P995 1692230 SpecsAsOne - DIV ONE DELETED.pdf
PDF 9 MB Posted
- Solicitation number
- N4008526R0002
About this file
Summary
This is a comprehensive technical specifications document for the P-995 Composite Repair Facility, a 105,755 square-foot depot-level facility at Marine Corps Air Station Cherry Point, North Carolina, designed to support advanced composites and rotor blade repair operations. The 24 December 2025 specification was prepared by NAVFAC Mid-Atlantic with design by MBF Architects (architectural), Stantec (civil), Kaydos-Daniels Engineering (structural), Crenshaw Consulting Engineering (mechanical/plumbing/electrical), Jensen Hughes (fire protection), Thorburn (audio video), and White Raven Security, LLC (cybersecurity). The facility comprises two major operational sections: a composite repair and manufacturing shop featuring disassembly, parts kitting, production control, assembly areas with climate-controlled dirty room, bonding room, clean room, depot and fleet classrooms, and engineering/laboratory space; and an aircraft rotor blade repair shop with disassembly/staging area, dirty room, sanding pit, and bonding room. Shared support spaces include painting, parts wash, freezer, hygiene facilities, bathrooms, and breakrooms.
The specification includes detailed requirements across 72 divisions covering site work, structural systems (cast-in-place concrete, masonry, structural steel, and cold-formed metal framing), thermal and moisture protection systems (waterproofing, insulation, air barriers), exterior envelope components (metal panels, roofing), interior finishes, mechanical systems (HVAC, plumbing, fire suppression), electrical distribution, communications infrastructure, and specialized manufacturing equipment including overhead cranes, paint spray booths, and X-ray testing equipment. The facility utilizes a precast structural concrete panel system with pile-supported foundation, slab-on-grade, and cross-laminated timber roof deck. Key environmental performance requirements include Leadership in Energy and Environmental Design (LEED) compatibility, sustainable material sourcing with recycled content requirements, and commissioning of air barrier and mechanical systems to verify design performance. The specification mandates comprehensive quality assurance, testing, and inspection protocols with designated manufacturer and installer qualifications, pre-construction conferences, warranty requirements, and field reporting by manufacturer technical representatives throughout construction and into the operational phase.
View the file
Other files
Show 40 more
Latest 50 of 63 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
24 December 2025 eProjects Work Order Number: 1692230 Appropriation:
P-995 COMPOSITE REPAIR FACILITY
at the
MARINE CORPS AIR STATION CHERRY POINT, NC
DESIGNED BY:
NAVFAC MID-ATLANTIC
9742 MARYLAND AVENUE
NORFOLK, VIRGINIA 23511-3095
SPECIFICATION PREPARED BY:
Architectural: MBF Architects Civil: Stantec Structural: Kaydos-Daniels Engineering Interior Design: Within Interior Design Mechanical/Plumbing/Electrical: Crenshaw Consulting Eng.
Fire Prot.: Jensen Hughes Audio Video: Thorburn Cybersecurity: White Raven Security, LLC
Specification: Darden J. Eure, III, MBF Architects
Date: 24 December 2025
SPECIFICATION APPROVED BY:
For Commander, NAVFAC MID-ATLANTIC:
Date: 09 March 2026
This page is intentionally left blank.
P-995 Composite Repair Facility 24 December 2025 MCAS Cherry Point, NC
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 15 02/24 LIST OF DRAWINGS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 02/24 SUMMARY OF WORK
01 14 00 11/22, CHG 3: 08/24 WORK RESTRICTIONS
01 20 00 11/20, CHG 5: 02/25 PRICE AND PAYMENT PROCEDURES
01 30 00 11/20, CHG 5: 02/25 ADMINISTRATIVE REQUIREMENTS
01 30 02.00 22 05/23 DESIGN, PROCUREMENT, AND INSTALLATION
OF AUDIOVISUAL EQUIPMENT
01 31 23.13 20 08/23 ELECTRONIC CONSTRUCTION AND FACILITY
SUPPORT CONTRACT MANAGEMENT SYSTEM
(eCMS)
01 32 17.00 20 11/23, CHG 1: 08/24 COST-LOADED NETWORK ANALYSIS SCHEDULES
(NAS)
01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES
01 33 29 02/21 SUSTAINABILITY REQUIREMENTS AND
REPORTING
01 35 26 05/24 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 05/24 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00 08/23, CHG 1: 05/24 QUALITY CONTROL
01 45 35 05/24 SPECIAL INSPECTIONS
01 50 00 11/20, CHG 3: 08/24 TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
01 57 19 08/22 TEMPORARY ENVIRONMENTAL CONTROLS
01 58 00 08/19, CHG 5: 08/22 PROJECT IDENTIFICATION
01 74 19 02/19, CHG 3: 11/21 CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL
01 78 00 05/19, CHG 1: 08/21 CLOSEOUT SUBMITTALS
01 78 23 05/23 OPERATION AND MAINTENANCE DATA
01 78 24.00 20 05/23 FACILITY DATA WORKBOOK (FDW)
01 78 30.00 22 02/16 GIS DATA DELIVERABLES
01 91 00.15 05/23, CHG 2: 11/23 BUILDING COMMISSIONING
01 91 19 05/23 BUILDING ENCLOSURE COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
02 41 00 08/22 DEMOLITION
DIVISION 03 - CONCRETE
03 30 00 02/19, CHG 4: 08/22 CAST-IN-PLACE CONCRETE
DIVISION 04 - MASONRY
04 20 00 11/15, CHG 2: 05/19 UNIT MASONRY
DIVISION 05 - METALS
05 05 20 05/22, CHG 1: 08/24 POST-INSTALLED CONCRETE AND MASONRY
ANCHORS
05 12 00 08/18, CHG 2: 05/21 STRUCTURAL STEEL
05 21 00 05/15, CHG 1: 08/18 STEEL JOIST FRAMING
05 30 00 05/15, CHG 2: 08/18 STEEL DECKS
05 40 00 05/15, CHG 1: 08/18 COLD-FORMED METAL FRAMING
PROJECT TABLE OF CONTENTS Page 1
DELETED
griffith Rectangle
05 50 13 05/17, CHG 1: 08/18 MISCELLANEOUS METAL FABRICATIONS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 08/16, CHG 2: 11/18 ROUGH CARPENTRY
06 41 16.00 10 08/10, CHG 1: 11/18 PLASTIC-LAMINATE-CLAD ARCHITECTURAL
CABINETS
06 61 16 08/20 SOLID SURFACING FABRICATIONS
06 82 14 08/23 FIBERGLASS REINFORCED PLASTIC (FRP)
PIPE AND TUBE RAILINGS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 10 40 04/21 CRYSTALLINE WATERPROOFING
07 21 13 02/16, CHG 2: 08/20 BOARD AND BLOCK INSULATION
07 21 16 11/11, CHG 4: 08/18 MINERAL FIBER BLANKET INSULATION
07 22 00 02/16, CHG 3: 11/18 ROOF AND DECK INSULATION
07 27 10 08/23 BUILDING AIR BARRIER SYSTEM
07 27 19.01 05/17, CHG 2: 08/20 SELF-ADHERING AIR BARRIERS
07 27 26 05/17, CHG 2: 08/20 FLUID-APPLIED MEMBRANE AIR BARRIERS
07 27 36 05/17, CHG 3: 02/23 SPRAY FOAM AIR BARRIERS
07 45 00 07/24 ALUMINUM COMPOSITE PANELS
07 52 00 05/12, CHG 5: 11/19 MODIFIED BITUMINOUS MEMBRANE ROOFING
07 60 00 05/17, CHG 2: 11/18 FLASHING AND SHEET METAL
07 61 14.00 20 08/16, CHG 1: 08/18 CP STEEL STANDING SEAM ROOFING
07 84 00.00 22 09/23 FIRESTOPPING
07 92 00 08/16, CHG 3: 11/18 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 08/20 STEEL DOORS AND FRAMES
08 11 16 05/17, CHG 2: 11/18 ALUMINUM DOORS AND FRAMES
08 14 00 08/16, CHG 1: 08/18 WOOD DOORS
08 31 00 05/17, CHG 1: 08/18 ACCESS DOORS AND PANELS
08 33 23 08/20, CHG 1: 02/22 STEEL OVERHEAD COILING DOORS
08 38 00 12/25 FLEXIIBLE STRIP DOORS
08 41 13 08/18, CHG 1: 08/18 ALUMINUM-FRAMED ENTRANCES AND
STOREFRONTS
08 44 00 05/19 CURTAIN WALL AND GLAZED ASSEMBLIES
08 71 00 02/16, CHG 4: 02/22 DOOR HARDWARE
08 81 00 05/19 GLAZING
08 91 00 08/20 ALUMINUM LOUVERS
DIVISION 09 - FINISHES
09 22 00 02/10, CHG 2: 08/18 SUPPORTS FOR GYPSUM BOARD
09 29 00 08/16, CHG 4: 02/20 GYPSUM BOARD
09 30 10 08/20 CERAMIC TILING
09 51 00 08/20 ACOUSTICAL CEILINGS
09 65 00 11/24 RESILIENT FLOORING
09 67 23.13 11/19 STANDARD RESINOUS FLOORING
09 68 00 11/24 CARPETING
09 90 00 02/21 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 11 00 08/20 VISUAL DISPLAY UNITS
10 14 00.10 08/17, CHG 1: 11/18 EXTERIOR SIGNAGE
10 14 00.20 08/20 INTERIOR SIGNAGE
PROJECT TABLE OF CONTENTS Page 2
10 21 13 TOILET COMPARTMENTS
10 22 13 08/16, CHG 1: 08/18 WIRE MESH PARTITIONS
10 26 00 WALL AND DOOR PROTECTION
10 28 13 08/20 TOILET ACCESSORIES
10 44 16 11/19 FIRE EXTINGUISHERS
10 51 13 08/24 LOCKERS
DIVISION 12 - FURNISHINGS
12 00 01.00 20 02/23 FURNITURE, FIXTURES AND EQUIPMENT
(FF&E) PACKAGES
12 24 13 08/20 ROLLER WINDOW SHADES
DIVISION 13 - SPECIAL CONSTRUCTION
13 21 26 02/16, CHG 1: 08/18 COLD-STORAGE ROOMS (PREFABRICATED
PANEL TYPE)
DIVISION 21 - FIRE SUPPRESSION
21 13 13 08/20 WET PIPE SPRINKLER SYSTEMS, FIRE
PROTECTION
21 13 16 08/20 DRY PIPE SPRINKLER SYSTEMS, FIRE
PROTECTION
21 30 00 04/08, CHG 1: 08/13 FIRE PUMPS
DIVISION 22 - PLUMBING
22 00 00 05/24, CHG 1: 11/24 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 03 00.00 20 08/10, CHG 3: 08/18 BASIC MECHANICAL MATERIALS AND METHODS
23 05 15 05/22, CHG 1: 02/24 COMMON PIPING FOR HVAC
23 05 48.19 05/18 SEISMIC BRACING FOR HVAC
23 05 93.00 22 09/19 TESTING, ADJUSTING, AND BALANCING FOR
MECHANICAL SYSTEMS
23 07 00 02/13, CHG 7: 05/20 THERMAL INSULATION FOR MECHANICAL
SYSTEMS
23 08 00 05/23 COMMISSIONING OF MECHANICAL AND
PLUMBING SYSTEMS
23 09 00.00 22 08/20, CHG 1: 03/22 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 11/15, CHG 2: 05/21 INSTRUMENTATION AND CONTROL DEVICES
FOR HVAC
23 09 23.02 02/19, CHG 1: 02/20 BACNET DIRECT DIGITAL CONTROL FOR HVAC
AND OTHER BUILDING CONTROL SYSTEMS
23 11 20 05/20 FACILITY GAS PIPING
23 21 13.00 20 04/06, CHG 2: 11/19 LOW TEMPERATURE WATER (LTW) HEATING
SYSTEM
23 23 00 08/21 REFRIGERANT PIPING
23 25 00 05/21 CHEMICAL TREATMENT OF WATER FOR
MECHANICAL SYSTEMS
23 30 00 05/20, CHG 1: 02/22 HVAC AIR DISTRIBUTION
23 35 19.00 20 02/10, CHG 2: 08/18 INDUSTRIAL VENTILATION AND EXHAUST
23 52 43.00 20 05/15 LOW PRESSURE WATER HEATING BOILERS
(UNDER 800,000 BTU/HR OUTPUT)
23 64 10 11/16 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 64 26 08/09, CHG 5: 11/19 CHILLED-HOT WATER PIPING SYSTEMS
23 74 33 05/24 DEDICATED OUTDOOR AIR SYSTEMS (DOAS)
PROJECT TABLE OF CONTENTS Page 3
23 81 00 05/18 DECENTRALIZED UNITARY HVAC EQUIPMENT
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11.01 08/24 CYBERSECURITY FOR FA/MNS
FACILITY-RELATED CONTROL SYSTEM
25 05 11.02 08/24 CYBERSECURITY FOR HVAC/DDC
FACILITY-RELATED CONTROL SYSTEM
25 05 11.03 08/24 CYBERSECURITY FOR LIGHTING
FACILITY-RELATED CONTROL SYSTEM
25 08 11.02 20 11/20 RISK MANAGEMENT FRAMEWORK FOR HVAC/DDC
FACILITY-RELATED CONTROL SYSTEM
DIVISION 26 - ELECTRICAL
26 05 73 08/23 POWER SYSTEM STUDIES
26 08 00 11/22 APPARATUS INSPECTION AND TESTING
26 12 19 05/24 PAD-MOUNTED, LIQUID-FILLED,
MEDIUM-VOLTAGE TRANSFORMERS
26 20 00 08/23 INTERIOR DISTRIBUTION SYSTEM
26 24 13 08/21 SWITCHBOARDS
26 27 14.00 20 02/21, CHG 1: 05/21 ELECTRICITY METERING
26 29 23 02/20, CHG 1: 05/21 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS
UNDER 600 VOLTS
26 32 15 05/24 ENGINE-GENERATOR SET STATIONARY
15-2500 KW, WITH AUXILIARIES
26 36 23 05/20, CHG 1: 08/21 AUTOMATIC TRANSFER SWITCHES AND
BY-PASS/ISOLATION SWITCH
26 41 00 11/13 LIGHTNING PROTECTION SYSTEM
26 51 00 05/20, CHG 2: 11/21 INTERIOR LIGHTING
26 56 00 08/21 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 10 00 08/11 BUILDING TELECOMMUNICATIONS CABLING
SYSTEM
27 53 19.13 05/20 FIRST RESPONDER DISTRIBUTED ANTENNAE
SYSTEMS (DAS)
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 76 08/20 INTERIOR FIRE ALARM AND MASS
NOTIFICATION SYSTEM, ADDRESSABLE
DIVISION 31 - EARTHWORK
31 00 00 08/23 EARTHWORK
31 05 19.13 02/21 GEOTEXTILES FOR EARTHWORK
31 11 00 11/18 CLEARING AND GRUBBING
31 31 16.13 08/22 CHEMICAL TERMITE CONTROL
31 32 19.16 02/21 GEOTEXTILE SOIL STABILIZATION
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 05 33 08/17 LANDSCAPE ESTABLISHMENT
32 11 20 05/22 BASE COURSE FOR RIGID PAVING AND
SUBBASE
32 11 23 05/22 AGGREGATE BASE COURSE FOR FLEXIBLE
PAVING
PROJECT TABLE OF CONTENTS Page 4
32 12 13 05/24 BITUMINOUS TACK AND PRIME COATS
32 12 16.16 11/20 ROAD-MIX ASPHALT PAVING
32 13 13.06 05/20 PORTLAND CEMENT CONCRETE PAVEMENT FOR
ROADS AND SITE FACILITIES
32 13 73.19 11/19 COMPRESSION CONCRETE PAVING JOINT
SEALANT
32 16 19 05/18 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 17 23.16 11/24 ROAD AND PARKING LOT PAVEMENT MARKINGS
32 31 13 11/21 CHAIN LINK FENCES AND GATES
32 92 23 04/06, CHG 1: 08/21 SODDING
32 93 00 08/17, CHG 1: 08/21 EXTERIOR PLANTS
DIVISION 33 - UTILITIES
33 11 00 02/18, CHG 2: 11/23 WATER UTILITY DISTRIBUTION PIPING
33 30 00 05/18 SANITARY SEWERAGE
33 40 00 11/21 STORMWATER UTILITIES
33 71 02 08/21 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 04/06 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT
41 22 13.15 11/22, CHG 1: 02/23 BRIDGE CRANES, OVERHEAD ELECTRIC,
UNDER RUNNING TROLLEY
41 22 14 11/22, CHG 1: 02/23 BOOTH BRIDGE CRANES, OVERHEAD
PNEUMATIC, UNDER RUNNING TROLLEY
41 22 23.19 05/20 MONORAIL HOISTS
41 34 23 04/23 PAINT SPRAY BOOTH
DIVISION 42 - PROCESS HEATING, COOLING, AND DRYING EQUIPMENT
42 15 00 06/25 INDUSTRIAL OVENS
DIVISION 45 - INDUSTRY-SPECIFIC MANUFACTURING EQUIPMENT
45 52 00 06/25 AEROSPACE X-RAY TESTING EQUIPMENT
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 5
THIS PAGE INTENTIONALLY LEFT BLANK
PROJECT TABLE OF CONTENTS Page 6
24 December 2025 eProjects Work Order Number: 1692230 Appropriation:
P-995 COMPOSITE REPAIR FACILITY
at the
MARINE CORPS AIR STATION CHERRY POINT, NC
DESIGNED BY:
NAVFAC MID-ATLANTIC
9742 MARYLAND AVENUE
NORFOLK, VIRGINIA 23511-3095
SPECIFICATION PREPARED BY:
Architectural: MBF Architects Civil: Stantec Structural: Kaydos-Daniels Engineering Interior Design: Within Interior Design Mechanical/Plumbing/Electrical: Crenshaw Consulting Eng.
Fire Prot.: Jensen Hughes Audio Video: Thorburn Cybersecurity: White Raven Security, LLC
Specification: Darden J. Eure, III, MBF Architects
Date: 24 December 2025
SPECIFICATION APPROVED BY:
For Commander, NAVFAC MID-ATLANTIC:
Date:
VOLUME 1 of 2 Division 00 - 13
This page is intentionally left blank.
VOLUME 1 - TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 15 02/24 LIST OF DRAWINGS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 02/24 SUMMARY OF WORK
01 14 00 11/22, CHG 3: 08/24 WORK RESTRICTIONS
01 20 00 11/20, CHG 5: 02/25 PRICE AND PAYMENT PROCEDURES
01 30 00 11/20, CHG 5: 02/25 ADMINISTRATIVE REQUIREMENTS
01 30 02.00 22 05/23 DESIGN, PROCUREMENT, AND INSTALLATION
OF AUDIOVISUAL EQUIPMENT
01 31 23.13 20 08/23 ELECTRONIC CONSTRUCTION AND FACILITY
SUPPORT CONTRACT MANAGEMENT SYSTEM
(eCMS)
01 32 17.00 20 11/23, CHG 1: 08/24 COST-LOADED NETWORK ANALYSIS SCHEDULES
(NAS)
01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES
SUBMITTAL REGISTER
01 33 29 02/21 SUSTAINABILITY REQUIREMENTS AND
REPORTING
HPSB CHECKLIST
01 35 26 05/24 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 05/24 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00 08/23, CHG 1: 05/24 QUALITY CONTROL
SCHEDULE OF FIRE PROTECTION SYSTEM
INSPECTIONS
01 45 35 05/24 SPECIAL INSPECTIONS
STATEMENT OF SPECIAL INSPECTIONS
SCHEDULE OF SPECIAL INSPECTIONS
01 50 00 11/20, CHG 3: 08/24 TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
01 57 19 08/22 TEMPORARY ENVIRONMENTAL CONTROLS
01 58 00 08/19, CHG 5: 08/22 PROJECT IDENTIFICATION
PROJECT SIGN DETAILS
01 74 19 02/19, CHG 3: 11/21 CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL
01 78 00 05/19, CHG 1: 08/21 CLOSEOUT SUBMITTALS
01 78 23 05/23 OPERATION AND MAINTENANCE DATA
01 78 24.00 20 05/23 FACILITY DATA WORKBOOK (FDW)
01 78 30.00 22 02/16 GIS DATA DELIVERABLES
01 91 00.15 05/23, CHG 2: 11/23 BUILDING COMMISSIONING
01 91 19 05/23 BUILDING ENCLOSURE COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
02 41 00 08/22 DEMOLITION
DIVISION 03 - CONCRETE
03 30 00 02/19, CHG 4: 08/22 CAST-IN-PLACE CONCRETE
DIVISION 04 - MASONRY
04 20 00 11/15, CHG 2: 05/19 UNIT MASONRY
DIVISION 05 - METALS
VOLUME 1 - TABLE OF CONTENTS Page 1
05 05 20 05/22, CHG 1: 08/24 POST-INSTALLED CONCRETE AND MASONRY
ANCHORS
05 12 00 08/18, CHG 2: 05/21 STRUCTURAL STEEL
05 21 00 05/15, CHG 1: 08/18 STEEL JOIST FRAMING
05 30 00 05/15, CHG 2: 08/18 STEEL DECKS
05 40 00 05/15, CHG 1: 08/18 COLD-FORMED METAL FRAMING
05 50 13 05/17, CHG 1: 08/18 MISCELLANEOUS METAL FABRICATIONS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 08/16, CHG 2: 11/18 ROUGH CARPENTRY
06 41 16.00 10 08/10, CHG 1: 11/18 PLASTIC-LAMINATE-CLAD ARCHITECTURAL
CABINETS
06 61 16 08/20 SOLID SURFACING FABRICATIONS
06 82 14 08/23 FIBERGLASS REINFORCED PLASTIC (FRP)
PIPE AND TUBE RAILINGS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 10 40 04/21 CRYSTALLINE WATERPROOFING
07 21 13 02/16, CHG 2: 08/20 BOARD AND BLOCK INSULATION
07 21 16 11/11, CHG 4: 08/18 MINERAL FIBER BLANKET INSULATION
07 22 00 02/16, CHG 3: 11/18 ROOF AND DECK INSULATION
07 27 10 08/23 BUILDING AIR BARRIER SYSTEM
07 27 19.01 05/17, CHG 2: 08/20 SELF-ADHERING AIR BARRIERS
07 27 26 05/17, CHG 2: 08/20 FLUID-APPLIED MEMBRANE AIR BARRIERS
07 27 36 05/17, CHG 3: 02/23 SPRAY FOAM AIR BARRIERS
07 45 00 07/24 ALUMINUM COMPOSITE PANELS
07 52 00 05/12, CHG 5: 11/19 MODIFIED BITUMINOUS MEMBRANE ROOFING
07 60 00 05/17, CHG 2: 11/18 FLASHING AND SHEET METAL
07 61 14.00 20 08/16, CHG 1: 08/18 CP STEEL STANDING SEAM ROOFING
07 84 00.00 22 09/23 FIRESTOPPING
07 92 00 08/16, CHG 3: 11/18 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 08/20 STEEL DOORS AND FRAMES
08 11 16 05/17, CHG 2: 11/18 ALUMINUM DOORS AND FRAMES
08 14 00 08/16, CHG 1: 08/18 WOOD DOORS
08 31 00 05/17, CHG 1: 08/18 ACCESS DOORS AND PANELS
08 33 23 08/20, CHG 1: 02/22 STEEL OVERHEAD COILING DOORS
08 38 00 12/25 FLEXIIBLE STRIP DOORS
08 41 13 08/18, CHG 1: 08/18 ALUMINUM-FRAMED ENTRANCES AND
STOREFRONTS
08 44 00 05/19 CURTAIN WALL AND GLAZED ASSEMBLIES
08 71 00 02/16, CHG 4: 02/22 DOOR HARDWARE
08 81 00 05/19 GLAZING
08 91 00 08/20 ALUMINUM LOUVERS
DIVISION 09 - FINISHES
09 22 00 02/10, CHG 2: 08/18 SUPPORTS FOR GYPSUM BOARD
09 29 00 08/16, CHG 4: 02/20 GYPSUM BOARD
09 30 10 08/20 CERAMIC TILING
09 51 00 08/20 ACOUSTICAL CEILINGS
09 65 00 11/24 RESILIENT FLOORING
09 67 23.13 11/19 STANDARD RESINOUS FLOORING
09 68 00 11/24 CARPETING
VOLUME 1 - TABLE OF CONTENTS Page 2
09 90 00 02/21 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 11 00 08/20 VISUAL DISPLAY UNITS
10 14 00.10 08/17, CHG 1: 11/18 EXTERIOR SIGNAGE
10 14 00.20 08/20 INTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 22 13 08/16, CHG 1: 08/18 WIRE MESH PARTITIONS
10 26 00 WALL AND DOOR PROTECTION
10 28 13 08/20 TOILET ACCESSORIES
10 44 16 11/19 FIRE EXTINGUISHERS
10 51 13 08/24 LOCKERS
DIVISION 12 - FURNISHINGS
12 00 01.00 20 02/23 FURNITURE, FIXTURES AND EQUIPMENT
(FF&E) PACKAGES
12 24 13 08/20 ROLLER WINDOW SHADES
DIVISION 13 - SPECIAL CONSTRUCTION
13 21 26 02/16, CHG 1: 08/18 COLD-STORAGE ROOMS (PREFABRICATED
PANEL TYPE)
-- End of Volume 1 Table of Contents --
VOLUME 1 - TABLE OF CONTENTS Page 3
VOLUME 1 - TABLE OF CONTENTS Page 4
DOCUMENT 00 01 15
LIST OF DRAWINGS
02/24
PART 1 GENERAL
1.1 SUMMARY
This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings and Specifications."
1.2 CONTRACT DRAWINGS
Contract drawings are as follows:
NAVDAC SHEET
No. No. TITLE
G GENERAL
12938149 G-001 TITLE SHEET
12938150 G-002 LOCATION MAPS, NOTES
12938151 G-003 INDEX OF DRAWINGS
12938152 G-004 INDEX OF DRAWINGS
GI GENERAL INFORMATION - LIFE SAFETY
12938153 GI001 LIFE SAFETY GENERAL NOTES AND LEGEND
12938154 GI002 CODE COMPLIANCE SITE PLAN
12938155 GI101 LIFE SAFETY COMPREHENSIVE FLOOR PLAN
B GEOTECHNICAL
12938156 B-001 GEOTECHNICAL GENERAL NOTES - FDA
12938157 B-101 EXPLORATION PLAN - FDA
12938158 B-102 SECTION A-A' - FDA
12938159 B-103 SECTION B-B' - FDA
12938160 B-104 SECTION C-C' - FDA
12938161 B-105 SPT BORING LOGS - FDA
12938162 B-106 SPT BORING LOGS - FDA
12938163 B-107 SPT BORING LOGS AND CPT SOUNDING - FDA
12938164 B-108 GEOTECHNICAL GENERAL NOTES - PDA
12938165 B-109 SUBSURFACE SOIL PROFILES - PDA
12938166 B-110 GEOPHYSICAL EXPLORATION RESULTS - PDA
12938167 B-111 SPT BORING LOGS - PDA
12938168 B-112 SPT BORING LOGS - PDA
12938169 B-113 CPT BORING LOGS - PDA
12938170 B-114 TEST PIT LOGS - PDA
12938171 B-115 TEMPORARY MONITORING WELLS - PDA
12938172 B-201 SITE PLAN - SETTLEMENT MONITORING
V SURVEY
12938173 VF001 SURVEY CONTROL POINTS AND NOTES
12938174 VF100 OVERALL EXISTING CONDITIONS
12938175 VF101 EXISTING CONDITIONS - AREA 1
12938176 VF102 EXISTING CONDITIONS - AREA 2
C CIVIL
12938177 C-001 CIVIL ABBREVIATIONS AND LEGENDS
12938178 CD100 OVERALL DEMOLITION PLAN
12938179 CD101 PARTIAL DEMOLITION PLAN - AREA 1
DOCUMENT 00 01 15 Page 1
NAVDAC SHEET
No. No. TITLE
12938180 CD102 PARTIAL DEMOLITION PLAN - AREA 2
12938181 CS100 OVERALL SITE PLAN
12938182 CS101 PARTIAL SITE PLAN - AREA 1
12938183 CS102 PARTIAL SITE PLAN - AREA 2
12938184 CS103 PARTIAL CONCRETE PAVEMENT JOINTING PLAN - AREA 1
12938185 CS104 PARTIAL CONCRETE PAVEMENT JOINTING PLAN - AREA 2
12938186 CS105 PARTIAL CONCRETE PAVEMENT JOINTING PLAN - AREA 3
12938187 CS106 PARTIAL CONCRETE PAVEMENT JOINTING PLAN - AREA 4
12938188 CS107 PARTIAL CONCRETE PAVEMENT JOINTING PLAN - AREA 5
12938189 CS108 PARTIAL CONCRETE PAVEMENT JOINTING PLAN - AREA 6
12938190 CS109 PARTIAL CONCRETE PAVEMENT JOINTING PLAN - AREA 7
12938191 CG100 OVERALL GRADING PLAN
12938192 CG101 PARTIAL GRADING PLAN - AREA 1
12938193 CG102 PARTIAL GRADING PLAN - AREA 2
12938194 CG121 PARTIAL EROSION CONTROL PLAN - AREA 1 - PHASE 1
12938195 CG122 PARTIAL EROSION CONTROL PLAN - AREA 2 - PHASE 1
12938196 CG131 PARTIAL EROSION CONTROL PLAN - AREA 1 - PHASE 2
12938197 CG132 PARTIAL EROSION CONTROL PLAN - AREA 2 - PHASE 2
12938198 CU100 OVERALL UTILITY PLAN
12938199 CU101 PARTIAL UTILITY PLAN - AREA 3 & 4
12938200 CU102 PARTIAL UTILITY PLAN - AREA 5
12938201 CU200 OVERALL UTILITY ALIGNMENT PLAN
12938202 CU201 WATER PROFILES
12938203 CU202 WATER PROFILES
12938204 CU203 STORM DRAIN PROFILES
12938205 CU204 STORM DRAIN PROFILES
12938206 C-501 SITE DETAILS
12938207 C-502 SITE DETAILS
12938208 C-503 EROSION AND SEDIMENT CONTROL DETAILS
12938209 C-504 SITE DETAILS
12938210 C-505 SITE DETAILS
12938211 C-506 SITE DETAILS
12938212 C-507 SITE DETAILS
12938213 C-508 SITE UTILITY DETAILS
12938214 C-509 SITE UTILITY DETAILS
12938215 C-510 SITE UTILITY DETAILS
12938216 C-511 SITE UTILITY DETAILS
12938217 C-512 SITE UTILITY DETAILS
12938218 C-513 SITE UTILITY DETAILS
12938219 C-514 EROSION AND SEDIMENT CONTROL DETAILS
12938220 C-515 EROSION AND SEDIMENT CONTROL DETAILS
12938221 C-516 EROSION AND SEDIMENT CONTROL DETAILS
12938222 C-517 NCG01
12938223 C-518 NCG02
LS LANDSCAPE ARCHITECTURE
12938224 LS100 OVERALL LANDSCAPING PLAN
12938225 LS101 PARTIAL LANDSCAPING PLAN - AREA 1
12938226 LS102 PARTIAL LANDSCAPING PLAN - AREA 2
12938227 LS501 PARTIAL LANDSCAPING PLAN - DETAILS
S STRUCTURAL
12938228 S-001 COVER SHEET
12938229 S-002 STRUCTURAL NOTES
12938230 S-003 STRUCTURAL NOTES
12938231 S-101 COMPREHENSIVE FOUNDATION PLAN
12938232 S-102 FOUNDATION PLAN - AREA A
DOCUMENT 00 01 15 Page 2
NAVDAC SHEET
No. No. TITLE
12938233 S-103 FOUNDATION PLAN - AREA B
12938234 S-104 FOUNDATION PLAN - AREA C
12938235 S-105 FOUNDATION PLAN - AREA D
12938236 S-106 FOUNDATION PLAN - AREA E
12938237 S-107 FOUNDATION PLAN - AREA F
12938238 S-108 FOUNDATION PLAN - AREA G
12938239 S-109 FOUNDATION PLAN - AREA H
12938240 S-201 COMPREHENSIVE FRAMING PLAN
12938241 S-202 FRAMING PLAN - AREA A
12938242 S-203 FRAMING PLAN - AREA B
12938243 S-204 FRAMING PLAN - AREA C
12938244 S-205 FRAMING PLAN - AREA D
12938245 S-206 FRAMING PLAN - AREA E
12938246 S-207 FRAMING PLAN - AREA F
12938247 S-208 FRAMING PLAN - AREA G
12938248 S-209 FRAMING PLAN - AREA H
12938249 S-301 SECTIONS
12938250 S-302 SECTIONS
12938251 S-303 SECTIONS
12938252 S-304 SECTIONS
12938253 S-401 TRUSS ELEVATIONS
12938254 S-501 GENERAL CONSTRUCTION DETAILS
12938255 S-502 GENERAL CONSTRUCTION DETAILS
12938256 S-503 GENERAL CONSTRUCTION DETAILS
12938257 S-504 GENERAL CONSTRUCTION DETAILS
A ARCHITECTURAL
12938258 A-001 SYMBOL LEGEND AND ABBREVIATIONS
12938259 A-101 COMPREHENSIVE FLOOR PLAN
12938260 A-102 FLOOR PLAN - AREA A
12938261 A-103 FLOOR PLAN - AREA B
12938262 A-104 FLOOR PLAN - AREA C
12938263 A-105 FLOOR PLAN - AREA D
12938264 A-106 FLOOR PLAN - AREA E
12938265 A-107 FLOOR PLAN - AREA F
12938266 A-108 COMPREHENSIVE REFLECTED CEILING PLAN
12938267 A-109 REFLECTED CEILING PLAN - AREA A
12938268 A-110 REFLECTED CEILING PLAN - AREA B
12938269 A-111 REFLECTED CEILING PLAN - AREA C
12938270 A-112 REFLECTED CEILING PLAN - AREA D
12938271 A-113 REFLECTED CEILING PLAN - AREA E
12938272 A-114 REFLECTED CEILING PLAN - AREA F
12938273 A-115 REFLECTED CEILING PLAN - EXTERIOR CANOPIES
12938274 A-116 ROOF PLAN
12938275 A-117 AIR & MOISTURE BARRIER DIAGRAMS AND DETAILS
12938276 A-201 EXTERIOR ELEVATIONS
12938277 A-301 BUILDING SECTIONS
12938278 A-302 PARTIAL WALL SECTIONS
12938279 A-303 PARTIAL WALL SECTIONS
12938280 A-304 SECTIONS & DETAILS
12938281 A-305 SECTIONS & DETAILS
12938282 A-306 SECTIONS & DETAILS
12938283 A-307 SECTIONS & DETAILS
12938284 A-308 SECTIONS & DETAILS
12938285 A-309 HAZARDOUS WASTE SUMP / DISPOSAL DETAILS
12938286 A-401 ENLARGED RESTROOM PLANS AND DETAILS
12938287 A-402 ENLARGED RESTROOM ELEVATIONS
DOCUMENT 00 01 15 Page 3
NAVDAC SHEET
No. No. TITLE
12938288 A-403 ENLARGED RESTROOM PLANS AND ELEVATIONS
12938289 A-404 ENLARGED RESTROOM ELEVATIONS AND SHOWER DETAILS
12938290 A-405 ENLARGED ENTRANCE PLAN AND DETAILS
12938291 A-406 ENLARGED PLAN & SECTIONS - ROOF STAIR
12938292 A-407 ENLARGED PLAN AND SECTIONS - WALK-IN FREEZER
12938293 A-408 ENLARGED PLAN AT AUTOCLAVES - RAILINGS
12938294 A-409 DUMPSTER ENCLOSURE PLANS & DETAILS
12938295 A-501 WALL TYPE DETAILS
12938296 A-502 WALL TYPE DETAILS
12938297 A-503 WALL TYPE DETAILS
12938298 A-504 ROOF DETAILS
12938299 A-505 ROOF DETAILS
12938300 A-506 DETAILS
12938301 A-507 DETAILS
12938302 A-508 DETAILS
12938303 A-509 EXTERIOR SIGN DETAILS
12938304 A-601 DOOR SCHEDULE AND DETAILS
12938305 A-602 DOOR DETAILS
12938306 A-603 DOOR DETAILS
12938307 A-604 DOOR DETAILS
12938308 A-605 DOOR DETAILS
12938309 A-701 ENLARGED PLANS - SANDING / PAINT BOOTHS
12938310 A-702 ENLARGED PLANS - SANDING / PAINT BOOTHS
12938311 A-703 ENLARGED PLANS - SANDING / PAINT BOOTHS
I INTERIOR DESIGN
12938312 I-101 FURNITURE PLAN - OVERALL
12938313 I-102 FURNITURE PLAN - AREA A
12938314 I-103 FURNITURE PLAN - AREA B
12938315 I-104 FURNITURE PLAN - AREA C
12938316 I-105 FURNITURE PLAN - AREA D
12938317 I-106 FURNITURE PLAN - AREA E
12938318 I-107 FURNITURE PLAN - AREA F
12938319 I-111 COLLATERAL EQUIPMENT PLAN - OVERALL
12938320 I-112 COLLATERAL EQUIPMENT PLAN - AREA A
12938321 I-113 COLLATERAL EQUIPMENT PLAN - AREA B
12938322 I-114 COLLATERAL EQUIPMENT PLAN - AREA C
12938323 I-115 COLLATERAL EQUIPMENT PLAN - AREA D
12938324 I-116 COLLATERAL EQUIPMENT PLAN - AREA E
12938325 I-117 COLLATERAL EQUIPMENT PLAN - AREA F
12938326 I-121 FINISH PLAN - AREA A
12938327 I-122 FINISH PLAN - AREA B
12938328 I-123 FINISH PLAN - AREA C
12938329 I-124 FINISH PLAN - AREA D
12938330 I-125 FINISH PLAN - AREA E
12938331 I-126 FINISH PLAN - AREA F
12938332 I-131 SIGNAGE PLAN - AREA A
12938333 I-132 SIGNAGE PLAN - AREA B
12938334 I-133 SIGNAGE PLAN - AREA C
12938335 I-134 SIGNAGE PLAN - AREA D
12938336 I-135 SIGNAGE PLAN - AREA E
12938337 I-136 SIGNAGE PLAN - AREA F
12938338 I-201 INTERIOR ELEVATIONS
12938339 I-202 INTERIOR ELEVATIONS
12938340 I-301 CASEWORK SECTIONS
12938341 I-302 CASEWORK SECTIONS
12938342 I-501 SIGNAGE DETAILS
DOCUMENT 00 01 15 Page 4
NAVDAC SHEET
No. No. TITLE
12938343 I-502 INTERIOR DETAILS
12938344 I-601 SCHEDULES & LEGENDS
12938345 I-602 SCHEDULES & LEGENDS
12938346 I-603 SCHEDULES & LEGENDS
FA FIRE ALARM
12938347 FA001 FIRE ALARM GENERAL NOTES AND LEGEND
12938348 FA101 FIRE ALARM FLOOR PLAN - AREA A
12938349 FA102 FIRE ALARM FLOOR PLAN - AREA B
12938350 FA103 FIRE ALARM FLOOR PLAN - AREA C
12938351 FA104 FIRE ALARM FLOOR PLAN - AREA D
12938352 FA105 FIRE ALARM FLOOR PLAN - AREA E
12938353 FA106 FIRE ALARM FLOOR PLAN - AREA F
12938354 FA501 FIRE ALARM DETAILS
12938355 FA502 FIRE ALARM DETAILS CONTINUED
FX FIRE PROTECTION
12938356 FX001 FIRE SUPPRESSION GENERAL NOTES AND LEGEND
12938357 FX002 FIRE SUPPRESSION OVERALL FLOOR PLAN
12938358 FX101 FIRE SUPPRESSION FLOOR PLAN - AREA A
12938359 FX102 FIRE SUPPRESSION FLOOR PLAN - AREA B
12938360 FX103 FIRE SUPPRESSION FLOOR PLAN - AREA C
12938361 FX104 FIRE SUPPRESSION FLOOR PLAN - AREA D
12938362 FX105 FIRE SUPPRESSION FLOOR PLAN - AREA E
12938363 FX106 FIRE SUPPRESSION FLOOR PLAN - AREA F
12938364 FX107 FIRE SUPPRESSION FLOOR PLANS - EXTERIOR STORAGE AREA D & F
12938365 FX501 FIRE SPRINKLER DETAILS
P PLUMBING
12938366 P-001 PLUMBING COVER SHEET
12938367 P-101 COMPREHENSIVE FLOOR PLAN - WASTE AND VENT
12938368 P-102 FLOOR PLAN - WASTE AND VENT - AREA A
12938369 P-103 FLOOR PLAN - WASTE AND VENT - AREA B
12938370 P-104 FLOOR PLAN - WASTE AND VENT - AREA C
12938371 P-105 FLOOR PLAN - WASTE AND VENT - AREA D
12938372 P-106 FLOOR PLAN - WASTE AND VENT - AREA E
12938373 P-107 FLOOR PLAN - WASTE AND VENT - AREA F
12938374 P-108 COMPREHENSIVE FLOOR PLAN - WATER
12938375 P-109 FLOOR PLAN - WATER - AREA A
12938376 P-110 FLOOR PLAN - WATER - AREA B
12938377 P-111 FLOOR PLAN - WATER - AREA C
12938378 P-112 FLOOR PLAN - WATER - AREA D
12938379 P-113 FLOOR PLAN - WATER - AREA E
12938380 P-114 FLOOR PLAN - WATER - AREA F
12938381 P-115 COMPREHENSIVE FLOOR PLAN - COMPRESSED AIR AND VACUUM
12938382 P-116 FLOOR PLAN - COMPRESSED AIR AND VACUUM - AREA A
12938383 P-117 FLOOR PLAN - COMPRESSED AIR AND VACUUM - AREA B
12938384 P-118 FLOOR PLAN - COMPRESSED AIR AND VACUUM - AREA C
12938385 P-119 FLOOR PLAN - COMPRESSED AIR AND VACUUM - AREA D
12938386 P-120 FLOOR PLAN - COMPRESSED AIR AND VACUUM - AREA E
12938387 P-121 FLOOR PLAN - COMPRESSED AIR AND VACUUM - AREA F
12938388 P-401 ENLARGED PLANS - WASTE AND VENT
12938389 P-402 ENLARGED PLANS - WASTE AND VENT
12938390 P-403 ENLARGED PLANS - WATER
12938391 P-404 ENLARGED PLANS - WATER
12938392 P-405 ENLARGED PLANS - COMPRESSED AIR AND VACUUM
12938393 P-501 PLUMBING DETAILS
DOCUMENT 00 01 15 Page 5
NAVDAC SHEET
No. No. TITLE
12938394 P-502 PLUMBING DETAILS
12938395 P-503 PLUMBING DETAILS
12938396 P-504 PLUMBING DETAILS
12938397 P-505 PLUMBING DETAILS
12938398 P-601 PLUMBING SCHEDULES
12938399 P-602 PLUMBING SCHEDULES
12938400 P-701 RISER DIAGRAMS - WASTE AND VENT
12938401 P-702 RISER DIAGRAMS - WATER
12938402 P-703 RISER DIAGRAMS - AREA A - COMPRESSED AIR AND VACUUM
12938403 P-704 RISER DIAGRAMS - AREAS A & B - COMPRESSED AIR AND VACUUM
12938404 P-705 RISER DIAGRAMS - AREAS B & C - COMPRESSED AIR AND VACUUM
12938405 P-706 RISER DIAGRAMS - AREA C - COMPRESSED AIR AND VACUUM
12938406 P-707 RISER DIAGRAMS - AREA D - COMPRESSED AIR AND VACUUM
12938407 P-708 RISER DIAGRAMS - AREAS D & E - COMPRESSED AIR AND VACUUM
12938408 P-709 RISER DIAGRAMS - AREAS E & F - COMPRESSED AIR AND VACUUM
12938409 P-710 RISER DIAGRAMS - AREA F - COMPRESSED AIR AND VACUUM
M MECHANICAL
12938410 M-001 MECHANICAL NOTES
12938411 MH101 OVERALL FLOOR PLAN - MECHANICAL HVAC
12938412 MH102 FLOOR PLAN - MECHANICAL HVAC - AREA A
12938413 MH103 FLOOR PLAN - MECHANICAL HVAC - AREA B
12938414 MH104 FLOOR PLAN - MECHANICAL HVAC - AREA C
12938415 MH105 FLOOR PLAN - MECHANICAL HVAC - AREA D
12938416 MH106 FLOOR PLAN - MECHANICAL HVAC - AREA E
12938417 MH107 FLOOR PLAN - MECHANICAL HVAC - AREA F
12938418 MH108 OVERALL ROOF PLAN - MECHANICAL HVAC
12938419 MH109 OVERALL FLOOR PLAN - MECHANICAL HVAC - DOAS
12938420 MH110 OVERALL FLOOR PLAN - MECHANICAL HVAC - SPECIALTY EQUIPMENT
12938421 MH111 OVERALL ROOF PLAN - MECHANICAL HVAC - SPECIALTY EQUIPMENT
12938422 MH401 MECHANICAL ROOM ENLARGED - HVAC
12938423 MP101 OVERALL FLOOR PLAN - MECHANICAL PIPING
12938424 MP102 FLOOR PLAN - MECHANICAL PIPING - AREA A
12938425 MP103 FLOOR PLAN - MECHANICAL PIPING - AREA B
12938426 MP104 FLOOR PLAN - MECHANICAL PIPING - AREA C
12938427 MP105 FLOOR PLAN - MECHANICAL PIPING - AREA D
12938428 MP106 FLOOR PLAN - MECHANICAL PIPING - AREA E
12938429 MP107 FLOOR PLAN - MECHANICAL PIPING - AREA F
12938430 MP108 OVERALL ROOF PLAN - MECHANICAL PIPNG
12938431 MP401 MECHANICAL ROOM ENLARGED - PIPING
12938432 M-301 MECHANICAL SECTION VIEW - CHILLER
12938433 M-302 MECHANICAL SECTION VIEW - MECHANICAL ROOMS
12938434 M-303 MECHANICAL SECTION VIEWS - RTU-1
12938435 M-304 MECHANICAL SECTION VIEWS - RTU-2 & RTU-3
12938436 M-305 MECHANICAL SECTION VIEWS - RTU-4 & RTU-5
12938437 M-306 MECHANICAL SECTION VIEWS - RTU-6 & RTU-7
12938438 M-307 MECHANICAL SECTION VIEWS - RTU-8 & RTU-9
12938439 M-308 MECHANICAL SECTION VIEWS - RTU-10 & RTU-11
12938440 M-309 MECHANICAL SECTION VIEWS - RTU-12
12938441 M-310 MECHANICAL SECTION VIEWS - RTU-13
12938442 M-311 MECHANICAL SECTION VIEWS - RTU-14 & RTU-15
12938443 M-312 MECHANICAL SECTION VIEWS - OVENS
12938444 M-313 MECHANICAL SECTION VIEWS - 132 SANDING BOOTH
AND 133 HONEYCOMB MACHINING
12938445 M-314 MECHANICAL SECTION VIEWS - 121 SANDING BOOTH
12938446 M-315 MECHANICAL SECTION VIEWS - 151 PAINT BOOTH
12938447 M-501 MECHANICAL DETAILS
DOCUMENT 00 01 15 Page 6
NAVDAC SHEET
No. No. TITLE
12938448 M-502 MECHANICAL DETAILS
12938449 M-503 MECHANICAL DETAILS
12938450 M-504 MECHANICAL DETAILS
12938451 M-505 MECHANICAL DETAILS
12938452 M-506 MECHANICAL DETAILS
12938453 M-507 MECHANICAL DETAILS
12938454 M-508 MECHANICAL DETAILS
12938455 M-509 MECHANICAL DETAILS
12938456 M-601 MECHANICAL SCHEDULES
12938457 M-602 MECHANICAL SCHEDULES
12938458 M-603 MECHANICAL SCHEDULES
12938459 M-604 MECHANICAL SCHEDULES
12938460 M-605 MECHANICAL SCHEDULES
12938461 M-701 MECHANICAL CONTROLS
12938462 M-702 MECHANICAL CONTROLS
12938463 M-703 MECHANICAL CONTROLS
12938464 M-704 MECHANICAL CONTROLS
12938465 M-705 MECHANICAL CONTROLS
12938466 M-706 MECHANICAL CONTROLS
12938467 M-707 MECHANICAL CONTROLS
12938468 M-708 MECHANICAL CONTROLS
12938469 M-709 MECHANICAL CONTROLS
12938470 M-710 MECHANICAL CONTROLS
12938471 M-711 MECHANICAL CONTROLS
12938472 M-712 MECHANICAL CONTROLS
12938473 M-801 CHILLED WATER PIPING DIAGRAM
12938474 M-802 HOT WATER PIPING DIAGRAM
12938475 M-901 3D ISOMETRIC - AREA A
12938476 M-902 3D ISOMETRIC - AREA B
12938477 M-903 3D ISOMETRIC - AREA C
12938478 M-904 3D ISOMETRIC - AREA D
12938479 M-905 3D ISOMETRIC - AREA E
12938480 M-906 3D ISOMETRIC - AREA F
12938481 M-907 3D ISOMETRIC - MECHANICAL ROOM
12938482 M-908 3D ISOMETRIC - DOAS
12938483 M-909 3D ISOMETRIC - HYDRONIC RISER
12938484 M-910 3D ISOMETRIC - GAS RISER
ES ELECTRICAL SITE
12938485 ES001 SITE ELECTRICAL LEGEND
12938486 ES101 SITE PLAN - ELECTRICAL
12938487 ES501 SITE ELECTRICAL DETAILS
12938488 ES502 SITE ELECTRICAL DETAILS
12938489 ES503 SITE ELECTRICAL DETAILS
12938490 ES504 SITE ELECTRICAL DETAILS
12938491 ES601 SITE ELECTRICAL SCHEDULES
12938492 ES701 SITE ELECTRICAL RISER DIAGRAM
E ELECTRICAL
12938493 E-001 ELECTRICAL NOTES AND LEGENDS
12938494 EG101 PARTIAL ROOF PLAN - LIGHTNING PROTECTION
12938495 EG102 PARTIAL ROOF PLAN - LIGHTNING PROTECTION
12938496 ES501 ELECTRICAL GROUNDING DETAILS
12938497 EH100 FLOOR PLAN - OVERALL HAZARDOUS AREAS
12938498 EL100 FLOOR PLAN - OVERALL LIGHTING
12938499 EL101 FLOOR PLAN - LIGHTING - AREA A
12938500 EL102 FLOOR PLAN - LIGHTING - AREA B
DOCUMENT 00 01 15 Page 7
NAVDAC SHEET
No. No. TITLE
12938501 EL103 FLOOR PLAN - LIGHTING - AREA C
12938502 EL104 FLOOR PLAN - LIGHTING - AREA D
12938503 EL105 FLOOR PLAN - LIGHTING - AREA E
12938504 EL106 FLOOR PLAN - LIGHTING - AREA F
12938505 EL107 FLOOR PLAN - LIGHTING - CANOPY - AREA D
12938506 EL108 FLOOR PLAN - LIGHTING - CANOPY - AREA F
12938507 EL301 ELECTRICAL SECTION VIEW - 160 STAIR
12938508 EP100 FLOOR PLAN - OVERALL POWER
12938509 EP101 FLOOR PLAN - POWER - AREA A
12938510 EP102 FLOOR PLAN - POWER - AREA B
12938511 EP103 FLOOR PLAN - POWER - AREA C
12938512 EP104 FLOOR PLAN - POWER - AREA D
12938513 EP105 FLOOR PLAN - POWER - AREA E
12938514 EP106 FLOOR PLAN - POWER - AREA F
12938515 EP107 FLOOR PLAN - EQUIPMENT CONNECTIONS - AREA A
12938516 EP108 FLOOR PLAN - EQUIPMENT CONNECTIONS - AREA B
12938517 EP109 FLOOR PLAN - EQUIPMENT CONNECTIONS - AREA C
12938518 EP110 FLOOR PLAN - EQUIPMENT CONNECTIONS - AREA D
12938519 EP111 FLOOR PLAN - EQUIPMENT CONNECTIONS - AREA E
12938520 EP112 FLOOR PLAN - EQUIPMENT CONNECTIONS - AREA F
12938521 EP113 FLOOR PLAN - EQUIPMENT CONNECTIONS - CANOPY - AREA D
12938522 EP114 FLOOR PLAN - EQUIPMENT CONNECTIONS - CANOPY - AREA F
12938523 EP115 PARTIAL ROOF PLAN - EQUIPMENT CONNECTIONS
12938524 EP116 PARTIAL ROOF PLAN - EQUIPMENT CONNECTIONS
12938525 EP401 ENLARGED FLOOR PLAN - POWER
12938526 EP402 ENLARGED FLOOR PLAN - POWER
12938527 EP403 ENLARGED FLOOR PLAN - POWER
12938528 EP404 ENLARGED FLOOR PLAN - POWER
12938529 EP405 ENLARGED FLOOR PLAN - POWER
12938530 EP406 ENLARGED FLOOR PLAN - POWER
12938531 EP407 ENLARGED FLOOR PLAN - POWER
12938532 EP408 ENLARGED FLOOR PLAN - POWER
12938533 EP409 ENLARGED FLOOR PLAN - POWER
12938534 EP410 ENLARGED FLOOR PLAN - POWER
12938535 EP411 ENLARGED FLOOR PLAN - POWER
12938536 E-501 ELECTRICAL DETAILS
12938537 E-502 ELECTRICAL DETAILS
12938538 E-503 ELECTRICAL DETAILS
12938539 E-504 ELECTRICAL DETAILS
12938540 E-505 ELECTRICAL DETAILS
12938541 E-601 ELECTRICAL SCHEDULES
12938542 E-602 ELECTRICAL SCHEDULES - 152 ELEC
12938543 E-603 ELECTRICAL SCHEDULES - 144 COMM, 152 ELEC
12938544 E-604 ELECTRICAL SCHEDULES - 147 MECH
12938545 E-605 ELECTRICAL SCHEDULES - 154, 155
12938546 E-606 ELECTRICAL SCHEDULES - 158 ELEC, 117 COMM
12938547 E-607 ELECTRICAL SCHEDULES - 128 ELEC
12938548 E-608 ELECTRICAL SCHEDULES - 130 COMPOSITE DIRTY
12938549 E-609 ELECTRICAL SCHEDULES - 135 CLEAN ROOM STAGING
12938550 E-610 ELECTRICAL SCHEDULES - 120 BLADE DIRTY
12938551 E-611 ELECTRICAL SCHEDULES - 136 COMPOSITE CLEAN
12938552 E-612 ELECTRICAL SCHEDULES - GENERATOR
12938553 E-613 ELECTRICAL SCHEDULES
12938554 E-614 ELECTRICAL SCHEDULES
12938555 E-615 ELECTRICAL SCHEDULES
12938556 E-616 ELECTRICAL SCHEDULES
12938557 E-701 ELECTRICAL RISER DIAGRAMS
DOCUMENT 00 01 15 Page 8
NAVDAC SHEET
No. No. TITLE
12938558 E-702 ELECTRICAL RISER DIAGRAMS
12938559 E-703 ELECTRICAL RISER DIAGRAMS
12938560 E-704 ELECTRICAL RISER DIAGRAMS
T TELECOMMUNICATIONS
12938561 T-001 TELECOMMUNICATIONS NOTES AND LEGENDS
12938562 T-101 FLOOR PLAN - TELECOMMUNICATIONS - AREA A
12938563 T-102 FLOOR PLAN - TELECOMMUNICATIONS - AREA B
12938564 T-103 FLOOR PLAN - TELECOMMUNICATIONS - AREA C
12938565 T-104 FLOOR PLAN - TELECOMMUNICATIONS - AREA D
12938566 T-105 FLOOR PLAN - TELECOMMUNICATIONS - AREA E
12938567 T-106 FLOOR PLAN - TELECOMMUNICATIONS - AREA F
12938568 T-107 FLOOR PLAN - A/V INFRASTRUCTURE - AREA E
12938569 T-108 FLOOR PLAN - CABLE TRAY - AREA A
12938570 T-109 FLOOR PLAN - CABLE TRAY - AREA B
12938571 T-110 FLOOR PLAN - CABLE TRAY - AREA C
12938572 T-111 FLOOR PLAN - CABLE TRAY - AREA D
12938573 T-112 FLOOR PLAN - CABLE TRAY - AREA E
12938574 T-113 FLOOR PLAN - CABLE TRAY - AREA F
12938575 T-114 FLOOR PLAN - DIGITAL TRACKING - A
12938576 T-115 FLOOR PLAN - DIGITAL TRACKING - B
12938577 T-116 FLOOR PLAN - DIGITAL TRACKING - C
12938578 T-117 FLOOR PLAN - DIGITAL TRACKING - D
12938579 T-118 FLOOR PLAN - DIGITAL TRACKING - E
12938580 T-119 FLOOR PLAN - DIGITAL TRACKING - F
12938581 T-401 ENLARGED FLOOR PLAN - TELECOMMUNICATIONS
12938582 T-501 TELECOMMUNICATIONS DETAILS
12938583 T-502 TELECOMMUNICATIONS DETAILS
12938584 T-503 TELECOMMUNICATIONS DETAILS
12938585 T-504 TELECOMMUNICATIONS DETAILS
12938586 T-505 TELECOMMUNICATIONS DETAILS
TY TELECOMMUNICATIONS - SECURITY
12938587 TY001 SECURITY NOTES AND LEGENDS
12938588 TY101 FLOOR PLAN - SECURITY INFRASTRUCTURE - AREA A
12938589 TY102 FLOOR PLAN - SECURITY INFRASTRUCTURE - AREA B
12938590 TY103 FLOOR PLAN - SECURITY INFRASTRUCTURE - AREA C
12938591 TY104 FLOOR PLAN - SECURITY INFRASTRUCTURE - AREA D
12938592 TY105 FLOOR PLAN - SECURITY INFRASTRUCTURE - AREA E
12938593 TY106 FLOOR PLAN - SECURITY INFRASTRUCTURE - AREA F
12938594 TY501 SECURITY INFRASTRUCTURE DETAILS
12938595 TY502 SECURITY INFRASTRUCTURE DETAILS
TA AUDIO VISUAL
12938596 TA001 SHEET INDEX AND NOTES
12938597 TA002 SYMBOLS AND ABBREVIATIONS
12938598 TA100 FLOOR PLANS
12938599 TA101 ENLARGED AV PLAN
12938600 TA301 ELEVATIONS
12938601 TA401 EQUIPMENT PLANS
12938602 TA402 FUNCTIONAL DIAGRAMS
12938603 TA601 SCHEDULES
12938604 TA701 GENERAL DETAILS
-- End of Document --
DOCUMENT 00 01 15 Page 9
DOCUMENT 00 01 15 Page 10
SECTION 02 41 00
DEMOLITION
08/22
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN SOCIETY OF SAFETY PROFESSIONALS (ASSP)
ASSP A10.6 (2006) Safety & Health Program Requirements for Demolition Operations - American National Standard for Construction and Demolition Operations
ASTM INTERNATIONAL (ASTM)
ASTM D2487 (2017; E 2020) Standard Practice for Classification of Soils for Engineering Purposes (Unified Soil Classification System)
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2024) Safety -- Safety and Occupational Health (SOH) Requirements
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
40 CFR 61 National Emission Standards for Hazardous Air Pollutants
1.2 PROJECT DESCRIPTION
1.2.1 Definitions
1.2.1.1 Demolition
Demolition is the process of tearing apart and removing any feature of a facility together with any related handling and disposal operations.
1.2.1.2 Deconstruction
Deconstruction is the process of taking apart a facility with the primary goal of preserving the value of all useful building materials.
1.2.1.3 Demolition Plan
Demolition Plan is the planned steps and processes for managing demolition activities and identifying the required sequencing activities and disposal mechanisms.
SECTION 02 41 00 Page 1
1.2.1.4 Deconstruction Plan
Deconstruction Plan is the planned steps and processes for dismantling all or portions of a structure or assembly, to include managing sequencing activities, storage, re-installation activities, salvage and disposal mechanisms.
1.2.2 Demolition/Deconstruction Plan
Prepare a Demolition Plan and submit proposed demolition and removal procedures for approval before work is started. Include in the plan procedures for careful removal and disposition of materials specified to be salvaged, coordination with other work in progress, a disconnection schedule of utility services, a detailed description of methods and equipment to be used for each operation and of the sequence of operations.
Identify components and materials to be salvaged for reuse or recycling with reference to paragraph Existing Facilities to be Removed. Append tracking forms for all removed materials indicating type, quantities, condition, destination, and end use. Provide procedures for safe conduct of the work in accordance with EM 385-1-1 . Plan must be approved by contractor's Structural PE before submitting to the Contracting Officer prior to work beginning.
1.2.3 General Requirements
Do not begin demolition or deconstruction until authorization is received from the Contracting Officer. The work of this section is to be performed in a manner that maximizes the value derived from the salvage and recycling of materials. The work includes demolition salvage of identified items and materials, and removal of resulting rubbish and debris. Remove rubbish and debris from Government property daily, unless otherwise directed. Store materials that cannot be removed daily in areas specified by the Contracting Officer. In the interest of occupational safety and health, perform the work in accordance with EM 385-1-1 , Section 23, Demolition, and other applicable Sections.
1.3 ITEMS TO REMAIN IN PLACE
Comply with FAR 52.236-9 to protect existing vegetation, structures, equipment, utilities, and improvements. Coordinate the work of this section with all other work indicated. Construct and maintain shoring, bracing, and supports as required. Ensure that structural elements are not overloaded. Increase structural supports or add new supports as may be required as a result of any cutting, removal, deconstruction, or demolition work performed under this contract. Do not overload pavements to remain. Provide new supports and reinforcement for existing construction weakened by demolition, deconstruction, or removal work.
Repairs, reinforcement, or structural replacement require approval by the Contracting Officer prior to performing such work.
1.3.1 Existing Construction Limits and Protection
Do not disturb existing construction beyond the extent indicated or necessary for installation of new construction. Provide temporary shoring and bracing for support of building components to prevent settlement or other movement. Provide protective measures to control accumulation and migration of dust and dirt in all work areas. Remove dust, dirt, and debris from work areas daily.
SECTION 02 41 00 Page 2
1.3.2 Weather Protection
For portions of the building to remain, protect building interior and materials and equipment from the weather at all times. Where removal of existing roofing is necessary to accomplish work, have materials and workmen ready to provide adequate and temporary covering of exposed areas.
1.3.3 Utility Service
Maintain existing utilities indicated to stay in service and protect against damage during demolition and deconstruction operations. Prior to start of work, utilities serving each area of alteration or removal will be shut off by the utility provider and disconnected and sealed by the Contractor.
1.3.4 Facilities
Protect electrical and mechanical services and utilities. Where removal of existing utilities and pavement is specified or indicated, provide approved barricades, temporary covering of exposed areas, and temporary services or connections for electrical and mechanical utilities. Floors, roofs, walls, columns, pilasters, and other structural components that are designed and constructed to stand without lateral support or shoring, and are determined to be in stable condition, must remain standing without additional bracing, shoring, or lateral support until demolished or deconstructed, unless directed otherwise by the Contracting Officer.
Ensure that no elements determined to be unstable are left unsupported and place and secure bracing, shoring, or lateral supports as may be required as a result of any cutting, removal, deconstruction, or demolition work performed under this contract.
1.4 BURNING
The use of burning at the project site for the disposal of refuse and debris will not be permitted. Where burning is permitted, adhere to federal, state, and local regulations.
1.5 AVAILABILITY OF WORK AREAS
Areas in which the work is to be accomplished will be available at contract award.
1.6 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Demolition Plan ; G
Existing Conditions
SD-07 Certificates
Notification ; G
SECTION 02 41 00 Page 3
1.7 QUALITY ASSURANCE
Submit timely notification of demolition projects to Federal, State, regional, and local authorities in accordance with 40 CFR 61 , Subpart M.
Notify the State's environmental protection agency and the Contracting Officer in writing 10 working days prior to the commencement of work in accordance with 40 CFR 61 , Subpart M. Comply with federal, state, and local hauling and disposal regulations. In addition to the requirements of the "Contract Clauses," conform to the safety requirements contained in ASSP A10.6 . Comply with the Environmental Protection Agency requirements specified. Use of explosives will not be permitted.
1.7.1 Dust and Debris Control
Prevent the spread of dust and debris and avoid the creation of a nuisance or hazard in the surrounding area. Do not use water if it results in hazardous or objectionable conditions such as, but not limited to, ice, flooding, or pollution. Sweep pavements as often as necessary to control the spread of debris that may result in foreign object damage potential to aircraft.
1.8 PROTECTION
1.8.1 Traffic Control Signs
a. Where pedestrian and driver safety is endangered in the area of removal work, use traffic barricades with flashing lights. Anchor barricades in a manner to prevent displacement by wind. Notify the Contracting Officer prior to beginning such work.
1.8.2 Protection of Personnel
Before, during and after the demolition work continuously evaluate the condition of the site specific features being demolished and take immediate action to protect all personnel working in and around the project site. No area, section, or component of floors, roofs, walls, columns, pilasters, or other structural element will be allowed to be left standing without sufficient bracing, shoring, or lateral support to prevent collapse or failure while workmen remove debris or perform other work in the immediate area.
1.9 FOREIGN OBJECT DAMAGE (FOD)
Aircraft and aircraft engines are subject to FOD from debris and waste material lying on airfield pavements. Remove all such materials that may appear on operational aircraft pavements due to the Contractor's operations. If necessary, the Contracting Officer may require the Contractor to install a temporary barricade at the Contractor's expense to control the spread of FOD potential debris. Provide a barricade consisting of a fence covered with a fabric designed to stop the spread of debris. Anchor the fence and fabric to prevent displacement by winds or jet/prop blasts. Remove barricade when no longer required.
1.10 RELOCATIONS
Perform the removal and reinstallation of relocated items as indicated with workmen skilled in the trades involved. Repair or replace items to be relocated which are damaged by the Contractor with new undamaged items as approved by the Contracting Officer.
SECTION 02 41 00 Page 4
1.11 EXISTING CONDITIONS
Before beginning any demolition or deconstruction work, survey the site and examine the drawings and specifications to determine the extent of the work. Record existing conditions in the presence of the Contracting Officer or the Contracting Officer's Representative showing the condition of structures and other facilities adjacent to areas of alteration or removal. Photographs or electronic images with a minimum resolution of 3072 x 2304 pixels, capable of a print resolution of 300 dpi, will be acceptable as a record of existing conditions. Include in the record the elevation of the top of foundation walls, finish floor elevations, possible conflicting electrical conduits, plumbing lines, alarms systems, the location and extent of existing cracks and other damage and description of surface conditions that exist prior to starting work. It is the Contractor's responsibility to verify and document all required outages which will be required during the course of work, and to note these outages on the record document. Submit survey results to the Contracting Officer or the Contracting Officer's Representative.
PART 2 PRODUCTS
2.1 FILL MATERIAL
a. Comply with excavating, backfilling, and compacting procedures for soils used as backfill material to fill basements, voids, depressions or excavations resulting from demolition or deconstruction of structures. Provide fill material consisting of waste products from demolition or deconstruction until all waste appropriate for this purpose is consumed.
b. Provide fill material conforming to the definition of satisfactory soil material as defined in ASTM D2487. In addition, fill material must be free from roots and other organic matter, trash, debris, frozen materials, and stones larger than 2 inches in any dimension.
PART 3 EXECUTION
3.1 EXISTING FACILITIES TO BE REMOVED
Inspect and evaluate existing structures onsite for reuse. Disassemble existing construction scheduled to be removed for reuse. Dismantled and removed materials are to be separated, set aside, and prepared as specified, and stored or delivered to a collection point for reuse, remanufacture, recycling, or other disposal, as specified. Designate materials for reuse onsite whenever possible.
3.1.1 Structures
a. Completely remove existing structures indicated including entirety of foundation systems. Cut off foundation piling to a distance not less than one foot below elevation indicated for new work, or four feet below grade, whichever is greater, and abandon remaining embedded portion of pile in-place. Remove utilities, slabs, sidewalks, curbs, gutters and light bases as indicated. Wood pile Cut offs are creosote treated and disposal must be managed accordingly for creosote treated timber projects .
b. Demolish structures in a systematic manner from the top of the
SECTION 02 41 00 Page 5 structure to the ground. Complete demolition work above each tier or floor before the supporting members on the lower level are disturbed.
Demolish concrete and masonry walls in small sections. Remove structural framing members and lower to ground by means of derricks, platforms hoists, or other suitable methods as approved by the Contracting Officer.
c. Locate demolition and deconstruction equipment throughout the structure and remove materials so as to not impose excessive loads to supporting walls, floors, or framing.
d. Building, or the remaining portions thereof, not exceeding 80 feet in height may be demolished by the mechanical method of demolition.
3.2 CONCURRENT EARTH-MOVING OPERATIONS
Do not begin excavation, filling, and other earth-moving operations that are sequential to demolition or deconstruction work in areas occupied by structures to be demolished or deconstructed until all demolition and deconstruction in the area has been completed and debris removed. Fill holes, open basements and other hazardous openings.
3.3 DISPOSITION OF MATERIAL
3.3.1 Title to Materials
Except for salvaged items specified in related Sections, and for materials or equipment scheduled for salvage, all materials and equipment removed and not reused or salvaged, become the property of the Contractor and must be removed from Government property.