Attachment H_Facilities Maintenance Construction Design Experience Project Data Sheet.docx

DOCX document 40 KB Posted

Attached to
Indefinite-Delivery/Indefinite Quantity (IDIQ) Job Order Contracts (JOC), at various locations to support Naval Facilities Engineering Systems Command Marianas? s (NAVFACMAR) area of responsibility (AOR)
Solicitation number
N4019225R9006
Issued by

About this file

Attachment H is a Facilities Maintenance Construction Design Experience Project Data Sheet designed to capture detailed project experience information for a Naval Facilities Engineering Systems Command (NAVFAC) Marianas solicitation. The document provides a comprehensive template for contractors to document their past project experience, including sections for project identification, contract type, work performed, project details, and self-performed work percentages.

The form allows contractors to detail up to five maintenance/construction or design projects, with specific fields to describe project characteristics such as contract type (e.g., Design-Build, Design-Bid-Build), award amounts, work type (new construction, renovation, repair), and project-specific details. Key information includes capturing the firm's role (prime/subcontractor), contract numbers, project locations, award and completion dates, and a narrative explanation of project relevance to the current NAVFAC Marianas solicitation N4019225R9006, which seeks two single-award Indefinite-Delivery/Indefinite Quantity (IDIQ) Job Order Contracts for construction and repair services across various NAVFAC Marianas locations.

View the file

Other files

File Type Posted
Attachment F_Coefficient Cost Breakdown_blank_rev1.xlsx XLSX spreadsheet
Attachment G_Table 3. Sample Coefficient Breakdown_rev1.pdf PDF
Attachment K - Section 01 00 00 - General Requirements (Continuation)_rev2.pdf PDF
Exhibit A_PPI Response Notice 4.pdf PDF
N4019225R9006_Amd 0005.pdf PDF
N4019225R9006_Amd 0004.pdf PDF
Attachment D - Table 1. Sample ELIN Price Schedule - Blue_rev1.pdf PDF
Exhibit A_PPI Response Notice 3.pdf PDF
Attachment E - Table 1. Sample ELIN Price Schedule - Gold_rev1.pdf PDF
N4019225R9006_Amd 0003.pdf PDF
Exhibit A_PPI Response Notice 2.pdf PDF
Exhibit A_PPI Response Notice 1.pdf PDF
N4019225R9006_Amd 0002.pdf PDF
Attachment J_JOC Construction and Design Specifications (Technical RFP)_rev1_28AUG25.pdf PDF
N4019225R9006_Amd 0001.pdf PDF
Attachment K - Section 01 00 00 - General Requirements (Continuation)_rev1.pdf PDF
Attachment C_Price Proposal Schedule.xlsx XLSX spreadsheet
Attachment D - Table 1. Sample ELIN Price Schedule - Blue.pdf PDF
Attachment F_Coefficient Cost Breakdown_blank.xlsx XLSX spreadsheet
Attachment I_Past Performance Questionnaire (PPQ).docx DOCX document
Attachment J_JOC Construction and Design Specifications (Technical RFP)_19JUN25.pdf PDF
Attachment B_PPI Tracker.xlsx XLSX spreadsheet
Attachment G_Table 3. Sample Coefficient Breakdown.pdf PDF
N4019225R9006 JOC Solicitation.pdf PDF
Attachment E - Table 2. Sample ELIN Price Schedule - Gold.pdf PDF
Attachment K_Section 01 00 00 - General Requirements (Continuation).pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT H

FACILITIES MAINTENANCE / CONSTRUCTION & DESIGN EXPERIENCE

PROJECT DATA SHEET

Project No. (check one) : |_| MX/CON #1 |_| MX/CON #2 |_| MX/CON #3 |_| MX/CON #4 |_| MX/CON #5

|_| DESIGN #1 |_| DESIGN #2 |_| DESIGN #3 |_| DESIGN #4 |_| DESIGN #5

1. Experience for: |_| Offeror |_| Joint-Venture |_| Other (Explain)

Firm Name:

Address:

Phone Number:

DUNS Number:

Point of Contact: Contact Phone Number:

2. Work Performed as: |_| Prime Contractor |_| Sub Contractor |_| Joint Venture |_| Other (Explain)

Percent of project work performed:

If subcontractor, who was prime (Name/Phone #):

3. Contract Number: Delivery/Task Order Number:

Title:

Location:

4. Award Date (mm/dd/yy): Completion Date (mm/dd/yy):

5. Type of work:

|_| New Construction |_| Renovation |_| Repair |_| Alteration |_| Facilities Maintenance |_| Other (explain):

6. Type of Contract/Task Order: (Check ALL that apply)

|_| Firm-Fixed Price |_| Cost/Time and Material |_| Other (explain):

Complete Block 7 for Construction Projects. Complete Block 8 for Design Projects.

7. Facilities Maintenance / Construction Project:

Award Amount: Final Price:

Type of Contract/Task Order: (Check ALL that apply)

|_| Design-Build |_| Design-Bid-Build |_| Delivery/Task Order (IDIQ) |_| Other (explain):

If Design-Build, identify the Lead Design Firm:______________________________________________

8. Design Project:

A/E Design Fee: Total Construction Value:

Type of Contract/Task Order: (Check ALL that apply)

|_| Design-Build |_| RFP Development |_| Designer of Record |_| Engineering Services |_| Full Plans & Specs

|_| Other (explain):

9. Provide a detailed description of the project and the relevancy to the project requirements of this RFP (i.e.: unique features, square footage, construction methods), including any sustainable features or Third Party sustainable certifications. If design-build, include a description of the design-effort.

10. Provide a detailed description of what work your firm self-performed on this project:

Self performed work: ___________% Subcontracted work: ___________%

11. Other Information:

Attachment H (April 2022)
Page 1 of 3

File details come from the government source that posted it. Updated .