This is a Structural Interior Design (SID) Package for the TT113 Child Development Center Renovation at Marine Corps Base Camp Lejeune, North Carolina, serving as the final submittal for June 2025.

The package establishes interior design standards and finishes for the renovation project, which must comply with Navy and Marine Corps Design Procedures (FC 1-300-09N), DoD Building Code (UFC 1-200-01), High Performance and Sustainable Building Requirements (UFC 1-200-02), and Interior Design standards (UFC 3-120-10). The project prioritizes aesthetics, sustainability, and durability for a child development center environment. Floor finishes include attached cushion carpet tile (CPT-1: Tarkett Aftermath II, Potpourri, 24" x 24" vertical ashlar pattern) and luxury vinyl tile (LVT-1: Tarkett Heritage Plank, Antique Cimarron, 6" x 36"). Wall finishes consist of painted drywall (PNT-1: Sherwin Williams Ecru SW 6135 primary walls; PNT-4: Sherwin Williams Utterly Beige SW 6080 for door frames). Ceiling treatments include acoustical mineral fiber tiles with minimum NRC of 0.85 in designated areas and painted gypsum in restrooms. Additional finishes specified include rubber base (RB-1: Johnsonite Welsh Castle), solid surface countertops (SS-1: LX Hausys HIMACS Wallowa G157), plastic laminate casework (PLAM-1: iShopRugby Shaker Sand), blackout roller shades (WS-1: Draper Flocke), and HDPE toilet partitions. Design meetings held December 19, 2024 (35% review) and March 11, 2025 (65% review) addressed finish selections, deletion of paint requirements for the communications/CCTV room (122), standardization of finishes across the facility, and childcare-specific requirements including integrated cabinet pulls and emergency-only blackout shade usage per accreditation regulations. The interior design team, led by Jamie Kissel, NCIDQ, CID of Within Interior Design, coordinated with MBF Architects and Marine Corps Base personnel including Kelly Root (Architectural Supervisor), Steven McNeill (Project Manager), and Beth Weinbrenner (Construction Project Manager).

View the file

Other files

File Type Posted
Amend 0015.pdf PDF
Amend 0014.pdf PDF
Amend 0013.pdf PDF
Amend 0012.pdf PDF
M-202-T.pdf PDF
60042049 _Rev03.pdf PDF
60042066_Rev03.pdf PDF
Amend 0011.pdf PDF
60042073_Rev03.pdf PDF
60042069_Rev03.pdf PDF
60042047 _Rev03.pdf PDF
60042070_Rev03.pdf PDF
N4008523B0044 PPI Revision 03.pdf PDF
Amend 0010 Enclosure 3 DWGS.pdf PDF
Amend 0010 Enclosure 1 DWG List.pdf PDF
Amend 0010.pdf PDF
Amend 0009.pdf PDF
Amend 0008.pdf PDF
Amend 0004.pdf PDF
Amend 0007.pdf PDF
Amend 0006.pdf PDF
Amend 0005.pdf PDF
Amend 0003.pdf PDF
Amend 0002 SECTION 01 31 50 TRANSFER AND ACCEPTANCE OF MILITARY REAL PROPERTY.pdf PDF
Amend 0002.pdf PDF
Amend 0001.pdf PDF
230044 Termite Inspection Report.pdf PDF
Mech MACC RFP.pdf PDF
N4008523B0044 Specs.pdf PDF
230044 Basis of Design.pdf PDF
N4008523B0044 Dwgs.pdf PDF
230044 Lead and Asbesto Report.pdf PDF
230044 APPD.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

interior design within

TT113 Mechanical Repairs Marine Corps Base, Camp Lejeune, NC

Structural Interior Design Package Final Submittal June 2025

TT113 Mechanical Repairs Marine Corps Base, Camp Lejeune, NC Structural Interior Design Package

Table of Contents

1. Point of Contact List

2. Narrative of Interior Design Objectives

3. Meeting Minutes

4. Finish Plans & Schedules

5. Finish Boards

TT113 Mechanical Repairs Marine Corps Base, Camp Lejeune, NC Structural Interior Design Package

Point of Contact List Architect Supervisor Kelly E. Root, RA, NCARB Architectural Supervisor, Design Branch Public Works Division Marine Corps Base Camp Lejeune

(910) 238-6476 kelly.root@usmc.mil

Facilities Management Beth P. Weinbrenner Construction Project Manager Facilities & Maintenance Divison MCCS Lejeune-New River

(910) 451-1310 beth.weinbrenner@USMC-MCCS.org

Project Manager Steven Mcneill Mechanical Engineering Bldg 1005, Public Works Division, Design Branch Marine Corps Base, Camp Lejeune

(580) 458-7516 steven.mcneill@usmc.mil

A&E Project Manager John Schmied MBF Architects 317-C Pollock Street New Bern, NC 28560

(252) 637-6373 schmied@mbfarchitects.com

A&E Interior Designer Jamie Kissel, NCIDQ, CID Within Interior Design, Inc.

1008 Granby Street Norfolk, VA 23510

(757) 224-0489 jkissel@withindesigns.com

TT113 Mechanical Repairs Marine Corps Base, Camp Lejeune, NC Structural Interior Design Package

SID Narrative

INTERIOR DESIGN CRITERIA

Interior Design work will comply with the latest edition of the following codes and standards:

FC 1-300-09N Navy & Marine Corps Design Procedures UFC 1-200-01 DoD Building Code UFC 1-200-02 High Performance and Sustainable Building Requirements UFC 1-300-09N Design Procedures UFC 3-120-01 Design: Sign Standards UFC 3-120-10 Interior Design UFC 4-740-06 Youth Centers

STRUCTURAL INTERIOR DESIGN

The TT113 Child Development Center Renovation an Camp Lejeune, NC requires interior finishes that have a balance between aesthetics and sustainability, as well as durability that can withstand the inherent day to day operating environment for staff and patrons utilizing the facility. To meet these objectives, the SID package will use all the general requirements for interior finishes that have been applied in similar facilities, as well as best practices recommended by manufacturers for areas requiring enhanced durability. Standard SID finishes will be used as requested by the activity.

The SID package will provide a variety of floor finishes throughout including attached cushion carpet tile and luxury vinyl tile.

Interior partitions will primarily be painted drywall.

Acoustical ceiling tiles on a suspended grid will provide high quality sound absorption in designated areas with easy access to mechanical and plumbing above. The square edge lay-in tiles are a moisture resistant mineral fiber and have a minimum NRC of 0.85, CAC of 35, and a light reflectance of 0.86. Restrooms will have painted gypsum ceiling.

Interior signage will be provided throughout the facility to form a well-organized, comprehensive interior environment that guides users and visitors through the building.

TT113 Mechanical Repairs Marine Corps Base, Camp Lejeune, NC Structural Interior Design Package

Meeting Minutes

1 | P a g e

1008 Granby Street | Norfolk, VA 23510 | 757.224.0489

MEETING MINUTES

Project: TT113 Mechanical Repairs Meeting: 35% Review Meeting Date: December 19th, 2024 Location: Public Works at MCB Camp Lejeune, NC

PROJECT TEAM IN ATTENDANCE:

Architecture MBF Architects (252) 637-6373 Civil Engineer Avolis Engineering (252) 633-0068 Structural Engineer Kaydos-Daniels Engineers (919) 828-4966 Mechanical/Electrical/Plumbing Crenshaw Consulting (919) 871-1070 Fire Protection Jensen Hughes (757) 213-6856 Geotechnical ECS Southeast (757) 366-5100 Cost Estimating Aiken Cost Consultants (864) 232-9342 Interior Design Within Interior Design (757) 224-0489

Below are the Interior Design items that were addressed during the 35% Review Meeting.

35% REVIEW COMMENTS

REVIEWER: KELLY ROOT

Item #8 I-111: I suggest keeping 1 carpet type, 1 LVT type, and 1 or two tile types depending on use. Makes it easier for replacement later on and cost savings.

Response: Concur.

REVIEWER: BETH WEINBRENNER

Item #17 I-111: The Family Care Program Team felt that LVT-1 and LVT-2 would ALL be the same, not 2 styles/looks.

Whether or not combined, could Rm 123 Storage LVT be the same as corridor LVT

Response: Concur. LVT will be the same throughout

Item #18 I-111: They thought the front Vestibule and Rm 117 Resource/Referral would also be LVT

(not CPT-1).

Response: Concur on Rm 117. However, the entry vestibule is actually showing CPT2 which is a walk-off carpet. Please confirm if you'd still like us to change Vestibule 115 to LVT.

Activity confirmed walk-off carpet is acceptable in Vestibule 115.

2 | P a g e

Item #19 I-602: I didn’t see “Finger Pinch” guards for doors listed anywhere. Maybe they’re already in place.

Response: Concur. Finger pinch guards will be added to the finish legend and the Wall & Door Protection spec (10 26 00).

REVIEWER: TIM VANNOY / MATT SATOR

Item #17 I-601: If rm 122 COMM/CCTV RM is painted or sanded all telecom must be covered, do not paint backboard

Response: Concur. We will add a GENERAL NOTE detailing these instructions.

Item #18 I-601: If faceplates removed from walls for painting, then contractor must mark/tape each cable with designated jack number. All cabling will be required to re-tested (per 27 10 00) from faceplate to patch panel.

Response: Concur. This statement will be added to our GENERAL NOTES.

ACTION ITEMS

1. 65% Submittal due 2/13/25.

Meeting: 65% Review Meeting Date: March 11th, 2025 Location: Public Works at MCB Camp Lejeune, NC

PROJECT TEAM IN ATTENDANCE:

Architecture MBF Architects (252) 637-6373 Civil Engineer Avolis Engineering (252) 633-0068 Structural Engineer Kaydos-Daniels Engineers (919) 828-4966 Mechanical/Electrical/Plumbing Crenshaw Consulting (919) 871-1070 Fire Protection Jensen Hughes (757) 213-6856 Geotechnical ECS Southeast (757) 366-5100 Cost Estimating Aiken Cost Consultants (864) 232-9342

Below are the Interior Design items that were addressed during the 65% Review Meeting.

35% REVIEW COMMENTS

REVIEWER: KELLY ROOT

Item #1 I-111: Wondering if we should show the finishes by phases so the contractor expects the installers to come back for each phase.

Response: Discuss during review meeting.

MBF agreed this can be sorted out separately – Will discuss in more detail during SID finishes presentation to the Activity.

REVIEWER: MATT SATOR / TIM VANNOY

Item #2 Interior Design, finish plan (multiple sheets): Note J and K – I thought there was some discussion that Comm rm (122) did not need to be painted.

Response: Concur. Paint finish will be removed from finish schedule for Comm Rm 112.

REVIEWER: BETH WEINBRENNER

Item #7 I-111 & I-601: Is it LVT-1 (Tile) or LVP-(Plank/wood look)? CDC says it looks like wood, so shouldn’t it say “LVP-1”?

Response: Concur.

Item #8 I-601: I didn’t see “Finger Pinch” guards for doors listed anywhere. Maybe they’re already in place.

Response: Concur. This has been added to the finish legend as "HW-2".

ACTION ITEMS

1. Pre-Final Submittal due 4/21/25.

2. WID & MBF to schedule finish scheme presentation to the activity prior to Pre-Final submittal.

Meeting: SID Finishes Review Meeting Date: April 3rd , 2025 (Thursday) Location: Public Works at MCB Camp Lejeune, NC

PROJECT TEAM IN ATTENDANCE:

Facilities Management (Beth W.) MCCS Camp Lejeune (910) 381-4895 Project Manager (Steve Mcneill) Public Works Division (580) 458-7516 Arch Supervisor (Kelly Root) Public Works Division (910) 238-6476 Activity (Kim Gipson) - -

FINISHES REVIEW COMMENTS

• Two schemes prepared by Within were not presented due to existing standardized finishes.

• Within team was asked to populate finish legend with standardized finishes.

• The following items were sent to Within team by the activity. All finishes are standardized

(PNT-1, PNT-4, RB-1, LVT-1, CPT-1, SS-1 and PLAM-1).

• PNT-1 (Primary Walls) – Sherwin Williams - Ecru SW 6135 (208-C2) – standardized finish.

• PNT-4 (Door Frames) – Sherwin Williams - Utterly Beige SW 6080 (198-C3) - standardized finish.

• RB-1 (Rubber Base) – Tarkett/Johnsonite - TA8 Welsh Castle CB - standardized finish.

• LVT-1 (Luxury Vinyl Tile) – Tarkett - Antique Cimarron PEHP GW29 TG 6”x36” (Heritage Plank).

• CPT-1 (Carpet Tile) – Tarkett - 03026 Aftermath II, 23510 Potpourri.

• SS-1 (Solid Surface) – Countertops – LX Hausys – HIMACS - Wallowa G157, Classic, Solid surface with 4” backsplash.

• PLAM-1 (Plastic Laminate) – Ishoprugby - Shaker Sand (SS), Premier Series.

• A walk-off carpet will not be needed.

• Activity suggested a need for Blackout Roller Shades with the lowering system that is accessible to adults only. Chain operated shades are not acceptable. The activity preferred lighter blackout roller shades (matching to standard rubber base - Tarkett/Johnsonite - TA8 Welsh Castle CB). If the light option is difficult to obtain due to custom color price, matching it to window trim (dark bronze) works well.

• Activity shared that Blackout Roller Shades could not be used at any time unless an emergency occurs. Within team will select the requested item.

• No Ceramic/Porcelain tile needed. Activity shared there is existing FRP on bathroom walls, toilet areas in children’s classrooms, scullery, kitchen and janitor’s closet walls. Luxury Vinyl tile on restroom/classroom restroom floors.

• General bathrooms’ finishes will remain the same.

• Due to accreditation regulations, walls cannot receive wall coverings or accent walls.

• Child accessible cabinetry should not receive knobs instead it should have integrated cabinet pulls.

• Activity might need toilet partitions. Once clarified, Within will provide toilet partition options.

TT113 Mechanical Repairs Marine Corps Base, Camp Lejeune, NC

Finish Plans & Schedules

FLOOR FINISH KEY

CPT-1

LVP-1

SC-1

NOT IN

SCOPE

PRETODDLER

PRETODDLER

PRETODDLER

PRETODDLER

PRETODDLER

PRETODDLER

PRETODDLER

PRETODDLER

CORRIDOR

TRAINING

SPECIALIST

STAFF TRAINING

OFFICE

DEPUTY

DIRECTOR

DIRECTOR

VESTIBULE

LOBBY

OFFICE

117A

INFANT

ADMIN

ADMIN

COMM/CCTV

STORAGE

STAFF RR

PUBLIC RR

INFANT

LAUNDRY

BREAK ROOM

JANITOR

INFANT

INFANT

INFANT

INFANT

SCULLERY

KITCHEN

ELETRICAL

MECHANICAL

DRY STORAGE

SPRINKLER

INFANT

PRESCHOOL

TODDLER

TODDLER

PRESCHOOL

PRESCHOOL

TODDLER

TODDLER

PRESCHOOL

TODDLER

CLOSET

102A

CLOSET

103A

CLOSET

104A

CLOSET

101A

CLOSET

105A

CLOSET

108A

CLOSET

107A

CLOSET

106A

CLOSET

119A

CLOSET

126A

CLOSET

134A

CLOSET

132A

CLOSET

142A

CLOSET

135A

CLOSET

133A

CLOSET

143A

CLOSET

146A

CLOSET

147A

CLOSET

150A

CLOSET

151A

CLOSET

149A

CLOSET

148A

CLOSET

145A

CLOSET

144A

CORRIDOR

CORRIDOR

RESTROOM

OFFICE

A B

C D

Fi le

P at h:

P rin t D at e:

E

SYM. DESCRIPTION DATE APP.

REVISIONS

DR.

DES.

CHK.

SUBMITTED BY:

DESIGN DIR.

APPROVED: PWO OR OICC

SATISFACTORY TO:

DATE

DATE

DEPARTMENT OF THE NAVY NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND

CAMP LEJEUNE, NORTH CAROLINA

MARINE CORPS BASE

SIZE CODE IDENT. NO. NAVFAC DRAWING NO.

E1 80091 CONSTR. CONTR. NO.

AS NOTEDSCALE SHEET

M

BF

A N

O

SPEC.

2 3 4 5 6

A B

C D

E

1 2 3 4 5 6

1008 GRANBY STREET

NORFOLK, VA 23510

757.224.0489

W :\2

TT

M ec ha ni ca l R ep ai rs

\R ev it\

_T

T1

W

ID

_R

.rv t

6/

/2

6:

:4

PM

I-111

DMR

JDK

JDK MECHANICAL REPAIRS

FINISH PLAN

60042047 N40085-23-B-0044

BUILDING TT113

4' 8' 16'0' 1/8" =1'-0"

GRAPHIC SCALE:

GENERAL NOTES

A. FINISHES INDICATED ARE THE APPROVED BASIS OF DESIGN

TO CONVEY COLOR, PATTERN, TEXTURE AND SALIENT

CHARACTERISTICS ONLY. THE LISTING OF MANUFACTURER

INFORMATION IS NOT INTENDED TO LIMIT THE SELECTION OF

PRODUCTS PROVIDED BY OTHER MANUFACTURERS.

PRODUCTS MEETING THESE CRITERIA WILL BE CONSIDERED

AND MUST BE REVIEWED BY THE INTERIOR DESIGNER OF

RECORD (IDOR) AND THE NAVFAC INTERIOR DESIGNER AND

APPROVED BY THE CONTRACTING OFFICER.

B. FINISH ITEMS ARE NOT TO BE SUBSTITUTED DUE TO

ORDERING LEAD TIMES. IT IS THE CONTRACTOR ’S

RESPONSIBILITY TO ORDER ALL MATERIALS IN TIME TO AVOID

DELAYS.

C. COORDINATE THERMOSTAT LOCATIONS WITH MECHANICAL

DRAWINGS AND CONSTRUCTION MANAGER. INSTALL

THERMOSTATS NEAR A CORNER OF THE ROOM OR BY LIGHT

SWITCHES. DO NOT INSTALL THERMOSTATS IN THE CENTER

OF A WALL.

D. ALL INTERIOR FINISHES IN VERTICAL EXIT WAYS, EXIT

LOBBIES, AND EXIT CORRIDORS MUST MEET MINIMUM CLASS

A RATING.

E. ALL MATERIALS/PRODUCTS ARE TO BE INSTALLED PER

MANUFACTURER'S INSTALLATION REQUIREMENTS.

F. SPRAY PAINT ELECTRICAL PANELS, ACCESS PANELS, AND

EXPANSION JOINTS TO MATCH THE ADJACENT WALL COLOR.

PANELS PAINTED BY BRUSH ARE NOT ACCEPTABLE.

G. ALL FLOORING TRANSITIONS MUST MEET ABA GUIDELINES.

FLOORING TRANSITIONS OCCURRING UNDER DOORS MUST

BE CENTERED UNDER DOOR.

H. CONTRACTOR MUST MARK/TAPE ALL CABLES WITH THEIR

DESIGNATED JACK NUMBER WHEN FACEPLATES ARE

REMOVED FOR PAINTING. ALL CABLING IS REQUIRED TO BE

RETESTED (PER 27 10 00) FROM FACEPLATE TO PANEL.

I. ALL TELECOM MUST BE COVERED WHEN THE COMM/CCTV

ROOM IS PAINTED.

J. BACKBOARD MUST NOT BE PAINTED IN THE COMM/CCTV

ROOM.

K. ALL AREAS TO RECEIVE RESILIENT BASE (RB-1).

L. ALL WALLS TO BE PAINTED (PNT-1) UNLESS OTHERWISE

INDICATED. ALL HOLLOW METAL DOORS AND DOOR FRAMES

TO BE PAINTED (PNT-4). ALL GWB CEILINGS TO BE PAINTED

(PNT-5).

M. ALL TOILET PARTITION TO BE HDPE FINISH (HDPE-1).

N. ALL INTERIOR WOOD DOORS TO BE (WD-1).

O. SEE I-601 & I-602 FOR ROOM FINISH SCHEDULE AND FINISH

LEGEND.

SCALE: 1/8" = 1'-0"A1 FINISH PLAN

I G

IV R

FOHT

I

NO

M N

EW

A

OM

L

C

C

A

Cert. 001152

JAMIE D. KISSEL RER

T

IFIED

INTERIOR

DE

SI

GN

E No.

INSTALL BLOCKING,

LEVEL AND PLUMB

FASTENERS

BRACKET, 2 1/4" UNI MOUNT

10# CLUTCH

SPRING OPERATED

TUBE ROLLER

SHADE FABRIC, WS-1

HEM POCKET

SH

AD

E H

EI

G

H T

FASCIA FINISHED IN SATIN

LUXURY VINYL TILE

TS-1

CARPET

SUBSTRATE

LUXURY VINYL TILE

TS-2

EXISTING TILE

SUBSTRATE

FILL WITH GROUT

HW-2

DOOR

HW-2

DOOR JAMB

A B

C D

Fi le

P at h:

P rin t D at e:

E

SYM. DESCRIPTION DATE APP.

REVISIONS

DR.

DES.

CHK.

SUBMITTED BY:

DESIGN DIR.

APPROVED: PWO OR OICC

SATISFACTORY TO:

DATE

DATE

DEPARTMENT OF THE NAVY NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND

CAMP LEJEUNE, NORTH CAROLINA

MARINE CORPS BASE

SIZE CODE IDENT. NO. NAVFAC DRAWING NO.

E1 80091 CONSTR. CONTR. NO.

AS NOTEDSCALE SHEET

M

BF

A N

O

SPEC.

2 3 4 5 6

A B

C D

E

1 2 3 4 5 6

1008 GRANBY STREET

NORFOLK, VA 23510

757.224.0489

W :\2

TT

M ec ha ni ca l R ep ai rs

\R ev it\

_T

T1

W

ID

_R

.rv t

6/

/2

6:

:4

PM

I-501

DMR

JDK

JDK MECHANICAL REPAIRS

INTERIOR DETAILS

60042048 N40085-23-B-0044

BUILDING TT113

SCALE: 3" = 1'-0"C1 SINGLE ROLLER SHADE DETAIL

SCALE: 12" = 1'-0"B3 LVT TO CARPET DETAIL

GRAPHIC SCALE:

12" = 1'-0" 0" 1/2" 1" 3"

GENERAL NOTES

A. FINISHES INDICATED ARE THE APPROVED BASIS OF DESIGN

TO CONVEY COLOR, PATTERN, TEXTURE AND SALIENT

CHARACTERISTICS ONLY. THE LISTING OF MANUFACTURER

INFORMATION IS NOT INTENDED TO LIMIT THE SELECTION OF

PRODUCTS PROVIDED BY OTHER MANUFACTURERS.

PRODUCTS MEETING THESE CRITERIA WILL BE CONSIDERED

AND MUST BE REVIEWED BY THE INTERIOR DESIGNER OF

RECORD (IDOR) AND THE NAVFAC INTERIOR DESIGNER AND

APPROVED BY THE CONTRACTING OFFICER.

B. FINISH ITEMS ARE NOT TO BE SUBSTITUTED DUE TO

ORDERING LEAD TIMES. IT IS THE CONTRACTOR ’S

RESPONSIBILITY TO ORDER ALL MATERIALS IN TIME TO AVOID

DELAYS.

C. COORDINATE THERMOSTAT LOCATIONS WITH MECHANICAL

DRAWINGS AND CONSTRUCTION MANAGER. INSTALL

THERMOSTATS NEAR A CORNER OF THE ROOM OR BY LIGHT

SWITCHES. DO NOT INSTALL THERMOSTATS IN THE CENTER

OF A WALL.

D. ALL INTERIOR FINISHES IN VERTICAL EXIT WAYS, EXIT

LOBBIES, AND EXIT CORRIDORS MUST MEET MINIMUM CLASS

A RATING.

E. ALL MATERIALS/PRODUCTS ARE TO BE INSTALLED PER

MANUFACTURER'S INSTALLATION REQUIREMENTS.

F. SPRAY PAINT ELECTRICAL PANELS, ACCESS PANELS, AND

EXPANSION JOINTS TO MATCH THE ADJACENT WALL COLOR.

PANELS PAINTED BY BRUSH ARE NOT ACCEPTABLE.

G. ALL FLOORING TRANSITIONS MUST MEET ABA GUIDELINES.

FLOORING TRANSITIONS OCCURRING UNDER DOORS MUST

BE CENTERED UNDER DOOR.

H. CONTRACTOR MUST MARK/TAPE ALL CABLES WITH THEIR

DESIGNATED JACK NUMBER WHEN FACEPLATES ARE

REMOVED FOR PAINTING. ALL CABLING IS REQUIRED TO BE

RETESTED (PER 27 10 00) FROM FACEPLATE TO PANEL.

I. ALL TELECOM MUST BE COVERED WHEN THE COMM/CCTV

ROOM IS PAINTED.

J. BACKBOARD MUST NOT BE PAINTED IN THE COMM/CCTV

ROOM.

K. ALL AREAS TO RECEIVE RESILIENT BASE (RB-1).

L. ALL WALLS TO BE PAINTED (PNT-1) UNLESS OTHERWISE

INDICATED. ALL HOLLOW METAL DOORS AND DOOR FRAMES

TO BE PAINTED (PNT-4). ALL GWB CEILINGS TO BE PAINTED

(PNT-5).

M. ALL TOILET PARTITION TO BE HDPE FINISH (HDPE-1).

N. ALL INTERIOR WOOD DOORS TO BE (WD-1).

O. SEE I-601 & I-602 FOR ROOM FINISH SCHEDULE AND FINISH

LEGEND.

SCALE: 12" = 1'-0"C3 LVT TO TILE DETAIL

SCALE: 3" = 1'-0"B1 FINGER PINCH GUARD DETAIL

I G

IV R

FOHT

I

NO

M N

EW

A

OM

L

C

C

A

Cert. 001152

JAMIE D. KISSEL RER

T

IFIED

INTERIOR

DE

SI

A B

C D

Fi le

P at h:

P rin t D at e:

E

SYM. DESCRIPTION DATE APP.

REVISIONS

DR.

DES.

CHK.

SUBMITTED BY:

DESIGN DIR.

APPROVED: PWO OR OICC

SATISFACTORY TO:

DATE

DATE

DEPARTMENT OF THE NAVY NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND

CAMP LEJEUNE, NORTH CAROLINA

MARINE CORPS BASE

SIZE CODE IDENT. NO. NAVFAC DRAWING NO.

E1 80091 CONSTR. CONTR. NO.

AS NOTEDSCALE SHEET

M

BF

A N

O

SPEC.

2 3 4 5 6

A B

C D

E

1 2 3 4 5 6

1008 GRANBY STREET

NORFOLK, VA 23510

757.224.0489

W :\2

TT

M ec ha ni ca l R ep ai rs

\R ev it\

_T

T1

W

ID

_R

.rv t

6/

/2

6:

:4

PM

I-601

DMR

JDK

JDK MECHANICAL REPAIRS

SCHEDULES & LEGENDS

60042049 N40085-23-B-0044

BUILDING TT113

ROOM FINISH SCHEDULE

ROOM

FLOOR FINISH BASE FINISH WALL FINISH CEILING FINISH NOTESNO. NAME

101 PRETODDLER LVP-1 RB-1 PNT-1 ACT-1 2

101A CLOSET LVP-1 RB-1 PNT-1 ACT-1

102 PRETODDLER LVP-1 RB-1 PNT-1 ACT-1 2

102A CLOSET LVP-1 RB-1 PNT-1 ACT-1

103 PRETODDLER LVP-1 RB-1 PNT-1 ACT-1 2

103A CLOSET LVP-1 RB-1 PNT-1 ACT-1

104 PRETODDLER LVP-1 RB-1 PNT-1 ACT-1 2

104A CLOSET LVP-1 RB-1 PNT-1 ACT-1

105 PRETODDLER LVP-1 RB-1 PNT-1 ACT-1 2

105A CLOSET LVP-1 RB-1 PNT-1 ACT-1

106 PRETODDLER LVP-1 RB-1 PNT-1 ACT-1 2

106A CLOSET LVP-1 RB-1 PNT-1 ACT-1

107 PRETODDLER LVP-1 RB-1 PNT-1 ACT-1 2

107A CLOSET LVP-1 RB-1 PNT-1 ACT-1

108 PRETODDLER LVP-1 RB-1 PNT-1 ACT-1 2

108A CLOSET LVP-1 RB-1 PNT-1 ACT-1

109 CORRIDOR LVP-1 RB-1 PNT-1 ACT-1

110 TRAINING SPECIALIST CPT-1 RB-1 PNT-1 ACT-1 1

111 STAFF TRAINING CPT-1 RB-1 PNT-1 ACT-1 1

112 OFFICE CPT-1 RB-1 PNT-1 ACT-1 1

113 DEPUTY DIRECTOR CPT-1 RB-1 PNT-1 ACT-1 1,2

114 DIRECTOR CPT-1 RB-1 PNT-1 ACT-1 1,2

115 VESTIBULE LVP-1 RB-1 PNT-1 ACT-1

116 LOBBY LVP-1 RB-1 PNT-1 ACT-1

117 OFFICE LVP-1 RB-1 PNT-1 ACT-1

117A OFFICE LVP-1 RB-1 PNT-1 ACT-1

118 CORRIDOR LVP-1 RB-1 PNT-1 ACT-1

119 INFANT LVP-1 RB-1 PNT-1 ACT-1 2

119A CLOSET LVP-1 RB-1 PNT-1 ACT-1

120 ADMIN CPT-1 RB-1 PNT-1 ACT-1 1

121 ADMIN CPT-1 RB-1 PNT-1 ACT-1 1

122 COMM/CCTV EXISTING EXISTING EXISTING EXISTING

123 STORAGE LVP-1 RB-1 PNT-1 ACT-1

124 STAFF RR EXISTING - EXISTING PNT-5

125 PUBLIC RR EXISTING - EXISTING PNT-5

126 INFANT LVP-1 RB-1 PNT-1 ACT-1 2

126A CLOSET LVP-1 RB-1 PNT-1 ACT-1

128 CORRIDOR LVP-1 RB-1 PNT-1 ACT-1

129 LAUNDRY LVP-1 RB-1 PNT-1 ACT-1

130 BREAK ROOM LVP-1 RB-1 PNT-1 ACT-1

131 JANITOR EXISTING - EXISTING PNT-5

132 INFANT LVP-1 RB-1 PNT-1 ACT-1 2

132A CLOSET LVP-1 RB-1 PNT-1 ACT-1

133 INFANT LVP-1 RB-1 PNT-1 ACT-1 2

133A CLOSET LVP-1 RB-1 PNT-1 ACT-1

134 INFANT LVP-1 RB-1 PNT-1 ACT-1 2

134A CLOSET LVP-1 RB-1 PNT-1 ACT-1

135 INFANT LVP-1 RB-1 PNT-1 ACT-1 2

135A CLOSET LVP-1 RB-1 PNT-1 ACT-1

136 SCULLERY EXISTING - PNT-1 PNT-5

137 KITCHEN EXISTING - PNT-1 PNT-5

138 ELETRICAL SC-1 - PNT-1 PNT-5

139 MECHANICAL SC-1 - PNT-1 PNT-5

140 DRY STORAGE EXISTING - PNT-1 PNT-5

141 SPRINKLER SC-1 - PNT-1 PNT-5

142 INFANT LVP-1 RB-1 PNT-1 ACT-1 2

142A CLOSET LVP-1 RB-1 PNT-1 ACT-1

143 PRESCHOOL LVP-1 RB-1 PNT-1 ACT-1 2

143A CLOSET LVP-1 RB-1 PNT-1 ACT-1

144 TODDLER LVP-1 RB-1 PNT-1 ACT-1 2

144A CLOSET LVP-1 RB-1 PNT-1 ACT-1

145 TODDLER LVP-1 RB-1 PNT-1 ACT-1 2

145A CLOSET LVP-1 RB-1 PNT-1 ACT-1

146 PRESCHOOL LVP-1 RB-1 PNT-1 ACT-1 2

146A CLOSET LVP-1 RB-1 PNT-1 ACT-1

147 PRESCHOOL LVP-1 RB-1 PNT-1 ACT-1 2

147A CLOSET LVP-1 RB-1 PNT-1 ACT-1

148 TODDLER LVP-1 RB-1 PNT-1 ACT-1 2

148A CLOSET LVP-1 RB-1 PNT-1 ACT-1

149 TODDLER LVP-1 RB-1 PNT-1 ACT-1 2

149A CLOSET LVP-1 RB-1 PNT-1 ACT-1

150 PRESCHOOL LVP-1 RB-1 PNT-1 ACT-1 2

150A CLOSET LVP-1 RB-1 PNT-1 ACT-1

151 TODDLER LVP-1 RB-1 PNT-1 ACT-1 2

151A CLOSET LVP-1 RB-1 PNT-1 ACT-1

152 RESTROOM EXISTING - EXISTING PNT-5

GENERAL NOTES

A. FINISHES INDICATED ARE THE APPROVED BASIS OF DESIGN

TO CONVEY COLOR, PATTERN, TEXTURE AND SALIENT

CHARACTERISTICS ONLY. THE LISTING OF MANUFACTURER

INFORMATION IS NOT INTENDED TO LIMIT THE SELECTION OF

PRODUCTS PROVIDED BY OTHER MANUFACTURERS.

PRODUCTS MEETING THESE CRITERIA WILL BE CONSIDERED

AND MUST BE REVIEWED BY THE INTERIOR DESIGNER OF

RECORD (IDOR) AND THE NAVFAC INTERIOR DESIGNER AND

APPROVED BY THE CONTRACTING OFFICER.

B. FINISH ITEMS ARE NOT TO BE SUBSTITUTED DUE TO

ORDERING LEAD TIMES. IT IS THE CONTRACTOR ’S

RESPONSIBILITY TO ORDER ALL MATERIALS IN TIME TO AVOID

DELAYS.

C. COORDINATE THERMOSTAT LOCATIONS WITH MECHANICAL

DRAWINGS AND CONSTRUCTION MANAGER. INSTALL

THERMOSTATS NEAR A CORNER OF THE ROOM OR BY LIGHT

SWITCHES. DO NOT INSTALL THERMOSTATS IN THE CENTER

OF A WALL.

D. ALL INTERIOR FINISHES IN VERTICAL EXIT WAYS, EXIT

LOBBIES, AND EXIT CORRIDORS MUST MEET MINIMUM CLASS

A RATING.

E. ALL MATERIALS/PRODUCTS ARE TO BE INSTALLED PER

MANUFACTURER'S INSTALLATION REQUIREMENTS.

F. SPRAY PAINT ELECTRICAL PANELS, ACCESS PANELS, AND

EXPANSION JOINTS TO MATCH THE ADJACENT WALL COLOR.

PANELS PAINTED BY BRUSH ARE NOT ACCEPTABLE.

G. ALL FLOORING TRANSITIONS MUST MEET ABA GUIDELINES.

FLOORING TRANSITIONS OCCURRING UNDER DOORS MUST

BE CENTERED UNDER DOOR.

H. CONTRACTOR MUST MARK/TAPE ALL CABLES WITH THEIR

DESIGNATED JACK NUMBER WHEN FACEPLATES ARE

REMOVED FOR PAINTING. ALL CABLING IS REQUIRED TO BE

RETESTED (PER 27 10 00) FROM FACEPLATE TO PANEL.

I. ALL TELECOM MUST BE COVERED WHEN THE COMM/CCTV

ROOM IS PAINTED.

J. BACKBOARD MUST NOT BE PAINTED IN THE COMM/CCTV

ROOM.

K. ALL AREAS TO RECEIVE RESILIENT BASE (RB-1).

L. ALL WALLS TO BE PAINTED (PNT-1) UNLESS OTHERWISE

INDICATED. ALL HOLLOW METAL DOORS AND DOOR FRAMES

TO BE PAINTED (PNT-4). ALL GWB CEILINGS TO BE PAINTED

(PNT-5).

M. ALL TOILET PARTITION TO BE HDPE FINISH (HDPE-1).

N. ALL INTERIOR WOOD DOORS TO BE (WD-1).

O. SEE I-601 & I-602 FOR ROOM FINISH SCHEDULE AND FINISH

LEGEND.

FINISH SCHEDULE KEY NOTES

1. CARPET TILE INSTALLATION TO BE VERTICAL ASHLAR

PATTERN.

2. WINDOWS TO RECEIVE SINGLE LAYER ROLLER SHADE

(WS-1). SEE DETAIL C1/I-502.

I G

IV R

FOHT

I

NO

M N

EW

A

OM

L

C

C

A

Cert. 001152

JAMIE D. KISSEL RER

T

IFIED

INTERIOR

DE

SI

A B

C D

Fi le

P at h:

P rin t D at e:

E

SYM. DESCRIPTION DATE APP.

REVISIONS

DR.

DES.

CHK.

SUBMITTED BY:

DESIGN DIR.

APPROVED: PWO OR OICC

SATISFACTORY TO:

DATE

DATE

DEPARTMENT OF THE NAVY NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND

CAMP LEJEUNE, NORTH CAROLINA

MARINE CORPS BASE

SIZE CODE IDENT. NO. NAVFAC DRAWING NO.

E1 80091 CONSTR. CONTR. NO.

AS NOTEDSCALE SHEET

M

BF

A N

O

SPEC.

2 3 4 5 6

A B

C D

E

1 2 3 4 5 6

1008 GRANBY STREET

NORFOLK, VA 23510

757.224.0489

W :\2

TT

M ec ha ni ca l R ep ai rs

\R ev it\

_T

T1

W

ID

_R

.rv t

6/

/2

6:

:4

PM

I-602

DMR

JDK

JDK MECHANICAL REPAIRS

SCHEDULES & LEGENDS

60042050 N40085-23-B-0044

BUILDING TT113

GENERAL NOTES

A. FINISHES INDICATED ARE THE APPROVED BASIS OF DESIGN

TO CONVEY COLOR, PATTERN, TEXTURE AND SALIENT

CHARACTERISTICS ONLY. THE LISTING OF MANUFACTURER

INFORMATION IS NOT INTENDED TO LIMIT THE SELECTION OF

PRODUCTS PROVIDED BY OTHER MANUFACTURERS.

PRODUCTS MEETING THESE CRITERIA WILL BE CONSIDERED

AND MUST BE REVIEWED BY THE INTERIOR DESIGNER OF

RECORD (IDOR) AND THE NAVFAC INTERIOR DESIGNER AND

APPROVED BY THE CONTRACTING OFFICER.

B. FINISH ITEMS ARE NOT TO BE SUBSTITUTED DUE TO

ORDERING LEAD TIMES. IT IS THE CONTRACTOR ’S

RESPONSIBILITY TO ORDER ALL MATERIALS IN TIME TO AVOID

DELAYS.

C. COORDINATE THERMOSTAT LOCATIONS WITH MECHANICAL

DRAWINGS AND CONSTRUCTION MANAGER. INSTALL

THERMOSTATS NEAR A CORNER OF THE ROOM OR BY LIGHT

SWITCHES. DO NOT INSTALL THERMOSTATS IN THE CENTER

OF A WALL.

D. ALL INTERIOR FINISHES IN VERTICAL EXIT WAYS, EXIT

LOBBIES, AND EXIT CORRIDORS MUST MEET MINIMUM CLASS

A RATING.

E. ALL MATERIALS/PRODUCTS ARE TO BE INSTALLED PER

MANUFACTURER'S INSTALLATION REQUIREMENTS.

F. SPRAY PAINT ELECTRICAL PANELS, ACCESS PANELS, AND

EXPANSION JOINTS TO MATCH THE ADJACENT WALL COLOR.

PANELS PAINTED BY BRUSH ARE NOT ACCEPTABLE.

G. ALL FLOORING TRANSITIONS MUST MEET ABA GUIDELINES.

FLOORING TRANSITIONS OCCURRING UNDER DOORS MUST

BE CENTERED UNDER DOOR.

H. CONTRACTOR MUST MARK/TAPE ALL CABLES WITH THEIR

DESIGNATED JACK NUMBER WHEN FACEPLATES ARE

REMOVED FOR PAINTING. ALL CABLING IS REQUIRED TO BE

RETESTED (PER 27 10 00) FROM FACEPLATE TO PANEL.

I. ALL TELECOM MUST BE COVERED WHEN THE COMM/CCTV

ROOM IS PAINTED.

J. BACKBOARD MUST NOT BE PAINTED IN THE COMM/CCTV

ROOM.

K. ALL AREAS TO RECEIVE RESILIENT BASE (RB-1).

L. ALL WALLS TO BE PAINTED (PNT-1) UNLESS OTHERWISE

INDICATED. ALL HOLLOW METAL DOORS AND DOOR FRAMES

TO BE PAINTED (PNT-4). ALL GWB CEILINGS TO BE PAINTED

(PNT-5).

M. ALL TOILET PARTITION TO BE HDPE FINISH (HDPE-1).

N. ALL INTERIOR WOOD DOORS TO BE (WD-1).

O. SEE I-601 & I-602 FOR ROOM FINISH SCHEDULE AND FINISH

LEGEND.

FINISH LEGEND

NO. NAME LOCATION MANUFACTURER MODEL COLOR SIZE

ACG-1 ACOUSTICAL CEILING GRID SUSPENDED CEILING (ACT-1) ARMSTRONG CEILINGS INTERLUDE XL HRC WHITE 9/16" ACT-1 ACOUSTICAL CEILING TILE NON-GWB OR EXPOSED CEILINGS ARMSTRONG CEILINGS FINE FISSURED SQUARE LAY-IN WHITE 24" X 24" CPT-1 CARPET TILE W/ ATTACHED PAD OFFICES TARKETT AFTERMATH II 03026 POTPOURRI 23510 24" x 24", VERTICAL ASHLAR HDPE-1 HIGH DENSITY POLYETHYLENE CLASSROOM TOILET AREAS SCRANTON PRODUCTS HINY HIDERS ORANGE PEEL CHARCOAL - HW-2 FINGER PINCH GUARD HINGE AND STOP SIDE OF INTERIOR DOORS FINGER GUARD USA FINGER KEEPER GREY LONG - FULL HEIGHT OF DOOR LVP-1 LUXURY VINYL PLANK CLASSROOMS & CORRIDORS TARKETT HERITAGE PLANK ANTIQUE CIMARRON PEHP GW29 TG 6" X 36"

PLAM-1 PLASTIC LAMINATE CASEWORK RUGBY PREMIER SERIES SHAKER SAND -

PNT-1 PAINT PRIMARY WALLS SHERWIN WILLIAMS SW 6135 ECU -

PNT-4 PAINT DOOR FRAMES SHERWIN WILLIAMS SW 6080 UTTERLY BEIGE -

PNT-5 PAINT GWB CEILINGS SHERWIN WILLIAMS SW 7757 HIGH REFLECTIVE WHITE -

RB-1 RUBBER BASE PRIMARY BASE TARKETT COVE TA8 WELSH CASTLE CB 4"H

SS-1 SOLID SURFACE COUNTERTOPS LG HIMACS CLASSIC WALLOWA G157 -

TS-1 TRANSITION STRIP LVT TO CARPET SCHLUTER VINPRO-S SATIN ANODIZED -

TS-2 TRANSITION STRIP LVT TO EXISTING TILE SCHLUTER RENO-U SATIN ANODIZED -

WS-1 BLACKOUT WINDOW SHADE EXTERIOR WINDOWS DRAPER FLOCKE LOUTRE/WHITE (BLACKOUT) -

I G

IV R

FOHT

I

NO

M N

EW

A

OM

L

C

C

A

Cert. 001152

JAMIE D. KISSEL RER

T

IFIED

INTERIOR

DE

SI

TT113 Mechanical Repairs Marine Corps Base, Camp Lejeune, NC

Finish Boards

TT113 Mechanical Repairs Marine Corps Base, Camp Lejeune, NC Structural Interior Design Package within interior design

ACT-1

Armstrong Fine Fissured 24X24 Square Lay-In, White *Image similar to finish

PNT-4 - Door Frame Paint Sherwin Williams SW 6080, Utterly Beige

PNT-1 - Primary Wall Paint Sherwin Williams SW6135, Ecru

WS-1- Blackout Draper Flocke, Loutre/White

Structural Interior Design Package within interior design

CPT-1 - Carpet Tile - Private Offices - 24” x 24” Tarkett Aftermath II, Potpourii

Structural Interior Design Package within interior design

LVT-1 - Luxury Vinyl Tile - Classrooms - 6” x 36” Tarkett Heritage Plank, Antique Cimarron

Structural Interior Design Package within interior design

SS-1 - Solid Surface - Countertops LX Hausys/HIMACS Wallowa G157

RB-1 - Rubber Base - Primary Base Johnsonite Welsh Castle

PLAM-1 - Plastic Laminate - Casework iShopRugby Standard Laminate, Shaker Sand

Table of Contents
Point of Contact List
SID Narrative
Meeting Minutes
Finish Plans & Schedules
Finish Boards

File details come from the government source that posted it. Updated .