CUI C03.0 Answer to Bidder's Questions 023.pdf
PDF 186 KB Posted
- Attached to
- USS Jacksonville Non-SUBSAFE Repair Work
- Solicitation number
- N4523A21R0800
About this file
This document provides clarification to bidder questions regarding a solicitation for non-SUBSAFE repair work on the USS Jacksonville. The Regional Maintenance Center at Puget Sound Naval Shipyard and Intermediate Maintenance Facility intends to award a firm-fixed-price contract for non-SUBSAFE pipe and structural welding, interference removals including cabling and sound damping tile, blanking of main ballast tanks and exterior tanks. The scope of work will be derived from document USS JACKSONVILLE (SSN-699) NON-NUCLEAR HULL BLANKING INACTIVATION and may include base metal build-up, structural member removal and replacement, and sound damping tile inspection and removal. The period of performance is from September 1, 2021 to December 20, 2021. The government anticipates awarding a lowest price technically acceptable contract in August 2021 in accordance with FAR 15.101-2.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR CLARIFICATION
N4523A21R0800 USS Jacksonville Blanking Attachment J-7
DATE OF REQUEST: QUESTION NO:
REQUIREMENT: USS Jacksonville Blanking REQUISITION NO.: N4523A21R0800
ITEM NO:
TITLE: CU Phase SPEC Clarification PSNS&IMF CONTRACTS POC & PHONE:
See POCs listed on RFP.
PARA. NO: PAGE NO:
PLANNER’S NAME: ATTACH. NO:
CONTRACTOR QUESTION: (ONE QUESTION PER PAGE)
DO NOT WRITE BELOW THIS LINE
SPEC CHG: Y/N DWG/REF CHG. Y/N RQMTS CHG: Y/N MAT'L CHG: Y/N
TECHNICAL REVIEW: SERIAL NO:
ALL BIDDER’S QUESTIONS MUST BE RECEIVED NO LATER THAN 12:00 P.M.
(PST),
21 April 2021
| ITEM NO: N/A |
| PARA NO: |
| PAGE NO: |
| CONTRACTOR QUESTION ONE QUESTION PER PAGE: • What SPEC Items are the following CU Phases attached to: |
38Z9917612 R82 38Z9917612 R83 38Z9917612 U03 38Z9917612 U04 38Z9917612 R84 38Z9917612 U05 38Z9917612 R85 38Z9917612 U06 38Z9917612 R86 38Z9917612 U07 38Z9917612 R87 38Z9917612 U08
| TECHNICAL REVIEW: Anna Lewis |
| SERIAL NO: |
| ALL BIDDERS QUESTIONS MUST BE RECEIVED NO LATER THAN 1200 PM: 38Z9917612 U03 KTR - MBT 1A (STBD) Remove Paint/Damping/SHT CONTRACTOR MBT 1A -123-11-001 |
38Z9917612 R82 KTR - MBT 1A (STBD) Install blast protection / containment CONTRACTOR MBT 1A -123-11-001
38Z9917612 U04 KTR - MBT 1B (PORT) Remove Paint/Damping/SHT CONTRACTOR MBT 1B -123-11-002
38Z9917612 R83 KTR - MBT 1B (PORT) Install blast protection / containment CONTRACTOR MBT 1B- 123-11-002
38Z9917612 U05 KTR - MBT 2A (STBD) Remove Paint/Damping/SHT CONTRACTOR MBT 2A -123-11-003
38Z9917612 R84 KTR - MBT 2A (STBD) Install blast protection / containment CONTRACTOR MBT 2A -123-11-003
38Z9917612 U06 KTR - MBT 2B (PORT) Remove Paint/Damping/SHT CONTRACTOR MBT 2B -123-11-004
38Z9917612 R85 KTR - MBT 2B (PORT) Install blast protection / containment CONTRACTOR MBT 2B -123-11-004
38Z9917612 U07 KTR - MBT 3A (STBD) Remove Paint/Damping/SHT CONTRACTOR MBT 3A -123-11-005
38Z9917612 R86 KTR - MBT 3A (STBD) Install blast protection / containment CONTRACTOR MBT 3A -23-11-005
38Z9917612 U08 KTR - MBT 3B (PORT) Remove Paint/Damping/SHT CONTRACTOR MBT 3B -123-11-006
38Z9917612 R87 KTR - MBT 3B (PORT) Install blast protection / containment CONTRACTOR MBT 3B -123-11-006
| Name 1: |
| Date: 4/20/21 |
| Text3: N |
| Text4: N |
| Text5: N |
| Text6: N |