Attachment E - Table 2. Sample ELIN Price Schedule - Gold.pdf
PDF 79 KB Posted
- Solicitation number
- N4019225R9006
About this file
This document is a Price Schedule for a Gold Job Order Contract (JOC) for Base Period: Ordering Period 1. The price schedule includes multiple ELIN (Extended Line Item Number) categories across primary, secondary, and tertiary locations, with varying estimated values for pre-priced and non-pre-priced line items. Each ELIN includes an Estimated Value (EVW) provided by the government and requires a coefficient to be filled in by the contractor. The price calculation for each line item follows the formula: $ = (EVW x Coef) + EVW.
The document breaks down pricing for different location types and service categories, including pre-priced line items, non-pre-priced items, OTR (Over the Road) multipliers, and escort multipliers. The total estimated value for the base period spans multiple line items, with the largest being $10,000,000.00 for pre-priced line items at the primary location and the smallest being $100,000.00 for OTR and escort multipliers at the tertiary location. The subtotal for the base period will be calculated as the sum of all ELIN dollar amounts.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRICE SCHEDULE - GOLD JOC
EVW COEFFICIENT
(USG Given) (Contractor fill-in)
Pre-priced line items
Primary Location
Non-pre-priced items
Primary Location
MULTIPLIER OTR
Primary Location
MULTIPLIER Escort
Primary Location
Pre-priced line items
Secondary Location
Non-pre-priced items
Secondary Location
MULTIPLIER OTR
Secondary Location
MULTIPLIER Escort
Secondary Location
Pre-priced line items
Tertiary Location
Non-pre-priced items
Tertiary Location
MULTIPLIER OTR
Tertiary Location
MULTIPLIER Escort
Tertiary Location
$ = (Sum of ELIN $ amounts)Subtotal for Base Period: Ordering Period 1
A0011 $100,000.00 (=/> 0.000) $ = (EVW x Coef) + EVW
A0012 $100,000.00 (=/> 0.000) $ = (EVW x Coef) + EVW
A0009 $1,000,000.00 $ = (EVW x Coef) + EVW
A0010 $500,000.00 (=/> 1.000)
A0007 $250,000.00 (=/> 0.000) $ = (EVW x Coef) + EVW
A0008 $250,000.00 (=/> 0.000) $ = (EVW x Coef) + EVW
A0005 $4,000,000.00 $ = (EVW x Coef) + EVW
A0006 $1,000,000.00 (=/> 1.000)
A0003 $750,000.00 (=/> 0.000) $ = (EVW x Coef) + EVW
A0004 $750,000.00 (=/> 0.000) $ = (EVW x Coef) + EVW
A0001 $10,000,000.00 $ = (EVW x Coef) + EVW
A0002 $3,000,000.00 (=/> 1.000)
ATTACHMENT E
Sample ELIN Price Schedule - GOLD
Base Period: Ordering Period 1
ELIN No. ELIN Description Calculated Amount (fill-in)
File details come from the government source that posted it. Updated .