About this file

The file is an Excel spreadsheet titled "Attachment F_Coefficient Cost Breakdown_blank_rev1.xlsx" related to a Naval Facilities Engineering Systems Command (NAVFAC) Marianas Indefinite-Delivery/Indefinite Quantity (IDIQ) Job Order Contracts (JOC) solicitation. The solicitation (N40192-25-R-9006) seeks to award two single-award, Firm-Fixed Price (FFP) Design-Build (DB) / Design-Bid-Build (DBB) IDIQ contracts designated as BLUE JOC and GOLD JOC to support various construction and repair services in NAVFAC Marianas' area of responsibility.

The specific Excel attachment appears to be a blank coefficient cost breakdown template that bidders will need to complete as part of their proposal. The solicitation covers general construction and repair services, including minor construction and alteration, with work to be priced using predetermined unit prices and bid price coefficients applied to R.S. Means pricing standards. The contract will require contractors to provide comprehensive services including supervision, labor, safety controls, materials, engineering, permits, and hazardous material handling across primary, secondary, and tertiary NAVFAC Marianas locations.

View the file

Other files

File Type Posted
Exhibit A_PPI Response Notice 4.pdf PDF
N4019225R9006_Amd 0005.pdf PDF
Attachment G_Table 3. Sample Coefficient Breakdown_rev1.pdf PDF
Attachment K - Section 01 00 00 - General Requirements (Continuation)_rev2.pdf PDF
Exhibit A_PPI Response Notice 3.pdf PDF
Attachment E - Table 1. Sample ELIN Price Schedule - Gold_rev1.pdf PDF
N4019225R9006_Amd 0004.pdf PDF
Attachment D - Table 1. Sample ELIN Price Schedule - Blue_rev1.pdf PDF
N4019225R9006_Amd 0003.pdf PDF
Exhibit A_PPI Response Notice 2.pdf PDF
N4019225R9006_Amd 0002.pdf PDF
Exhibit A_PPI Response Notice 1.pdf PDF
N4019225R9006_Amd 0001.pdf PDF
Attachment K - Section 01 00 00 - General Requirements (Continuation)_rev1.pdf PDF
Attachment J_JOC Construction and Design Specifications (Technical RFP)_rev1_28AUG25.pdf PDF
N4019225R9006 JOC Solicitation.pdf PDF
Attachment E - Table 2. Sample ELIN Price Schedule - Gold.pdf PDF
Attachment K_Section 01 00 00 - General Requirements (Continuation).pdf PDF
Attachment C_Price Proposal Schedule.xlsx XLSX spreadsheet
Attachment D - Table 1. Sample ELIN Price Schedule - Blue.pdf PDF
Attachment F_Coefficient Cost Breakdown_blank.xlsx XLSX spreadsheet
Attachment I_Past Performance Questionnaire (PPQ).docx DOCX document
Attachment J_JOC Construction and Design Specifications (Technical RFP)_19JUN25.pdf PDF
Attachment B_PPI Tracker.xlsx XLSX spreadsheet
Attachment G_Table 3. Sample Coefficient Breakdown.pdf PDF
Attachment H_Facilities Maintenance Construction Design Experience Project Data Sheet.docx DOCX document
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A0001,0002,0005,0006,0009,0010

Attachment F
Coefficient Breakdown Sheet
ELIN A0001 - Primary Location
Pre-Priced CostsMaterialsLaborEquipmentAmount
RS Means Bare Cost
(Presumed Annual Amount)$2,520,000.00$1,400,000.00$80,000.00$4,000,000.00$0.00
DIRECT COSTS
Worker's Compensation Insurance
Average Fixed Labor
Project Overhead Pre-Priced
Material Mark-up
Equipment Mark-up
City Cost Index (CCI)
SUBTOTAL
OTHER COSTS
General & Administrative
Profit
SUBTOTAL OTHER COSTS
TOTAL DIRECT & OTHER COSTS$0.00
Coefficient Factor
RS Means Bare Cost (Production/Discount - Factor)
PRE-PRICE COEFFICIENT$0.00
ERROR:#DIV/0!
ELIN A0002 - Primary Location
Non Pre-Priced CostsMaterialsLaborEquipmentAmount
Non Pre-Priced Bare Costs
(Presumed Annual Amount)$2,520,000.00$1,400,000.00$80,000.00$4,000,000.00$0.00
Worker's Compensation Insurance
Average Fixed Labor
Project Overhead Non Pre-Priced
Material Mark-up
Equipment Mark-up
SUBTOTAL
OTHER COSTS
General & Administrative
Profit
SUBTOTAL OTHER COSTS
TOTAL DIRECT & OTHER COSTS$0.00
BARE COST

NON PRE-PRICE COEFFICIENT