About this file

This document is a Price Schedule for a Gold Job Order Contract (JOC) for Ordering Period 1, detailing various line items across primary, secondary, and tertiary locations. The price schedule includes pre-priced and non-pre-priced items with different multipliers for Over-the-Road (OTR) and Escort services. The Electronic Line Item Numbers (ELINs) range from A0001 to A0012, with Estimated Value Weights (EVW) for each line item, such as $10,000,000.00 for pre-priced line items at the primary location and $3,000,000.00 for non-pre-priced items at the primary location. The contractor is required to fill in a coefficient for each line item, with the calculated amount determined by multiplying the EVW by the coefficient. The subtotal for the base period represents the sum of all ELIN dollar amounts.

View the file

Other files

File Type Posted
Attachment F_Coefficient Cost Breakdown_blank_rev1.xlsx XLSX spreadsheet
Attachment G_Table 3. Sample Coefficient Breakdown_rev1.pdf PDF
Attachment K - Section 01 00 00 - General Requirements (Continuation)_rev2.pdf PDF
Exhibit A_PPI Response Notice 4.pdf PDF
N4019225R9006_Amd 0005.pdf PDF
N4019225R9006_Amd 0004.pdf PDF
Attachment D - Table 1. Sample ELIN Price Schedule - Blue_rev1.pdf PDF
Exhibit A_PPI Response Notice 3.pdf PDF
N4019225R9006_Amd 0003.pdf PDF
Exhibit A_PPI Response Notice 2.pdf PDF
Exhibit A_PPI Response Notice 1.pdf PDF
N4019225R9006_Amd 0002.pdf PDF
Attachment J_JOC Construction and Design Specifications (Technical RFP)_rev1_28AUG25.pdf PDF
N4019225R9006_Amd 0001.pdf PDF
Attachment K - Section 01 00 00 - General Requirements (Continuation)_rev1.pdf PDF
Attachment C_Price Proposal Schedule.xlsx XLSX spreadsheet
Attachment D - Table 1. Sample ELIN Price Schedule - Blue.pdf PDF
Attachment F_Coefficient Cost Breakdown_blank.xlsx XLSX spreadsheet
Attachment I_Past Performance Questionnaire (PPQ).docx DOCX document
Attachment J_JOC Construction and Design Specifications (Technical RFP)_19JUN25.pdf PDF
Attachment B_PPI Tracker.xlsx XLSX spreadsheet
Attachment G_Table 3. Sample Coefficient Breakdown.pdf PDF
Attachment H_Facilities Maintenance Construction Design Experience Project Data Sheet.docx DOCX document
N4019225R9006 JOC Solicitation.pdf PDF
Attachment E - Table 2. Sample ELIN Price Schedule - Gold.pdf PDF
Attachment K_Section 01 00 00 - General Requirements (Continuation).pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRICE SCHEDULE - GOLD JOC

EVW COEFFICIENT

(USG Given) (Contractor fill-in)

Pre-priced line items

Primary Location

Non-pre-priced items

Primary Location

MULTIPLIER OTR

Primary Location

MULTIPLIER Escort

Primary Location

Pre-priced line items

Secondary Location

Non-pre-priced items

Secondary Location

MULTIPLIER OTR

Secondary Location

MULTIPLIER Escort

Secondary Location

Pre-priced line items

Tertiary Location

Non-pre-priced items

Tertiary Location

MULTIPLIER OTR

Tertiary Location

MULTIPLIER Escort

Tertiary Location

$ = (Sum of ELIN $ amounts)Subtotal for Base Period: Ordering Period 1

A0011 $100,000.00 (=/> 0.000) $ = (EVW x Coef)

A0012 $100,000.00 (=/> 0.000) $ = (EVW x Coef)

A0009 $1,000,000.00 $ = (EVW x Coef)

A0010 $500,000.00 (=/> 1.000) $ = (EVW x Coef)

A0007 $250,000.00 (=/> 0.000) $ = (EVW x Coef)

A0008 $250,000.00 (=/> 0.000) $ = (EVW x Coef)

A0005 $4,000,000.00 $ = (EVW x Coef)

A0006 $1,000,000.00 (=/> 1.000) $ = (EVW x Coef)

A0003 $750,000.00 (=/> 0.000) $ = (EVW x Coef)

A0004 $750,000.00 (=/> 0.000) $ = (EVW x Coef)

A0001 $10,000,000.00 $ = (EVW x Coef)

A0002 $3,000,000.00 (=/> 1.000) $ = (EVW x Coef)

ATTACHMENT E

Revised Sample ELIN Price Schedule - GOLD

Base Period: Ordering Period 1

ELIN No. ELIN Description Calculated Amount (fill-in)

File details come from the government source that posted it. Updated .