This is Amendment 0014 to a federal solicitation for mechanical repairs to Building TT113 CDC, issued by NAVFAC Mid-Atlantic. The solicitation number is N40085-26-R-9010, dated 02/05/26, with project number 23-0044. The amendment, effective 04/14/26, extends the proposal due date and time to Tuesday, April 28, 2026 by 3:00 pm. Offerors must acknowledge receipt of this amendment prior to submission; failure to do so may result in proposal rejection.

The amendment provides answers to two Requests for Information (RFIs) regarding mechanical system design details. For the Fan Coil Control Detail (sheet M-705, detail B1), the government approved omitting the supply air flow station, return temperature sensor, return humidity sensor, and freezestat from each unit, as the FCUs operate as 100% return air units. For the Chilled Water System Control Detail (sheet M-703, detail A2), the government requires contractors to propose per the existing plans and specifications, rejecting a suggested alternative piping arrangement for the three parallel primary chilled water pumps. All other terms and conditions of the contract remain unchanged. Offerors are administered by NAVFAC Mid-Atlantic, Resident Officer in Charge of Construction, located at 1107A Birch Street, Camp Lejeune, NC 28547-2521.

View the file

Other files

File Type Posted
Amend 0015.pdf PDF
Amend 0013.pdf PDF
M-202-T.pdf PDF
Amend 0012.pdf PDF
60042049 _Rev03.pdf PDF
60042066_Rev03.pdf PDF
Amend 0011.pdf PDF
60042047 _Rev03.pdf PDF
60042070_Rev03.pdf PDF
N4008523B0044 PPI Revision 03.pdf PDF
60042069_Rev03.pdf PDF
60042073_Rev03.pdf PDF
Amend 0010.pdf PDF
Amend 0010 Enclosure 3 DWGS.pdf PDF
Amend 0010 Enclosure 1 DWG List.pdf PDF
Amend 0009.pdf PDF
Amend 0008.pdf PDF
Amend 0004.pdf PDF
Amend 0007.pdf PDF
Amend 0006.pdf PDF
Amend 0005.pdf PDF
Amend 0003.pdf PDF
Amend 0002 SECTION 01 31 50 TRANSFER AND ACCEPTANCE OF MILITARY REAL PROPERTY.pdf PDF
Amend 0002.pdf PDF
Amend 0001.pdf PDF
230044 Termite Inspection Report.pdf PDF
Mech MACC RFP.pdf PDF
230044 Lead and Asbesto Report.pdf PDF
230044 APPD.pdf PDF
N4008523B0044 Dwgs.pdf PDF
N4008523B0044 Specs.pdf PDF
230044 SID Binder.pdf PDF
230044 Basis of Design.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 11)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

1 2

AMENDMENT NO. 0014 04/14/26 23-0044

N40085

NAVFAC Mid-Atlantic Resident Officer in Charge of Construction 1107A Birch Street Camp Lejeune, NC 28547-2521

See Item 6

✘ N40085-26-R-9010

02/05/26

23-0044, Mechanical Repairs Bldg TT113 CDC Amendment 0014, Answer RFIs

The due date and time for proposals is hereby changed to Tuesday, 4/28/2026 by 3:00 pm.

This amendment should be acknowledged when your proposal is submitted. Failure to acknowledge the amendment may constitute grounds for rejection of a proposal.

N40085-26-R-9010 Amendment 0014

CONTINUATION SHEET

1. QUESTION: On sheet M-705 detail B1: Fan Coil Control Detail - calls for Supply Air flow stations, Return Temperature and Humidity sensors, and Freezestats on each unit.

The FCU are 100% return air units and these sensors serve no purpose. However, adding these sensors will significantly increase the project cost. Can these sensors be eliminated?

ANSWER: Supply air flow station, Return Temperature sensor, Return Humidity sensor and freezestat can be omitted from detail B1/M-705.

2. QUESTION: Sheet M-703 detail A2: Chilled Water System Control Detail - System calls for three parallel primary CHW pumps piped into both chillers. Typically chiller manufactures recommend the chiller control the pumps. The pumps cannot be controlled by the chillers in this arrangement. Two parallel pumps piped in series with each chiller would be a more standard application, allow for redundancy, and allow each chiller to control the pumps.

ANSWER: Propose per plans and specifications.

3. All other terms and conditions remain unchanged.