CUI C09.0 Attachment J-2 USS JACKSONVILLE - Work Item Package (Errata 3).pdf
PDF 2 MB Posted
- Attached to
- USS Jacksonville Non-SUBSAFE Repair Work
- Solicitation number
- N4523A21R0800
About this file
This solicitation seeks proposals for non-SUBSAFE repair work on the USS Jacksonville. The contractor will perform non-SUBSAFE pipe and structural welding, interference removals including cabling and special hull tile removal, and blanking of main ballast tanks and exterior tanks. The work will be performed at Puget Sound Naval Shipyard and Intermediate Maintenance Facility in Bremerton, Washington according to Navy specifications and quality standards. The period of performance is from September 1, 2021 to December 20, 2021. The Navy intends to award a firm-fixed-price contract in August 2021 to the responsible offeror with the lowest technically acceptable price in accordance with Federal Acquisition Regulation Part 15.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE NAVY
NWRMC (NMD)
USS JACKSONVILLE (SSN 699)
SPECIFICATIONS FOR WORK TO BE ACCOMPLISHED
SPECIFICATION NUMBER: NWRMC-502-21
INCLUDES ALL CHANGES THROUGH 4/5/2021
INDEX
SHIP: USS JACKSONVILLE (SSN 699) NWRMC-502-21
ITEMS THAT ARE STRUCK OUT IN THIS INDEX DO NOT APPLY TO THIS CONTRACT.
CATEGORY I. FY-21 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE.
ITEM_NO. TITLE CHANGE DATE CHANGE
009-01 General Criteria; accomplish 10/01/2019 Original
009-02 Environmental Compliance Report for Material Usage; accomplish 10/01/2019 Original
009-03 Toxic and Hazardous Substance; control 10/01/2019 Original
009-04 Quality Management System; provide 10/01/2019 Original
009-06 Maintaining Protection and Cleanliness from Non-Radioactive Operations;
accomplish
03/06/2020 CH-2
009-07 Confined Space Entry, Certification, Fire Prevention and Housekeeping;
accomplish
07/24/2019 Original
009-08 Shipboard Fire Protection and Fire Prevention; accomplish 10/01/2019 Original
009-10 Asbestos-Containing Material (ACM); control 10/01/2019 Original
009-18 Mine Warfare Ships Magnetic Material; control 04/30/2018 Original
009-19 Provisioning Technical Documentation (PTD); provide 10/01/2018 Original
009-20 Government Property; control 10/01/2017 Original
009-21 Logistics and Technical Data; provide 10/01/2018 Original
009-23 Interference; remove and install 10/01/2018 Original
009-24 Authorization, Control, Isolation, Blanking, Tagging, and Cleanliness;
accomplish
10/01/2019 Original
009-34 Fire Protection of Unmanned Vessel at Contractor Facility; accomplish 10/01/2018 Original
009-39 Technical Manual Contract Requirement (TMCR) for a New Technical Manual for Commercial Equipment/Component; accomplish
10/01/2018 Original
009-40 Contractor Crane, Multi-Purpose Machine and Material Handling Equipment at a Naval Facility; provide
10/01/2019 Original
009-60 Schedule and Associated Reports for Availabilities Over 9 Weeks in Duration;
provide and manage
01/14/2020 CH-1
009-61 Shipboard Use of Fluorocarbons; control 07/18/2014 Original
009-67 Integrated Total Ship Testing; manage 04/30/2018 Original
009-69 Heavy Weather/Mooring Plan; provide 04/30/2018 Original
009-70 Confined Space Entry, Certification, Fire Protection, Fire Prevention and
Housekeeping for Unmanned Vessels; accomplish
10/01/2019 Original
009-72 Physical Security at a Private Contractor Facility; accomplish 10/01/2019 Original
009-73 Shipboard Electrical/Electronic Cable Procedure; inspect, test, install, remove, and repair
10/01/2018 Original
009-74 Occupational, Safety and Health Plan; accomplish 01/14/2020 CH-1
009-80 Ship Facilities; maintain 11/18/2016 Original
009-81 Compartment Closeout; accomplish 10/01/2019 Original
009-82 Installation of Equal Component Vice Specified Component; report 03/26/2018 Original
009-84 Threaded Fastener Requirements; accomplish 03/06/2020 CH-2
009-93 Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution
Prevention Act (PPA) Information; provide
03/06/2018 Original
009-99 Ship Departure Report; provide 07/18/2014 Original
009-100 Ship's Stability; maintain 03/06/2018 Original
Page 1 of 5 EXECUTING WORK
ITEM_NO. TITLE CHANGE DATE CHANGE
009-101 Ship Transit and Berthing; accomplish 03/26/2018 Original
009-106 Work Authorization Form Coordinator (WAFCOR); provide 10/01/2017 Original
009-109 Non-SUBSAFE Work on SUBSAFE-Certified Vessel; accomplish 10/01/2017 Original
009-110 Non-Nuclear Work on a Nuclear Vessel; accomplish 11/18/2016 Original
009-111 Schedule and Associated Reports for Availabilities 9 Weeks or Less in
Duration; provide and manage
04/30/2018 (E3) Original
009-117 Combat Systems, Light-Off Suport; provide 10/01/2019 Original
009-118 CG Deck Loading; accomplish 07/18/2014 Original
009-120 Fact Finding and Critique of Unplanned Event; manage 03/06/2018 Original
009-122 Temporary Padeye; install and remove 10/01/2018 Original
009-125 Boats Less Than 65 Feet Long; accomplish 07/11/2020 CH-3
099-01NW General Occupational Safety and Health Requirements for the Bremerton
Naval Complex (BNC); accomplish
04/19/2019 Original
099-02NW General Contractor Environmental Protection Requirements for Bremerton
Naval Complex (BNC); accomplish
07/01/2016 Original
099-03NW General Contractor Air Pollution Control and Reporting Requirements for
Bremerton Naval Complex (BNC); accomplish
09/11/2018 Original
099-04NW General Contractor Hazardous Material Requirements for Bremerton Naval
Complex (BNC); accomplish
01/11/2017 Original
099-05NW General Contractor Water Pollution and Spill Prevention Requirements for
Bremerton Naval Complex (BNC); accomplish
06/24/2018 Original
099-06NW General Contractor Waste Management Requirements for Bremerton Naval
Complex (BNC); accomplish
01/11/2017 Original
099-07NW General Contractor Solid Waste Management Requirements for Bremerton
Naval Complex (BNC); accomplish
01/11/2017 Original
099-08NW Schedule and Associated Reports for Availabilities at Puget Sound Naval
Shipyard Over 9 Weeks in Duration; provide and manage
06/24/2018 Original
099-09NW Schedule and Associated Reports for Availabilities 9 Weeks or Less in
Duration; provide and manage
06/24/2018 Original
099-10NW Maintaining Protection and Cleanliness from Non-Radioactive Operations;
accomplish
04/19/2019 Original
099-11NW Compartment Closeout; accomplish 06/24/2018 Original
099-12NW General Requirements for Service Contracts; accomplish 04/19/2019 Original
Page 2 of 5 EXECUTING WORK
CHANGE DATETITLEITEM NO.
CATEGORY II. FY-21 STANDARD ITEMS WHICH MAY BE INVOKED IN THE WORK ITEMS OF THIS JOB ORDER
CHANGE
009-103 Weight and Moment Change Data; provide 04/30/2018 Original
Page 3 of 5 EXECUTING WORK
ITEM NO. TITLE
WORKPLACE REQUIREMENTS042-10-001
Hazardous Waste Produced on Naval Vessels; control077-11-001
Pressure Hull FWD-PORT & STBD; interference remove (DESCOPED)111-00-001
Pressure Hull FWD-PORT & STBD; cable interference remove
(DESCOPED)
111-01-001
Pressure Hull; blank install (DESCOPED)111-11-001
Sonar Sphere Tunnel; interference remove (DESCOPED)112-00-001
TEP port and Starboard Interferences; remove (DESCOPED)112-00-002
Torpedo Tube interferences; remove (DESCOPED)112-00-003
Sonar Sphere Tunnel, electrical interference; remove (DESCOPED)112-01-001
Main Ballast Tank (MBT) 3A; interference remove123-00-001
Main Ballast Tank (MBT) 3B; interference remove123-00-002
Main Ballast Tank (MBT) 5A; interference remove (DESCOPED)123-00-003
Main Ballast Tank (MBT) 1 electrical interference; remove123-01-001
Main Ballast Tank (MBT) 2 electrical interference; remove123-01-002
Main Ballast Tank (MBT) 3; electrical&mechanical interference123-01-003
Main Ballast Tank (MBT) 4 electrical interference; remove (DESCOPED)123-01-004
Main Ballast Tank (MBT) 5 electrical interference; remove (DESCOPED)123-01-005
Main Ballast Tank (MBT) 1A; welded cap install123-10-001
Main Ballast Tank (MBT) 1B; welded cap install123-10-002
Main Ballast Tank (MBT) 2A; welded cap install123-10-003
Main Ballast Tank (MBT) 2B; welded cap install123-10-004
Main Ballast Tank (MBT) 5A; welded cap install (DESCOPED)123-10-005
Main Ballast Tank (MBT) 1A; blank install123-11-001
Main Ballast Tank (MBT) 1B; blank install123-11-002
Main Ballast Tank (MBT) 2A; blank install123-11-003
Main Ballast Tank (MBT) 2B; blank install123-11-004
Main Ballast Tank (MBT) 3A; blank install123-11-005
Main Ballast Tank (MBT) 3B; blank install123-11-006
Main Ballast Tank (MBT) 4A; blank install(DESCOPED)123-11-007
Page 4 of 5 EXECUTING WORK
Main Ballast Tank (MBT) 4B; blank install (DESCOPED)123-11-008
Main Ballast Tank (MBT) 5A; blank install (DESCOPE)123-11-009
Main Ballast Tank (MBT) 5B; blank install (DESCOPED)123-11-010
Contractor Facilities; provide992-10-001
Page 5 of 5 EXECUTING WORK
SHIP: USS JACKSONVILLE (SSN 699) ITEM NO: 042-10-001 (E2)
COAR: 40 PCN: SSPS-L001
CMP: NONE
PLANNER: LEWIS, ANNA
COOPER, DANIEL
SSP: NWRMC-502-21 1 of 5 ITEM NO: 042-10-001
ERRATA NO. 2
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: WORKPLACE REQUIREMENTS
1.2 Location of Work:
1.2.1 USS JACKSONVILLE (SSN-699), Puget Sound Naval Shipyard and Intermediate Maintenance Facility(PSNS & IMF)
1.3 Identification:
1.3.1 Not Applicable
2. REFERENCES:
2.1 Standard Items , (FY21)
3. REQUIREMENTS:
3.1 Accomplish the requirements of 2.1 for schedule and associated reports.
3.2 Contractor work schedule and work breakdown structure shall coincide with PSNS & IMF work specified in Attachment A.
3.2.1 Provide daily updates to the SUPERVISOR and Work Integration Team (WIT), progressing and updating the Shipyard schedule, prior to 10 am. These updates will include the following functions:
3.2.1.1 Report all claimed starts and finishes, via WIT, to be processed for Completion (CPL).
3.2.1.2 Managing remaining durations (RDU) to work items. If
additional RDU is required, the Shipyard schedulers shall be notified, via the WIT, to analyze.
3.2.1.3 Provide to the SUPERVISOR daily updates to each
Contractor work item listed in the Daily Priority List (DPL).
3.2.1.4 Provide to the SUPERVISOR weekly updates to each
Contractor work item listed in the Short Range View (SRV).
3.2.2 Accomplish the requirements of section C-1.5 of the contract for project management and execution/ planning.
3.3 Project Work Place Requirements:
3.3.1 Each contractor employee requiring access to the ship shall be required to attend a mandatory project indoctrination briefing approximately 2 hours long.
3.3.1.1 Contact SUPERVISOR for times and locations. Briefing
includes Project Introduction, Environmental Safety & Health, Gas Free/Confined Space Briefing, Submarine Orientation, Shipboard Fire Safety Control, Cleanliness and Material Tracking. Employees shall sign the Employee Introduction Training Roster after
SHIP: USS JACKSONVILLE (SSN 699)
SSP: NWRMC-502-21 2 of 5 ITEM NO: 042-10-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
completion of the training.
3.3.2 Notify the SUPERVISOR via email, 72 hours before vehicle escort is required.
3.3.2.1 Email shall include company name, drivers name, phone number, estimated arrival date, estimated arrival time and what is being delivered.
3.3.3 Accomplish the requirements of section C-2.5 of the contract, for the Work Authorization Form Coordinator (WAFCOR) to be qualified to obtain a RED shipyard ID badge.
4. NOTES:
4.1 The term "SUPERVISOR" is defined as CODE 400 Project Maintenance Team.
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
5.3 KITTED MATERIAL:
1. None.
SSP: NWRMC-502-21 3 of 5 ITEM NO: 042-10-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S. International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
ICN KO CU Phase Title Component Name Start Date Completion
Date 38Z9917612 U18 KTR - (MBT 1-6) Remove INTF cable and BTF T-25 to support blank CONTRACTOR MBT 1A 9/3/2021 9/7/2021 38Z9917612 R82 KTR - MBT 1A (STBD) Install blast protection / containment CONTRACTOR MBT 1A 9/3/2021 9/7/2021 38Z9917612 U19 KTR - (MBT 1-1) Remove INTF cable and BTF T-20 to support blank CONTRACTOR MBT 1B 9/3/2021 9/7/2021 38Z9917612 R83 KTR - MBT 1B (PORT) Install blast protection / containment CONTRACTOR MBT 1B 9/3/2021 9/7/2021 38Z9917612 S01 KTR - Provide Firewatch Services for MBT 1 FIREWATCH SERVICES 9/7/2021 12/21/2021 38Z9917612 S06 KTR - Provide Gas Free Services for MBT 1 GAS FREE SERVICES 9/7/2021 12/21/2021 38Z9917612 U17 KTR - (MBT 1-3) Remove INTF cable and BTF T-22 to support blank CONTRACTOR MBT 1A 9/8/2021 9/9/2021 38Z9917612 U03 KTR - MBT 1A (STBD) Remove Paint/Damping/SHT CONTRACTOR MBT 1A 9/8/2021 9/10/2021 38Z9917612 U20 KTR - (MBT 1-4) Remove INTF cable and BTF T-23 to support blank CONTRACTOR MBT 1B 9/8/2021 9/9/2021 38Z9917612 U04 KTR - MBT 1B (PORT) Remove Paint/Damping/SHT CONTRACTOR MBT 1B 9/8/2021 9/10/2021 38Z9917612 U16 KTR - (MBT 1-2) Remove INTF cable and BTF T-21 to support blank CONTRACTOR MBT 1A 9/9/2021 9/10/2021 38Z9917612 U21 KTR - (MBT 1-5) Remove INTF cable and BTF T-24 to support blank CONTRACTOR MBT 1B 9/9/2021 9/10/2021 38Z9917612 R22 KTR - (MBT 1-14) Install MBT 1A Vent Valve Blank CONTRACTOR MBT 1A 9/10/2021 9/14/2021 38Z9917612 R20 KTR - (MBT 1-9) Install MBT 1A Flood Hole Blank FR 12-14 OUTBD CONTRACTOR MBT 1A 9/10/2021 9/14/2021 38Z9917612 R30 KTR - (MBT 1-15) Install MBT 1B Vent Valve Blank CONTRACTOR MBT 1B 9/10/2021 9/14/2021 38Z9917612 R28 KTR - (MBT 1-12) Install MBT 1B Flood Hole Blank FR 12-14 OUTBD CONTRACTOR MBT 1B 9/10/2021 9/14/2021 38Z9917612 U22 KTR - (MBT 1-4) Remove INTF cable and BTF T-40 to support blank CONTRACTOR MBT 1B 9/13/2021 9/14/2021 38Z9917612 U23 KTR - (MBT 1-20) Remove INTF to support AN/BQN-17 Window blank CONTRACTOR MBT 1B 9/14/2021 9/15/2021 38Z9917612 R21 KTR - (MBT 1-10) Install MBT 1A Flood Hole Blank FR 14-15 CONTRACTOR MBT 1A 9/15/2021 9/17/2021 38Z9917612 R19 KTR - (MBT 1-8) Install MBT 1A Flood Hole Blank FR 12/14 INBD CONTRACTOR MBT 1A 9/15/2021 9/17/2021 38Z9917612 R32 KTR - (MBT 1-21) Install AN/BQN-17 Recess Drain Blank CONTRACTOR MBT 1B 9/15/2021 9/16/2021 38Z9917612 R27 KTR - (MBT 1-11) Install MBT 1B Flood Hole Blank FR 12-14 INBD CONTRACTOR MBT 1B 9/15/2021 9/17/2021 38Z9917612 R29 KTR - (MBT 1-13) Install MBT 1B Flood Hole Blank FR 14-15 CONTRACTOR MBT 1B 9/16/2021 9/20/2021 38Z9917612 R18 KTR - (MBT 1-6) Install Electrical Tank Fitting T25 Blank CONTRACTOR MBT 1A 9/17/2021 9/21/2021 38Z9917612 R17 KTR - (MBT 1-3) Install Electrical Tank Fitting T22 Blank CONTRACTOR MBT 1A 9/17/2021 9/21/2021 38Z9917612 R23 KTR - (MBT 1-1) Install Electrical Tank Fitting T20 Blank CONTRACTOR MBT 1B 9/17/2021 9/21/2021 38Z9917612 R26 KTR - (MBT 1-7) Install Electrical Tank Fitting T40 Blank CONTRACTOR MBT 1B 9/21/2021 9/23/2021 38Z9917612 R90 KTR - (MBT-1A) Install Welded Cap on MBT-1A Emergency Blow Pipe CONTRACTOR MBT 1A 9/22/2021 9/24/2021 38Z9917612 R24 KTR - (MBT 1-4) Install Electrical Tank Fitting T23 Blank CONTRACTOR MBT 1B 9/22/2021 9/24/2021 38Z9917612 R91 KTR - (MBT-1B) Install Welded Cap on MBT-1B Emergency Blow Pipe CONTRACTOR MBT 1B 9/23/2021 9/27/2021 38Z9917612 R16 KTR - (MBT 1-2) Install Electrical Tank Fitting T21 Blank CONTRACTOR MBT 1A 9/24/2021 9/28/2021 38Z9917612 R25 KTR - (MBT 1-5) Install Electrical Tank Fitting T24 Blank CONTRACTOR MBT 1B 9/24/2021 9/28/2021 38Z9917612 R31 KTR - (MBT 1-20) Install AN/BQN-17 Window Blank CONTRACTOR MBT 1B 9/28/2021 9/30/2021 38Z9917612 U29 KTR - (MBT 2-17) Remove INTF to support AN/BQN-15 Window blank CONTRACTOR MBT 2A 9/29/2021 9/30/2021 38Z9917612 U27 KTR - (MBT 2-14) Remove INTF cable and BTF T-32 to support blank CONTRACTOR MBT 2A 9/29/2021 9/30/2021 38Z9917612 R84 KTR - MBT 2A (STBD) Install blast protection / containment CONTRACTOR MBT 2A 9/29/2021 9/30/2021 38Z9917612 U25 KTR - (MBT 2-10/ MBT 2-12) Remove INTF cable and BTF T-28/T-30 to support blank CONTRACTOR MBT 2A 10/1/2021 10/4/2021 38Z9917612 U05 KTR - MBT 2A (STBD) Remove Paint/Damping/SHT CONTRACTOR MBT 2A 10/1/2021 10/5/2021 38Z9917612 U24 KTR - (MBT 2-9/ MBT 2-11) Remove INTF cables and BTF T-27/T-29 to support blanks CONTRACTOR MBT 2B 10/1/2021 10/4/2021 38Z9917612 R85 KTR - MBT 2B (PORT) Install blast protection / containment CONTRACTOR MBT 2B 10/1/2021 10/4/2021 38Z9917612 R39 KTR - (MBT 2-26) Install MBT 2A Vent Valve Blank CONTRACTOR MBT 2A 10/5/2021 10/7/2021 38Z9917612 R37 KTR - (MBT 2-18) Install AN/BQN-15 Recess Drain Blank CONTRACTOR MBT 2A 10/5/2021 10/7/2021 38Z9917612 U06 KTR - MBT 2B (PORT) Remove Paint/Damping/SHT CONTRACTOR MBT 2B 10/5/2021 10/7/2021 38Z9917612 U26 KTR - (MBT 2-13) Remove INTF cable sand BTF T-31 to support blank CONTRACTOR MBT 2B 10/6/2021 10/7/2021 38Z9917612 R45 KTR - (MBT 2-23, 2-24, 2-25) Install MBT 2B Flood Hole Blanks CONTRACTOR MBT 2B 10/7/2021 10/14/2021 38Z9917612 R43 KTR - (MBT 2-15) Install DT-705-CTD Duct Inlet Blank CONTRACTOR MBT 2B 10/7/2021 10/12/2021 38Z9917612 R38 KTR - (MBT 2-20, 2-21, 2-22) Install MBT 2A Flood Hole Blanks CONTRACTOR MBT 2A 10/8/2021 10/15/2021 38Z9917612 R35 KTR - (MBT 2-14) Install Electrical Tank Fitting T32 Blank CONTRACTOR MBT 2A 10/8/2021 10/13/2021 38Z9917612 R34 KTR - (MBT 2-12) Install Electrical Tank Fitting T30 Blank CONTRACTOR MBT 2A 10/13/2021 10/15/2021 38Z9917612 R93 KTR - (MBT 2B) Install Welded Cap on MBT-2B Emergency Blow Pipe CONTRACTOR MBT 2B 10/13/2021 10/19/2021 38Z9917612 R92 KTR - (MBT 2A) Install Welded Cap on MBT-2A Emergency Blow Pipe CONTRACTOR MBT 2A 10/15/2021 10/19/2021 38Z9917612 R46 KTR - (MBT 2-27) Install MBT 2B Vent Valve Blank CONTRACTOR MBT 2B 10/15/2021 10/18/2021 38Z9917612 R33 KTR - (MBT 2-10) Install Electrical Tank Fitting T28 Blank CONTRACTOR MBT 2A 10/18/2021 10/20/2021 38Z9917612 R40 KTR - (MBT 2-9) Install Electrical Tank Fitting T27 Blank CONTRACTOR MBT 2B 10/18/2021 10/20/2021 38Z9917612 R42 KTR - (MBT 2-13) Install Electrical Tank Fitting T31 Blank CONTRACTOR MBT 2B 10/19/2021 10/21/2021 38Z9917612 R36 KTR - (MBT 2-17) Install AN/BQN-15 Window Blank CONTRACTOR MBT 2A 10/20/2021 10/22/2021 38Z9917612 R41 KTR - (MBT 2-11) Install Electrical Tank Fitting T29 Blank CONTRACTOR MBT 2B 10/21/2021 10/25/2021 38Z9917612 U38 KTR - (MBT 3-39, MBT 3-48, MBT 3-49) Remove INTF to support AN/BQQ-5 blanks CONTRACTOR MBT 3A 10/25/2021 10/27/2021 38Z9917612 R86 KTR - MBT 3A (STBD) Install blast protection / containment CONTRACTOR MBT 3A 10/25/2021 10/26/2021
SSP: NWRMC-502-21 4 of 5 ITEM NO: 042-10-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S. International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
38Z9917612 U37 KTR - (MBT 3-28) Remove INTF cable from BTF T-50 to support blank CONTRACTOR MBT 3A 10/26/2021 10/27/2021 38Z9917612 U07 KTR - MBT 3A (STBD) Remove Paint/Damping/SHT CONTRACTOR MBT 3A 10/26/2021 10/28/2021 38Z9917612 U09 KTR - (MBT 3-23) Remove WLR-9 foundation flush with non-pressure hull CONTRACTOR MBT 3B 10/26/2021 10/28/2021 38Z9917612 R87 KTR - MBT 3B (PORT) Install blast protection / containment CONTRACTOR MBT 3B 10/26/2021 10/27/2021 38Z9917612 U11 KTR - Remove AN/BQQ-5 Cover Foundation/Sheave Foundation/Electrical Cable Hanger CONTRACTOR MBT 3A 10/27/2021 10/29/2021 38Z9917612 U47 KTR - (MBT 3-39, MBT 3-47, MBT 3-48, MBT 3-49, MBT 3-54) Remove AN/BQQ-5 STRUC I CONTRACTOR MBT 3A 10/28/2021 11/1/2021 38Z9917612 U32 KTR - (MBT 3-18) Remove INTF cable and BTF T-38 to support blank CONTRACTOR MBT 3B 10/28/2021 10/29/2021 38Z9917612 U08 KTR - MBT 3B (PORT) Remove Paint/Damping/SHT CONTRACTOR MBT 3B 10/28/2021 11/1/2021 38Z9917612 R71 KTR - (MBT 3-50) Install MBT 3A Vent Valve Blank CONTRACTOR MBT 3A 10/29/2021 11/2/2021 38Z9917612 U34 KTR - (MBT 3-23) Remove INTF to support AN-WLR9 Hydrophone BCL blank CONTRACTOR MBT 3B 10/29/2021 11/2/2021
SSP: NWRMC-502-21 5 of 5 ITEM NO: 042-10-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S. International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
38Z9917612 U10 KTR - (MBT 3-24) Remove WLR-9 foundation flush with non-pressure hull CONTRACTOR MBT 3B 10/29/2021 11/2/2021 38Z9917612 U33 KTR - (MBT 3-19) Remove INTF cable and BTF T-39 to support blank CONTRACTOR MBT 3A 11/1/2021 11/2/2021
38Z9917612 U12 KTR - (MBT 3-54) Remove Hatch Cover CONTRACTOR MBT 3A 11/1/2021 11/3/2021
38Z9917612 R56 KTR - (MBT 3-51) Install MBT 3B Vent Valve Blank CONTRACTOR MBT 3B 11/1/2021 11/3/2021
38Z9917612 R52 KTR - (MBT 3-28) Install PORT Torpedo Recess Electrical Tank Fitting Blank CONTRACTOR MBT 3B 11/1/2021 11/3/2021
38Z9917612 R73 KTR - (MBT 3-58) Install STBD 1" Diameter Vent Hole Blank CONTRACTOR MBT 3A 11/2/2021 11/4/2021
38Z9917612 U35 KTR - (MBT 3-24) Remove INTF to support AN-WLR9 Hydrophone TCL blank CONTRACTOR MBT 3B 11/2/2021 11/3/2021
38Z9917612 U31 KTR - (MBT 3-15/ MBT 3-17) Remove INTF cable and BTF T-35/T-37 to support blank CONTRACTOR MBT 3A 11/3/2021 11/4/2021
38Z9917612 U36 KTR - (MBT 3-27) Remove INTF cable from BTF T-51 to support blank CONTRACTOR MBT 3A 11/4/2021 11/5/2021
38Z9917612 U30 KTR - (MBT 3-14/ MBT 3-16) Remove INTF cable and BTF T-34/T-36 to support blank CONTRACTOR MBT 3B 11/4/2021 11/5/2021
38Z9917612 R58 KTR - (MBT 3-59) Install PORT 1" Dia Drain Hole Blank CONTRACTOR MBT 3B 11/4/2021 11/8/2021
38Z9917612 R53 KTR - (MBT 3-32, 3-33, 3-34) Install MBT 3B Flood Hole Blanks CONTRACTOR MBT 3B 11/4/2021 11/8/2021
38Z9917612 U48 KTR - (MBT 3-21) Remove INTF to support Sonar Window Blank CONTRACTOR MBT 3B 11/5/2021 11/5/2021
38Z9917612 R63 KTR - (MBT 3-21) Install Sonar Window Blank CONTRACTOR MBT 3A 11/8/2021 11/9/2021
38Z9917612 R50 KTR - (MBT 3-23) Install AN-WLR9 Hydrophone BCL Blank CONTRACTOR MBT 3B 11/8/2021 11/10/2021
38Z9917612 R49 KTR - (MBT 3-18) Install Electrical Tank Fitting T38 Blank CONTRACTOR MBT 3B 11/8/2021 11/10/2021
38Z9917612 R66 KTR - (MBT 3-39) Install AN/BQQ-5 Sheave Recess Blank CONTRACTOR MBT 3A 11/9/2021 11/12/2021
38Z9917612 R55 KTR - (MBT 3-42) Install PORT Rodmeter and Vent Blank CONTRACTOR MBT 3B 11/12/2021 11/16/2021
38Z9917612 R51 KTR - (MBT 3-24) Install AN-WLR9 Hydrophone TCL Blank CONTRACTOR MBT 3B 11/12/2021 11/16/2021
38Z9917612 R67 KTR - (MBT 3-41) Install STBD Rodmeter and Vent Blank CONTRACTOR MBT 3A 11/15/2021 11/17/2021
38Z9917612 R48 KTR - (MBT 3-16) Install Electrical Tank Fitting T36 Blank CONTRACTOR MBT 3B 11/16/2021 11/18/2021
38Z9917612 R69 KTR - (MBT 3-48) Install AN/BQQ-5 Pump Recess Blank CONTRACTOR MBT 3A 11/17/2021 11/19/2021
38Z9917612 R47 KTR - (MBT 3-14) Install Electrical Tank Fitting T34 Blank CONTRACTOR MBT 3B 11/19/2021 11/23/2021
38Z9917612 R70 KTR - (MBT 3-49) Install AN/BQQ-5 Pump Recess Blank CONTRACTOR MBT 3A 11/22/2021 11/24/2021
38Z9917612 R65 KTR - (MBT 3-29, 3-30, 3-31) Install MBT 3A Flood Hole Blanks CONTRACTOR MBT 3A 11/24/2021 11/29/2021
38Z9917612 R68 KTR - (MBT 3-43) Install AN/BQQ-5 Flushing Pipe Blank CONTRACTOR MBT 3A 11/30/2021 12/2/2021
38Z9917612 R62 KTR - (MBT 3-19) Install Electrical Tank Fitting T39 Blank CONTRACTOR MBT 3A 12/2/2021 12/6/2021
38Z9917612 R61 KTR - (MBT 3-17) Install Electrical Tank Fitting T37 Blank CONTRACTOR MBT 3A 12/7/2021 12/9/2021
38Z9917612 R64 KTR - (MBT 3-27) Install STBD Torpedo Recess Electrical Tank Fitting Blank CONTRACTOR MBT 3A 12/9/2021 12/13/2021
38Z9917612 R60 KTR - (MBT 3-15) Install Electrical Tank Fitting T35 Blank CONTRACTOR MBT 3A 12/14/2021 12/16/2021 38Z9917612 R72 KTR - (MBT 3-54) Install Access Hatch Blank CONTRACTOR MBT 3A 12/16/2021 12/20/2021
HAZMAT
SHIP: USS JACKSONVILLE (SSN 699) ITEM NO: 077-11-001 (E1)
COAR: 40 PCN: SSPS-L002
CMP: NONE
PLANNER: LEWIS, ANNA
COOPER, DANIEL
KOURLIS, MARINA
SSP: NWRMC-502-21 1 of 4 ITEM NO: 077-11-001 ERRATA NO. One
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Hazardous Waste Produced on Naval Vessels; control
1.2 Location of Work:
1.2.1 USS-JACKSONVILLE (SSN-699), Puget Sound Naval Shipyard and Intermediate
Maintenance Facility (PSNS & IMF)
1.3 Identification:
1.3.1 Not Applicable
2. REFERENCES:
2.1 Standard Items , (FY19)FY21) (E1)
2.2 Resource Conservation and Recovery Act, (RCRA)
2.3 49 U.S.C. 5103, Federal Hazardous Materials Transportation Act
2.4 Applicable Hazardous Waste, Manifest Form
2.5 10 U.S.C., 7311
3. REQUIREMENTS:
3.1 Manage and dispose of all hazardous waste listed in 3.5 in accordance with 2.1 through 2.5.
3.1.1 When a Navy generator number is required by this Work Item, submit the original of 2.5 to the SUPERVISOR for assignment of Environmental Protection Agency (EPA) or delegated state environmental agency identification number.
3.1.2 Manage and transport for Navy disposal, Navy-generated
hazardous waste listed in 3.5 in accordance with 2.2 and 2.4, as designated by the SUPERVISOR.
3.2 Complete documentation required by 2.2 and 2.4, using EPA or delegated state environmental agency identification number in accordance with 2.5.
3.2.1 Documentation related to hazardous waste generated solely by the physical actions of contractor personnel (termed Contractor- Generated Hazardous Waste) shall bear a generator identification number issued to the contractor pursuant to applicable law.
Regardless of the presence of other material in or on the shipboard systems or structure which may have qualified a waste stream as hazardous, where the contractor performs work on a system or
SSP: NWRMC-502-21 2 of 4 ITEM NO: 077-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
structure using materials (whether or not the use of such materials was specified by the Navy) which by themselves would cause the waste from such work to be a hazardous waste, documentation related to such waste shall only bear a generator number issued to the contractor.
3.2.2 Documentation related to hazardous waste generated by the combined physical actions of Navy and contractor personnel (termed Co-Generated Hazardous Waste) shall bear a generator identification number issued to the contractor pursuant to applicable law and shall also cite in the remarks block a generator identification number issued to the Navy pursuant to applicable law. When the contractor merely drains a system and such drainage creates hazardous waste or the contractor performs work on system or structure using materials which by themselves would not cause the waste from such work to be hazardous waste but such work nonetheless creates a hazardous waste, documentation related to such waste shall bear a generator identification number issued to the contractor and shall also cite in the remarks block a generator identification number issued to the Navy. The contractor shall sign the generator certification on the Uniform Hazardous Waste Manifest whenever use of the manifest is required for disposal. The contractor shall obtain SUPERVISOR's concurrence with the categorization of the wastes as co-generated before completion of the manifest. Manifests prepared shall be presented to the SUPERVISOR for completion after the hazardous waste has been identified.
3.3 Obtaining approval of the SUPERVISOR, the contractor shall use the Navy site generator identification number and insert in the remarks block the contractor generator identification number issued for the site where his main facilities are located.
3.4 Hazardous waste, as identified in 2.2, expected to be produced during performance of this Job Order:
AMOUNT
TYPE NAVY CO-GENERATED CONTRACTOR
Acid Solutions (may include _____ ____________ __________ spent sulfamic, citric, chromic, nitric, sulfuric, hydrochloric, etc.)
Ethylene Glycol (Antifreeze) _____ ____________ __________
Sodium Hydroxide _____ ____________ __________
Cleaning Solvents _____ ____________ ____150 Gal______
Sodium Phosphates (Tri, Bi, _____ ____________ __________ or Mono)
Fluorocarbons _____ ____________ __________
Morpholine _____ ____________ __________
SSP: NWRMC-502-21 3 of 4 ITEM NO: 077-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
Sodium Chromates _____ ____________ __________
Hydrazine _____ ____________ __________
Carbohydrazide _____ ____________ __________
Methyl Ethyl Ketone _____ ____________ _________
Spent Abrasive Blast Material _____ ____________ __________
(contaminated with a known hazardous waste)
Trichloroethane _____ ____________ __________
Miscellaneous Chemicals _____ ____________ __________
(Ignitable)
Miscellaneous Chemicals _____ ____________ __________
(Corrosive)
Miscellaneous Chemicals _____ ____________ __________
(TCLP Toxic)
Miscellaneous Chemicals _____ ____________ __________
(Reactive)
Oil (Synthetic) _____ ____________ __________
Paints (Enamel, Latex, _____ ____________ ________
Epoxy, thinners, oil based, rubber paint, nonskid, lacquer, remover, varnishes)
Paints (May include lead, cadmium, or chrome)
Paint Strippers (phenols, _____ ____________ __________ lead, chromium)
Sludge (Contaminated with _____ ____________ __________ a known hazardous waste)
Wool Felt (contaminated _____ ____________ __________ with chromium and PCB's)
Ventilation Debris/Residue
(heavy metals, e.g., cadmium, chromium) _____ ____________ __________
3.5 Notify the SUPERVISOR at least one working day prior to shipment of hazardous waste for disposal.
3.6 Submit one legible copy, in hard copy or approved transferrable media, of a report identifying type, amount of waste listed in 3.5 that
SSP: NWRMC-502-21 4 of 4 ITEM NO: 077-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
was removed during the performance of this Job Order to the SUPERVISOR.
3.6.1 The report shall include analysis or other method used to identify the waste and state whether each listed waste was hazardous (with generator assignment), non-hazardous, or did not exist.
3.6.1.1 Chemical analysis shall be accomplished by laboratories with state or EPA approved quality assurance programs.
3.6.2 The contractor shall make an effort to minimize hazardous waste generation by reducing the volume or toxicity by neutralizing, recycling, or otherwise removing it from the requirements of Subtitle C of 2.1 and include a description of such efforts in the report.
3.7 Nothing contained in this Work Item shall relieve the contractor from complying with applicable federal, state, and local laws, codes, ordinances, and regulations, including the obtaining of licenses and permits in connection with hazardous waste handlingsposal in the performance of this contract.
4. NOTES:
4.1 None.
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
SHIP: USS JACKSONVILLE (SSN 699) ITEM NO: 111-00-001 (E2)
COAR: 40 PCN: None
CMP: NONE
PLANNER: LEWIS, ANNA
COOPER, DANIEL
SSP: NWRMC-502-21 1 of 2 ITEM NO: 111-00-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Pressure Hull FWD-PORT & STBD; interference remove (DESCOPED) (E2)
1.2 Location of Work:
1.2.1 Pressure Hull FWD-PORT & STBD
1.2.1.1 P59-1C
1.3 Identification:
1.3.1 Strainer plate PC No.4
2. REFERENCES:
2.1 Standard Items
2.2 IPI 0770-903 Rev -, HOT WORK PRECAUTIONS
2.3 VAR-6772233 Rev -, SSN688CL DEMILITARIZATION GUIDELINES BY SWAB FOR
SUBMARINE RECYCLE
2.4 100-4497330 Rev L, PENETRATIONS PRESSURE HULL FRAMES 52-87
2.5 2285-304 Rev M, Depth Control Comb Hull and Tank Selector Valve Detail Sheet No.1’
2.6 100-8779866 Rev -, USS JACKSONVILLE (SSN 699) NON-NUCLEAR HULL
BLANKING INACTIVATION
3. REQUIREMENTS:
3.1 Accomplish the requirement of 2.2 Enclosure (2) for blank locations listed in 1.2.
3.2 Remove interferences identified in 1.3 using 2.1 through 2.6, for blank locations listed in 1.2.
3.2.1 Accomplish the requirements of 009-103 of 2.1 for all
interferences removed.
3.2.2 Submit one legible copy, in approved transferrable media, of a report listing results of the requirements of 3.2.2 to the SUPERVISOR within 72 hours after completion of interference removal.
3.3 Dispose of materials removed in 3.2, in accordance with 2.3.
4. NOTES:
4.1 None.
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
SSP: NWRMC-502-21 2 of 2 ITEM NO: 111-00-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
5.2 PUSH MATERIAL:
1. None.
SHIP: USS JACKSONVILLE (SSN 699) ITEM NO: 111-01-001 (E2)
CMP: NONE
PLANNER: LEWIS, ANNA
COOPER, DANIEL
SSP: NWRMC-502-21 1 of 2 ITEM NO: 111-01-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Pressure Hull FWD-PORT & STBD; cable interference remove
(DESCOPED)
(E2)
1.2 Location of Work:
1.2.1 Pressure Hull
1.2.1.1 Sonar Sphere; Interior
1.3 Identification:
1.3.1 Lighting Connection Boxes, Items 301-1 and 301-2
1.3.2 Lighting Circuit Cable L1-1L-A/LR1-1L-A between connection boxes 301-1 and 301-2
1.3.3 Light Fixture, Item 250C
1.3.4 Common Alarm Circuit Cable C-IC/7FD between terminal boxes C- IC6 and C-IC3 in Sonar Sphere access trunk
1.3.5 Sound Powered Phone Cable C-SJ1 between Jackbox Station 24 and terminal box C-SJ2
2. REFERENCES:
2.1 Standard Items
2.2 VAR-6772233, SSN688CL DEMILITARIZATION GUIDELINES BY SWAB FOR
SUBMARINE RECYCLE
2.3 100-8779866, USS JACKSONVILLE (SSN-699) NON-NUCLEAR HULL BLANKING
INACTIVATION
2.4 303-4454583 Rev G, Lighting System Wiring Deck Drawing Sonar Sphere and Access Trunk
2.5 401-4456774 Rev E, Common Alarm Circuit IC Cabling Diagram
2.6 401-4456988 Rev F, Sound Powered Matrix Telephone System IC CKT SJ Cabling Diagram
3. REQUIREMENTS:
3.1 Remove interferences identified in 1.3 in accordance with 2.1 using
2.2 through 2.6 as guidance.
3.1.1 Remove items listed in 1.3.2 of reference 2.4 between
connection box 301-1 and 301.2.
3.1.2 Remove items listed in 1.3.3 of reference 2.4 including cable pigtail.
3.1.3 Remove items listed in 1.3.4 between terminal boxes C-IC6 and C-IC3 in Sonar Sphere access trunk of reference 2.5.
3.1.4 Remove items listed in 1.3.5 at Jack box Sta. 24 of reference
SSP: NWRMC-502-21 2 of 2 ITEM NO: 111-01-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
2.6 and pull cable back into the Sonar Sphere access trunk .
3.2 Accomplish the requirements of 009-103 of 2.1 for all interferences removed.
3.2.1 Submit one legible copy, in approved transferrable media, of a report listing the results of 3.2 to the SUPERVISOR within 72 hours after completion of interference removal.
3.3 Dispose of materials removed in 3.2, in accordance with 2.2.
4. NOTES:
4.1 None.
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
SHIP: USS JACKSONVILLE (SSN 699) ITEM NO: 111-11-001 (E2)
BWST FILE NO: 000-001 CMP: NONE
REVISED: 05 Apr 2019 PLANNER: LEWIS, ANNA
COOPER, DANIEL
KOURLIS, MARINA
SSP: NWRMC-502-21 1 of 6 ITEM NO: 111-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Pressure Hull; blank install (DESCOPED) (E2)
1.2 Location of Work:
1.2.1 Pressure Hull, Forward Interior and Exterior, Port & Starboard
1.3 Identification:
1.3.1 (P23-1C) Manhole-Sonar Sphere Cable Trunk, 37-1/4” diameter blank with 37-7/8” OD x 1-1/2” wide backing ring, see Figure 3 of 2.5
1.3.2 (P26-1S) Torpedo Ejection Pump Sea Valve Operating Gear, 4-1/2” diameter blank, in Starboard hull recess
1.3.3 (P26-2P) Torpedo Ejection Pump Sea Valve Operating Gear, 4-1/2” diameter blank, in Port hull recess
1.3.4 (P28-1P) Torpedo Tube #2 Upper, 20-5/8” diameter blank with 21-1/8” backing ring, blank inside muzzle end of torpedo tube at about Frame 27, see Figures 22-24 of 2.5
1.3.5 (P28-1PA) Torpedo Tube #2 Muzzle Door Shaft Sleeve, 9” diameter blank, blank outboard end
1.3.6 (P28-2S) Torpedo Tube #1 Upper, 20-5/8” diameter blank with 21-1/8” backing ring, blank inside muzzle end of torpedo tube at about Frame 27, see Figures 22-24 of 2.5
1.3.7 (P28-2SA) Torpedo Tube #1 Muzzle Door Shaft Sleeve, 9” diameter blank, blank outboard end
1.3.8 (P29-1P) Ejection Tube Water Cylinder, 28-1/2” diameter blank, blank Forward end of cylinder at about Frame 26
1.3.9 (P29-2P) Torpedo Tube #4 Lower, 20-5/8” diameter blank with 21-1/8” backing ring, blank inside muzzle end of torpedo tube at about Frame 27, see Figures 22-24 of 2.5
1.3.10 (P29-2PA) Torpedo Tube #4 Muzzle Door Shaft Sleeve, 3-1/2” diameter blank
1.3.11 (P29-3S) Torpedo Tube # 3 Lower, 20-5/8” diameter blank with 21-1/8” backing ring, blank inside muzzle end of torpedo tube at about Frame 27, see Figures 22-24 of 2.5
1.3.12 (P29-3SA) Torpedo Tube #3 Muzzle Door Shaft Sleeve, 3-1/2” diameter blank, blank outboard end
1.3.13 (P29-4S) Ejection Tube Water Cylinder, 28-1/2” diameter blank, blank Forward end of cylinder at about Frame 26
1.3.14 (P35-1P) Sanitary System Overboard Discharge, 7-1/2” diameter
SSP: NWRMC-502-21 2 of 6 ITEM NO: 111-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
blank
1.3.15 (P35-2S) Torpedo Tube Equalizing (TD-29/30), 10-1/2” diameter blank
1.3.16 (P49-2P) Trash Disposal Unit, 22” diameter blank
1.3.17 (P49-6P) 3” Launcher Flood Valve, 6” diameter blank
1.3.18 (P49-7P) Depth Gage (CG-4/5), 5” diameter blank
1.3.19 (P49-8S) Depth Gage (CG-1/2), 5” diameter blank
1.3.20 (P54-1S) Diesel SW Suction, 15” diameter blank
1.3.21 (P56-1S) Diesel SW Discharge, 12” diameter blank
1.3.22 (P57-1P) TD-7/8 Trim Pump Discharge & Seawater Ingestion, 12” diameter blank
1.3.23 (P59-1C) TD-100/101 Depth Control Valve, 10” diameter blank
2. REFERENCES:
2.1 Standard Items, FY 21
2.2 IPI 0770-903, Chg -, HOT WORK PRECAUTIONS
2.3 MATERIAL SAFETY DATA SHEET, AD79 Tile RUBBER COMPOUND
2.4 100-7097815 Rev -, FABRICATION, WELDING AND INSPECTION FOR
INACTIVATED SUBMARINES AND SURFACE SHIPS
2.5 100-8779866 Rev -, USS JACKSONVILLE (SSN-699) NON-NUCLEAR HULL
BLANKING INACTIVATION
2.6 MIL-STD-1689A, FABRICATION, WELDING, AND INSPECTION OF SHIP’S
STRUCTURE
2.7 845-5345285 Rev K, DESIGN REVIEW PENETRATIONS PRESSURE HULL-LIST
2.8 115-4403243 Rev L, SONAR SPHERE ACCESS & CABLE TRUNK
2.9 708-4457180 Rev H, TORP EJECT PUMP SEA VLV OPER GR ARRT
2.10 708-4494346 Rev M, TORPDEO EJECTION PUMP SEA VALVE OPERATING GEAR
HULL PENETRATION - ASSY & DETS
2.11 10001-2995542 Rev C, TORPEDO TUBE BARREL MUZZLE SECTION UPPER-RIGHT
HAND
2.12 10001-2995546 Rev B, TORPEDO TUBE BARREL MUZZLE SECTION WELDMENT-
UPPER
2.13 708-4454205 Rev T, TORPEDO & EJECTION TUBE SLEEVES
2.14 113-4457190 Rev B, LOCATING DIMENSIONS & TOLERANCES FOR STRL INSTL
OFTT & ASSC STRUCTURE
2.15 10001-2882645 Rev C, CYLINDER, WATER FWD SECTION WELDMENT
2.16 10001-2882646 Rev A, CYLINDER, WATER FWD SECTION
2.17 10001-2995543 Rev D, TORPEDO TUBE BARREL MUZZLE SECTION LOWER-RIGHT
HAND
2.18 10001-2995547 Rev B, TORPEDO TUBE BARREL MUZZLE SECTION WELDMENT-
SSP: NWRMC-502-21 3 of 6 ITEM NO: 111-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
LOWER
2.19 100-4497328 Rev L, PENETRATIONS-PRESS HULL FR 30-42
2.20 505-4457347 Rev H, TRASH DSPL UN ARR IN SHIP
2.21 505-4457328 Rev E, TRASH DSPL UNIT BALL VALVE DET SHT 1
2.22 100-4497305 Rev M, PENETRATIONS PRESS HULL FR 47-52
2.23 100-4497330 Rev L, PENETRATIONS-PRESSURE HULL FR 52-87
3. REQUIREMENTS:
3.1 Accomplish the requirements of 2.2 Enclosure (2) for strip back distances for heat sensitive materials when heat controlled welding processes cannot be used.
3.1.1 Heat control process must not allow backside temperature to exceed 400 degrees Fahrenheit.
3.2 Remove SHT tile and SHT tile remnants in way of blank installation listed in 1.3.14 through 1.3.23 in accordance with 2.1 through 2.3 and note 4.3 for guidance only.
3.2.1 Avoid gouging of hull and disturbing adjacent tile.
3.2.2 Place removed SHT and SHT tile remnants into a bin staged at a PSNS Satellite Accumulation Area (SAA).
3.3 Install blanks listed in 1.3 for locations listed in 1.2 in accordance with 2.1, 2.2 and 2.4 through 2.6 using 2.7 through 2.23 as guidance.
3.3.1 Install and remove temporary padeyes and rigging attachment in accordance with 2.1 and 2.4.
(I) "NONDESTRUCTIVE TESTING VISUAL INSPECTION"
3.4 Accomplish nondestructive visual inspection in accordance with 2.5 and 2.6 as implemented by 2.4 Vol II, after installation of blanks listed in 1.3.
3.4.1 Submit one legible copy, in approved transferrable media, any Objective Quality Evidence (OQE), required by 2.4 Vol I, to the SUPERVISOR within 72 hours after completion of blank installation.
(I) "NONDESTRUCTIVE TESTING MAGNETIC PARTICLE"
3.5 Accomplish nondestructive magnetic particle testing in accordance with 2.5 and 2.6 as implemented by 2.4 Vol II for blanks listed in 1.3.1 through 1.3.3, 1.3.5, 1.3.7, and 1.3.14 through 1.3.23.
3.5.1 Submit one legible copy, in approved transferrable media, any Objective Quality Evidence (OQE), required by 2.4 Vol I, to the SUPERVISOR within 72 hours after completion of blank installation.
(I) "NONDESTRUCTIVE TESTING 5X VISUAL INSPECTION"
SSP: NWRMC-502-21 4 of 6 ITEM NO: 111-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
3.6 Accomplish nondestructive 5X visual inspection in accordance with
2.6 as implemented by 2.5 for blanks listed in 1.3.4, 1.3.6 and 1.3.8 through 1.3.13.
3.6.1 Submit one legible copy, in approved transferrable media, any Objective Quality Evidence (OQE), required by 2.4 Vol I, to the SUPERVISOR within 72 hours after completion of blank installation.
4. NOTES:
4.1 CAUTION: SHT tile coverply contains lead.
4.2 CAUTION: Damping tile and epoxy adhesives contain crystalline silicas which are hazardous.
4.3 Government SHT removal and adhesive removal process for guidance purposes only.
4.3.1 Use long handle chisel similar to woodworking tool slicer or 3” wide beryllium-bronze chisel.
4.3.1.1 Keep chisel angled low to prevent gouging of hull. Cut tile to be removed around the perimeter of the tile.
4.3.1.2 Tension at adhesive bond during chipping will aid in
removal.
4.3.2 Work back SHT tile until edge can be gripped by vice grips.
4.3.2.1 While pulling end of tile, cut tile from hull with a
sharp utility knife or sharpened Sawzall blades.
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
5.3 KITTED MATERIAL:
TOTAL
QUANTITY
PROVIDED NAME Of PART
PIECE
NO.
REF
NO.
NATIONAL
STOCK
NO.
REQ
PARA NO.
1. 1 AY
JO 38Z99-02801-
F0137-1/4” diameter blank with 37-7/8” OD x 1-1/2” wide backing ring P23-1C 2.5
2. 1 AY
4-1/2” diameter blank JO 38Z99- 02801-F01 P26-1S 2.5
3. 1 AY 4-1/2”
diameter blank
P26-2P 2.5
SSP: NWRMC-502-21 5 of 6 ITEM NO: 111-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
JO 38Z99-02801-
F01
4. 1 AY
20-5/8” diameter blank with 21- 1/8” backing ring JO 38Z99- 02801-F01 P28-1P 2.5
5. 1 AY
9” diameter blank JO 38Z99-
02801-F01 P28-1PA 2.5
6. 1 AY
JO 38Z99-02801-
F01 20-5/8” diameter blank with 21-1/8” backing ring P28-2S 2.5
7. 1 AY
9” diameter blank JO 38Z99-
02801-F01 P28-2SA 2.5
8. 1 AY
28-1/2” diameter blank JO 38Z99- 02801-F01 P29-1P 2.5
9. 1 AY
20-5/8” diameter blank with 21- 1/8” backing ring P29-2P 2.5
10. 1 AY
3-1/2” diameter blank JO 38Z99-
02801-F01 P29-2PA 2.5
11. 1 AY
20-5/8” diameter blank with 21- 1/8” backing ring JO 38Z99- 02801-F01 P29-3S 2.5
12. 1 AY
3-1/2” diameter blank JO 38Z99-
02801-F01 P29-3SA 2.5
13. 1 AY
28-1/2” diameter blank JO 38Z99- 02801-F01 P29-4S 2.5
14. 1 AY
7-1/2” diameter blank JO 38Z99- 02801-F01 P35-1P 2.5
15. 1 AY
10-1/2” diameter blank JO 38Z99- 02801-F01 P35-2S 2.5
16. 1 AY
22” diameter
P49-2P 2.5
SSP: NWRMC-502-21 6 of 6 ITEM NO: 111-11-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
blank JO 38Z99- 02801-F02
17. 1 AY
6” diameter blank JO 38Z99- 02801-F01 P49-6P 2.5
18. 1 AY
5” diameter blank JO 38Z99- 02801-F01 P49-7P 2.5
19. 1 AY
5” diameter blank JO 38Z99- 02801-F01 P49-8S 2.5
20. 1 AY
15” diameter blank JO 38Z99- 02801-F02 P54-1S 2.5
21. 1 AY
12” diameter blank JO 38Z99- 02801-F01 P56-1S 2.5
22. 1 AY
12” diameter blank JO 38Z99- 02801-F01 P57-1P 2.5
23. 1 AY
10” diameter blank JO 38Z99- 02801-F01 P59-1C 2.5
GAS FREE CERTIFICATION REQUIRED
SHIP: USS JACKSONVILLE (SSN 699) ITEM NO: 112-00-001 (E2)
COAR: 40 PCN: None
CMP: NONE
PLANNER: LEWIS, ANNA
COOPER, DANIEL
SSP: NWRMC-502-21 1 of 2 ITEM NO: 112-00-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Sonar Sphere Tunnel; interference remove (DESCOPED) (E2)
1.2 Location of Work:
1.2.1 Sonar Sphere Tunnel
1.3 Identification:
1.3.1 27 feet of ALP Drain Piping, P-283 shown on reference 2.9 through 2.11
1.3.2 27 feet of Aux Drain Piping, P-90 shown on reference 2.7 and 2.8
2. REFERENCES:
2.1 Standard Items
2.2 IPI 0770-903 Rev -, HOT WORK PRECAUTIONS
2.3 VAR-6772233 Rev -, SSN688CL DEMILITARIZATION GUIDELINES BY SWAB FOR
SUBMARINE RECYCLE
2.4 100-7097815 Rev -, FABRICATION, WELDING AND INSPECTION FOR
INACTIVATED SUBMARINES AND SURFACE SHIPS
2.5 100-8779866 Rev -, USS JACKSONVILLE (SSN-699) NON-NUCLEAR HULL
BLANKING INACTIVATION
2.6 MIL-STD-1689A, FABRICATION, WELDING, AND INSPECTION OF SHIP’S
STRUCTURE
2.7 508-4456437 Rev L, DIAG AUX DRAIN SYSTEM ARR
2.8 508-4456475 Rev E, TRIM DRAIN AUX DRAIN IN FWD MBT SONAR DOME AND
SONAR SPHERE-MATL NOTES
2.9 513- 4456344 Rev E, DIAGRAM SERVICE AIR SYSTEM ARRANGEMENT-SHEET 1
2.10 513-4456345 Rev G, PIPING SERVICE AIR-BHD 65 FORWARD- 1ST & 2ND
PLAT MATERIAL
2.11 513-4456346 Rev G, PPG SERV AIR BHD 65 FWD 1ST & 2ND PLATF PLAN &
ELEV
3. REQUIREMENTS:
3.1 Accomplish the requirements of 2.2 Enclosure (2) for strip back distances for heat sensitive material.
3.2 Remove interferences identified in 1.3.1 and 1.3.2 using 2.1 through 2.11, for locations listed in 1.2.
3.2.1 Cut the 27 foot long cuts at about 21 feet forward of frame 20
SSP: NWRMC-502-21 2 of 2 ITEM NO: 112-00-001
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
and at 6 feet aft of frame 20.
3.2.2 Forward end of cuts should be between frame 9 and 10.
3.3 Accomplish the requirements of 009-103 of 2.1 for all interferences removed.
3.3.1 Submit one legible copy, in approved transferrable media, of a report listing the results of 3.3 o the SUPERVISOR within 72 hours after completion of interference removal.
3.4 Dispose of materials removed in 3.2, in accordance with 2.3.
4. NOTES:
4.1 A section of pipe P-283 may still be attached…