This document is a Price Schedule (Attachment D) for a Blue Job Order Contract (JOC) for Ordering Period 1, detailing multiple line items across primary, secondary, and tertiary locations. The schedule includes pre-priced and non-pre-priced items with associated Expected Value Weights (EVW) and coefficients. Line items cover various categories such as Pre-priced line items, Non-pre-priced items, MULTIPLIER OTR (Over the Road), and MULTIPLIER Escort, with monetary values ranging from $100,000 to $10,000,000.

The pricing mechanism follows a formula of $ = (EVW x Coefficient) + EVW, with some line items having a specified coefficient threshold (=/> 0.000 or =/> 1.000). The base period covers Ordering Period 1, and the total subtotal is calculated as the sum of all ELIN (Element Line Item Number) dollar amounts. The document provides a structured template for contractors to fill in coefficients and calculate final amounts for each line item across different location types.

View the file

Other files

File Type Posted
Exhibit A_PPI Response Notice 4.pdf PDF
N4019225R9006_Amd 0005.pdf PDF
Attachment F_Coefficient Cost Breakdown_blank_rev1.xlsx XLSX spreadsheet
Attachment G_Table 3. Sample Coefficient Breakdown_rev1.pdf PDF
Attachment K - Section 01 00 00 - General Requirements (Continuation)_rev2.pdf PDF
Exhibit A_PPI Response Notice 3.pdf PDF
Attachment E - Table 1. Sample ELIN Price Schedule - Gold_rev1.pdf PDF
N4019225R9006_Amd 0004.pdf PDF
Attachment D - Table 1. Sample ELIN Price Schedule - Blue_rev1.pdf PDF
N4019225R9006_Amd 0003.pdf PDF
Exhibit A_PPI Response Notice 2.pdf PDF
N4019225R9006_Amd 0002.pdf PDF
Exhibit A_PPI Response Notice 1.pdf PDF
N4019225R9006_Amd 0001.pdf PDF
Attachment K - Section 01 00 00 - General Requirements (Continuation)_rev1.pdf PDF
Attachment J_JOC Construction and Design Specifications (Technical RFP)_rev1_28AUG25.pdf PDF
N4019225R9006 JOC Solicitation.pdf PDF
Attachment E - Table 2. Sample ELIN Price Schedule - Gold.pdf PDF
Attachment K_Section 01 00 00 - General Requirements (Continuation).pdf PDF
Attachment C_Price Proposal Schedule.xlsx XLSX spreadsheet
Attachment F_Coefficient Cost Breakdown_blank.xlsx XLSX spreadsheet
Attachment I_Past Performance Questionnaire (PPQ).docx DOCX document
Attachment J_JOC Construction and Design Specifications (Technical RFP)_19JUN25.pdf PDF
Attachment B_PPI Tracker.xlsx XLSX spreadsheet
Attachment G_Table 3. Sample Coefficient Breakdown.pdf PDF
Attachment H_Facilities Maintenance Construction Design Experience Project Data Sheet.docx DOCX document
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRICE SCHEDULE - BLUE JOC

EVW COEFFICIENT

(USG Given) (Contractor fill-in)

Pre-priced line items

Primary Location

Non-pre-priced items

Primary Location

MULTIPLIER OTR

Primary Location

MULTIPLIER Escort

Primary Location

Pre-priced line items

Secondary Location

Non-pre-priced items

Secondary Location

MULTIPLIER OTR

Secondary Location

MULTIPLIER Escort

Secondary Location

Pre-priced line items

Tertiary Location

Non-pre-priced items

Tertiary Location

MULTIPLIER OTR

Tertiary Location

MULTIPLIER Escort

Tertiary Location

$ = (Sum of ELIN $ amounts)

Base Period: Ordering Period 1

ATTACHMENT D

Sample ELIN Price Schedule - BLUE

A0012 $100,000.00 (=/> 0.000) $ = (EVW x Coef) + EVW

Subtotal for Base Period: Ordering Period 1

A0010 $500,000.00 (=/> 1.000)

A0011 $100,000.00 (=/> 0.000) $ = (EVW x Coef) + EVW

A0008 $250,000.00 (=/> 0.000) $ = (EVW x Coef) + EVW

A0009 $1,000,000.00 $ = (EVW x Coef) + EVW

A0006 $1,000,000.00 (=/> 1.000)

A0007 $250,000.00 (=/> 0.000) $ = (EVW x Coef) + EVW

A0004 $750,000.00 (=/> 0.000) $ = (EVW x Coef) + EVW

A0005 $4,000,000.00 $ = (EVW x Coef) + EVW

A0002 $3,000,000.00 (=/> 1.000)

A0003 $750,000.00 (=/> 0.000) $ = (EVW x Coef) + EVW