CUI C03.0 Answer to Bidder's Questions 019.pdf
PDF 187 KB Posted
- Attached to
- USS Jacksonville Non-SUBSAFE Repair Work
- Solicitation number
- N4523A21R0800
About this file
This document includes a request for clarification regarding a solicitation for non-SUBSAFE repair work on the USS Jacksonville. The solicitation seeks a firm-fixed-price contract to perform non-SUBSAFE pipe and structural welding, interference removals including cabling and sound damping tile, and blanking of main ballast tanks and exterior tanks at Puget Sound Naval Shipyard and Intermediate Maintenance Facility in Bremerton, Washington. The period of performance is from September 1, 2021 to December 20, 2021. Interested parties must submit all questions by April 21, 2021. The Navy intends to award a contract in August 2021 to the responsible contractor with the lowest price using a technically acceptable basis in accordance with the Federal Acquisition Regulation.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR CLARIFICATION
N4523A21R0800 USS Jacksonville Blanking Attachment J-7
DATE OF REQUEST: QUESTION NO:
REQUIREMENT: USS Jacksonville Blanking REQUISITION NO.: N4523A21R0800
ITEM NO:
TITLE: Hydrophone Removal Responsibility PSNS&IMF CONTRACTS POC & PHONE:
See POCs listed on RFP.
PARA. NO: PAGE NO:
PLANNER’S NAME: ATTACH. NO:
CONTRACTOR QUESTION: (ONE QUESTION PER PAGE)
DO NOT WRITE BELOW THIS LINE
SPEC CHG: Y/N DWG/REF CHG. Y/N RQMTS CHG: Y/N MAT'L CHG: Y/N
TECHNICAL REVIEW: SERIAL NO:
ALL BIDDER’S QUESTIONS MUST BE RECEIVED NO LATER THAN 12:00 P.M.
(PST),
21 April 2021
| ITEM NO: 123-00-002 |
| PARA NO: |
| PAGE NO: |
| CONTRACTOR QUESTION ONE QUESTION PER PAGE: No mention of removing any Hydrophones in this SPEC Item. Only interferences. Which activity is responsible for removal and is the work identified as a predecessor/successor to these CU Phases? |
| TECHNICAL REVIEW: Anna Lewis |
| SERIAL NO: |
| ALL BIDDERS QUESTIONS MUST BE RECEIVED NO LATER THAN 1200 PM: Hydrophones are removed on the 123-01-003 work item. |
| Name 1: |
| Date: 4/20/21 |
| Text3: N |
| Text4: N |
| Text5: N |
| Text6: N |