Attachment F_Coefficient Cost Breakdown_blank.xlsx
XLSX spreadsheet 26 KB Posted
- Solicitation number
- N4019225R9006
About this file
Attachment F is a blank Coefficient Cost Breakdown Excel spreadsheet related to Naval Facilities Engineering Systems Command Marianas (NAVFACMAR) Solicitation N4019225R9006. The solicitation is for two single-award Firm-Fixed Price (FFP) Indefinite-Delivery/Indefinite Quantity (IDIQ) Job Order Contracts (JOC) designated as BLUE JOC and GOLD JOC, covering construction and repair services across various NAVFAC Marianas locations. The contracts will involve design-build and design-bid-build services, including minor construction, alteration, material sampling, testing, and hazardous material removal, with unit prices and bid price coefficients based on R.S. Means pricing standards. The spreadsheet appears to be a template for contractors to detail their cost coefficients for potential task order pricing, though the specific details of the blank template are not elaborated in the provided document.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A0001,0002,0005,0006,0009,0010
| Attachment F | ||||||
| Coefficient Breakdown Sheet | ||||||
| ELIN A0001 - Primary Location | ||||||
| Pre-Priced Costs | Materials | Labor | Equipment | Amount | ||
| RS Means Bare Cost | ||||||
| (Presumed Annual Amount) | $0.00 | |||||
| DIRECT COSTS | ||||||
| Worker's Compensation Insurance | ||||||
| Average Fixed Labor | ||||||
| Project Overhead Pre-Priced | ||||||
| Material Mark-up | ||||||
| Equipment Mark-up | ||||||
| City Cost Index (CCI) |
| SUBTOTAL |
| OTHER COSTS |
| General & Administrative |
| Profit |
| SUBTOTAL OTHER COSTS | |
| TOTAL DIRECT & OTHER COSTS | $0.00 |
| Coefficient Factor | |
| RS Means Bare Cost (Production/Discount - Factor) |
| PRE-PRICE COEFFICIENT | $0.00 |
| ERROR:#DIV/0! |
| ELIN A0002 - Primary Location | ||||||
| Non Pre-Priced Costs | Materials | Labor | Equipment | Amount | ||
| Non Pre-Priced Bare Costs | ||||||
| (Presumed Annual Amount) | $0.00 | |||||
| Worker's Compensation Insurance | ||||||
| Average Fixed Labor | ||||||
| Project Overhead Non Pre-Priced | ||||||
| Material Mark-up | ||||||
| Equipment Mark-up |
| SUBTOTAL |
| OTHER COSTS |
| General & Administrative |
| Profit |
| SUBTOTAL OTHER COSTS | |
| TOTAL DIRECT & OTHER COSTS | $0.00 |
| BARE COST |
NON PRE-PRICE COEFFICIENT
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .