1701820 Continuation Sheet 2026.10.28.docx

DOCX document 50 KB Posted

Attached to
Design-Bid-Build (DBB) SOF Marine Raider Facilities Complex, Marine Corps Base (MCB) Camp Lejeune, North Carolina
Solicitation number
N4008526R0138
Issued by

About this file

This is a continuation sheet for specifications revisions to the P-1550 SOF Marine Raider Battalion/Company/Team Facilities project at Marine Corps Base (MCB) Camp Lejeune, North Carolina, dated October 28, 2026. The document addresses a revision to Section 01 57 19 Temporary Environmental Controls, specifically revising Part 1.5.1.2 to align Camp Lejeune requirements with the MCB Camp Lejeune Environmental Standard Operating Procedure ESOP 5090.10.1, effective January 21, 2026.

This revision sheet is part of the Design-Bid-Build (DBB) solicitation (N4008526R0138) for construction of SOF Marine Raider facilities comprising approximately 20,262 SM (217,200 SF) of structures including battalion operations, supply, communications and intelligence facilities; company headquarters and team facilities; and storage buildings, plus associated site work including utilities, parking, roadways, and storm water management. The structures feature single-story steel frame construction with brick veneer, standing seam metal roofs, and pile foundations on surcharged sites with wetlands mitigation. The Navy's Naval Facilities Engineering Command (NAVFAC) is the procuring agency for this fixed-price construction contract. The document contains an image reference but does not specify response deadlines, award dates, or pricing terms.

View the file

Other files

File Type Posted
01 57 19.pdf PDF
AMENDMENT 0014 - N4008526R0138.pdf PDF
1701820 Continuation Sheet 2026.10.28.docx DOCX document
01 57 19.pdf PDF
P1550 PPI RESPONSES 6.pdf PDF
P-1550 PRICE SCHEDULE_NAVFAC REVISIONS 20261027_V3.docx DOCX document
AMENDMENT 0013 - N4008526R0138.pdf PDF
AMENDMENT 0012 - N4008526R0138.pdf PDF
AMENDMENT 0011 - N4008526R0138.pdf PDF
P1550 PPI RESPONSES 5.pdf PDF
AMENDMENT 0010 - N4008526R0138.pdf PDF
AMENDMENT 0009 - N4008526R0138.pdf PDF
AMENDMENT 0008 - N4008526R0138.pdf PDF
P1550 PPI RESPONSES 3.pdf PDF
WD NC20260010.pdf PDF
AMENDMENT 0006- 26R0138.pdf PDF
1701820 Continuation Sheet_0004.pdf PDF
1701820dwg_Revision_0004_A2.pdf PDF
P1550 PPI RESPONSES 3.pdf PDF
AMENDMENT 0005 - 26R0138.pdf PDF
13 34 19.pdf PDF
1701820 Continuation Sheet.docx DOCX document
AMENDMENT 0004 - 26R0138.pdf PDF
1701820dwg_Revision_0003_A2.pdf PDF
AMENDMENT 0003 - 26R0138.pdf PDF
1701820dwg01of01.pdf PDF
1701820 Continuation Sheet .docx DOCX document
P1550 PPI RESPONSES 2.pdf PDF
1701820 Continuation Sheet 2026.06.04.docx DOCX document
26 56 00.pdf PDF
03 30 00.pdf PDF
P1550 Site Visit Sign-in Sheet.pdf PDF
26 32 15.00.pdf PDF
08 33 23.pdf PDF
1701820dwg_Revision_0001_A2-A3-Site.pdf PDF
AMENDMENT 0002 - 26R0138.pdf PDF
Construction Site Visit MARSOC Access List.xlsx XLSX spreadsheet
Attachment I - DOD-CUI_Non-Disclosure Agreement.pdf PDF
Attachment C - Price Proposal Form REVISED.docx DOCX document
AMENDMENT 0001 - 26R0138.pdf PDF
P1550 PPI RESPONSES 1.pdf PDF
1701820 A1 - FINAL_1.pdf PDF
1701820 A3 - FINAL_3.pdf PDF
Attachment F - Historical Small Business Utilization.docx DOCX document
1701820 SITE - FINAL_v2_4 Flattened 2 of 2.pdf PDF
1701820 SPC -FINAL.pdf PDF
Attachment G - SPCD.docx DOCX document
Attachment D - Construction and Design Experience Project Data Sheet.docx DOCX document
1701820 A2 - FINAL_2.pdf PDF
Attachment B - PIEE Vendor Access Instructions.pdf PDF
Show 40 more

Latest 50 of 56 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P-1550 SOF MARINE RAIDER BATTALION /COMPANY / TEAM FACILITIES

Continuation Sheet for Revisions October 28, 2026

Specifications

1. Section 01 57 19 Temporary Environmental Controls: Revised Part 1.5.1.2 Camp Lejeune to align with the requirements on the MCB Camp Lejeune Environmental Standard Operating Procedure ESOP 5090.10.1 January 21, 2026 image1.jpeg

File details come from the government source that posted it. Updated .