52.212-2.pdf
PDF 7 KB Posted
- Attached to
- 17 Ton Forklift Rental Federal contract opportunity
- Solicitation number
- N4523A-18-R-0010
About this file
52.212-2
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Responses_to_Questions-addl.docx | DOCX document | |
| Responses_to_Questions.docx | DOCX document | |
| SOW_17-Ton_Forklift_Rental_C740_Delta.docx | DOCX document | |
| 52.212-4.pdf | ||
| SOW_17-Ton_Forklift_Rental_C740_Delta.pdf | ||
| 52.212-5.pdf | ||
| 52.212-3.docx | DOCX document | |
| 52.212-1.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
52.212-2 -- Evaluation -- Commercial Items (Oct 2014)
(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:
(i) TECHNICAL CAPABILITY - Provide a technical description of the items being offered in sufficient detail to evaluate compliance with the requirements in the solicitation. This may include product literature, or other documents, if necessary.
(ii) ABILITY TO MEET THE GOVERNMENT'S REQUIRED NEED DATE WITH ALL FORKLIFTS.
(iii) PRICE
The Government intends to make award on the basis of the lowest evaluated price of quotes meeting or exceeding the acceptability standards for Factor (i) and Factor (ii), the non-price factors. (The Government will not, however, provide additional credit for those proposals that may exceed the standards.) The technical capability to provide forklift services meeting the specifications (Factor i) and the ability to meet the delivery date (Factor ii) are equal to price (Factor iii). Offerors proposals will be evaluated under Factor (i) above, which represents the minimum acceptable criteria. Under this factor, the Government will rate the quote as either acceptable or unacceptable.
Failure to meet the minimum criteria for this factor will render the entire quote unacceptable and the quote may not be considered for award. See paragraph (b) below. Only those Offers which meet the minimum requirements required by Factor (i) will be further evaluated under Factor (ii), Meet the Period of Performance. Failure to meet the minimum criteria for this factor will render the entire quote unacceptable and the quote may not be considered for award. See paragraph (c) below. For those proposals that are rated acceptable on Factor (i) and Factor (ii), the
Government will then evaluate Factor (iii), Price. Award will be made on the lowest evaluated total price. See paragraph (b-d) below.
All moving services must be proposed. No partial quotes shall be accepted.
(b) Technical Capability, Factor (i), will be assessed by evaluating the vendor's provided documentation.
Rating Description
Acceptable License does clearly meet the minimum requirements above.
Unacceptable License does not clearly meet the minimum requirements above.
(c) Ability to Meet the need date, Factor (ii), is clearly defined on the PWS. The ability to meet the required need date shall be demonstrated by the offeror's submission of a signed offer which has not taken exception to the required delivery date.
Rating Description
Acceptable Quote does not take exception to need date with all forklifts.
Unacceptable Quote does take exception to the need date with all forklifts.
(d) Price. All vendors shall provide a breakdown of pricing on the attached 'CLINs for Quote' (ONLY IF YOU
HAVE A SEPARATE SPREADSHEET). The total price for all leases including any fees will be evaluated.
(e) A written notice of award or acceptance of an offer mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award. At the discretion of the Contracting Officer, the Government intends to evaluate quotes and award a contract without discussions with offerors. Each initial offer should, therefore contain the Offeror's best terms from both a price and technical standpoint.
File details come from the government source that posted it. Updated .