1701820 Continuation Sheet .docx

DOCX document 54 KB Posted

Attached to
Design-Bid-Build (DBB) SOF Marine Raider Facilities Complex, Marine Corps Base (MCB) Camp Lejeune, North Carolina
Solicitation number
N4008526R0138
Issued by

About this file

This is a Continuation Sheet documenting revisions to the design drawings for the P-1550 SOF Marine Raider Battalion/Company/Team Facilities project at Marine Corps Base Camp Lejeune, North Carolina, dated June 16, 2026. The document details 58 specific revisions across multiple discipline drawings including site civil, utility, landscape, and architectural plans. Notable revisions include: relocated fence sections and demolition coordination; addition of Americans with Disabilities Act (ADA) gate accommodations with associated sidewalk and curb modifications; updated building Finish For Execution (FFE) elevations across Buildings A1, A2-1, A2-2, and A3; revised grading and drainage plans including spot elevation additions around the external loading dock; utility connection location updates and coordination notes for underground conflicts and force main routing adjustments; delineated stockpile areas; landscape modifications requiring all trees to be positioned minimum 7 feet from paving and 20 feet from the perimeter fence with removal from view triangles; coordination with electrical design for light pole relocation relative to tree canopies along Everett Creek Road; wetland bench planting revisions for wildlife resistance; and pavement mix specifications changed from S9.5B to S9.5C. Additionally, the sheet reflects a new octagonal gazebo detail incorporating wind load requirements with corresponding bench layout adjustments, and architectural floor finish hatch corrections for spaces SV-2 and SV-3 to align with the finish legend and project specifications.

View the file

Other files

File Type Posted
P1550 PPI RESPONSES 5.pdf PDF
AMENDMENT 0010 - N4008526R0138.pdf PDF
AMENDMENT 0009 - N4008526R0138.pdf PDF
P1550 PPI RESPONSES 3.pdf PDF
AMENDMENT 0008 - N4008526R0138.pdf PDF
WD NC20260010.pdf PDF
AMENDMENT 0006- 26R0138.pdf PDF
1701820 Continuation Sheet_0004.pdf PDF
1701820dwg_Revision_0004_A2.pdf PDF
P1550 PPI RESPONSES 3.pdf PDF
AMENDMENT 0005 - 26R0138.pdf PDF
13 34 19.pdf PDF
1701820 Continuation Sheet.docx DOCX document
AMENDMENT 0004 - 26R0138.pdf PDF
1701820dwg_Revision_0003_A2.pdf PDF
1701820dwg01of01.pdf PDF
AMENDMENT 0003 - 26R0138.pdf PDF
P1550 PPI RESPONSES 2.pdf PDF
1701820dwg_Revision_0001_A2-A3-Site.pdf PDF
08 33 23.pdf PDF
AMENDMENT 0002 - 26R0138.pdf PDF
03 30 00.pdf PDF
P1550 Site Visit Sign-in Sheet.pdf PDF
26 32 15.00.pdf PDF
26 56 00.pdf PDF
1701820 Continuation Sheet 2026.06.04.docx DOCX document
Construction Site Visit MARSOC Access List.xlsx XLSX spreadsheet
AMENDMENT 0001 - 26R0138.pdf PDF
Attachment C - Price Proposal Form REVISED.docx DOCX document
P1550 PPI RESPONSES 1.pdf PDF
Attachment I - DOD-CUI_Non-Disclosure Agreement.pdf PDF
Solicitation - N4008526R0138.pdf PDF
1701820 A1 - FINAL_1.pdf PDF
1701820 A2 - FINAL_2.pdf PDF
1701820 A3 - FINAL_3.pdf PDF
1701820 SPC -FINAL.pdf PDF
Attachment D - Construction and Design Experience Project Data Sheet.docx DOCX document
Attachment G - SPCD.docx DOCX document
1701820 SITE - FINAL_v2_4 Flattened 1 of 2.pdf PDF
Attachment E - Past Performance Questionnaire.pdf PDF
Attachment C - Price Proposal Form.docx DOCX document
Attachment A - Pre-Proposal Inquiry (PPI) Log.xlsx XLSX spreadsheet
1701820 SITE - FINAL_v2_4 Flattened 2 of 2.pdf PDF
Attachment B - PIEE Vendor Access Instructions.pdf PDF
Attachment H -Small Business Subcontracting Plan.docx DOCX document
Attachment F - Historical Small Business Utilization.docx DOCX document
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P-1550 SOF MARINE RAIDER BATTALION /COMPANY / TEAM FACILITIES

Continuation Sheet for Revisions June 16, 2026

Drawings

1. SITE-CD101: Moved portion of fence to proper demolition plan sheets. Removed the demolished fence from site plan.

2. SITE-CD110: Note added for the coordination of the demolition of existing junction box with installation of telecommunications.

3. SITE-CS101: Removed small fence stub. Plans revised.

4. SITE-CS102: 10’ of clear space is now provided on the outside of the fence line.

5. SITE-CS103: Detail and key note for a taper curb added on sheets.

6. SITE-CS106: Sidewalk revised to allow room for an ABA gate. Detail added accordingly. Key note added for clarity.

7. SITE-CS109: Sidewalk revised to allow room for an ABA gate. Detail added accordingly. Key note added for clarity. Fence slightly adjusted to allow for ABA gate. Curb taper added on sheets with key note.

8. SITE-CS110: Curb taper detail and key note added. Key note #8 revised to show gate length.

9. SITE-CG100: Building A3 label updated to show FFE.

10. SITE-CG101: Contours revised. Key notes updated to reflect plan.

11. SITE-CG102: Spot elevations added to show drainage on south side of road.

12. SITE-CG103: Spot elevations provided for and around the external loading dock. Positive drainage provided around the dock. Grading slightly revised for security of site, around the gate area.

13. SITE-CG104: UGC conflict has been addressed. Contour has been updated north side of the road. Curb spot elevations have been updated. Inlet rim elevations have also been revised.

14. SITE-CG106: Building A3 labeled. A3 FFE labeled as well. Spots elevations in front of building A2-1 have been adjusted. Contours west of the building have been revised as well. Curb and gutter line work has been revised.

15. SITE-CG113: Building A1 FFE labeled.

16. SITE-CG116: Buildings A2-1 and A2-2 FFE’s have been labeled. The routing and tie angle has been revised for the 24” and 12” pipes connecting to a junction structure.

17. SITE-CG119: Buildings A3 and A2-2 FFE’s have been labeled.

18. SITE-CG147: All buildings on sheet now have FFE provided.

19. SITE-CG150: Buildings A3 and A2-2 now have FFE provided.

20. SITE-CG151: Stock pile area has been delineated. Key note added for stock pile area.

21. SITE-CU152: Stock pile area has been delineated. Key note added for stock pile area.

22. SITE-CU101:UGC conflicts will be coordinated with telecommunication team, note added.

23. SITE-CU103: Utility connection locations updated.

24. SITE-CU104: Utility connection locations updated.

25. SITE-CU105: Utility connection locations updated.

26. SITE-CU106: Utility connection locations updated.

27. SITE-CU108: Utility connection locations updated.

28. SITE-CU109: Existing force main location reviewed. Added note for construction coordination between project 1550 and project 1538. Bollards and hand hole moved to demolition layer.

29. SITE-CU111: Communication lines continue. KTR to verify location prior to construction.

30. SITE-CU117: Existing force main and fence revised.

31. SITE-CU119: Existing force main and fence revised.

32. SITE-CU120: Proposed force main passes through existing fence. Callouts to demolition and replace fence have been added.

33. SITE-CU121: Existing force main and fence revised.

34. SITE-CU222: Air release valve has been adjusted to new grade level with high points created. Check valves removed. Gas and UGE crossings have been added.

35. SITE-CU223: Air release valve has been adjusted to new grade level with high points created. Check valves removed.

36. SITE-CU224: Existing surface updated on profile view.

37. SITE-CU225: Existing surface updated on profile view.

38. SITE-CU226: Existing surface updated on profile view.

39. SITE-CU228: Check valves removed.

40. SITE-CU229: Check valves removed.

41. SITE-CU230: Check valves removed.

42. SITE-CU231: Check valves removed.

43. SITE-C-511: The S9.5B mix has been swapped to S9.5C mix.

44. SITE-C-515: The S9.5B mix has been swapped to S9.5C mix.

45. SITE-LS100: Plant material has been revised per comments and updated in Plant Schedule. Plant Legend has been revised to reflect Plant Schedule accurately.

46. SITE-LS101: Added new octagonal gazebo detail per wind load requirement comment to LS101 sheet.

47. SITE-LS102: All trees moved 20 feet from perimeter fence. All trees moved a minimum of 7 feet from paving and given a typical dimension. All trees moved from view triangle.

48. SITE-LS103: All trees confirmed 20 feet from perimeter fence. All trees moved a minimum of 7 feet from paving and given a typical dimension.

49. SITE-LS104: All trees confirmed moved a minimum of 7 feet from paving and given a typical dimension. Coordination with electrical design to move light poles in close proximity to tree canopies by accessible parking spaces and along Everett Creek Road per comment. All trees confirmed moved from view triangle.

50. SITE-LS105: All trees confirmed 20 feet from perimeter fence. Wetland Bench planting revised to ensure resistance to wildlife.

51. SITE-LS106: All trees confirmed moved a minimum of 7 feet from paving and given a typical dimension. Coordination with electrical design to move light poles in close proximity to tree canopies along Everett Creek Road per comment. Octagonal gazebo detail and reference callout revised per wind load requirement comment. Bench layout revised per new gazebo layout.

52. SITE-LS107: All trees confirmed moved a minimum of 7 feet from paving and given a typical dimension. Coordination with electrical design to move light poles in close proximity to tree canopies along Everett Creek Road per comment.

53. SITE-LS108: All trees confirmed 20 feet from perimeter fence. Wetland Bench planting revised to ensure resistance to wildlife.

54. SITE-LS109: All trees confirmed moved a minimum of 7 feet from paving and given a typical dimension. All trees confirmed 20 feet from perimeter fence. Wetland Bench planting revised to ensure resistance to wildlife.

55. SITE-LS110: All trees confirmed 20 feet from perimeter fence. All trees moved a minimum of 7 feet from paving and given a typical dimension. Coordination with electrical design to move light poles in close proximity to tree canopies along Everett Creek Road and out of view triangle per comment.

56. SITE-LS111: All trees confirmed 20 feet from perimeter fence

57. SITE-LS501: Old gazebo detail removed. New gazebo detail shown on LS101 for space. Detail tags revised to show new detail locations.

58. A1-I-117: Floor finish hatch for SV-2 and SV-3 have been swapped to match the finish legend and SID binder.