N4008523B0044 Specs.pdf

PDF 18 MB Posted

Attached to
Mechanical Repairs Bldg TT113 CDC
Solicitation number
N4008526R9010
Issued by

About this file

This is a specifications document for mechanical repairs to Building TT113 at Marine Corps Base Camp Lejeune, North Carolina, Project 23-0044. The document provides comprehensive contract requirements including detailed construction drawings, specifications organized by CSI MasterFormat divisions, and administrative procedures. The scope encompasses mechanical system repairs including HVAC equipment, piping systems, controls, and related infrastructure. Contract drawings include structural, architectural, mechanical, electrical, plumbing, fire protection, and telecommunications systems across multiple sheets (60042008-60042126). The specifications address 33 divisions of work ranging from general requirements and demolition to utilities, with particular emphasis on mechanical systems (Division 23), electrical systems (Division 26), fire protection (Division 21), and environmental controls.

The contract incorporates mandatory Navy and federal requirements including the Electronic Construction and Facility Support Contract Management System (eCMS) for document management, Construction Quality Control (CQC) procedures with required Quality Control Manager qualifications, comprehensive submittal procedures with 15-20 working day review periods, and multiple inspection phases (preparatory, initial, and follow-up). Key administrative requirements include adherence to EM 385-1-1 safety standards, High Performance and Sustainable Building (HPSB) Guiding Principles compliance, construction waste diversion targeting 60 percent minimum, GIS data deliverables following SDSFIE schema standards, and operation and maintenance documentation. The contractor must provide as-built drawings, record drawings, operation and maintenance manuals, training programs with video documentation, and facility electronic operation and maintenance support information (eOMSI) prior to beneficial occupancy. Utility coordination, including 14-day advance notification for cutovers and hazardous energy control procedures, is required. The project is restricted to MACC-qualified mechanical contractors listed on the General Requirements cover page.

View the file

Other files

File Type Posted
Amend 0015.pdf PDF
Amend 0014.pdf PDF
Amend 0013.pdf PDF
M-202-T.pdf PDF
Amend 0012.pdf PDF
60042073_Rev03.pdf PDF
60042049 _Rev03.pdf PDF
60042066_Rev03.pdf PDF
Amend 0011.pdf PDF
60042047 _Rev03.pdf PDF
60042070_Rev03.pdf PDF
N4008523B0044 PPI Revision 03.pdf PDF
60042069_Rev03.pdf PDF
Amend 0010.pdf PDF
Amend 0010 Enclosure 3 DWGS.pdf PDF
Amend 0010 Enclosure 1 DWG List.pdf PDF
Amend 0009.pdf PDF
Amend 0008.pdf PDF
Amend 0004.pdf PDF
Amend 0007.pdf PDF
Amend 0006.pdf PDF
Amend 0005.pdf PDF
Amend 0003.pdf PDF
Amend 0002 SECTION 01 31 50 TRANSFER AND ACCEPTANCE OF MILITARY REAL PROPERTY.pdf PDF
Amend 0002.pdf PDF
Amend 0001.pdf PDF
230044 SID Binder.pdf PDF
230044 Basis of Design.pdf PDF
230044 Termite Inspection Report.pdf PDF
Mech MACC RFP.pdf PDF
230044 Lead and Asbesto Report.pdf PDF
230044 APPD.pdf PDF
N4008523B0044 Dwgs.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

THIS PAGE INTENTIONALLY LEFT BLANK

Mechanical Repairs Building TT113 Project 23-0044 MCB Camp Lejeune, NC 18 June 2025

LIST OF DRAWINGS

Contract drawings are as follows:

NAVFAC PLATE SHEET

NO NO TITLE

G GENERAL

60042008 G-001 TITLE SHEET AND INDEX OF DRAWINGS

GI LIFE SAFETY

60042009 GI001 LIFE SAFETY NOTES AND LEGEND

60042010 GI002 CODE COMPLIANCE SITE PLAN

60042011 GI101 LIFE SAFETY FLOOR PLAN

C CIVIL

60042012 C-001 CIVIL NOTES, LEGEND, AND ABBREVIATIONS

60042013 CD101 SITE PLAN-EXISTING CONDITIONS AND DEMOLITION

60042014 CS101 SITE PLAN-NEW WORK

60042015 CG101 SITE GRADING PLAN

60042016 CU101 SITE UTILITY PLAN

60042017 CS501 DETAILS

60042018 CG501 DETAILS

60042019 CU501 DETAILS

S STRUCTURAL

60042020 S-001 STRUCTURAL COVER SHEET

60042021 S-002 GENERAL NOTES

60042022 S-101 CATWALK FRAMING PLAN

60042023 S-102 ROOF FRAMING PLAN

60042024 S-103 MECHANICAL EQUIPMENT BUILDING - CONSTRUCTION

60042025 S-104 ACCESS PLATFORM - CONSTRUCTION

60042026 S-201 SECTIONS

60042027 S-202 MECHANICAL EQUIPMENT BUILDING SECTIONS

60042028 S-501 TYPICAL CONSTRUCTION DETAILS

A ARCHITECTURAL

60042029 A-001 SYMBOL LEGEND AND ABBREVIATIONS

60042030 AD101 FLOOR PLAN - EXISTING/DEMOLITION

60042031 AD103 ROOF PLAN - EXISTING/DEMOLITION

60042032 AD104 REFLECTED CEILING PLAN - EXISTING/DEMOLITION

60042033 AD201 EXTERIOR ELEVATIONS - EXISTING/DEMOLITION

60042034 A-101 FLOOR PLAN - CONSTRUCTION

60042035 A-102 ATTIC PLAN - CONSTRUCTION

60042036 A-103 ROOF PLAN - CONSTRUCTION

60042037 A-104 REFLECTED CEILING PLAN - CONSTRUCTION

60042038 A-110 MECHANICAL EQUIPMENT BUILDING - CONSTRUCTION

60042039 A-111 MECHANICAL EQUIPMENT BUILDING - EXTERIOR

ELEVATIONS/BUILDING SECTION

60042040 A-201 EXTERIOR ELEVATIONS - CONSTRUCTION

60042041 A-301 PARTIAL BUILDING SECTIONS - CONSTRUCTION

60042042 A-401 ENLARGED FLOOR PLANS

60042043 A-501 ASSEMBLIES AND DETAILS

60042044 A-502 DETAILS

60042045 A-503 DETAILS

60042046 A-601 DOOR SCHEDULE

SECTION DWGLIST - SI Template Page 1

NAVFAC PLATE SHEET

NO NO TITLE

I INTERIOR DESIGN

60042047 I-111 FINISH PLAN

60042048 I-502 INTERIOR DETAILS

60042049 I-601 ROOM FINISH SCHEDULE

60042050 I-602 FINISH LEGEND

FP FIRE PROTECTION

60042051 FP001 FIRE PROTECTION NOTES AND LEGEND

60042052 FP101 FIRE PROTECTION FLOOR PLAN

P PLUMBING

60042053 P-001 PLUMBING COVER SHEET

60042054 P-101 FIRST FLOOR PLAN - PLUMBING

60042055 P-201 ENLARGED FLOOR PLANS - PLUMBING

M MECHANICAL

60042056 M-001 MECHANICAL NOTES, ABBREVIATIONS, AND LEGEND

60042057 MD101 FIRST FLOOR PLAN - OVERALL - MECHANICAL HVAC DEMOLITION

60042058 MD102 FIRST FLOOR PLAN - EAST WING - MECHANICAL DEMOLITION

60042059 MD103 FIRST FLOOR PLAN - SOUTH WING - MECHANICAL DEMOLITION

60042060 MD104 FIRST FLOOR PLAN - WEST WING - MECHANICAL DEMOLITION

60042061 MD105 ATTIC PLAN - OVERALL - MECHANICAL DEMOLITION

60042062 MD106 ATTIC PLAN - EAST WING - MECHANICAL DEMOLITION

60042063 MD107 ATTIC PLAN - SOUTH WING - MECHANICAL DEMOLITION

60042064 MD108 ATTIC PLAN - WEST WING - MECHANICAL DEMOLITION

60042065 MD109 ATTIC PLAN - OVERALL - MECHANICAL PIPING DEMOLITION

60042066 MH101 FIRST FLOOR PLAN - OVERALL - MECHANICAL HVAC

60042067 MH102 FIRST FLOOR PLAN - EAST WING - MECHANICAL HVAC

60042068 MH103 FIRST FLOOR PLAN - SOUTH WING - MECHANICAL HVAC

60042069 MH104 FIRST FLOOR PLAN - WEST WING - MECHANICAL HVAC

60042070 MH105 ATTIC PLAN - OVERALL - MECHANICAL HVAC

60042071 MH106 ATTIC PLAN - EAST WING - MECHANICAL HVAC

60042072 MH107 ATTIC PLAN - SOUTH WING - MECHANICAL HVAC

60042073 MH108 ATTIC PLAN - WEST WING - MECHANICAL HVAC

60042074 MP101 FIRST FLOOR PLAN - OVERALL - MECHANICAL PIPING

60042075 MP102 FIRST FLOOR PLAN - EAST WING - MECHANICAL PIPING

60042076 MP103 FIRST FLOOR PLAN - SOUTH WING - MECHANICAL PIPING

60042077 MP104 FIRST FLOOR PLAN - WEST WING - MECHANICAL PIPING

60042078 MP105 ATTIC PLAN - OVERALL - MECHANICAL PIPING

60042079 MP106 ATTIC PLAN - EAST WING - MECHANICAL PIPING

60042080 MP107 ATTIC PLAN - SOUTH WING - MECHANICAL PIPING

60042081 MP108 ATTIC PLAN - WEST WING - MECHANICAL PIPING

60042082 MS101 SITE PLAN - MECHANICAL

60042083 M-301 MECHANICAL SECTION VIEW

60042084 M-302 MECHANICAL SECTION VIEW

60042085 M-303 MECHANICAL SECTION VIEW

60042086 M-401 MECHANICAL BUILDING - ENLARGED

60042087 M-501 MECHANICAL DETAILS

60042088 M-502 MECHANICAL DETAILS

60042089 M-503 MECHANICAL DETAILS

60042090 M-504 MECHANICAL DETAILS

60042091 M-505 MECHANICAL DETAILS

60042092 M-506 MECHANICAL DETAILS

60042093 M-601 MECHANICAL SCHEDULES

60042094 M-602 MECHANICAL SCHEDULES

60042095 M-603 MECHANICAL SCHEDULES

60042096 M-701 MECHANICAL CONTROLS

SECTION DWGLIST - SI Template Page 2

NAVFAC PLATE SHEET

NO NO TITLE

60042097 M-702 MECHANICAL CONTROLS

60042098 M-703 MECHANICAL CONTROLS

60042099 M-704 MECHANICAL CONTROLS

60042100 M-705 MECHANICAL CONTROLS

60042101 M-706 MECHANICAL CONTROLS

60042102 M-801 HOT WATER SYSTEM DIAGRAM

60042103 M-802 CHILLED WATER SYSTEM DIAGRAM

60042104 M-901 3D ISOMETRIC VIEW - DOAS-1

60042105 M-902 3D ISOMETRIC VIEW - DOAS-2

60042106 M-903 3D ISOMETRIC VIEW - DOAS-3

E ELECTRICAL

60042107 E-001 ELECTRICAL NOTES AND LEGENDS

60042108 ES101 SITE PLAN - ELECTRICAL

60042109 ED101 FLOOR PLAN - EQUIPMENT DEMOLITION

60042110 ED102 FLOOR PLAN - LIGHTING DEMOLITION

60042111 ED103 FLOOR PLAN - LOW VOLTAGE DEMOLITION

60042112 E-101 FLOOR PLAN - EQUIPMENT CONNECTIONS

60042113 E-102 FLOOR PLAN - LIGHTING

60042114 E-103 ROOF PLAN - LIGHTNING PROTECTION

60042115 E-104 MECHANICAL BUILDING - LIGHTNING PROTECTION

60042116 E-105 FLOOR PLAN - LOW VOLTAGE

60042117 E-401 ENLARGED PLANS - EQUIPMENT CONNECTIONS

60042118 E-402 ENLARGED PLANS - MECHANICAL BUILDING

60042119 E-501 ELECTRICAL DETAILS

60042120 E-502 ELECTRICAL DETAILS

60042121 E-503 ELECTRICAL DETAILS

60042122 E-601 ELECTRICAL SCHEDULES

60042123 E-602 ELECTRICAL SCHEDULES

60042124 E-603 ELECTRICAL SCHEDULES

60042125 E-604 ELECTRICAL SCHEDULES

60042126 E-701 ELECTRICAL RISER DIAGRAM

SECTION DWGLIST - SI Template Page 3

SECTION DWGLIST - SI Template Page 4

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 04/22 SUMMARY OF WORK

01 14 00 04/22 WORK RESTRICTIONS (MCBL)

01 20 00 04/22 PRICE AND PAYMENT PROCEDURES (MCBCL)

01 30 00 01/23 ADMINISTRATIVE REQUIREMENTS

01 31 23.13 20 05/17, CHG 7: 11/21 ELECTRONIC CONSTRUCTION AND FACILITY

SUPPORT CONTRACT MANAGEMENT SYSTEM

01 31 50 04/22 TRANSFER AND ACCEPTANCE OF MILITARY

REAL PROPERTY

01 32 16.00 20 08/18, CHG 1: 08/20 SMALL PROJECT CONSTRUCTION PROGRESS

SCHEDULES

01 33 00 04/22 SUBMITTAL PROCEDURES

01 33 29 02/21 SUSTAINABILITY REQUIREMENTS AND REPORTING

HPSB CHECKLIST

01 35 26 11/20, CHG 3: 02/22 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 02/19 SOURCES FOR REFERENCE PUBLICATIONS

CONTROLS01 45 00 08/23 QUALITY CONTROL

01 50 00 11/20, CHG 3: 08/24 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 19 05/12 TEMPORARY ENVIRONMENTAL CONTROLS

01 74 19 02/19, CHG 3: 11/21 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

01 78 00 04/22 CLOSEOUT SUBMITTALS

01 78 23 04/22 OPERATION AND MAINTENANCE DATA

01 78 24.00 20 03/23 FACILITY ELECTRONIC OPERATION AND

MAINTENANCE SUPPORT INFORMATION (eOMSI)

01 78 30.00 22 5/22 GIS DATA DELIVERABLES

DIVISION 02 - EXISTING CONDITIONS

02 41 00 08/22 DECONSTRUCTION

DIVISION 03 - CONCRETE

03 30 00 02/19, CHG 4: 08/22 CAST-IN-PLACE CONCRETE

03 30 53 05/14 MISCELLANEOUS CAST-IN-PLACE CONCRETE SIDEWALKS

DIVISION 04 - MASONRY

04 20 00 11/15, CHG 2: 05/19 UNIT MASONRY

DIVISION 05 - METALS

05 12 00 08/18, CHG 2: 05/21 STRUCTURAL STEEL

05 30 00 05/15, CHG 2: 08/18 STEEL DECKS

05 40 00 05/15, CHG 1: 08/18 COLD-FORMED METAL FRAMING

05 50 13 05/17, CHG 1: 08/18 MISCELLANEOUS METAL FABRICATIONS

05 51 33 02/16, CHG 2: 02/18 METAL LADDERS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 08/16, CHG 2: 11/18 ROUGH CARPENTRY

06 41 16.00 10 08/10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS

06 61 16 08/20 SOLID SURFACING FABRICATIONS

PROJECT TABLE OF CONTENTS Page 1

SCHEDULE OF FIRE PROTECTION SYSTEM INSPECTIONS

BY FPQC SPECIALIST

SUBMITTAL REGISTER

TT113 FURNITURE INVENTORY

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 22 00 02/16, CHG 3: 11/18 ROOF AND DECK INSULATION

07 27 19.01 05/17, CHG 2: 08/20 SELF-ADHERING AIR BARRIERS

07 27 26 05/17, CHG 2: 08/20 FLUID-APPLIED MEMBRANE AIR BARRIERS

07 27 36 05/17, CHG 3: 02/23 SPRAY FOAM AIR BARRIERS

07 42 13 05/11, CHG 2: 02/18 METAL WALL PANELS

07 60 00 05/17, CHG 2: 11/18 FLASHING AND SHEET METAL

07 61 15.00 20 08 March 2021 CL ALUMINUM STANDING SEAM ROOFING

07 84 00.00 22 09/23 FIRESTOPPING

07 92 00 08/16, CHG 3: 11/18 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 08/20 STEEL DOORS AND FRAMES

08 14 00 08/16, CHG 1: 08/18 WOOD DOORS

08 31 00 05/17, CHG 1: 08/18 ACCESS DOORS AND PANELS

08 33 24 08/20, CHG 1: 02/22 ALUMINUM OVERHEAD COILING DOORS

08 71 00 02/16, CHG 4: 02/22 DOOR HARDWARE

08 91 00 06/24 MCBCL ALUMINUM WALL LOUVERS

DIVISION 09 - FINISHES

09 22 00 02/10, CHG 2: 08/18 SUPPORTS FOR GYPSUM BOARD

09 29 00 08/16, CHG 4: 02/20 GYPSUM BOARD

09 51 00 08/20 ACOUSTICAL CEILINGS

09 65 00 08/10, CHG 3: 08/18 RESILIENT FLOORING

09 68 00 11/17, CHG 2: 08/20 CARPET TILE

09 90 00 02/21 PAINTS AND COATINGS

DIVISION 10 - SPECIALTIES

10 26 00 08/20 WALL AND DOOR PROTECTION

10 44 16 11/19 FIRE EXTINGUISHERS

DIVISION 12 - FURNISHINGS

12 24 13 08/20 ROLLER WINDOW SHADES

DIVISION 21 - FIRE SUPPRESSION

21 13 13 08/20 WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION

DIVISION 22 - PLUMBING

22 00 00 11/15, CHG 4: 05/21 PLUMBING, GENERAL PURPOSE

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 03 00.00 20 08/24 MCBCL BASIC MECHANICAL MATERIALS AND METHODS

23 05 15 05/22, CHG 1: 02/24 COMMON PIPING FOR HVAC

23 05 48.19 05/18 SEISMIC BRACING FOR HVAC

23 05 93 11/15 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 02/13, CHG 7: 05/20 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 09 00 02/25 MCBCL INSTRUMENTATION AND CONTROL FOR HVAC

PROJECT TABLE OF CONTENTS Page 2

23 09 13 02/25 MCBCL INSTRUMENTATION AND CONTROL DEVICES

FOR HVAC

23 09 23.02 02/25 MCBCL BACNET DIRECT DIGITAL CONTROL FOR HVAC

AND OTHER BUILDING CONTROL SYSTEMS

23 21 13.00 20 04/06, CHG 2: 11/19 LOW TEMPERATURE WATER (LTW) HEATING

SYSTEM

23 23 00 08/21 REFRIGERANT PIPING

23 25 00 05/21 CHEMICAL TREATMENT OF WATER FOR

MECHANICAL SYSTEMS

23 30 00 05/20, CHG 1: 02/22 HVAC AIR DISTRIBUTION

23 52 43.00 20 05/15 LOW PRESSURE WATER HEATING BOILERS

(UNDER 800,000 BTU/HR OUTPUT)

23 64 10 11/16 WATER CHILLERS, VAPOR COMPRESSION TYPE

23 64 26 08/09, CHG 5: 11/19 CHILLED WATER PIPING SYSTEMS

23 74 33 05/24 DEDICATED OUTDOOR AIR SYSTEMS (DOAS)

23 81 00 05/18 DECENTRALIZED UNITARY HVAC EQUIPMENT

DIVISION 25 - INTEGRATED AUTOMATION

25 05 11.00 09/22 CYBERSECURITY FOR FACILITY-RELATED

CONTROL SYSTEMS - ISOLATED SYSTEMS

DIVISION 26 - ELECTRICAL

26 20 00 08/19, CHG 3: 11/21 INTERIOR DISTRIBUTION SYSTEM

26 41 00 11/13 LIGHTNING PROTECTION SYSTEM

26 51 00 05/20, CHG 2: 11/21 INTERIOR LIGHTING

DIVISION 27 - COMMUNICATIONS

27 10 00 04/22 BUILDING TELECOMMUNICATIONS CABLING

SYSTEM (MCBCL)

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 31 76 08/20 INTERIOR FIRE ALARM AND MASS

NOTIFICATION SYSTEM, ADDRESSABLE

DIVISION 31 - EARTHWORK

31 00 00 08/23 EARTHWORK

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 92 23 04/06, CHG 1: 08/21 SODDING

DIVISION 33 - UTILITIES

33 11 00 08/24 WATER UTILITY DISTRIBUTION PIPING

33 30 00 05/18 SANITARY SEWERAGE

33 61 14 02/10 EXTERIOR BURIED PREINSULATED WATER PIPING

33 71 02 08/21 UNDERGROUND ELECTRICAL DISTRIBUTION

33 82 00 08/22 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 3

APPENDIX - Reports

ASBESTOS, LEAD PAINT, AND MOLD ASSESSMENT

TERMITE INSPECTION REPORT

PROJECT TABLE OF CONTENTS Page 4

SECTION 01 11 00

SUMMARY OF WORK

04/22

PART 1 GENERAL

1.1 WORK COVERED BY CONTRACT DOCUMENTS

1.1.1 Project Description

The work includes all items of work as described in the attached project description.

1.1.2 Location

The work shall be located at the Marine Corps Base Camp Lejeune, North Carolina, at the building and/or area as described in the attached project description. The exact location will be indicated by the Contracting Officer.

1.2 PHASED CONSTRUCTION SCHEDULE

Within the overall project schedule, commence and complete the work in phases as described in the attached project description.

1.3 EXISTING WORK

In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements":

a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.

b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work shall be in a condition equal to or better than that which existed before new work started.

1.4 LOCATION OF UNDERGROUND FACILITIES

The Contractor will be responsible for obtaining the services of a professional utility locator to scan the construction site with electromagnetic or sonic equipment, and mark the surface of the ground where existing underground utilities are discovered. Verify the elevations of existing piping, utilities, and any type of underground obstruction not indicated or specified to be removed but indicated or discovered during scanning in locations to be traversed by piping, ducts, and other work to be installed. Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.

SECTION 01 11 00 Page 1

1.4.1 Notification Prior to Excavation

Notify the Contracting Officer 's Representative (COR) 48 hours prior to starting excavation work .

1.5 GOVERNMENT-FURNISHED MATERIAL AND EQUIPMENT

Government furnished material and equipment will be indicated on drawings and in scope of work if applicable.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

-- End of Section --

SECTION 01 11 00 Page 2

SECTION 01 14 00

WORK RESTRICTIONS (MCBL)

04/22

PART 1 GENERAL

1.1 SUBMITTALS

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-01 Preconstruction Submittals

List of Contact Personnel

1.2 SPECIAL SCHEDULING REQUIREMENTS

a. The Contractor shall comply with all special scheduling requirements as described in the attached project description.

d. Permission to interrrupt any Station roads, railroads, and/or utility service shall be requested in writing a minimum of 15 calendar days prior to the desired date of interruption.

1.3 CONTRACTOR ACCESS AND USE OF PREMISES

1.3.1 Activity Regulations

Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. Wear appropriate personal protective equipment (PPE) in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Ensure all Contractor equipment, include delivery vehicles, are clearly identified with their company name.

1.3.1.1 Subcontractors and Personnel Contacts

Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.

1.3.1.2 Installation Access

Obtain access to Navy installations through participation in the Defense Biometrics Identification System (DBIDS). Requirements for Contractor employee registration, and transition for employees currently under Navy Commercial Access Control System (NCACS), are available at https://www.cnic.navy.mil/om/dbids.html . No fees are associated with obtaining a DBIDS credential.

Participation in the DBIDS is not mandatory, and Contractor personnel may apply for One-Day Passes at the Base Visitor Control Office to access an installation.

The following are specific details regarding contractor personnel

SECTION 01 14 00 Page 1 requirements. For the most up-to-date information regarding Base Access please visit https://www.lejeune.marines.mil/Base-Access/.

1.3.1.2.1 Registration for DBIDS

Registration for DBIDS is available at https://www.cnic.navy.mil/om/dbids.html . Procedure includes:

a. Present a letter or official award document (i.e. DD Form 1155 or SF 1442) from the Contracting Officer, that provides the purpose for access, to the base Visitor Control Center representative.

b. Present valid identification, such as a passport or Real ID Act-compliant state driver's license.

c. Provide completed SECNAV FORM 5512/1 to the base Visitor Control Center representative to obtain a background check. This form is available for download at https://www.cnic.navy.mil/om/dbids.html .

d. Upon successful completion of the background check, the Government will complete the DBIDS enrollment process, which includes Contractor employee photo, fingerprints, base restriction and several other assessments.

e. Upon successful completion of the enrollment process, the Contractor employee will be issued a DBIDS credential, and will be allowed to proceed to worksite.

1.3.1.2.2 DBIDS Eligibility Requirements

Throughout the length of the contract, the Contractor employee must continue to meet background screen standards. Periodic background screenings are conducted to verify continued DBIDS participation and installation access privileges. DBIDS access privileges will be immediately suspended or revoked if at any time a Contractor employee becomes ineligible.

An adjudication process may be initiated when a background screen failure results in disqualification from participation in the DBIDS, and Contractor employee does not agree with the reason for disqualification.

The Government is the final authority.

1.3.1.2.3 DBIDS Notification Requirements

a. Immediately report instances of lost or stolen badges to the Contracting Officer.

b. Immediately collect DBIDS credentials and notify the Contracting Officer in writing under the following circumstances:

(1) An employee has departed the company without having properly returned or surrendered their DBIDS credentials.

(2) There is a reasonable basis to conclude that an employee, or former employee, might pose a risk, compromise, or threat to the safety or security of the Installation or anyone therein.

SECTION 01 14 00 Page 2

1.3.1.2.4 One-Day Passes

Personnel applying for One-Day passes at the Base Visitor Control Office are subject to daily mandatory vehicle inspection, and will have limited access to the installation. The Government is not responsible for any cost or lost time associated with obtaining daily passes or added vehicle inspections incurred by non-participants in the DBIDS.

1.3.2 No Smoking Policy

Smoking is prohibited within and outside of all buildings on installation, except in designated smoking areas. This applies to existing buildings, buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The Contracting Officer will identify designated smoking areas.

1.3.3 Working Hours

Regular working hours shall be 0730-1600, Monday through Friday, excluding Government holidays .

1.3.4 Work Outside Regular Hours

Work outside regular working hours requires COR approval. Provide written request at least 15 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress. During periods of darkness, the different parts of the work shall be lighted in a manner approved by the COR.

1.3.5 Existing Buildings

1.3.5.1 Storage of Furniture and Boxed Items

The Government boxes small classroom and office items. The Contractor labels and documents the original location of each box and furniture item. Handle and transport packed boxes and furniture items to temporary climate controlled storage units. Handle, transport and return packed boxes and furniture items to thier respective spaces after construction is complete and within the contract time allowed. The Government unpacks boxes and positions furniture items within spaces.

Anticipate handling, transporting and storing 80 boxes for each classroom and 80 boxes for each office. Reference the attached TT113 Furniture Inventory for a listing of furniture items to be handled, transported and stored.

Leave attached items in place, and protect them against damage, or temporarily disconnect, relocate, protect, and reinstall them at the completion of the work.

1.3.5.2 Work Areas

The Contractor works within a portion of an existing building which is not occupied. Secure the existing building and its contents at all times.

SECTION 01 14 00 Page 3

1.3.6 Utility Cutovers and Interruptions

a. The Contractor shall coordinate a minimum of 14 calendar days prior to any planned utility cutover / interruption. Make utility cutovers and interruptions during normal working hours.

b. Ensure that new utility lines are complete, except for the connection, before interrupting existing service.

c. Interruption to water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, heating, fire alarm, and compressed air shall be considered utility cutovers. This time limit includes time for deactivation and reactivation.

d. Operation of Station Utilities: The Contractor shall not operate nor disturb the setting of control devices in the station utilities system, including water, sewer, electrical, and steam services. The Government will operate the control devices as required for normal conduct of the work. The Contractor shall notify the Contracting Officer at least 15 days prior to such operation.

1.4 SECURITY REQUIREMENTS

Contract Clause "FAR 52.204-2, Security Requirements and Alternate II," "FAC 5252.236-9301, Special Working Conditions and Entry to Work Area," apply.

1.5 EMERGENCY UNEXPLODED ORDNANCE (UXO) RESPONSE

In the event that UXO, as defined in 40 CFR 260 is encountered during the construction activities that are deemed to be a threat to human health or the environment, Camp Lejeune Military Police and EOD professionals shall be immediately contacted to conduct an emergency response. Additionally, immediately contact the Contracting Officer if UXO is encountered. An evaluation of this scenario and procedures, with contract numbers, shall be included in the Health and Safety Plan (HASP) for the fieldwork.

1.5.1 3R TRAINING

All Contractor personnel performing ground disturbing activities must complete contractor awareness training related to recognizing UXO. This training (3R TRAINING) is available online at:

http://www.lejeune.marines.mil/OfficesStaff/EnvironmentalMgmt/TrainingVideo.aspx

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

SECTION 01 14 00 Page 4

Room # Room

Description Item Description Quantity

Width (in inches)

Length (in inches)

Height (in inches)

101 PreToddler 8 Chair 14 14 16 23 101 PreToddler 8 Changing Table 1 23 45 40 101 PreToddler 8 Shelf 1 22 32 28 101 PreToddler 8 Curved Table 2 30 67 15 101 PreToddler 8 Dome 1 39 39 38 101 PreToddler 8 Large Corner Shelf 1 15 15 25 101 PreToddler 8 Shelf 3 14 49 24 101 PreToddler 8 Large Personal Cubby 2 14 49 40 101 PreToddler 8 Play Cabinet 1 14 16 30 101 PreToddler 8 Play Sink 1 14 16 19 101 PreToddler 8 Play Stove 1 14 16 19 101 PreToddler 8 Play Table 1 27 27 14 101 PreToddler 8 Sand Table 1 24 26 19 101 PreToddler 8 Shelf 1 14 24 24 101 PreToddler 8 Small Personal Cubby 1 14 17 40 101 PreToddler 8 Three Drawer Podium Cabinet 1 20 25 44 101 PreToddler 8 Two Door Cabinet 1 15 36 33 101 PreToddler 8 Moving Box 80 18 18 16 102 PreToddler 7 Chair 14 14 16 23 102 PreToddler 7 Changing Table 1 23 45 40 102 PreToddler 7 Large Corner Shelf 2 15 15 25 102 PreToddler 7 Large Cubby 1 14 49 24 102 PreToddler 7 Large Personal Cubby 2 14 48 53 102 PreToddler 7 Play Cabinet 1 14 16 30 102 PreToddler 7 Play Sink 1 14 16 19 102 PreToddler 7 Play Stove 1 14 16 19 102 PreToddler 7 Sand Table 1 24 26 19 102 PreToddler 7 Shelf 3 14 24 24 102 PreToddler 7 Shelf 1 15 37 24 102 PreToddler 7 Small Personal Cubby 1 14 25 53 102 PreToddler 7 Three Drawer Podium Cabinet 1 20 25 44 102 PreToddler 7 Two Door Cabinet 1 15 36 33 102 PreToddler 7 Moving Box 80 18 18 16 103 PreToddler 1 Chair 12 14 16 23 103 PreToddler 1 Changing Table 1 23 45 40 103 PreToddler 1 Couch - Child 1 24 25 23 103 PreToddler 1 Curved Shelf 1 14 29 16 103 PreToddler 1 Large Corner Shelf 1 15 15 25 103 PreToddler 1 Shelf 2 14 49 24 103 PreToddler 1 Large Personal Cubby 2 14 48 53 103 PreToddler 1 Play Cabinet 1 14 16 30 103 PreToddler 1 Play Sink 1 14 16 19 103 PreToddler 1 Play Stove 1 14 16 19 103 PreToddler 1 Play Table 1 27 27 14 103 PreToddler 1 Sand Table 1 24 26 19 103 PreToddler 1 Shelf 1 14 24 24 103 PreToddler 1 Shelf 1 15 37 24 103 PreToddler 1 Small Personal Cubby 1 14 25 53

TT113 Funiture Inventory

Description Item Description Quantity

Width (in inches)

Length (in inches)

Height (in inches)

103 PreToddler 1 Small Toy Bin 1 15 19 12 103 PreToddler 1 Square Table 2 22 22 17 103 PreToddler 1 Three Drawer Podium Cabinet 1 20 25 44 103 PreToddler 1 Two Door Cabinet 1 15 36 33 103 PreToddler 1 Moving Box 80 18 18 16 103 PreToddler 5 Chair 14 14 16 23 103 PreToddler 5 Changing Table 1 23 45 40 103 PreToddler 5 Curved Shelf 1 14 29 24 103 PreToddler 5 Curved Table 2 14 29 24 103 PreToddler 5 Shelf 3 14 49 24 103 PreToddler 5 Large Personal Cubby 2 14 48 53 103 PreToddler 5 Play Cabinet 1 14 16 30 103 PreToddler 5 Play Sink 1 14 16 19 103 PreToddler 5 Play Stove 1 14 16 19 103 PreToddler 5 Play Table 1 27 27 14 103 PreToddler 5 Sand Table 1 24 26 19 103 PreToddler 5 Small Cubby 3 15 37 24 103 PreToddler 5 Small Personal Cubby 1 14 25 53 103 PreToddler 5 Three Drawer Cabinet 1 20 25 44 103 PreToddler 5 Two Door Cabinet 1 15 36 33 103 PreToddler 5 Moving Box 80 18 18 16 104 PreToddler 6 Chair 12 14 16 23 104 PreToddler 6 Changing Table 1 23 45 40 104 PreToddler 6 Shelf 2 14 49 24 104 PreToddler 6 Large Personal Cubby 2 14 48 53 104 PreToddler 6 Play Cabinet 1 14 16 30 104 PreToddler 6 Play Sink 1 14 16 19 104 PreToddler 6 Play Square Table 2 22 22 17 104 PreToddler 6 Play Stove 1 14 16 19 104 PreToddler 6 Play Table 1 27 27 14 104 PreToddler 6 Sand Table 1 24 26 19 104 PreToddler 6 Shelf 1 14 24 24 104 PreToddler 6 Shelf 3 15 37 24 104 PreToddler 6 Small Personal Cubby 1 14 25 53 104 PreToddler 6 Small Toy Bin 1 15 19 12 104 PreToddler 6 Three Drawer Podium Cabinet 1 20 25 44 104 PreToddler 6 Two Door Cabinet 1 15 36 33 104 PreToddler 6 Moving Box 80 18 18 16 106 PreToddler 3 Chair 14 14 16 23 106 PreToddler 3 Changing Table 1 23 45 40 106 PreToddler 3 Large Corner Shelf 2 15 15 25 106 PreToddler 3 Shelf 2 14 49 24 106 PreToddler 3 Large Personal Cubby 2 14 48 53 106 PreToddler 3 Large Toy Bin 1 14 37 12 106 PreToddler 3 Play Cabinet 1 14 16 30 106 PreToddler 3 Play Sink 1 14 16 19 106 PreToddler 3 Play Square Table 1 22 22 17 106 PreToddler 3 Play Stove 1 14 16 19

Description Item Description Quantity

Width (in inches)

Length (in inches)

Height (in inches)

106 PreToddler 3 Sand Table 1 24 26 19 106 PreToddler 3 Shelf 1 14 14 14 106 PreToddler 3 Shelf 2 14 24 24 106 PreToddler 3 Shelf 1 15 37 24 106 PreToddler 3 Small Personal Cubby 2 14 25 53 106 PreToddler 3 Square Table 2 22 22 17 106 PreToddler 3 Two Door Cabinet 1 20 25 44 106 PreToddler 4 Chair 12 14 16 23 106 PreToddler 4 Changing Table 1 23 45 40 106 PreToddler 4 Curved Table 2 30 67 15 106 PreToddler 4 Shelf 3 14 49 24 106 PreToddler 4 Large Personal Cubby 2 14 48 53 106 PreToddler 4 Play Cabinet 1 14 16 30 106 PreToddler 4 Play Sink 1 14 16 19 106 PreToddler 4 Play Stove 1 14 16 19 106 PreToddler 4 Play Table 1 27 27 14 106 PreToddler 4 Sand Table 1 24 26 19 106 PreToddler 4 Shelf 1 14 14 18 106 PreToddler 4 Shelf 1 14 24 24 106 PreToddler 4 Shelf 2 15 37 24 106 PreToddler 4 Small Curved Shelf 1 14 29 16 106 PreToddler 4 Small Personal Cubby 1 14 25 53 106 PreToddler 4 Three Drawer Podium Cabinet 1 20 25 44 106 PreToddler 4 Moving Box 80 18 18 16 108 PreToddler 2 Bookshelf 1 14 25 33 108 PreToddler 2 Chair 11 14 16 23 108 PreToddler 2 Changing Table 1 23 45 40 108 PreToddler 2 Couch - Child 1 24 25 23 108 PreToddler 2 Shelf 1 14 25 25 108 PreToddler 2 Large Corner Shelf 3 15 15 25 108 PreToddler 2 Shelf 2 14 49 24 108 PreToddler 2 Large Personal Cubby 3 14 48 53 108 PreToddler 2 Play Cabinet 1 14 16 30 108 PreToddler 2 Play Sink 1 14 16 19 108 PreToddler 2 Play Stove 1 14 16 19 108 PreToddler 2 Play Table 1 27 27 14 108 PreToddler 2 Sand Table 1 24 26 19 108 PreToddler 2 Shelf 2 15 37 24 108 PreToddler 2 Small Personal Cubby 2 14 25 53 108 PreToddler 2 Table 2 30 48 16 108 PreToddler 2 Three Drawer Podium Cabinet 1 20 25 44 108 PreToddler 2 Two Door Cabinet 1 15 36 33 108 PreToddler 2 Moving Box 80 18 18 16 110 Trainer Office Corner Shelf 1 14 14 32 110 Trainer Office Desk Chairs 3 110 Trainer Office Desk Drawers 6 16 20 29 110 Trainer Office Filing Cabinet on Wheels 1 13 16 25 110 Trainer Office L-Shape Desk 3 60 72 73

Description Item Description Quantity

Width (in inches)

Length (in inches)

Height (in inches)

110 Trainer Office Mini Fridge 1 19 19 49 110 Trainer Office Office Desk Chair 3 30 31 33 110 Trainer Office Storage Cart on Wheels 1 13 25 33 110 Trainer Office Supply Cabinet 1 19 30 36 110 Trainer Office Two door Cabinet 2 16 48 30 110 Trainer Office Work Table 2 24 48 42 110 Trainer Office Moving Box 80 18 18 16 110 Training Room Bookshelf 2 12 36 72 110 Training Room Computer Chair 20 19 22 39 110 Training Room Desk Table 12 24 48 30 110 Training Room Enteritament Center 1 21 72 30 110 Training Room Two Door Cabinet 2 16 47 30 110 Training Room Two Drawer Cabinet 1 21 36 31 110 Training Room Moving Box 80 18 18 16 112 Nurse Office L-Shape Desk 1 65 71 72(W/ hutch) 30 112 Nurse Office Bookshelf 1 19 36 72 112 Nurse Office Cabinet on wheels 1 22 23 35 112 Nurse Office Metal Cabinet 1 18 30 66 112 Nurse Office Mini Fridge 1 22 22 31 112 Nurse Office Office Desk Chair 1 30 31 33 112 Nurse Office Round Table 1 36 36 31 112 Nurse Office Safe 1 18 18 22 112 Nurse Office Two Drawer Lateral 1 21 32 30 112 Nurse Office Moving Box 80 18 18 16 113 Dir. Office L-Shape Desk 1 65 71 72(W/ hutch) 30 113 Dir. Office Mini Fridge 1 22 22 31 113 Dir. Office Office Chair 2 30 33 34 113 Dir. Office Office Desk Chair 2 30 31 33 113 Dir. Office Two Drawer Lateral 1 21 32 30 113 Dir. Office Moving Box 80 18 18 16 114 Asst. Dir Office BookShelf 1 12 24 28 114 Asst. Dir Office BookShelf 1 15 30 30 114 Asst. Dir Office BookShelf 1 12 36 60 114 Asst. Dir Office Corner Shelf 2 14 14 28 114 Asst. Dir Office L-Shape Desk 2 65 71 72(W/ hutch) 30 114 Asst. Dir Office Metal Cabinet 1 18 36 65 114 Asst. Dir Office Mini Fridge 1 22 22 31 114 Asst. Dir Office Office Chair 2 30 33 34 114 Asst. Dir Office Office Desk Chair 2 30 31 33 114 Asst. Dir Office Two Drawer Lateral 2 21 32 30 114 Asst. Dir Office Moving Box 80 18 18 16 114 Toddler 1 Chair 17 24 25 23 114 Toddler 1 Changing Table 1 23 45 40 114 Toddler 1 Couch 1 21 42 23 114 Toddler 1 Shelf 2 14 37 24 114 Toddler 1 Shelf 3 14 49 24 114 Toddler 1 Large Corner Shelf 1 15 15 25 114 Toddler 1 Large Personal Cubby 3 14 48 53

Description Item Description Quantity

Width (in inches)

Length (in inches)

Height (in inches)

114 Toddler 1 Play Cabinet 1 14 16 30 114 Toddler 1 Play High Chair 1 12 12 24 114 Toddler 1 Play Round Table 1 30 30 18 114 Toddler 1 Play Sink 1 14 16 19 114 Toddler 1 Play Stove 1 14 16 19 114 Toddler 1 Sand Table 2 24 26 19 114 Toddler 1 Small Corner Shelf 5 13 13 78 114 Toddler 1 Small Personal Cubby 1 14 24 53 114 Toddler 1 Small Toy Bin 1 15 19 12 114 Toddler 1 Table 2 30 60 18 114 Toddler 1 Three Drawer Podium Cabinet 1 20 25 44 114 Toddler 1 Moving Box 80 18 18 16 117 Computer Lab Computer Chairs 12 19 22 39 117 Computer Lab Computer desk 4 24 48 30 117 Computer Lab Construction paper roller 1 22 38 53 117 Computer Lab Metal Shelf 1 25 49 72 117 Computer Lab Sqaure Construction paper roller 1 27 27 46 117 Computer Lab Square Table 1 48 96 30 117 Computer Lab Supply Shelf 1 15 37 49 117 Computer Lab Supply Shelf 1 15 49 49 117 Computer Lab Tree House? 1 25 25 26 117 Computer Lab Xyron Laminator 1 15 21 19 117 Meeting/File Room Bookshelf 1 14 36 50 117 Computer Lab Computer Chairs 6 19 22 39 117 Meeting/File Room Computer Desk 2 24 48 30 117 Meeting/File Room Metal Cabinet 2 19 30 66 117 Meeting/File Room Metal Cabinet(black) 2 18 36 72 117 Meeting/File Room Metal Cabinet(tan) 2 24 36 72 117 Meeting/File Room Seat 2 22 22 17 117 Meeting/File Room Two Drawer Cabinet 1 16 48 30 117 Meeting/File Room Moving Box 80 18 18 16 119 Infant 1 Chair 5 15 16 19 119 Infant 1 Changing Table 1 23 45 40 119 Infant 1 Corner Shelf 4 13 13 78 119 Infant 1 Crib(Evacuation) 2 26 40 37 119 Infant 1 Crib 2 26 40 37 119 Infant 1 Shelf 2 14 37 24 119 Infant 1 Fridge 1 27 28 60 119 Infant 1 High Chair 2 21 23 37 119 Infant 1 Large Corner Shelf 1 15 15 25 119 Infant 1 Large Curved Shelf 1 14 29 24 119 Infant 1 Large Toy Bin 2 14 37 12 119 Infant 1 Play Table 1 14 37 16 119 Infant 1 Rocking Chair 1 24 39 45 119 Infant 1 Small Curved Shelf 1 14 29 16 119 Infant 1 Small Toy Bin 1 15 19 12 119 Infant 1 Square Table 1 21 21 39 119 Infant 1 Table 1 26 59 16

Description Item Description Quantity

Width (in inches)

Length (in inches)

Height (in inches)

119 Infant 1 Three Drawer Cabinet 1 20 25 44 119 Infant 1 Moving Box 80 18 18 16 126 Infant 2 Chair 5 15 16 19 126 Infant 2 Changing Table 1 23 45 40 126 Infant 2 Crib (Evacuation) 3 26 40 37 126 Infant 2 Crib 3 26 40 37 126 Infant 2 Shelf 1 14 37 24 126 Infant 2 Fridge 1 27 28 60 126 Infant 2 High Chair 2 21 23 37 126 Infant 2 Rocking Chair 1 24 39 45 126 Infant 2 Small Corner Shelf 1 13 13 78 126 Infant 2 Small Curved Shelf 4 14 29 16 126 Infant 2 Small Toy Bin 2 15 19 12 126 Infant 2 Table 1 26 59 16 126 Infant 2 Three Drawer Cabinet 1 20 25 44 126 Infant 2 Moving Box 80 18 18 16 129 Laundry Room Dryer 4 22 27 43 129 Laundry Room Fridge 1 32 33 66 129 Laundry Room Metal Shelf 1 19 37 73 129 Laundry Room Two Drawer Lateral 2 20 36 30 129 Laundry Room Washing Machine 2 26 28 43 129 Laundry Room Wood Shelf 1 16 26 72 129 Laundry Room Moving Box 80 18 18 16 130 Break Room Short Fridge 2 27 27 60 130 Break Room Short Round Table 2 36 36 30 130 Break Room Tall Fridge 2 32 34 69 130 Break Room Tall Round Table 2 30 30 43 130 Break Room Moving Box 80 18 18 16 132 Infant 3 Bookshelf 1 12 25 24 132 Infant 3 Chair 5 15 16 19 132 Infant 3 Changing Table 1 23 45 40 132 Infant 3 Crib (Evacuation) 2 26 40 37 132 Infant 3 Crib 4 26 40 37 132 Infant 3 Shelf 2 14 37 24 132 Infant 3 Fridge 1 27 28 60 132 Infant 3 High Chair 2 21 23 37 132 Infant 3 Large Corner Shelf 1 15 15 25 132 Infant 3 Large Curved Shelf 1 14 29 24 132 Infant 3 Shelf 1 14 49 24 132 Infant 3 Play Table 1 14 37 16 132 Infant 3 Rocking Chair 1 24 39 45 132 Infant 3 Seat 1 18 18 12 132 Infant 3 Small Toy Bin 1 15 19 12 132 Infant 3 Table 1 26 59 16 132 Infant 3 Three Drawer Cabinet 1 20 25 44 132 Infant 3 Moving Box 80 18 18 16 133 Infant 5 Chair 5 15 16 19 133 Infant 5 Changing Table 1 23 45 40

Description Item Description Quantity

Width (in inches)

Length (in inches)

Height (in inches)

133 Infant 5 Crib(Evacuation) 2 26 40 37 133 Infant 5 Crib 4 26 40 37 133 Infant 5 Shelf 2 14 37 24 133 Infant 5 Fridge 1 27 28 60 133 Infant 5 High Chair 2 21 23 37 133 Infant 5 Shelf 1 14 49 24 133 Infant 5 Large Curved Shelf 2 14 29 24 133 Infant 5 Podium 1 15 33 46 133 Infant 5 Rocking Chair 1 24 39 45 133 Infant 5 Seat 1 18 18 12 133 Infant 5 Small Curved Shelf 4 14 29 16 133 Infant 5 Small Toy Bin 2 15 19 12 133 Infant 5 Table 1 26 59 16 133 Infant 5 Three Drawer Podium Cabinet 1 20 25 44 133 Infant 5 Toy Table 1 14 37 16 133 Infant 5 Moving Box 80 18 18 16 134 Infant 4 Chair 5 15 16 19 134 Infant 4 Changing Table 1 23 45 40 134 Infant 4 Crib(Evacuation) 2 26 40 37 134 Infant 4 Crib 1 26 40 37 134 Infant 4 Shelf 1 14 37 24 134 Infant 4 Fridge 1 27 28 60 134 Infant 4 High Chair 2 21 23 37 134 Infant 4 Large Corner Shelf 1 15 15 25 134 Infant 4 Shelf 1 14 49 24 134 Infant 4 Large Toy Bin 1 14 37 12 134 Infant 4 Play Table 1 14 37 16 134 Infant 4 Rocking Chair 1 24 39 45 134 Infant 4 Seat 1 18 18 12 134 Infant 4 Small Corner Shelf 6 13 13 78 134 Infant 4 Small Toy Bin 2 15 19 12 134 Infant 4 Table 1 26 59 16 134 Infant 4 Three Drawer Cabinet 1 20 25 44 134 Infant 4 Moving Box 80 18 18 16 135 Infant 6 Chair 5 15 16 19 135 Infant 6 Changing Table 1 23 45 40 135 Infant 6 Crib (Evacuation) 2 26 40 37 135 Infant 6 Crib 4 26 40 37 135 Infant 6 Shelf 1 14 37 24 135 Infant 6 Fridge 1 27 28 60 135 Infant 6 High Chair 2 21 23 37 135 Infant 6 Large Cubby Shelf 1 14 49 24 135 Infant 6 Large Curved Shelf 2 14 29 24 135 Infant 6 Rocking Chair 1 24 39 45 135 Infant 6 Small Corner Shelf 4 13 13 78 135 Infant 6 Small Curved Shelf 2 14 29 16 135 Infant 6 Small Toy Bin 1 15 19 12 135 Infant 6 Table 1 30 48 15

Description Item Description Quantity

Width (in inches)

Length (in inches)

Height (in inches)

135 Infant 6 Three Drawer Podium Cabinet 1 20 25 44 135 Infant 6 Toy Table 1 14 37 16 135 Infant 6 Moving Box 80 18 18 16 137 Kitchen Burlodge 2 28 57 58 137 Kitchen Can Cart 2 26 35 34 137 Kitchen Cart 19 21 34 37 137 Kitchen Fridge 4 34 35 79 137 Kitchen Green Rack 9 21 48 75 137 Kitchen Hot Box 1 29 22 75 137 Kitchen Personal Cubbby 2 14 17 48 137 Kitchen Stainless Steel Rack 1 18 36 76 137 Kitchen Moving Box 80 18 18 16 142 Infant 7 Chair 5 15 16 19 142 Infant 7 Changing Table 1 23 45 40 142 Infant 7 Crib (Evacuation) 5 26 40 37 142 Infant 7 Crib 1 26 40 37 142 Infant 7 Shelf 3 14 37 24 142 Infant 7 Fridge 1 27 28 60 142 Infant 7 High Chair 2 21 23 37 142 Infant 7 Rocking Chair 1 24 39 45 142 Infant 7 Seat 1 18 18 12 142 Infant 7 Small Corner Shelf 5 13 13 78 142 Infant 7 Table 1 26 59 16 142 Infant 7 Three Drawer Podium Cabinet 1 20 25 44 142 Infant 7 Toy Table 2 14 37 16 142 Infant 7 Moving Box 80 18 18 16 143 Preschool 1 Blue Couch 1 22 42 24 143 Preschool 1 Bookshelf 1 15 37 48 143 Preschool 1 Chair 25 30 40 42 143 Preschool 1 Changing Table 1 23 45 40 143 Preschool 1 Shelf 3 14 49 24 143 Preschool 1 Shelf 1 14 37 24 143 Preschool 1 Shelf 1 15 24 32 143 Preschool 1 Shelf 1 15 48 39 143 Preschool 1 Shelf 1 14 48 32 143 Preschool 1 Shelf 1 14 36 32 143 Preschool 1 Shelf 4 14 25 25 143 Preschool 1 Curved Shelf 1 14 29 24 143 Preschool 1 Dry Erase Board 1 25 28 48 143 Preschool 1 Green Couch 1 24 39 26 143 Preschool 1 Large Corner Shelf 1 13 13 33 143 Preschool 1 Large Corner Shelf 1 13 13 33 143 Preschool 1 Large Personal Cubby 4 12 48 53 143 Preschool 1 Lego Table 1 27 32 18 143 Preschool 1 Paint Rack 1 28 20 41 143 Preschool 1 Play Dryer 1 15 22 24

Description Item Description Quantity

Width (in inches)

Length (in inches)

Height (in inches)

143 Preschool 1 Play High Chair 1 12 12 24 143 Preschool 1 Play Round Table 1 30 30 18 143 Preschool 1 Play Sink 1 15 22 24 143 Preschool 1 Play Stove 1 15 22 24 143 Preschool 1 Play Table 1 22 44 20 143 Preschool 1 Playhouse 1 12 28 25 143 Preschool 1 Sand Table 1 24 27 25 143 Preschool 1 Small Corner Shelf 2 14 14 24 143 Preschool 1 Small Personal Cubby 1 12 24 53 143 Preschool 1 Small Toy Bin 1 15 29 9 143 Preschool 1 Table 4 30 60 21 143 Preschool 1 Three Drawer Podium Cabinet 1 19 25 44 143 Preschool 1 Two Door Cabinet 2 15 36 32 143 Preschool 1 Two Door Cabinet 1 15 22 38 143 Preschool 1 Water Table 1 24 45 25 143 Preschool 1 Moving Box 80 18 18 16 145 Toddler 2 Bookshelf 1 14 25 33 145 Toddler 2 Chair 17 14 16 23 145 Toddler 2 Changing Table 1 23 45 40 145 Toddler 2 Couch 1 21 42 23 145 Toddler 2 Craft shelf 1 15 38 39 145 Toddler 2 Shelf 3 14 25 25 145 Toddler 2 Shelf 6 15 49 25 145 Toddler 2 Dry Erase Board 1 25 28 48 145 Toddler 2 Large Corner Shelf 2 15 15 25 145 Toddler 2 Large Personal Cubby 3 14 48 53 145 Toddler 2 Play Cabinet 1 14 16 30 145 Toddler 2 Play High Chair 1 12 12 24 145 Toddler 2 Play Round Table 2 30 30 18 145 Toddler 2 Play Sink 1 14 16 19 145 Toddler 2 Play Stove 1 14 16 19 145 Toddler 2 Sand Table 1 24 26 19 145 Toddler 2 Small Personal Cubby 1 14 24 53 145 Toddler 2 Table 2 30 60 18 145 Toddler 2 Three Drawer Cabinet 1 20 25 44 145 Toddler 2 Tree House 1 25 25 28 145 Toddler 2 Moving Box 80 18 18 16 146 Preschool 2 Bookshelf 1 15 37 48 146 Preschool 2 Chair 24 16 17 26 146 Preschool 2 Changing Table 1 23 45 40 146 Preschool 2 Climb Through 1 30 31 29 146 Preschool 2 Shelf 1 15 25 33 146 Preschool 2 Shelf 2 14 25 33 146 Preschool 2 Shelf 4 14 49 32 146 Preschool 2 Shelf 4 14 48 25 146 Preschool 2 Curved Shelf 2 14 29 24

Description Item Description Quantity

Width (in inches)

Length (in inches)

Height (in inches)

146 Preschool 2 Dry Erase Board 1 25 28 48 146 Preschool 2 Green Couch 1 24 39 26 146 Preschool 2 Large Curved Shelf 3 14 29 24 146 Preschool 2 Paint Rack 1 28 20 41 146 Preschool 2 Personal Cubby 1 12 48 53 146 Preschool 2 Play Cabinet 1 16 23 39 146 Preschool 2 Play Dryer 1 15 22 24 146 Preschool 2 Play High Chair 1 12 12 24 146 Preschool 2 Play High Chair 1 12 12 24 146 Preschool 2 Play Round Table 1 30 30 18 146 Preschool 2 Play Sink 1 15 22 24 146 Preschool 2 Play Stove 1 15 22 24 146 Preschool 2 Play Table 1 24 44 21 146 Preschool 2 Sand Table 3 24 27 25 146 Preschool 2 Small Corner Shelf 3 14 14 24 146 Preschool 2 Table 4 30 60 21 146 Preschool 2 Three Drawer Podium Cabinet 1 19 25 44 146 Preschool 2 Two Door Cabinet 1 15 22 38 146 Preschool 2 Moving Box 80 18 18 16 147 Preschool 3 Bookshelf 1 15 37 48 147 Preschool 3 Chair 25 16 17 26 147 Preschool 3 Changing Table 1 23 45 40 147 Preschool 3 Craft Shelf 2 15 38 39 147 Preschool 3 Crawl Through 1 40 40 48 147 Preschool 3 Shelf 5 14 48 24 147 Preschool 3 Shelf 1 14 38 24 147 Preschool 3 Shelf 1 14 37 32 147 Preschool 3 Shelf 2 14 24 32 147 Preschool 3 Shelf 2 14 25 24 147 Preschool 3 Dry Erase Board 1 25 28 48 147 Preschool 3 Green Couch 1 24 39 26 147 Preschool 3 Large Corner Shelf 2 15 15 25 147 Preschool 3 Lego Table 1 16 31 17 147 Preschool 3 Paint Rack 1 28 20 41 147 Preschool 3 Personal Cubby 5 12 48 53 147 Preschool 3 Play Cabinet 2 16 23 39 147 Preschool 3 Play Dryer 1 15 22 24 147 Preschool 3 Play Round Table 2 30 30 18 147 Preschool 3 Play Sink 1 15 22 24 147 Preschool 3 Play Stove 1 15 22 24 147 Preschool 3 Play Table 2 22 44 20 147 Preschool 3 Playhouse 1 16 24 22 147 Preschool 3 Sand Table 2 24 27 25 147 Preschool 3 Table 4 30 60 21 147 Preschool 3 Table 1 22 30 18 147 Preschool 3 Three Drawer Podium Cabinet 1 19 25 44 147 Preschool 3 Two Door Cabinet 1 15 22 38

Description Item Description Quantity

Width (in inches)

Length (in inches)

Height (in inches)

147 Preschool 3 Moving Box 80 18 18 16 148 Toddler 3 Chair 16 14 16 23 148 Toddler 3 Changing Table 1 23 45 40 148 Toddler 3 Couch 1 21 42 23 148 Toddler 3 Shelf 1 14 25 24 148 Toddler 3 Shelf 4 14 49 24 148 Toddler 3 Large Corner Shelf 2 15 15 25 148 Toddler 3 Large Curved Shelf 2 14 29 24 148 Toddler 3 Large Personal Cubby 3 14 48 53 148 Toddler 3 Play Cabinet 1 14 16 30 148 Toddler 3 Play Round Table 1 30 30 18 148 Toddler 3 Play Sink 1 14 16 19 148 Toddler 3 Play Stove 1 14 16 19 148 Toddler 3 Sand Table 1 24 26 19 148 Toddler 3 Bookshelf 1 15 30 14 148 Toddler 3 Small Corner Shelf 4 13 13 78 148 Toddler 3 Small Personal Cubby 1 14 24 53 148 Toddler 3 Table 2 30 60 18 148 Toddler 3 Three Drawer Podium Cabinet 1 20 25 44 148 Toddler 3 Moving Box 80 18 18 16 149 Toddler 4 Bookshelf 1 14 25 33 149 Toddler 4 Chair 16 14 16 23 149 Toddler 4 Changing Table 1 23 45 40 149 Toddler 4 Couch 1 21 42 23 149 Toddler 4 Craft Shelf 1 15 38 39 149 Toddler 4 Shelf 6 14 49 24 149 Toddler 4 Dry Erase Board 1 25 28 48 149 Toddler 4 Large Corner Shelf 3 15 15 25 149 Toddler 4 Large Personal Cubby 2 14 48 53 149 Toddler 4 Play Cabinet 1 14 16 30 149 Toddler 4 Play High Chair 1 12 12 24 149 Toddler 4 Play Round Table 1 30 30 18 149 Toddler 4 Play Sink 1 14 16 19 149 Toddler 4 Play Stove 1 14 16 19 149 Toddler 4 Sand Table 1 24 26 19 149 Toddler 4 Sand Table 1 24 26 19 149 Toddler 4 Small Corner Shelf 1 13 13 78 149 Toddler 4 Small Personal Cubby 2 14 24 53 149 Toddler 4 Square Table 1 24 24 30 149 Toddler 4 Table 2 30 60 18 149 Toddler 4 Three Drawer Podium Cabinet 1 20 25 44 149 Toddler 4 Tree House 1 25 25 28 149 Toddler 4 Moving Box 80 18 18 16 150 Preschool 4 Bookshelf 1 15 37 48 150 Preschool 4 Chair 25 16 17 26 150 Preschool 4 Changing Table 1 23 45 40 150 Preschool 4 Craft Shelf 3 15 38 39 150 Preschool 4 Shelf 2 14 48 24

Description Item Description Quantity

Width (in inches)

Length (in inches)

Height (in inches)

150 Preschool 4 Shelf 5 14 25 24 150 Preschool 4 Shelf 2 15 49 32 150 Preschool 4 Shelf 6 15 25 32 150 Preschool 4 Shelf 4 15 25 32 150 Preschool 4 Shelf 1 15 36 32 150 Preschool 4 Dry Erase Board 1 25 28 48 150 Preschool 4 Green Couch 1 24 39 26 150 Preschool 4 Large Corner Shelf 1 15 15 25 150 Preschool 4 Large Toy Bin 1 14 37 12 150 Preschool 4 Paint Rack 1 28 20 41 150 Preschool 4 Play Cabinet 2 16 23 39 150 Preschool 4 Play Dryer 1 15 22 24 150 Preschool 4 Play High Chair 1 12 12 24 150 Preschool 4 Play Round Table 1 30 30 18 150 Preschool 4 Play Round Table 1 36 36 20 150 Preschool 4 Play Sink 1 15 22 24 150 Preschool 4 Play Square Table 2 30 30 20 150 Preschool 4 Play Stove 1 15 22 24 150 Preschool 4 Play Table 1 22 30 19 150 Preschool 4 Play Table 1 24 45 25 150 Preschool 4 Sand Table 3 24 27 25 150 Preschool 4 Table 4 30 60 21 150 Preschool 4 Three Drawer Podium Cabinet 1 19 25 44 150 Preschool 4 Two Door Play Cabinet 1 15 22 38 150 Preschool 4 Moving Box 80 18 18 16 151 3 School Bookshelf 1 14 25 33 151 3 School Chair 16 14 16 23 151 3 School Changing Table 1 23 45 40 151 3 School Couch 1 21 42 23 151 3 School Craft Shelf 1 15 38 39 151 3 School Shelf 5 14 49 24 151 3 School Shelf 1 14 24 24 151 3 School Large Corner Shelf 4 15 15 25 151 3 School Personal Cubby 2 14 48 53 151 3 School Play Cabinet 3 14 16 30 151 3 School Play High Chair 2 12 12 24 151 3 School Play House 2 12 28 25 151 3 School Play Round Table 1 30 30 18 151 3 School Play Sink 1 14 16 19 151 3 School Play Stove 1 14 16 19 151 3 School Sand Table 1 24 26 19 151 3 School Table 2 30 48 20 151 3 School Table 1 19 42 20 151 3 School Three Drawer Podium Cabinet 1 20 25 44 151 3 School Tree House 1 25 25 38 151 3 School Two Door Cabinet 1 15 36 33 151 3 School Moving Box 80 18 18 16 Lobby Main Area Metal Cabinet (tan) 3 19 30 66

Description Item Description Quantity

Width (in inches)

Length (in inches)

Height (in inches)

Lobby Main Area Metal Supply Cabinet on Wheels 1 13 16 39 Lobby Main Area Office Desk Chairs 2 30 31 33 Lobby Main Area Three Shelf Cabinet on Wheels 1 18 18 29 Lobby Main Area Moving Box 80 18 18 16

This page is intentionally left blank.

SECTION 01 20 00

PRICE AND PAYMENT PROCEDURES (MCBCL)

04/22

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

EP 1110-1-8 (2021) Engineering and Design -- Construction Equipment Ownership and Operating Expense Schedule

1.2 SUBMITTALS

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-01 Preconstruction Submittals

Schedule of Prices

1.3 SCHEDULE OF PRICES

1.3.1 Data Required

Within 15 calendar days of notice of award, prepare and deliver to COR a schedule of prices (construction contract). Provide a detailed breakdown of the contract price, giving quantities for each of the various kinds of work, unit prices, and extended prices therefor. Schedule of prices shall be separated by individual building numbers with subtotals for each building.

1.3.2 Payment Schedule Instructions

Payments will not be made until the Schedule of Prices has been submitted to and accepted by the Contracting Officer.

Additionally, the Schedule of Prices must be separated as follows:

a. Primary Facilities Cost Breakdown:

Defined as work on the primary facilities out to the 5 foot line.

Work out to the 5 foot line includes construction encompassed within a theoretical line 5 foot from the face of exterior walls and includes attendant construction, such as pad mounted HVAC cooling equipment, cooling towers, and transformers placed beyond the 5 foot line.

b. Supporting Facilities Cost Breakdown:

Defined as site work, including incidental work, outside the 5 foot line.

SECTION 01 20 00 Page 1

1.4 CONTRACT MODIFICATIONS

In conjunction with the Contract Clause DFARS 252.236-7000 Modification Proposals-Price Breakdown, and where actual ownership and operating costs of construction equipment cannot be determined from Contractor accounting records, base equipment use rates upon the applicable provisions of the

EP 1110-1-8 .

1.5 CONTRACTOR'S INVOICE AND CONTRACT PERFORMANCE STATEMENT

1.5.1 Content of Invoice

Requests for payment will be processed in accordance with the Contract Clause FAR 52.232-27 Prompt Payment for Construction Contracts and FAR 52.232-5 Payments Under Fixed-Price Construction Contracts. Invoices not completed in accordance with contract requirements will be returned to the Contractor for correction of the deficiencies. The requests for payment shall include the documents listed below.

a. The Contractor's invoice, on NAVFAC Form 7300/30 furnished by the Government, showing in summary form, the basis for arriving at the amount of the invoice. Form 7300/30 must include certification by Quality Control (QC) Manager as required by the Contract.

b. The Estimate for Voucher/ Contract Performance Statement on NAVFAC Form 4330/54 furnished by the Government. Use NAVFAC Form 4330, unless otherwise directed by the Contracting Officer, on NAVFAC Contracts when a Monthly Estimate for Voucher is required.

c. Contractor's Monthly Estimate for Voucher and Contractors Certification (NAVFAC Form 4330) with Subcontractor and supplier payment certification. Other documents, including but not limited to, that need to be received prior to processing payment include the following submittals as required. These items are still required monthly even when a pay voucher is not submitted.

d. Monthly Work-hour report.

e. Updated Construction Progress Schedule and tabular reports required by the contract.

f. Contractor Safety Self Evaluation Checklist.

g. Updated submittal register.

h. Solid Waste…

This is the start of the file's text. The full file is on GovTribe.