This is a drawing revision document for the Mechanical Repairs Building TT113 project (Contract N4008523B0044). The document provides PPI Revision 03 dated 31 March 2026 and specifies updates to six NAVFAC architectural and mechanical drawings.
The revisions include replacements and updates to the following drawings: NAVFAC No. 60042047 (I-111 Finish Plan) to show Corridor 153 floor finish with LVP-1 material; NAVFAC No. 60042049 (I-601 Schedules & Legends) to revise the Room Finish Schedule for Corridor 153; NAVFAC No. 60042066 (MH101 First Floor Plan – Overall – Mechanical HVAC); NAVFAC No. 60042069 (MH104 First Floor Plan – West Wing – Mechanical HVAC); NAVFAC No. 60042070 (MH105 Attic Plan – Overall – Mechanical HVAC); and NAVFAC No. 60042073 (MH108 Attic Plan – West Wing – Mechanical HVAC). All drawings are to be replaced with revision 3 dated 31 March 2026, with specific mechanical HVAC and finish schedule revisions as indicated on each plan. This document serves as a construction drawing revision set for mechanical repair work on Building TT113.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend 0015.pdf | ||
| Amend 0014.pdf | ||
| Amend 0013.pdf | ||
| Amend 0012.pdf | ||
| M-202-T.pdf | ||
| 60042049 _Rev03.pdf | ||
| 60042073_Rev03.pdf | ||
| Amend 0011.pdf | ||
| 60042066_Rev03.pdf | ||
| 60042069_Rev03.pdf | ||
| 60042070_Rev03.pdf | ||
| 60042047 _Rev03.pdf | ||
| Amend 0010.pdf | ||
| Amend 0010 Enclosure 3 DWGS.pdf | ||
| Amend 0010 Enclosure 1 DWG List.pdf | ||
| Amend 0009.pdf | ||
| Amend 0008.pdf | ||
| Amend 0004.pdf | ||
| Amend 0007.pdf | ||
| Amend 0006.pdf | ||
| Amend 0005.pdf | ||
| Amend 0003.pdf | ||
| Amend 0002 SECTION 01 31 50 TRANSFER AND ACCEPTANCE OF MILITARY REAL PROPERTY.pdf | ||
| Amend 0002.pdf | ||
| Amend 0001.pdf | ||
| 230044 Termite Inspection Report.pdf | ||
| N4008523B0044 Specs.pdf | ||
| Mech MACC RFP.pdf | ||
| N4008523B0044 Dwgs.pdf | ||
| 230044 Basis of Design.pdf | ||
| 230044 SID Binder.pdf | ||
| 230044 Lead and Asbesto Report.pdf | ||
| 230044 APPD.pdf |
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MECHANICAL REPAIRS BUILDING TT113
N4008523B0044
PPI REVISION 03
31 MARCH 2026
DRAWINGS:
NAVFAC No. 60042047, I-111, FINISH PLAN
REPLACE: Replace existing sheet with sheet including revision 3 dated 31 March 2026
- Revise: A1/I-111 Finish Plan to show Corridor 153 floor finish (LVP-1)
NAVFAC No. 60042049, I-601, SCHEDULES & LEGENDS
- Revise: Revise Room Finish Schedule to include finishes for Corridor 153
NAVFAC No. 60042066, MH101, FIRST FLOOR - OVERALL – MECHANICAL HVAC
- Revise: Revise A1/MH101 First Floor Plan – Overall – Mechanical HVAC as indicated
NAVFAC No. 60042069, MH104, FIRST FLOOR PLAN – WEST WING – MECHANICAL HVAC
- Revise: Revise B1/MH104 First Floor Plan – West Wing – Mechanical HVAC as indicated
NAVFAC No. 60042070, MH105, ATTIC PLAN – OVERALL – MECHANICAL HVAC
- Revise: Revise A1/MH105 Attic Plan – Overall – Mechanical HVAC as indicated
NAVFAC No. 60042073, MH108, ATTIC PLAN – WEST WING – MECHANICAL HVAC
- Revise: Revise B1/MH108 Attic Plan – West Wing – Mechanical HVAC as indicated