230044 SID Binder.pdf
PDF 2 MB Posted
- Attached to
- Mechanical Repairs Bldg TT113 CDC
- Solicitation number
- N4008526R9010
About this file
This is a Structural Interior Design (SID) Package for the TT113 Child Development Center Renovation at Marine Corps Base Camp Lejeune, North Carolina, serving as the final submittal for June 2025.
The package establishes interior design standards and finishes for the renovation project, which must comply with Navy and Marine Corps Design Procedures (FC 1-300-09N), DoD Building Code (UFC 1-200-01), High Performance and Sustainable Building Requirements (UFC 1-200-02), and Interior Design standards (UFC 3-120-10). The project prioritizes aesthetics, sustainability, and durability for a child development center environment. Floor finishes include attached cushion carpet tile (CPT-1: Tarkett Aftermath II, Potpourri, 24" x 24" vertical ashlar pattern) and luxury vinyl tile (LVT-1: Tarkett Heritage Plank, Antique Cimarron, 6" x 36"). Wall finishes consist of painted drywall (PNT-1: Sherwin Williams Ecru SW 6135 primary walls; PNT-4: Sherwin Williams Utterly Beige SW 6080 for door frames). Ceiling treatments include acoustical mineral fiber tiles with minimum NRC of 0.85 in designated areas and painted gypsum in restrooms. Additional finishes specified include rubber base (RB-1: Johnsonite Welsh Castle), solid surface countertops (SS-1: LX Hausys HIMACS Wallowa G157), plastic laminate casework (PLAM-1: iShopRugby Shaker Sand), blackout roller shades (WS-1: Draper Flocke), and HDPE toilet partitions. Design meetings held December 19, 2024 (35% review) and March 11, 2025 (65% review) addressed finish selections, deletion of paint requirements for the communications/CCTV room (122), standardization of finishes across the facility, and childcare-specific requirements including integrated cabinet pulls and emergency-only blackout shade usage per accreditation regulations. The interior design team, led by Jamie Kissel, NCIDQ, CID of Within Interior Design, coordinated with MBF Architects and Marine Corps Base personnel including Kelly Root (Architectural Supervisor), Steven McNeill (Project Manager), and Beth Weinbrenner (Construction Project Manager).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend 0015.pdf | ||
| Amend 0014.pdf | ||
| Amend 0013.pdf | ||
| Amend 0012.pdf | ||
| M-202-T.pdf | ||
| 60042049 _Rev03.pdf | ||
| 60042066_Rev03.pdf | ||
| Amend 0011.pdf | ||
| 60042073_Rev03.pdf | ||
| 60042069_Rev03.pdf | ||
| 60042047 _Rev03.pdf | ||
| 60042070_Rev03.pdf | ||
| N4008523B0044 PPI Revision 03.pdf | ||
| Amend 0010 Enclosure 3 DWGS.pdf | ||
| Amend 0010 Enclosure 1 DWG List.pdf | ||
| Amend 0010.pdf | ||
| Amend 0009.pdf | ||
| Amend 0008.pdf | ||
| Amend 0004.pdf | ||
| Amend 0007.pdf | ||
| Amend 0006.pdf | ||
| Amend 0005.pdf | ||
| Amend 0003.pdf | ||
| Amend 0002 SECTION 01 31 50 TRANSFER AND ACCEPTANCE OF MILITARY REAL PROPERTY.pdf | ||
| Amend 0002.pdf | ||
| Amend 0001.pdf | ||
| 230044 Termite Inspection Report.pdf | ||
| Mech MACC RFP.pdf | ||
| N4008523B0044 Specs.pdf | ||
| 230044 Basis of Design.pdf | ||
| N4008523B0044 Dwgs.pdf | ||
| 230044 Lead and Asbesto Report.pdf | ||
| 230044 APPD.pdf |
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
interior design within
TT113 Mechanical Repairs Marine Corps Base, Camp Lejeune, NC
Structural Interior Design Package Final Submittal June 2025
TT113 Mechanical Repairs Marine Corps Base, Camp Lejeune, NC Structural Interior Design Package
Table of Contents
1. Point of Contact List
2. Narrative of Interior Design Objectives
3. Meeting Minutes
4. Finish Plans & Schedules
5. Finish Boards
TT113 Mechanical Repairs Marine Corps Base, Camp Lejeune, NC Structural Interior Design Package
Point of Contact List Architect Supervisor Kelly E. Root, RA, NCARB Architectural Supervisor, Design Branch Public Works Division Marine Corps Base Camp Lejeune
(910) 238-6476 kelly.root@usmc.mil
Facilities Management Beth P. Weinbrenner Construction Project Manager Facilities & Maintenance Divison MCCS Lejeune-New River
(910) 451-1310 beth.weinbrenner@USMC-MCCS.org
Project Manager Steven Mcneill Mechanical Engineering Bldg 1005, Public Works Division, Design Branch Marine Corps Base, Camp Lejeune
(580) 458-7516 steven.mcneill@usmc.mil
A&E Project Manager John Schmied MBF Architects 317-C Pollock Street New Bern, NC 28560
(252) 637-6373 schmied@mbfarchitects.com
A&E Interior Designer Jamie Kissel, NCIDQ, CID Within Interior Design, Inc.
1008 Granby Street Norfolk, VA 23510
(757) 224-0489 jkissel@withindesigns.com
TT113 Mechanical Repairs Marine Corps Base, Camp Lejeune, NC Structural Interior Design Package
SID Narrative
INTERIOR DESIGN CRITERIA
Interior Design work will comply with the latest edition of the following codes and standards:
FC 1-300-09N Navy & Marine Corps Design Procedures UFC 1-200-01 DoD Building Code UFC 1-200-02 High Performance and Sustainable Building Requirements UFC 1-300-09N Design Procedures UFC 3-120-01 Design: Sign Standards UFC 3-120-10 Interior Design UFC 4-740-06 Youth Centers
STRUCTURAL INTERIOR DESIGN
The TT113 Child Development Center Renovation an Camp Lejeune, NC requires interior finishes that have a balance between aesthetics and sustainability, as well as durability that can withstand the inherent day to day operating environment for staff and patrons utilizing the facility. To meet these objectives, the SID package will use all the general requirements for interior finishes that have been applied in similar facilities, as well as best practices recommended by manufacturers for areas requiring enhanced durability. Standard SID finishes will be used as requested by the activity.
The SID package will provide a variety of floor finishes throughout including attached cushion carpet tile and luxury vinyl tile.
Interior partitions will primarily be painted drywall.
Acoustical ceiling tiles on a suspended grid will provide high quality sound absorption in designated areas with easy access to mechanical and plumbing above. The square edge lay-in tiles are a moisture resistant mineral fiber and have a minimum NRC of 0.85, CAC of 35, and a light reflectance of 0.86. Restrooms will have painted gypsum ceiling.
Interior signage will be provided throughout the facility to form a well-organized, comprehensive interior environment that guides users and visitors through the building.
TT113 Mechanical Repairs Marine Corps Base, Camp Lejeune, NC Structural Interior Design Package
Meeting Minutes
1 | P a g e
1008 Granby Street | Norfolk, VA 23510 | 757.224.0489
MEETING MINUTES
Project: TT113 Mechanical Repairs Meeting: 35% Review Meeting Date: December 19th, 2024 Location: Public Works at MCB Camp Lejeune, NC
PROJECT TEAM IN ATTENDANCE:
Architecture MBF Architects (252) 637-6373 Civil Engineer Avolis Engineering (252) 633-0068 Structural Engineer Kaydos-Daniels Engineers (919) 828-4966 Mechanical/Electrical/Plumbing Crenshaw Consulting (919) 871-1070 Fire Protection Jensen Hughes (757) 213-6856 Geotechnical ECS Southeast (757) 366-5100 Cost Estimating Aiken Cost Consultants (864) 232-9342 Interior Design Within Interior Design (757) 224-0489
Below are the Interior Design items that were addressed during the 35% Review Meeting.
35% REVIEW COMMENTS
REVIEWER: KELLY ROOT
Item #8 I-111: I suggest keeping 1 carpet type, 1 LVT type, and 1 or two tile types depending on use. Makes it easier for replacement later on and cost savings.
Response: Concur.
REVIEWER: BETH WEINBRENNER
Item #17 I-111: The Family Care Program Team felt that LVT-1 and LVT-2 would ALL be the same, not 2 styles/looks.
Whether or not combined, could Rm 123 Storage LVT be the same as corridor LVT
Response: Concur. LVT will be the same throughout
Item #18 I-111: They thought the front Vestibule and Rm 117 Resource/Referral would also be LVT
(not CPT-1).
Response: Concur on Rm 117. However, the entry vestibule is actually showing CPT2 which is a walk-off carpet. Please confirm if you'd still like us to change Vestibule 115 to LVT.
Activity confirmed walk-off carpet is acceptable in Vestibule 115.
2 | P a g e
Item #19 I-602: I didn’t see “Finger Pinch” guards for doors listed anywhere. Maybe they’re already in place.
Response: Concur. Finger pinch guards will be added to the finish legend and the Wall & Door Protection spec (10 26 00).
REVIEWER: TIM VANNOY / MATT SATOR
Item #17 I-601: If rm 122 COMM/CCTV RM is painted or sanded all telecom must be covered, do not paint backboard
Response: Concur. We will add a GENERAL NOTE detailing these instructions.
Item #18 I-601: If faceplates removed from walls for painting, then contractor must mark/tape each cable with designated jack number. All cabling will be required to re-tested (per 27 10 00) from faceplate to patch panel.
Response: Concur. This statement will be added to our GENERAL NOTES.
ACTION ITEMS
1. 65% Submittal due 2/13/25.
Meeting: 65% Review Meeting Date: March 11th, 2025 Location: Public Works at MCB Camp Lejeune, NC
PROJECT TEAM IN ATTENDANCE:
Architecture MBF Architects (252) 637-6373 Civil Engineer Avolis Engineering (252) 633-0068 Structural Engineer Kaydos-Daniels Engineers (919) 828-4966 Mechanical/Electrical/Plumbing Crenshaw Consulting (919) 871-1070 Fire Protection Jensen Hughes (757) 213-6856 Geotechnical ECS Southeast (757) 366-5100 Cost Estimating Aiken Cost Consultants (864) 232-9342
Below are the Interior Design items that were addressed during the 65% Review Meeting.
35% REVIEW COMMENTS
REVIEWER: KELLY ROOT
Item #1 I-111: Wondering if we should show the finishes by phases so the contractor expects the installers to come back for each phase.
Response: Discuss during review meeting.
MBF agreed this can be sorted out separately – Will discuss in more detail during SID finishes presentation to the Activity.
REVIEWER: MATT SATOR / TIM VANNOY
Item #2 Interior Design, finish plan (multiple sheets): Note J and K – I thought there was some discussion that Comm rm (122) did not need to be painted.
Response: Concur. Paint finish will be removed from finish schedule for Comm Rm 112.
REVIEWER: BETH WEINBRENNER
Item #7 I-111 & I-601: Is it LVT-1 (Tile) or LVP-(Plank/wood look)? CDC says it looks like wood, so shouldn’t it say “LVP-1”?
Response: Concur.
Item #8 I-601: I didn’t see “Finger Pinch” guards for doors listed anywhere. Maybe they’re already in place.
Response: Concur. This has been added to the finish legend as "HW-2".
ACTION ITEMS
1. Pre-Final Submittal due 4/21/25.
2. WID & MBF to schedule finish scheme presentation to the activity prior to Pre-Final submittal.
Meeting: SID Finishes Review Meeting Date: April 3rd , 2025 (Thursday) Location: Public Works at MCB Camp Lejeune, NC
PROJECT TEAM IN ATTENDANCE:
Facilities Management (Beth W.) MCCS Camp Lejeune (910) 381-4895 Project Manager (Steve Mcneill) Public Works Division (580) 458-7516 Arch Supervisor (Kelly Root) Public Works Division (910) 238-6476 Activity (Kim Gipson) - -
FINISHES REVIEW COMMENTS
• Two schemes prepared by Within were not presented due to existing standardized finishes.
• Within team was asked to populate finish legend with standardized finishes.
• The following items were sent to Within team by the activity. All finishes are standardized
(PNT-1, PNT-4, RB-1, LVT-1, CPT-1, SS-1 and PLAM-1).
• PNT-1 (Primary Walls) – Sherwin Williams - Ecru SW 6135 (208-C2) – standardized finish.
• PNT-4 (Door Frames) – Sherwin Williams - Utterly Beige SW 6080 (198-C3) - standardized finish.
• RB-1 (Rubber Base) – Tarkett/Johnsonite - TA8 Welsh Castle CB - standardized finish.
• LVT-1 (Luxury Vinyl Tile) – Tarkett - Antique Cimarron PEHP GW29 TG 6”x36” (Heritage Plank).
• CPT-1 (Carpet Tile) – Tarkett - 03026 Aftermath II, 23510 Potpourri.
• SS-1 (Solid Surface) – Countertops – LX Hausys – HIMACS - Wallowa G157, Classic, Solid surface with 4” backsplash.
• PLAM-1 (Plastic Laminate) – Ishoprugby - Shaker Sand (SS), Premier Series.
• A walk-off carpet will not be needed.
• Activity suggested a need for Blackout Roller Shades with the lowering system that is accessible to adults only. Chain operated shades are not acceptable. The activity preferred lighter blackout roller shades (matching to standard rubber base - Tarkett/Johnsonite - TA8 Welsh Castle CB). If the light option is difficult to obtain due to custom color price, matching it to window trim (dark bronze) works well.
• Activity shared that Blackout Roller Shades could not be used at any time unless an emergency occurs. Within team will select the requested item.
• No Ceramic/Porcelain tile needed. Activity shared there is existing FRP on bathroom walls, toilet areas in children’s classrooms, scullery, kitchen and janitor’s closet walls. Luxury Vinyl tile on restroom/classroom restroom floors.
• General bathrooms’ finishes will remain the same.
• Due to accreditation regulations, walls cannot receive wall coverings or accent walls.
• Child accessible cabinetry should not receive knobs instead it should have integrated cabinet pulls.
• Activity might need toilet partitions. Once clarified, Within will provide toilet partition options.
TT113 Mechanical Repairs Marine Corps Base, Camp Lejeune, NC
Finish Plans & Schedules
FLOOR FINISH KEY
CPT-1
LVP-1
SC-1
NOT IN
SCOPE
PRETODDLER
PRETODDLER
PRETODDLER
PRETODDLER
PRETODDLER
PRETODDLER
PRETODDLER
PRETODDLER
CORRIDOR
TRAINING
SPECIALIST
STAFF TRAINING
OFFICE
DEPUTY
DIRECTOR
DIRECTOR
VESTIBULE
LOBBY
OFFICE
117A
INFANT
ADMIN
ADMIN
COMM/CCTV
STORAGE
STAFF RR
PUBLIC RR
INFANT
LAUNDRY
BREAK ROOM
JANITOR
INFANT
INFANT
INFANT
INFANT
SCULLERY
KITCHEN
ELETRICAL
MECHANICAL
DRY STORAGE
SPRINKLER
INFANT
PRESCHOOL
TODDLER
TODDLER
PRESCHOOL
PRESCHOOL
TODDLER
TODDLER
PRESCHOOL
TODDLER
CLOSET
102A
CLOSET
103A
CLOSET
104A
CLOSET
101A
CLOSET
105A
CLOSET
108A
CLOSET
107A
CLOSET
106A
CLOSET
119A
CLOSET
126A
CLOSET
134A
CLOSET
132A
CLOSET
142A
CLOSET
135A
CLOSET
133A
CLOSET
143A
CLOSET
146A
CLOSET
147A
CLOSET
150A
CLOSET
151A
CLOSET
149A
CLOSET
148A
CLOSET
145A
CLOSET
144A
CORRIDOR
CORRIDOR
RESTROOM
OFFICE
A B
C D
Fi le
P at h:
P rin t D at e:
E
SYM. DESCRIPTION DATE APP.
REVISIONS
DR.
DES.
CHK.
SUBMITTED BY:
DESIGN DIR.
APPROVED: PWO OR OICC
SATISFACTORY TO:
DATE
DATE
DEPARTMENT OF THE NAVY NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND
CAMP LEJEUNE, NORTH CAROLINA
MARINE CORPS BASE
SIZE CODE IDENT. NO. NAVFAC DRAWING NO.
E1 80091 CONSTR. CONTR. NO.
AS NOTEDSCALE SHEET
M
BF
A N
O
SPEC.
2 3 4 5 6
A B
C D
E
1 2 3 4 5 6
1008 GRANBY STREET
NORFOLK, VA 23510
757.224.0489
W :\2
TT
M ec ha ni ca l R ep ai rs
\R ev it\
_T
T1
W
ID
_R
.rv t
6/
/2
6:
:4
PM
I-111
DMR
JDK
JDK MECHANICAL REPAIRS
FINISH PLAN
60042047 N40085-23-B-0044
BUILDING TT113
4' 8' 16'0' 1/8" =1'-0"
GRAPHIC SCALE:
GENERAL NOTES
A. FINISHES INDICATED ARE THE APPROVED BASIS OF DESIGN
TO CONVEY COLOR, PATTERN, TEXTURE AND SALIENT
CHARACTERISTICS ONLY. THE LISTING OF MANUFACTURER
INFORMATION IS NOT INTENDED TO LIMIT THE SELECTION OF
PRODUCTS PROVIDED BY OTHER MANUFACTURERS.
PRODUCTS MEETING THESE CRITERIA WILL BE CONSIDERED
AND MUST BE REVIEWED BY THE INTERIOR DESIGNER OF
RECORD (IDOR) AND THE NAVFAC INTERIOR DESIGNER AND
APPROVED BY THE CONTRACTING OFFICER.
B. FINISH ITEMS ARE NOT TO BE SUBSTITUTED DUE TO
ORDERING LEAD TIMES. IT IS THE CONTRACTOR ’S
RESPONSIBILITY TO ORDER ALL MATERIALS IN TIME TO AVOID
DELAYS.
C. COORDINATE THERMOSTAT LOCATIONS WITH MECHANICAL
DRAWINGS AND CONSTRUCTION MANAGER. INSTALL
THERMOSTATS NEAR A CORNER OF THE ROOM OR BY LIGHT
SWITCHES. DO NOT INSTALL THERMOSTATS IN THE CENTER
OF A WALL.
D. ALL INTERIOR FINISHES IN VERTICAL EXIT WAYS, EXIT
LOBBIES, AND EXIT CORRIDORS MUST MEET MINIMUM CLASS
A RATING.
E. ALL MATERIALS/PRODUCTS ARE TO BE INSTALLED PER
MANUFACTURER'S INSTALLATION REQUIREMENTS.
F. SPRAY PAINT ELECTRICAL PANELS, ACCESS PANELS, AND
EXPANSION JOINTS TO MATCH THE ADJACENT WALL COLOR.
PANELS PAINTED BY BRUSH ARE NOT ACCEPTABLE.
G. ALL FLOORING TRANSITIONS MUST MEET ABA GUIDELINES.
FLOORING TRANSITIONS OCCURRING UNDER DOORS MUST
BE CENTERED UNDER DOOR.
H. CONTRACTOR MUST MARK/TAPE ALL CABLES WITH THEIR
DESIGNATED JACK NUMBER WHEN FACEPLATES ARE
REMOVED FOR PAINTING. ALL CABLING IS REQUIRED TO BE
RETESTED (PER 27 10 00) FROM FACEPLATE TO PANEL.
I. ALL TELECOM MUST BE COVERED WHEN THE COMM/CCTV
ROOM IS PAINTED.
J. BACKBOARD MUST NOT BE PAINTED IN THE COMM/CCTV
ROOM.
K. ALL AREAS TO RECEIVE RESILIENT BASE (RB-1).
L. ALL WALLS TO BE PAINTED (PNT-1) UNLESS OTHERWISE
INDICATED. ALL HOLLOW METAL DOORS AND DOOR FRAMES
TO BE PAINTED (PNT-4). ALL GWB CEILINGS TO BE PAINTED
(PNT-5).
M. ALL TOILET PARTITION TO BE HDPE FINISH (HDPE-1).
N. ALL INTERIOR WOOD DOORS TO BE (WD-1).
O. SEE I-601 & I-602 FOR ROOM FINISH SCHEDULE AND FINISH
LEGEND.
SCALE: 1/8" = 1'-0"A1 FINISH PLAN
I G
IV R
FOHT
I
NO
M N
EW
A
OM
L
C
C
A
Cert. 001152
JAMIE D. KISSEL RER
T
IFIED
INTERIOR
DE
SI
GN
E No.
INSTALL BLOCKING,
LEVEL AND PLUMB
FASTENERS
BRACKET, 2 1/4" UNI MOUNT
10# CLUTCH
SPRING OPERATED
TUBE ROLLER
SHADE FABRIC, WS-1
HEM POCKET
SH
AD
E H
EI
G
H T
FASCIA FINISHED IN SATIN
LUXURY VINYL TILE
TS-1
CARPET
SUBSTRATE
LUXURY VINYL TILE
TS-2
EXISTING TILE
SUBSTRATE
FILL WITH GROUT
HW-2
DOOR
HW-2
DOOR JAMB
A B
C D
Fi le
P at h:
P rin t D at e:
E
SYM. DESCRIPTION DATE APP.
REVISIONS
DR.
DES.
CHK.
SUBMITTED BY:
DESIGN DIR.
APPROVED: PWO OR OICC
SATISFACTORY TO:
DATE
DATE
DEPARTMENT OF THE NAVY NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND
CAMP LEJEUNE, NORTH CAROLINA
MARINE CORPS BASE
SIZE CODE IDENT. NO. NAVFAC DRAWING NO.
E1 80091 CONSTR. CONTR. NO.
AS NOTEDSCALE SHEET
M
BF
A N
O
SPEC.
2 3 4 5 6
A B
C D
E
1 2 3 4 5 6
1008 GRANBY STREET
NORFOLK, VA 23510
757.224.0489
W :\2
TT
M ec ha ni ca l R ep ai rs
\R ev it\
_T
T1
W
ID
_R
.rv t
6/
/2
6:
:4
PM
I-501
DMR
JDK
JDK MECHANICAL REPAIRS
INTERIOR DETAILS
60042048 N40085-23-B-0044
BUILDING TT113
SCALE: 3" = 1'-0"C1 SINGLE ROLLER SHADE DETAIL
SCALE: 12" = 1'-0"B3 LVT TO CARPET DETAIL
GRAPHIC SCALE:
12" = 1'-0" 0" 1/2" 1" 3"
GENERAL NOTES
A. FINISHES INDICATED ARE THE APPROVED BASIS OF DESIGN
TO CONVEY COLOR, PATTERN, TEXTURE AND SALIENT
CHARACTERISTICS ONLY. THE LISTING OF MANUFACTURER
INFORMATION IS NOT INTENDED TO LIMIT THE SELECTION OF
PRODUCTS PROVIDED BY OTHER MANUFACTURERS.
PRODUCTS MEETING THESE CRITERIA WILL BE CONSIDERED
AND MUST BE REVIEWED BY THE INTERIOR DESIGNER OF
RECORD (IDOR) AND THE NAVFAC INTERIOR DESIGNER AND
APPROVED BY THE CONTRACTING OFFICER.
B. FINISH ITEMS ARE NOT TO BE SUBSTITUTED DUE TO
ORDERING LEAD TIMES. IT IS THE CONTRACTOR ’S
RESPONSIBILITY TO ORDER ALL MATERIALS IN TIME TO AVOID
DELAYS.
C. COORDINATE THERMOSTAT LOCATIONS WITH MECHANICAL
DRAWINGS AND CONSTRUCTION MANAGER. INSTALL
THERMOSTATS NEAR A CORNER OF THE ROOM OR BY LIGHT
SWITCHES. DO NOT INSTALL THERMOSTATS IN THE CENTER
OF A WALL.
D. ALL INTERIOR FINISHES IN VERTICAL EXIT WAYS, EXIT
LOBBIES, AND EXIT CORRIDORS MUST MEET MINIMUM CLASS
A RATING.
E. ALL MATERIALS/PRODUCTS ARE TO BE INSTALLED PER
MANUFACTURER'S INSTALLATION REQUIREMENTS.
F. SPRAY PAINT ELECTRICAL PANELS, ACCESS PANELS, AND
EXPANSION JOINTS TO MATCH THE ADJACENT WALL COLOR.
PANELS PAINTED BY BRUSH ARE NOT ACCEPTABLE.
G. ALL FLOORING TRANSITIONS MUST MEET ABA GUIDELINES.
FLOORING TRANSITIONS OCCURRING UNDER DOORS MUST
BE CENTERED UNDER DOOR.
H. CONTRACTOR MUST MARK/TAPE ALL CABLES WITH THEIR
DESIGNATED JACK NUMBER WHEN FACEPLATES ARE
REMOVED FOR PAINTING. ALL CABLING IS REQUIRED TO BE
RETESTED (PER 27 10 00) FROM FACEPLATE TO PANEL.
I. ALL TELECOM MUST BE COVERED WHEN THE COMM/CCTV
ROOM IS PAINTED.
J. BACKBOARD MUST NOT BE PAINTED IN THE COMM/CCTV
ROOM.
K. ALL AREAS TO RECEIVE RESILIENT BASE (RB-1).
L. ALL WALLS TO BE PAINTED (PNT-1) UNLESS OTHERWISE
INDICATED. ALL HOLLOW METAL DOORS AND DOOR FRAMES
TO BE PAINTED (PNT-4). ALL GWB CEILINGS TO BE PAINTED
(PNT-5).
M. ALL TOILET PARTITION TO BE HDPE FINISH (HDPE-1).
N. ALL INTERIOR WOOD DOORS TO BE (WD-1).
O. SEE I-601 & I-602 FOR ROOM FINISH SCHEDULE AND FINISH
LEGEND.
SCALE: 12" = 1'-0"C3 LVT TO TILE DETAIL
SCALE: 3" = 1'-0"B1 FINGER PINCH GUARD DETAIL
I G
IV R
FOHT
I
NO
M N
EW
A
OM
L
C
C
A
Cert. 001152
JAMIE D. KISSEL RER
T
IFIED
INTERIOR
DE
SI
A B
C D
Fi le
P at h:
P rin t D at e:
E
SYM. DESCRIPTION DATE APP.
REVISIONS
DR.
DES.
CHK.
SUBMITTED BY:
DESIGN DIR.
APPROVED: PWO OR OICC
SATISFACTORY TO:
DATE
DATE
DEPARTMENT OF THE NAVY NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND
CAMP LEJEUNE, NORTH CAROLINA
MARINE CORPS BASE
SIZE CODE IDENT. NO. NAVFAC DRAWING NO.
E1 80091 CONSTR. CONTR. NO.
AS NOTEDSCALE SHEET
M
BF
A N
O
SPEC.
2 3 4 5 6
A B
C D
E
1 2 3 4 5 6
1008 GRANBY STREET
NORFOLK, VA 23510
757.224.0489
W :\2
TT
M ec ha ni ca l R ep ai rs
\R ev it\
_T
T1
W
ID
_R
.rv t
6/
/2
6:
:4
PM
I-601
DMR
JDK
JDK MECHANICAL REPAIRS
SCHEDULES & LEGENDS
60042049 N40085-23-B-0044
BUILDING TT113
ROOM FINISH SCHEDULE
ROOM
FLOOR FINISH BASE FINISH WALL FINISH CEILING FINISH NOTESNO. NAME
101 PRETODDLER LVP-1 RB-1 PNT-1 ACT-1 2
101A CLOSET LVP-1 RB-1 PNT-1 ACT-1
102 PRETODDLER LVP-1 RB-1 PNT-1 ACT-1 2
102A CLOSET LVP-1 RB-1 PNT-1 ACT-1
103 PRETODDLER LVP-1 RB-1 PNT-1 ACT-1 2
103A CLOSET LVP-1 RB-1 PNT-1 ACT-1
104 PRETODDLER LVP-1 RB-1 PNT-1 ACT-1 2
104A CLOSET LVP-1 RB-1 PNT-1 ACT-1
105 PRETODDLER LVP-1 RB-1 PNT-1 ACT-1 2
105A CLOSET LVP-1 RB-1 PNT-1 ACT-1
106 PRETODDLER LVP-1 RB-1 PNT-1 ACT-1 2
106A CLOSET LVP-1 RB-1 PNT-1 ACT-1
107 PRETODDLER LVP-1 RB-1 PNT-1 ACT-1 2
107A CLOSET LVP-1 RB-1 PNT-1 ACT-1
108 PRETODDLER LVP-1 RB-1 PNT-1 ACT-1 2
108A CLOSET LVP-1 RB-1 PNT-1 ACT-1
109 CORRIDOR LVP-1 RB-1 PNT-1 ACT-1
110 TRAINING SPECIALIST CPT-1 RB-1 PNT-1 ACT-1 1
111 STAFF TRAINING CPT-1 RB-1 PNT-1 ACT-1 1
112 OFFICE CPT-1 RB-1 PNT-1 ACT-1 1
113 DEPUTY DIRECTOR CPT-1 RB-1 PNT-1 ACT-1 1,2
114 DIRECTOR CPT-1 RB-1 PNT-1 ACT-1 1,2
115 VESTIBULE LVP-1 RB-1 PNT-1 ACT-1
116 LOBBY LVP-1 RB-1 PNT-1 ACT-1
117 OFFICE LVP-1 RB-1 PNT-1 ACT-1
117A OFFICE LVP-1 RB-1 PNT-1 ACT-1
118 CORRIDOR LVP-1 RB-1 PNT-1 ACT-1
119 INFANT LVP-1 RB-1 PNT-1 ACT-1 2
119A CLOSET LVP-1 RB-1 PNT-1 ACT-1
120 ADMIN CPT-1 RB-1 PNT-1 ACT-1 1
121 ADMIN CPT-1 RB-1 PNT-1 ACT-1 1
122 COMM/CCTV EXISTING EXISTING EXISTING EXISTING
123 STORAGE LVP-1 RB-1 PNT-1 ACT-1
124 STAFF RR EXISTING - EXISTING PNT-5
125 PUBLIC RR EXISTING - EXISTING PNT-5
126 INFANT LVP-1 RB-1 PNT-1 ACT-1 2
126A CLOSET LVP-1 RB-1 PNT-1 ACT-1
128 CORRIDOR LVP-1 RB-1 PNT-1 ACT-1
129 LAUNDRY LVP-1 RB-1 PNT-1 ACT-1
130 BREAK ROOM LVP-1 RB-1 PNT-1 ACT-1
131 JANITOR EXISTING - EXISTING PNT-5
132 INFANT LVP-1 RB-1 PNT-1 ACT-1 2
132A CLOSET LVP-1 RB-1 PNT-1 ACT-1
133 INFANT LVP-1 RB-1 PNT-1 ACT-1 2
133A CLOSET LVP-1 RB-1 PNT-1 ACT-1
134 INFANT LVP-1 RB-1 PNT-1 ACT-1 2
134A CLOSET LVP-1 RB-1 PNT-1 ACT-1
135 INFANT LVP-1 RB-1 PNT-1 ACT-1 2
135A CLOSET LVP-1 RB-1 PNT-1 ACT-1
136 SCULLERY EXISTING - PNT-1 PNT-5
137 KITCHEN EXISTING - PNT-1 PNT-5
138 ELETRICAL SC-1 - PNT-1 PNT-5
139 MECHANICAL SC-1 - PNT-1 PNT-5
140 DRY STORAGE EXISTING - PNT-1 PNT-5
141 SPRINKLER SC-1 - PNT-1 PNT-5
142 INFANT LVP-1 RB-1 PNT-1 ACT-1 2
142A CLOSET LVP-1 RB-1 PNT-1 ACT-1
143 PRESCHOOL LVP-1 RB-1 PNT-1 ACT-1 2
143A CLOSET LVP-1 RB-1 PNT-1 ACT-1
144 TODDLER LVP-1 RB-1 PNT-1 ACT-1 2
144A CLOSET LVP-1 RB-1 PNT-1 ACT-1
145 TODDLER LVP-1 RB-1 PNT-1 ACT-1 2
145A CLOSET LVP-1 RB-1 PNT-1 ACT-1
146 PRESCHOOL LVP-1 RB-1 PNT-1 ACT-1 2
146A CLOSET LVP-1 RB-1 PNT-1 ACT-1
147 PRESCHOOL LVP-1 RB-1 PNT-1 ACT-1 2
147A CLOSET LVP-1 RB-1 PNT-1 ACT-1
148 TODDLER LVP-1 RB-1 PNT-1 ACT-1 2
148A CLOSET LVP-1 RB-1 PNT-1 ACT-1
149 TODDLER LVP-1 RB-1 PNT-1 ACT-1 2
149A CLOSET LVP-1 RB-1 PNT-1 ACT-1
150 PRESCHOOL LVP-1 RB-1 PNT-1 ACT-1 2
150A CLOSET LVP-1 RB-1 PNT-1 ACT-1
151 TODDLER LVP-1 RB-1 PNT-1 ACT-1 2
151A CLOSET LVP-1 RB-1 PNT-1 ACT-1
152 RESTROOM EXISTING - EXISTING PNT-5
GENERAL NOTES
A. FINISHES INDICATED ARE THE APPROVED BASIS OF DESIGN
TO CONVEY COLOR, PATTERN, TEXTURE AND SALIENT
CHARACTERISTICS ONLY. THE LISTING OF MANUFACTURER
INFORMATION IS NOT INTENDED TO LIMIT THE SELECTION OF
PRODUCTS PROVIDED BY OTHER MANUFACTURERS.
PRODUCTS MEETING THESE CRITERIA WILL BE CONSIDERED
AND MUST BE REVIEWED BY THE INTERIOR DESIGNER OF
RECORD (IDOR) AND THE NAVFAC INTERIOR DESIGNER AND
APPROVED BY THE CONTRACTING OFFICER.
B. FINISH ITEMS ARE NOT TO BE SUBSTITUTED DUE TO
ORDERING LEAD TIMES. IT IS THE CONTRACTOR ’S
RESPONSIBILITY TO ORDER ALL MATERIALS IN TIME TO AVOID
DELAYS.
C. COORDINATE THERMOSTAT LOCATIONS WITH MECHANICAL
DRAWINGS AND CONSTRUCTION MANAGER. INSTALL
THERMOSTATS NEAR A CORNER OF THE ROOM OR BY LIGHT
SWITCHES. DO NOT INSTALL THERMOSTATS IN THE CENTER
OF A WALL.
D. ALL INTERIOR FINISHES IN VERTICAL EXIT WAYS, EXIT
LOBBIES, AND EXIT CORRIDORS MUST MEET MINIMUM CLASS
A RATING.
E. ALL MATERIALS/PRODUCTS ARE TO BE INSTALLED PER
MANUFACTURER'S INSTALLATION REQUIREMENTS.
F. SPRAY PAINT ELECTRICAL PANELS, ACCESS PANELS, AND
EXPANSION JOINTS TO MATCH THE ADJACENT WALL COLOR.
PANELS PAINTED BY BRUSH ARE NOT ACCEPTABLE.
G. ALL FLOORING TRANSITIONS MUST MEET ABA GUIDELINES.
FLOORING TRANSITIONS OCCURRING UNDER DOORS MUST
BE CENTERED UNDER DOOR.
H. CONTRACTOR MUST MARK/TAPE ALL CABLES WITH THEIR
DESIGNATED JACK NUMBER WHEN FACEPLATES ARE
REMOVED FOR PAINTING. ALL CABLING IS REQUIRED TO BE
RETESTED (PER 27 10 00) FROM FACEPLATE TO PANEL.
I. ALL TELECOM MUST BE COVERED WHEN THE COMM/CCTV
ROOM IS PAINTED.
J. BACKBOARD MUST NOT BE PAINTED IN THE COMM/CCTV
ROOM.
K. ALL AREAS TO RECEIVE RESILIENT BASE (RB-1).
L. ALL WALLS TO BE PAINTED (PNT-1) UNLESS OTHERWISE
INDICATED. ALL HOLLOW METAL DOORS AND DOOR FRAMES
TO BE PAINTED (PNT-4). ALL GWB CEILINGS TO BE PAINTED
(PNT-5).
M. ALL TOILET PARTITION TO BE HDPE FINISH (HDPE-1).
N. ALL INTERIOR WOOD DOORS TO BE (WD-1).
O. SEE I-601 & I-602 FOR ROOM FINISH SCHEDULE AND FINISH
LEGEND.
FINISH SCHEDULE KEY NOTES
1. CARPET TILE INSTALLATION TO BE VERTICAL ASHLAR
PATTERN.
2. WINDOWS TO RECEIVE SINGLE LAYER ROLLER SHADE
(WS-1). SEE DETAIL C1/I-502.
I G
IV R
FOHT
I
NO
M N
EW
A
OM
L
C
C
A
Cert. 001152
JAMIE D. KISSEL RER
T
IFIED
INTERIOR
DE
SI
A B
C D
Fi le
P at h:
P rin t D at e:
E
SYM. DESCRIPTION DATE APP.
REVISIONS
DR.
DES.
CHK.
SUBMITTED BY:
DESIGN DIR.
APPROVED: PWO OR OICC
SATISFACTORY TO:
DATE
DATE
DEPARTMENT OF THE NAVY NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND
CAMP LEJEUNE, NORTH CAROLINA
MARINE CORPS BASE
SIZE CODE IDENT. NO. NAVFAC DRAWING NO.
E1 80091 CONSTR. CONTR. NO.
AS NOTEDSCALE SHEET
M
BF
A N
O
SPEC.
2 3 4 5 6
A B
C D
E
1 2 3 4 5 6
1008 GRANBY STREET
NORFOLK, VA 23510
757.224.0489
W :\2
TT
M ec ha ni ca l R ep ai rs
\R ev it\
_T
T1
W
ID
_R
.rv t
6/
/2
6:
:4
PM
I-602
DMR
JDK
JDK MECHANICAL REPAIRS
SCHEDULES & LEGENDS
60042050 N40085-23-B-0044
BUILDING TT113
GENERAL NOTES
A. FINISHES INDICATED ARE THE APPROVED BASIS OF DESIGN
TO CONVEY COLOR, PATTERN, TEXTURE AND SALIENT
CHARACTERISTICS ONLY. THE LISTING OF MANUFACTURER
INFORMATION IS NOT INTENDED TO LIMIT THE SELECTION OF
PRODUCTS PROVIDED BY OTHER MANUFACTURERS.
PRODUCTS MEETING THESE CRITERIA WILL BE CONSIDERED
AND MUST BE REVIEWED BY THE INTERIOR DESIGNER OF
RECORD (IDOR) AND THE NAVFAC INTERIOR DESIGNER AND
APPROVED BY THE CONTRACTING OFFICER.
B. FINISH ITEMS ARE NOT TO BE SUBSTITUTED DUE TO
ORDERING LEAD TIMES. IT IS THE CONTRACTOR ’S
RESPONSIBILITY TO ORDER ALL MATERIALS IN TIME TO AVOID
DELAYS.
C. COORDINATE THERMOSTAT LOCATIONS WITH MECHANICAL
DRAWINGS AND CONSTRUCTION MANAGER. INSTALL
THERMOSTATS NEAR A CORNER OF THE ROOM OR BY LIGHT
SWITCHES. DO NOT INSTALL THERMOSTATS IN THE CENTER
OF A WALL.
D. ALL INTERIOR FINISHES IN VERTICAL EXIT WAYS, EXIT
LOBBIES, AND EXIT CORRIDORS MUST MEET MINIMUM CLASS
A RATING.
E. ALL MATERIALS/PRODUCTS ARE TO BE INSTALLED PER
MANUFACTURER'S INSTALLATION REQUIREMENTS.
F. SPRAY PAINT ELECTRICAL PANELS, ACCESS PANELS, AND
EXPANSION JOINTS TO MATCH THE ADJACENT WALL COLOR.
PANELS PAINTED BY BRUSH ARE NOT ACCEPTABLE.
G. ALL FLOORING TRANSITIONS MUST MEET ABA GUIDELINES.
FLOORING TRANSITIONS OCCURRING UNDER DOORS MUST
BE CENTERED UNDER DOOR.
H. CONTRACTOR MUST MARK/TAPE ALL CABLES WITH THEIR
DESIGNATED JACK NUMBER WHEN FACEPLATES ARE
REMOVED FOR PAINTING. ALL CABLING IS REQUIRED TO BE
RETESTED (PER 27 10 00) FROM FACEPLATE TO PANEL.
I. ALL TELECOM MUST BE COVERED WHEN THE COMM/CCTV
ROOM IS PAINTED.
J. BACKBOARD MUST NOT BE PAINTED IN THE COMM/CCTV
ROOM.
K. ALL AREAS TO RECEIVE RESILIENT BASE (RB-1).
L. ALL WALLS TO BE PAINTED (PNT-1) UNLESS OTHERWISE
INDICATED. ALL HOLLOW METAL DOORS AND DOOR FRAMES
TO BE PAINTED (PNT-4). ALL GWB CEILINGS TO BE PAINTED
(PNT-5).
M. ALL TOILET PARTITION TO BE HDPE FINISH (HDPE-1).
N. ALL INTERIOR WOOD DOORS TO BE (WD-1).
O. SEE I-601 & I-602 FOR ROOM FINISH SCHEDULE AND FINISH
LEGEND.
FINISH LEGEND
NO. NAME LOCATION MANUFACTURER MODEL COLOR SIZE
ACG-1 ACOUSTICAL CEILING GRID SUSPENDED CEILING (ACT-1) ARMSTRONG CEILINGS INTERLUDE XL HRC WHITE 9/16" ACT-1 ACOUSTICAL CEILING TILE NON-GWB OR EXPOSED CEILINGS ARMSTRONG CEILINGS FINE FISSURED SQUARE LAY-IN WHITE 24" X 24" CPT-1 CARPET TILE W/ ATTACHED PAD OFFICES TARKETT AFTERMATH II 03026 POTPOURRI 23510 24" x 24", VERTICAL ASHLAR HDPE-1 HIGH DENSITY POLYETHYLENE CLASSROOM TOILET AREAS SCRANTON PRODUCTS HINY HIDERS ORANGE PEEL CHARCOAL - HW-2 FINGER PINCH GUARD HINGE AND STOP SIDE OF INTERIOR DOORS FINGER GUARD USA FINGER KEEPER GREY LONG - FULL HEIGHT OF DOOR LVP-1 LUXURY VINYL PLANK CLASSROOMS & CORRIDORS TARKETT HERITAGE PLANK ANTIQUE CIMARRON PEHP GW29 TG 6" X 36"
PLAM-1 PLASTIC LAMINATE CASEWORK RUGBY PREMIER SERIES SHAKER SAND -
PNT-1 PAINT PRIMARY WALLS SHERWIN WILLIAMS SW 6135 ECU -
PNT-4 PAINT DOOR FRAMES SHERWIN WILLIAMS SW 6080 UTTERLY BEIGE -
PNT-5 PAINT GWB CEILINGS SHERWIN WILLIAMS SW 7757 HIGH REFLECTIVE WHITE -
RB-1 RUBBER BASE PRIMARY BASE TARKETT COVE TA8 WELSH CASTLE CB 4"H
SS-1 SOLID SURFACE COUNTERTOPS LG HIMACS CLASSIC WALLOWA G157 -
TS-1 TRANSITION STRIP LVT TO CARPET SCHLUTER VINPRO-S SATIN ANODIZED -
TS-2 TRANSITION STRIP LVT TO EXISTING TILE SCHLUTER RENO-U SATIN ANODIZED -
WS-1 BLACKOUT WINDOW SHADE EXTERIOR WINDOWS DRAPER FLOCKE LOUTRE/WHITE (BLACKOUT) -
I G
IV R
FOHT
I
NO
M N
EW
A
OM
L
C
C
A
Cert. 001152
JAMIE D. KISSEL RER
T
IFIED
INTERIOR
DE
SI
TT113 Mechanical Repairs Marine Corps Base, Camp Lejeune, NC
Finish Boards
TT113 Mechanical Repairs Marine Corps Base, Camp Lejeune, NC Structural Interior Design Package within interior design
ACT-1
Armstrong Fine Fissured 24X24 Square Lay-In, White *Image similar to finish
PNT-4 - Door Frame Paint Sherwin Williams SW 6080, Utterly Beige
PNT-1 - Primary Wall Paint Sherwin Williams SW6135, Ecru
WS-1- Blackout Draper Flocke, Loutre/White
Structural Interior Design Package within interior design
CPT-1 - Carpet Tile - Private Offices - 24” x 24” Tarkett Aftermath II, Potpourii
Structural Interior Design Package within interior design
LVT-1 - Luxury Vinyl Tile - Classrooms - 6” x 36” Tarkett Heritage Plank, Antique Cimarron
Structural Interior Design Package within interior design
SS-1 - Solid Surface - Countertops LX Hausys/HIMACS Wallowa G157
RB-1 - Rubber Base - Primary Base Johnsonite Welsh Castle
PLAM-1 - Plastic Laminate - Casework iShopRugby Standard Laminate, Shaker Sand
| Table of Contents |
| Point of Contact List |
| SID Narrative |
| Meeting Minutes |
| Finish Plans & Schedules |
| Finish Boards |
File details come from the government source that posted it. Updated .