This document is a Questions and Answers (Q&A) file containing pre-proposal inquiries (PPIs) and government responses related to a federal construction solicitation for Project P-1550 SOF Marine Raider Battalion Company & Team Facilities. All inquiries were submitted on 5/19/2026 and 5/26/2026, with responses provided by the Navy NAVFAC contracting office.

Key clarifications include: CMMC Level 1 cybersecurity requirements apply, with previously posted CUI-labeled drawings removed from public distribution and reissued via secure NDA-protected channels; Attachment C Price Schedule contained clerical errors corrected in Amendment 0001, with all line item subtotals 0001A through 0001J included in the total CLIN 0001 price; Factor 2 submission requires an unlimited-page CPM schedule and separate one-page summary schedule as distinct deliverables; VETS 4212 reporting should follow RFP requirements; small business subcontracting plan attachments should be treated as format guides with content updated to reflect current FAR 52.219 regulations effective February 2026. Additional administrative clarifications address site visit scheduling in Amendment 0001, pre-proposal inquiry deadlines of 14 calendar days, proposal submission deadline of 29 June 2026 at 2:00 PM EDT per SF1442, the correct project title as "P-1550 SOF Marine Raider Battalion Company & Team Facilities," and substitution of SAM.gov Responsibility/Qualification section in lieu of the obsolete FAPIIS Certification requirement. Interested vendors requiring deleted file "1701820 A1 - FINAL_1.pdf" should contact Contract Specialist Andy Bui via email to receive the file through DoDSafe.

View the file

Other files

File Type Posted
P1550 PPI RESPONSES 5.pdf PDF
AMENDMENT 0010 - N4008526R0138.pdf PDF
AMENDMENT 0009 - N4008526R0138.pdf PDF
WD NC20260010.pdf PDF
P1550 PPI RESPONSES 3.pdf PDF
AMENDMENT 0008 - N4008526R0138.pdf PDF
1701820 Continuation Sheet_0004.pdf PDF
1701820dwg_Revision_0004_A2.pdf PDF
P1550 PPI RESPONSES 3.pdf PDF
AMENDMENT 0006- 26R0138.pdf PDF
AMENDMENT 0005 - 26R0138.pdf PDF
AMENDMENT 0004 - 26R0138.pdf PDF
1701820dwg_Revision_0003_A2.pdf PDF
13 34 19.pdf PDF
1701820 Continuation Sheet.docx DOCX document
AMENDMENT 0003 - 26R0138.pdf PDF
1701820 Continuation Sheet .docx DOCX document
P1550 PPI RESPONSES 2.pdf PDF
1701820dwg01of01.pdf PDF
03 30 00.pdf PDF
P1550 Site Visit Sign-in Sheet.pdf PDF
26 32 15.00.pdf PDF
26 56 00.pdf PDF
1701820 Continuation Sheet 2026.06.04.docx DOCX document
08 33 23.pdf PDF
AMENDMENT 0002 - 26R0138.pdf PDF
1701820dwg_Revision_0001_A2-A3-Site.pdf PDF
Construction Site Visit MARSOC Access List.xlsx XLSX spreadsheet
Attachment I - DOD-CUI_Non-Disclosure Agreement.pdf PDF
AMENDMENT 0001 - 26R0138.pdf PDF
Attachment C - Price Proposal Form REVISED.docx DOCX document
1701820 SITE - FINAL_v2_4 Flattened 2 of 2.pdf PDF
Attachment B - PIEE Vendor Access Instructions.pdf PDF
Attachment H -Small Business Subcontracting Plan.docx DOCX document
Attachment F - Historical Small Business Utilization.docx DOCX document
Attachment D - Construction and Design Experience Project Data Sheet.docx DOCX document
Attachment G - SPCD.docx DOCX document
1701820 SITE - FINAL_v2_4 Flattened 1 of 2.pdf PDF
Attachment E - Past Performance Questionnaire.pdf PDF
Attachment C - Price Proposal Form.docx DOCX document
Attachment A - Pre-Proposal Inquiry (PPI) Log.xlsx XLSX spreadsheet
Solicitation - N4008526R0138.pdf PDF
1701820 A1 - FINAL_1.pdf PDF
1701820 A2 - FINAL_2.pdf PDF
1701820 A3 - FINAL_3.pdf PDF
1701820 SPC -FINAL.pdf PDF
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Date Submitte d

Reference Question Response

Page Section Paragraph

5/19/2026 46 00 70 00 The Solicitation specifically DFARS 252.204-7021 and 7025 note this project requires CMMC Level 1, which offeror's would assume the project does not contain CUI. However, several drawings in package A1 - BN HQ, specifially the AY set of drawings have a CUI label. Please confirm if these drawings are in fact CUI and need to be handled as CUI including requiring a CMMC Level 2 from the prime contract as well as subcontractors that will handle these documents. Please note the documents were publically distrubted on SAM.gov/PIEE without any restrictions.

File has been removed from SAM.gov. Further guidance will be provided when files are available.

5/19/2026 Attachment C - Price Schedule

CLIN ITEM 0001 states "Project P-1550 - SOF Armory…" please confirm this was done by mistake, and a new bid form with the correct information will be forthcoming.

This was a clerical error and the description has been corrected. Please see Amendment 0001 for the revised form

5/19/2026 Attachment C - Price Schedule

CLIN ITEM 0001 states "includes subtotal of 0001A and 0001B" please confirm this was done by mistake, and it should read includes subtotal of 0001A through 0001J. If so, please provide a new bid form with the correct information in a forthcoming Amendment.

This was a clerical error and the description has been corrected. Please see Amendment 0001 for the revised form

5/19/2026 Attachment C - Price Schedule

Please confirm that all subtotal costs provided on line items 0001A through 0001J should be included in the Total Price for CLIN 0001 and these breakouts are for information only.

Yes, this is correct.

5/19/2026 Pages 9-10

Factor 2 On pages 9-10 of the RFP, Factor 2 requires a CPM schedule with no page limit, as well as a Summary Schedule limited to 1 page. Please clarify that these are 2 separate deliverables within Factor 2, and that the page limits are accurate for each.

Yes. Factor 2 submission requirements do not place a page limit on the CPM schedule. The summary schedule itself is limited to one (1) page.

5/19/2026 Page

Price Proposal If an Offeror files VETS 4212 reports for multiple hiring regions, please confirm if all report confirmations should be included in the proposal, or only the report confirmation that corresponds to the region of the project.

Propose per RFP.

5/19/2026 Attachment H - Small Business Subcontracting Plan

Section 00 70 00 – Conditions of the Contract references the DoD adoption of the FAR Overhaul (RFO) deviation effective February 2026, which includes updated provisions under FAR

52.219 governing the small business subcontracting requirements. The small business plan attachments provided with this solicitation appear to reference regulatory language that predates these updates. Will the Government provide revised small business attachments that reflect the current regulatory requirements as referenced in Section 00 70 00, or confirm whether the existing attachments should be used as a format guide only, with content updated to reflect currently effective regulations?

Propose per RFP.

5/26/2026 N/A 1701820 A1 - FINAL_1.pdf (deleted)

How does the government plan to reissue file "1701820 A1 - FINAL_1.pdf (deleted)" which is not posted via SAM or PIEE?

NAVFAC recommends all interested vendors please submit a request via email to the Contract Specialist, Andy Bui, andy.h.bui.civ@us.navy.m il to receive the file through DoDSafe. An NDA will be provided via attachment with Amendment 0001 and will be required to receive files containing CUI.

5/26/2026 14 Solicitation - N4008526R013

4.1 4.1 SITE VISIT - The Solicitation references that a site visit will be provided via Amendment.

With the solicitation being issued almost 12 days ago, please provide feedback on forthcoming amendment.

Please refer to Amendment 0001 for Site Visit information.

5/26/2026 15 Solicitation - N4008526R013

4.3 4.3 PRE-PROPOSAL

INQUIRIES (PPIs) - The Solicitation references that all inquiries must be submitted in writing and received by the Contract Specialist prior to the solicitation closing date in fourteen (14) calendar days order to permit adequate time to reply to the inquiry. Please consider allowing for 2 full weeks to address PPIs after the site visit.

Please refer to Amendment 0001 for Site Visit information, including information regarding the timeframe for response. Propose per

RFP.

5/26/2026 15 Solicitation - N4008526R013

4.3 4.3 PRE-PROPOSAL

INQUIRIES (PPIs) - The Solicitation references that all inquiries must be submitted in writing and received by the Contract Specialist prior to the solicitation closing date in fourteen (14) calendar days order to permit adequate time to reply to the inquiry. Please consider allowing for a brief period of time to respond to government responses from the first wave of PPIs (Amendment) if falling within the 14 calendar day

Please refer to Amendment 0001.

window. At times initial responses lend to additional PPIs and/or further clarifications as it relates to conflicting info in the contract docs.

5/26/2026 14 Solicitation - N4008526R013

4.2 4.2 PROPOSAL

SUBMISSION

INSTRUCTIONS - The Notifications via SAM & PIEE states that offers are due by Jun 29, 2026 2:00 PM EDT however this is not listed in the Solicitation instructions.

Due to the size of the project, the absence of file 1 drawings, and site visit not scheduled. Please consider extending this proposal due date to provide at least 30 days from the time of the full files being issued and a physical site visit.

Please note Box 13 of the SF1442, that provides the proposal due date of 29 June 2026 at 2:00pm as stated in the instructions.

5/26/2026 SF1442 The SF 1442 lists two different titles for this pursuit: a) DBB P-1550 SOF Marine Raider Battalion Company & Team Facilities – and – b) DBB P1550 SOF Marine Raider Facilities Complex.

Please clarify which title Offerors should use in their proposal.

Please use "P-1550 SOF Marine Raider Battalion Company & Team Facilities"

5/26/2026 7 Price Proposal The RFP requests FAPIIS Certification in the Price Proposal, but that website is no longer active and has been replaced with the Responsibility/Qualificatio n section of SAM.gov.

Please advise if Offerors should include the Responsibility/Qualificatio n section of SAM.gov in lieu of the FAPIIS Certification, or please remove the requirement for FAPIIS Certification altogether.

Include the Responsibility/Qualificatio n section of SAM.gov in lieu of the certification.

File details come from the government source that posted it. Updated .