M-202-T.pdf

PDF 529 KB Posted

Attached to
Mechanical Repairs Bldg TT113 CDC
Solicitation number
N4008526R9010
Issued by

About this file

This document is a construction piping plan for the Tarawa facility. The plan depicts a detailed layout of piping systems and mechanical equipment distributions across a multi-section building complex, with scale noted as 3/32" = 1'-0". The piping plan shows multiple pipe runs with various diameter specifications, including 1-1/4" and 1-1/2" connections down to hub drains, connected to HVAC units designated by model numbers such as FC-7K through FC-36K, HRU-030, HRU-040, and various other mechanical units including ERV-T1, ERV-T3, VRV units, and HPCU systems. The plan includes specific connection details and notes requiring UNISTRUT with pipe clamps to hold pipes at the same height as unit connections, typical throughout the installation.

The document is a technical construction drawing produced by Luckett & Farley architectural firm, bearing drawing number M-202-T. The plan is divided into a five-by-four grid coordinate system (columns 1-5, rows A-D) to facilitate precise location identification. Pipe routing, equipment placement, and system interconnections are shown in detail with both graphic and numeric scales provided. This piping plan serves as a construction document for mechanical contractors responsible for installing HVAC distribution systems and condensate drainage throughout the Tarawa facility.

View the file

Other files

File Type Posted
Amend 0015.pdf PDF
Amend 0014.pdf PDF
Amend 0013.pdf PDF
Amend 0012.pdf PDF
60042073_Rev03.pdf PDF
60042049 _Rev03.pdf PDF
60042066_Rev03.pdf PDF
Amend 0011.pdf PDF
60042069_Rev03.pdf PDF
60042047 _Rev03.pdf PDF
60042070_Rev03.pdf PDF
N4008523B0044 PPI Revision 03.pdf PDF
Amend 0010 Enclosure 3 DWGS.pdf PDF
Amend 0010 Enclosure 1 DWG List.pdf PDF
Amend 0010.pdf PDF
Amend 0009.pdf PDF
Amend 0008.pdf PDF
Amend 0004.pdf PDF
Amend 0007.pdf PDF
Amend 0006.pdf PDF
Amend 0005.pdf PDF
Amend 0003.pdf PDF
Amend 0002 SECTION 01 31 50 TRANSFER AND ACCEPTANCE OF MILITARY REAL PROPERTY.pdf PDF
Amend 0002.pdf PDF
Amend 0001.pdf PDF
N4008523B0044 Specs.pdf PDF
230044 SID Binder.pdf PDF
230044 Basis of Design.pdf PDF
230044 Termite Inspection Report.pdf PDF
Mech MACC RFP.pdf PDF
N4008523B0044 Dwgs.pdf PDF
230044 Lead and Asbesto Report.pdf PDF
230044 APPD.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M-301

M-301

FC-18K

FC-12K

FC-24K

FC-15K

FC-15K FC-15K

FC-24K

FC-18K

FC-12K

FC-12K

FC-7K

FC-28K

FC-36K

FC-28K

FC-28K

FC-28K

FC-28K

FC-28K

FC-7K

FC-28K

FC-36K

FC-24K

FC-15K

FC-24K

FC-15K

FC-15KFC-15K

FC-15K

FC-18K

FC-24K

FC-28K

FC-9K

FC-12K

UH-1

UH-1

EF-1

EF-1

EF-1

FC-095

ERV-T3

ERV-T2

ERV-T1

RP 3/8-3/4-7/8

HRU-040

RP 3/8-1/2-5/8

HRU-030

HRU-040

RP 5/8-7/8-1 1/8

HRU-040

RP 3/8-3/4-7/8

TCP

TCP

TCP

RP 3/8-3/4-7/8

RP 3/8-1/2-5/8

HRU-040

HRU-030

RP 5/8-7/8-1 1/8

RP 3/8-3/4-7/8

RP 3/8-5/8-3/4

HRU-040

HRU-030

RP 3/8-3/4-7/8

RP 5/8-1 1/8-1 1/8

RP 5/8-1 1/8-1 3/8

HRU-040

RP (2) 5/8-1 1/8-1/2

CD 1 1/4

CD 1 1/4

CD 1 1/4

CD 1 1/4

CD 1 1/4

RP (2) 5/8-1 1/8-1/2

RP (2) 5/8-1 1/8-1/2

RP (2) 5/8-1 1/8-1/2

CD 1 1/4

CD 1 1/4

CD 1 1/4

HPCU-T1

VRV-T1

HPCU-T2

VRV-T2

HPCU-T3VRV-T3

VRV-T4

1-1/2" CD DOWN TO

HUB DRAIN (TYP)

CD 1 1/4

CD 1 1/4

CD 1 1/4

1-1/4" CD DOWN TO HUB

DRAIN (TYP)

CD 1 1/4

CD 1 1/4

1-1/2" CD DOWN TO HUB DRAIN

CD 1 1/4

CD 1 1/4

CD 1 1/4

CD 1 1/4CD 1 1/4 CD 1 1/4

CD 1 1/4

1-1/2" CD DOWN TO HUB DRAIN

UNISTRUT WITH PIPE CLAMP

HOLD PIPE AT SAME HEIGHT AS

CONNECTION TO UNITS (TYP).

1 2 3 4 5

1 2 3 4 5

D

C

B

A

D

C

B

A

SATISFACTORY TO DATE

ACTIVITY

FOR COMMANDER NAVFAC

APPROVED

<<PM / DM>>

BRANCH MANAGER

CHIEF ENG / ARCH

<<XX>>

CONTRACTOR

SEAL

DESIGN TEAM

SCALE:

EPROJECT NO.:

CONSTR. CONTR. NO.:

NAVFAC DRAWING NO.

SHEET OF

AS NOTED

P1096B / P1113

N40085-09-C-3222

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

M

AR

IN

E

C O

R P S

N O

R

TH

C A

R O

LI

N

A

N

AV

A L F

AC

IL

I T

IE

S E

N G

IN

E

ER

IN

G C

O M

M A N

D

N

AV

A L

ST

AT

IO

N

- N O

R F O

LK

V

IR

G

IN

IA

M C

B C

AM

P

LE

JE

U N

E

JA

C

KS

O

N

VI

LL

E, N C

M-202-T

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O

M M

AN

D

M

ID

-A

TL

AN

TI

C

C H

IL

D

D

EV

EL

O

PM

EN

T C

EN

TE

R S

P1

6B

P1

6/2/10

TA

R

AW

A

- P

IP

IN

G

P

LA

N

Bob V.Bob T.

CONSTRUCTION

DOCUMENTS

SCALE:

GRAPHIC SCALE SUPERSEDES NUMERIC SCALE

0 4 8 16

PLAN

NORTH

3/32" = 1'-0"

TARAWA

PIPING PLAN

12572109

D I

GN

R E

E N

I RETS

E

C

KY

TU

KEF N

E R

S

SE

O

R P

F

S

TA

TE

G

12413

ZABLOUDIL

ANTHONY J.

O

NOI ELA

File details come from the government source that posted it. Updated .