About this file

Attachment F is a blank Coefficient Cost Breakdown Excel spreadsheet related to Naval Facilities Engineering Systems Command Marianas (NAVFACMAR) Solicitation N4019225R9006. The solicitation is for two single-award Firm-Fixed Price (FFP) Indefinite-Delivery/Indefinite Quantity (IDIQ) Job Order Contracts (JOC) designated as BLUE JOC and GOLD JOC, covering construction and repair services across various NAVFAC Marianas locations. The contracts will involve design-build and design-bid-build services, including minor construction, alteration, material sampling, testing, and hazardous material removal, with unit prices and bid price coefficients based on R.S. Means pricing standards. The spreadsheet appears to be a template for contractors to detail their cost coefficients for potential task order pricing, though the specific details of the blank template are not elaborated in the provided document.

View the file

Other files

File Type Posted
Attachment F_Coefficient Cost Breakdown_blank_rev1.xlsx XLSX spreadsheet
Attachment G_Table 3. Sample Coefficient Breakdown_rev1.pdf PDF
Attachment K - Section 01 00 00 - General Requirements (Continuation)_rev2.pdf PDF
N4019225R9006_Amd 0005.pdf PDF
Exhibit A_PPI Response Notice 4.pdf PDF
N4019225R9006_Amd 0004.pdf PDF
Attachment D - Table 1. Sample ELIN Price Schedule - Blue_rev1.pdf PDF
Attachment E - Table 1. Sample ELIN Price Schedule - Gold_rev1.pdf PDF
Exhibit A_PPI Response Notice 3.pdf PDF
N4019225R9006_Amd 0003.pdf PDF
Exhibit A_PPI Response Notice 2.pdf PDF
Exhibit A_PPI Response Notice 1.pdf PDF
N4019225R9006_Amd 0002.pdf PDF
Attachment J_JOC Construction and Design Specifications (Technical RFP)_rev1_28AUG25.pdf PDF
N4019225R9006_Amd 0001.pdf PDF
Attachment K - Section 01 00 00 - General Requirements (Continuation)_rev1.pdf PDF
Attachment B_PPI Tracker.xlsx XLSX spreadsheet
Attachment G_Table 3. Sample Coefficient Breakdown.pdf PDF
Attachment H_Facilities Maintenance Construction Design Experience Project Data Sheet.docx DOCX document
Attachment C_Price Proposal Schedule.xlsx XLSX spreadsheet
Attachment D - Table 1. Sample ELIN Price Schedule - Blue.pdf PDF
Attachment I_Past Performance Questionnaire (PPQ).docx DOCX document
Attachment J_JOC Construction and Design Specifications (Technical RFP)_19JUN25.pdf PDF
Attachment E - Table 2. Sample ELIN Price Schedule - Gold.pdf PDF
Attachment K_Section 01 00 00 - General Requirements (Continuation).pdf PDF
N4019225R9006 JOC Solicitation.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A0001,0002,0005,0006,0009,0010

Attachment F
Coefficient Breakdown Sheet
ELIN A0001 - Primary Location
Pre-Priced CostsMaterialsLaborEquipmentAmount
RS Means Bare Cost
(Presumed Annual Amount)$0.00
DIRECT COSTS
Worker's Compensation Insurance
Average Fixed Labor
Project Overhead Pre-Priced
Material Mark-up
Equipment Mark-up
City Cost Index (CCI)
SUBTOTAL
OTHER COSTS
General & Administrative
Profit
SUBTOTAL OTHER COSTS
TOTAL DIRECT & OTHER COSTS$0.00
Coefficient Factor
RS Means Bare Cost (Production/Discount - Factor)
PRE-PRICE COEFFICIENT$0.00
ERROR:#DIV/0!
ELIN A0002 - Primary Location
Non Pre-Priced CostsMaterialsLaborEquipmentAmount
Non Pre-Priced Bare Costs
(Presumed Annual Amount)$0.00
Worker's Compensation Insurance
Average Fixed Labor
Project Overhead Non Pre-Priced
Material Mark-up
Equipment Mark-up
SUBTOTAL
OTHER COSTS
General & Administrative
Profit
SUBTOTAL OTHER COSTS
TOTAL DIRECT & OTHER COSTS$0.00
BARE COST

NON PRE-PRICE COEFFICIENT

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .