View the file

Other files

File Type Posted
Amendment 0018.pdf PDF
Amendment 0017.pdf PDF
Amendment 0016.pdf PDF
Amendment 0016 Revised Drawings.pdf PDF
Amendment 0016 Revised Specifications.pdf PDF
Amendment 0015.pdf PDF
Amendment 0014.pdf PDF
P702 JA Interior Finishes_redacted.pdf PDF
CU502_revised.pdf PDF
CM102_revised.pdf PDF
Amendment 0013.pdf PDF
Amendment 0012.pdf PDF
08 11 13_revised.pdf PDF
Amendment 0011.pdf PDF
Amendment 0010.pdf PDF
07 42 13 METAL WALL PANELS - Amendment 0010.pdf PDF
Arch Sheet - Amendment 0010.pdf PDF
41 22 13 15_Rev1.pdf PDF
13 34 19_Rev1.pdf PDF
P702 Structural Drawings.pdf PDF
Attachment E - Price Proposal Form Seed Project revised.docx DOCX document
Amendment 0009.pdf PDF
Amendment 0008.pdf PDF
Amendment 0007.pdf PDF
Final FFE Package.pdf PDF
CIVIL SHEETS 007.pdf PDF
MECH SHEETS 0007.pdf PDF
P702-1704807-ELEC DWGS.pdf PDF
P702-1704807-CIVIL DWGS.pdf PDF
P702-Geotechnical Data Report.pdf PDF
VNG Natural Gas Line Agreement.pdf PDF
Gate 6 Site Characterization Report.pdf PDF
Amendment 0006.pdf PDF
P702-1704807 MECH DWG.pdf PDF
Amendment 0005.pdf PDF
Amendment 0004.pdf PDF
23R2562 P702 Site Visit Log.pdf PDF
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
Amendment 0001.pdf PDF
Attachment C - Construction and Design Experience Project Data Sheet.docx DOCX document
Attachment H - P702 Drawings.pdf PDF
Attachment I - Approved Identity Proofing Documents.pdf PDF
N4008523R2562 SB MACC HR GEN CONSTR.pdf PDF
Attachment B - PIEE Vendor Access Instructions.pdf PDF
Attachment K - SECNAV 5512.pdf PDF
Attachment G - P702 Specifications.pdf PDF
Attachment E - Price Proposal Form Seed Project.docx DOCX document
Attachment J - Criteria for Denying Access to Navy Installations.pdf PDF
Attachment A - Pre-Proposal Inquiry Log Template.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 52 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N40085-22R-2577 Amend 0001

CONTINUATION SHEET

THE PURPOSE OF THIS AMENDMENT IS TO PROVIDE THE FOLLOWING:

PROJECT TABLE OF CONTENTS

SECTION 01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

3.2.1 Temporary Utilities

Add to the end of the current paragraph:

“For construction temporary electrical service requirements, the existing medium voltage switch and service transformer feeding existing building CEP-126 may be used. See sheet ED101 in bid package drawings. Relocate the switch and transformer to a location on the project site, but outside of any new construction conflicts. Primary feeder to the medium voltage switch is fed underground from pole CEP-65 riser and may be reused to feed switch and transformer in new location. Exact switch and transformer relocation area shall be coordinated with the Construction Manager to accommodate the contractor’s needs and construction site layout. Contractor shall extend primary feeders to switch and transformer, and secondary feeders from transformer to contractor provided secondary equipment, as needed and in compliance with UFC 3 550 01, Change 3 and 2023 NEC (NFPA 70). All construction temporary electrical service equipment must be demolished after no longer needed as shown on the bid package drawings.”

-- End of Amendment --