-21A, R-SK/SLL-21B, R-SK/SLL-22A,
R-SK/SLL-22B, R-SK/SLL-23A, and R-SK/SLL-23B
1.3.6.2 Gland ring, grommet plates, and grommet
1.3.7 (MBT1-4) MBT 1A/1B Electrical Tank Fitting T40
1.3.7.1 R-SK/SLL-27A, R-SK/SLL-27B, R-SK/SLL-28A, R-SK/SLL-28B,
R-SK/SLL-29A, and R-SK/SLL-29B
SSP: NWRMC-502-21 2 of 3 ITEM NO: 123-01-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1.3.7.2 Gland ring, grommet plates, and grommet
1.3.8 (MBT1-20) AN/BQN-17 Window 13-1/2” Aft of FR 15, 23” Port of Centerline
1.3.8.1 (AN/BQN-17) BQN-17 Unit 4 Window, BQN-17 Unit 4 TR-302 Transducer, and cable R-SS/SHL/SLL-10
2. REFERENCES:
2.1 Standard Items
2.2 100-8779866 Rev -, USS JACKSONVILLE (SSN-699) NON-NUCLEAR HULL
BLANKING INACTIVATION
2.3 302-4454471 Rev T, EXTERNAL WIREWAYS FORWARD
2.4 113-4454492 Rev AH, ASSIGNMENT OF ELECTRICAL HOLES IN HULL AND TANKS
2.5 302-4456068 Rev G, 60 HERTZ AC POWER DIST WDD
2.6 302-4454512 Rev J, DC AND 400HZ PWR DIST WDD
2.7 412-4456937 Rev J, SONAR PERFORMANCE COMPUTER SYS AN/BQA-8B CKT R-SM
CD
2.8 302-6226086 Rev E, S/A SSN3164K SSN 688CL AN/BQH-5(V)4 DATA
GATHERING SET MODS TO EXT W/W
2.9 412-4456939 Rev E, UNDRWTR COMM SYS AN/WQC-2 CKT R-SB CD
2.10 412-5202783 Rev E, REMOVAL OF AN/BQN-20 INTERROGATOR ALT 2382D
2.11 412-6294611 Rev B, S/A 3439K SSN688 CL AN/BQQ-5 TO AN/BQQ-5D(V)1
CKT R-SK INSTALLATION CABLING DIAG
2.12 412-4637493 Rev E, ECHO SOUNDING SET CKT. R-SS AN/BQN-17 CABLING
DIAGRAM
2.13 302-5202773 Rev C, AN/BQN-17 RIPOUT/INSTL IN-LINE CONNECTOR
2.14 412-4557382 Rev C, BQS-15 & BQN-17 ACOUSTIC WINDOWS
2.15 TM-NUWC-NPT TECH MEMO 05-046 Rev E, IN-SERVICE ENGINEERING
HANDBOOK FOR SONAR DOMES AND WINDOWS
2.16 VAR-6772233, SSN688CL DEMILITARIZATION GUIDELINES BY SWAB FOR
SUBMARINE RECYCLE
3. REQUIREMENTS:
3.1 Remove interferences identified in paragraph 1.3.1 for locations listed in 1.2.1 using 2.2, 2.3 and 2.9.
3.2 Remove interferences identified in paragraph 1.3.2 for locations listed in 1.2.1 using 2.2, 2.3, 2.9, and 2.10.
3.3 Remove interferences identified in paragraph 1.3.3 for locations listed in 1.2.1 using 2.2, 2.3 and 2.11.
3.4 Remove interferences identified in paragraph 1.3.4 for locations listed in 1.2.2 using 2.2, 2.3, 2.7, and 2.8.
3.5 Remove interferences identified in paragraph 1.3.5 for locations listed in 1.2.2 using 2.2, 2.3, 2.7, and 2.11.
3.6 Remove interferences identified in paragraph 1.3.6 for locations
SSP: NWRMC-502-21 3 of 3 ITEM NO: 123-01-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
listed in 1.2.2 using 2.2, 2.3 and 2.11
3.7 Remove interferences identified in paragraph 1.3.7 for locations listed in 1.2.1 and 1.2.2 using 2.2, 2.3 and 2.11.
3.8 Remove interferences identified in paragraph 1.3.8 for locations listed in 1.2.1 using 2.2 and 2.15 section 5.1 as guidance.
3.8.1 MX-12313 hull window and rubber material contain hazmat, see reference 2.15 section 5.1 for details.
3.8.1.1 Remove window and camping ring from the foundation and scrap using 2.12 through 2.15.
3.8.2 Disconnect cable R-SS/SHL/SLL-10 from the transducer. Cut cable up to tank fitting T-69.
3.8.3 Remove transducer from the foundation.
3.8.3.1 Tag transducer and turn over to the Supervisor after
removal.
3.9 Install Foreign Material Exclusion (FME) on cut ends of all cable.
3.10 Dispose of materials removed in 3.8, in accordance with 2.16.
3.11 Accomplish the requirements of 009-103 of 2.1 for all interferences removed.
3.11.1 Submit one legible copy, in approved transferrable media, of a report listing the results of 3.11 to the SUPERVISOR within 72 hours after completion of interference removal.
4. NOTES:
4.1 None.
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
SHIP: USS JACKSONVILLE (SSN 699) ITEM NO: 123-01-002
COAR: 40 PCN: SSPS-L019
SSPS-L018
CMP: NONE
PLANNER: LEWIS, ANNA
KOURLIS, MARINA
SSP: NWRMC-502-21 1 of 3 ITEM NO: 123-01-002
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Main Ballast Tank (MBT) 2 electrical interference; remove
1.2 Location of Work:
1.2.1 MBT 2A
1.2.2 MBT 2B
1.3 Identification:
1.3.1 (MBT2-10) MBT 2A Electrical Tank Fitting T28
1.3.1.1 R-SK/SLL-27A, R-SK/SLL-27B, R-SK/SLL-28A, R-SK/SLL-28B,
R-SK/SLL-29A, R-SK/SLL-29B, R-SK/SLL-30A, R-SK/SLL-30B, R-SK/SLL-
31A, R-SK/SLL-31B, R-SK/SLL-32A, R-SK/SLL-32B, R-SK/SLL-33A, R-
SK/SLL-33B, R-SK/SLL-34A, R-SK/SLL-34B, R-SK/SLL-35A, R-SK/SLL-
35B, R-SK/SLL-36A, R-SK/SLL-36B, R-SK/SLL-37A, and R-SK/SLL-37B
1.3.1.2 Gland ring, grommet plates, and grommet
1.3.2 (MBT2-12) MBT 2A Electrical Tank Fitting T30
1.3.2.1 R-SK/SLL-27A, R-SK/SLL-27B, R-SK/SLL-28A, R-SK/SLL-28B,
R-SK/SLL-29A, R-SK/SLL-29B, R-SK/SLL-30A, R-SK/SLL-30B, R-SK/SLL-
31A, R-SK/SLL-31B, R-SK/SLL-32A, R-SK/SLL-32B, R-SK/SLL-33A, R-
SK/SLL-33B, R-SK/SLL-34A, R-SK/SLL-34B, R-SK/SLL-35A, R-SK/SLL-
35B, R-SK/SLL-36A, R-SK/SLL-36B, R-SK/SLL-37A, and R-SK/SLL-37B
1.3.2.2 Gland ring, grommet plates, and grommet
1.3.3 (MBT2-14) MBT 2A Electrical Tank Fitting T32
1.3.3.1 R-BS/SHL/SLL-1, R-SB/SHL/SLL-13, R-SB/SHL/SLL-14, and R-
SB/SHL/SLL-15
1.3.3.2 Gland ring, grommet plates, and grommet
1.3.4 (MBT2-9) MBT 2B Electrical Tank Fitting T27
1.3.4.1 R-SK/SLL-16A, R-SK/SLL-16B, R-SK/SLL-17A, R-SK/SLL-17B,
R-SK/SLL-18A, R-SK/SLL-18B, R-SK/SLL-19A, R-SK/SLL-19B, R-SK/SLL-
20A, R-SK/SLL-20B, R-SK/SLL-21A, R-SK/SLL-21B, R-SK/SLL-22A, R-
SK/SLL-22B, R-SK/SLL-23A, R-SK/SLL-23B, R-SK/SLL-24A, R-SK/SLL-
24B, R-SK/SLL-25A, R-SK/SLL-25B, R-SK/SLL-26A, and R-SK/SLL-26B
1.3.4.2 Gland ring, grommet plates, and grommet
1.3.5 (MBT2-11) MBT 2B Electrical Tank Fitting T29
1.3.5.1 R-SK/SLL-16A, R-SK/SLL-16B, R-SK/SLL-17A, R-SK/SLL-17B,
R-SK/SLL-18A, R-SK/SLL-18B, R-SK/SLL-19A, R-SK/SLL-19B, R-SK/SLL-
20A, R-SK/SLL-20B, R-SK/SLL-21A, R-SK/SLL-21B, R-SK/SLL-22A, R-
SK/SLL-22B, R-SK/SLL-23A, R-SK/SLL-23B, R-SK/SLL-24A, R-SK/SLL-
SSP: NWRMC-502-21 2 of 3 ITEM NO: 123-01-002
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
24B, R-SK/SLL-25A, R-SK/SLL-25B, R-SK/SLL-26A, and R-SK/SLL-26B
1.3.5.2 Gland ring, grommet plates, and grommet
1.3.6 (MBT2-13) MBT 2B Electrical Tank Fitting T31
1.3.6.1 R-SS/SHL/SLL-10
1.3.6.2 Gland ring, grommet plates, and grommet
1.3.6.3 Transducer
1.3.7 (MBT2-17) AN/BQS-15 Window
1.3.7.1 MX-7533 acoustic window and clamping ring
1.3.7.2 R-SF/SHL/SLL-42 from the BQS-15 Unit 13 – TR-281
Transducer.
2. REFERENCES:
2.1 Standard Items
2.2 100-8779866 Rev -, USS JACKSONVILLE (SSN-699) NON-NUCLEAR HULL
BLANKING INACTIVATION
2.3 302-4454471 Rev T, EXTERNAL WIREWAYS FORWARD
2.4 113-4454492 Rev AH, ASSIGNMENT OF ELECTRICAL HOLES IN HULL AND TANKS
2.5 302-4456068 Rev G, 60 HERTZ AC POWER DIST WDD
2.6 302-4454512 Rev J, DC AND 400HZ PWR DIST WDD
2.7 412-6294611 Rev B, S/A 3439K SSN688 CL AN/BQQ-5 TO AN/BQQ-5D(V)1 CKT
R-SK INSTALLATION CABLING DIAG
2.8 412-4637493 Rev E, ECHO SOUNDING SET CKT. R-SS AN/BQN-17 CABLING
DIAGRAM
2.9 412-4456939 Rev E, UNDRWTR COMM SYS AN/WQC-2 CKT R-SB CD
2.10 412-5202783 Rev E, REMOVAL OF AN/BQN-20 INTERROGATOR ALT 2382D
2.11 412-4456943 Rev D, BEACON SET AN/BQN-13 CKT R-SU CABLING DIAGRAM
2.12 412-4456962 Rev H, UNDER ICE & CLOSE CONTACT AVOIDANCE SONAR SYS
AN/BQS-15 CKT R-SF CD
2.13 114-4403274 Rev S, BHD 15" AFT OF FRAMES 9,15 AND 20
2.14 412-4557382 Rev C, BQS-15 & BQN-17 ACOUSTIC WINDOWS
2.15 TM-NUWC-NPT TECH MEMO 05-046 Rev E, IN-SERVICE ENGINEERING
HANDBOOK FOR SONAR DOMES AND WINDOWS
2.16 VAR-6772233, SSN688CL DEMILITARIZATION GUIDELINES BY SWAB FOR
SUBMARINE RECYCLE
3. REQUIREMENTS:
3.1 Remove interferences identified in paragraph 1.3.1 and 1.3.2 for locations listed in 1.2.1 using 2.2, 2.3 and 2.7.
3.2 Remove interferences identified in paragraph 1.3.3 for locations listed in 1.2.1 using 2.2, 2.3, 2.9 and 2.10.
3.3 Remove interferences identified in paragraph 1.3.4 and 1.3.5 for
SSP: NWRMC-502-21 3 of 3 ITEM NO: 123-01-002
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
locations listed in 1.2.1 using 2.2, 2.3 and 2.7.
3.4 Remove interferences identified in paragraph 1.3.5 for locations listed in 1.2.2 using 2.2, 2.3 and 2.8.
3.5 Remove interferences identified in paragraph 1.3.6 for locations listed in 1.2.2 using 2.2, 2.3 and 2.8.
3.6 Remove interferences identified in paragraph 1.3.7 for locations listed in 1.2.1 and 1.2.2 using 2.2, 2.12 through 2.15.
3.6.1 Remove, identify and tag the BQS-15 Unit 13 – TR-281
Transducer from the foundation and turn over to the SUPERVISOR.
3.7 Install Foreign Material Exclusion (FME) on cut ends of all cable.
3.8 Dispose of materials removed in 3.5 and 3.6, in accordance with 2.16.
3.9 Accomplish the requirements of 009-103 of 2.1 for all interferences removed.
3.9.1 Submit one legible copy, in approved transferrable media, of a report listing the results of 3.8 to the SUPERVISOR within 72 hours after completion of interference removal.
4. NOTES:
4.1 None.
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
SHIP: USS JACKSONVILLE (SSN 699) ITEM NO: 123-01-003 (E1)
COAR: 40 PCN: SSPS-L037
SSPS-L038
CMP: NONE
PLANNER: LEWIS, ANNA
COOPER, DANIEL
SSP: NWRMC-502-21 1 of 5 ITEM NO: 123-01-003
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Main Ballast Tank (MBT) 3; electrical&mechanical interference
1.2 Location of Work:
1.2.1 MBT 3A
1.2.2 MBT 3B
1.3 Identification:
1.3.1 (MBT3-14/MBT3-16) MBT 3B Electrical Tank Fitting T34/T36
1.3.1.1 Cables R-SK/SLL-11A, R-SK/SLL-11B, R-SK/SLL-12A, R-
SK/SLL-12B, R-SK/SLL-13A, R-SK/SLL-13B, R-SK/SLL-14A, R-SK/SLL-
14B, R-SK/SLL-15A, R-SK/SLL-15B, R-SK/SLL-16A, R-SK/SLL-16B, R-
SK/SLL-17A, R-SK/SLL-17B, R-SK/SLL-18A, R-SK/SLL-18B, R-SK/SLL-
19A, R-SK/SLL-19B, R-SK/SLL-20A, R-SK/SLL-20B, R-SK/SLL-21A, R-
SK/SLL-21B, R-SK/SLL-22A, R-SK/SLL-22B, R-SK/SLL-23A, R-SK/SLL-
23B, R-SK/SLL-24A, R-SK/SLL-24B, R-SK/SLL-25A, R-SK/SLL-25B, R-
SK/SLL-26A, and R-SK/SLL-26B
1.3.1.2 Gland ring, grommet plates, and grommet
1.3.2 (MBT3-15/MBT3-17) MBT 3A Electrical Tank Fitting T35/T37
1.3.2.1 Cables R-SK/SLL-27A, R-SK/SLL-27B, R-SK/SLL-28A, R-
SK/SLL-28B, R-SK/SLL-29A, R-SK/SLL-29B, R-SK/SLL-30A, R-SK/SLL-
30B, R-SK/SLL-31A, R-SK/SLL-31B, R-SK/SLL-32A, R-SK/SLL-32B, R-
SK/SLL-33A, R-SK/SLL-33B, R-SK/SLL-34A, R-SK/SLL-34B, R-SK/SLL-
35A, R-SK/SLL-35B,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .