Attachment E - Price Proposal Form Seed Project revised.docx

DOCX document 32 KB Posted

Attached to
Indefinite Delivery Indefinite Quantity Multiple Award Construction Contract for General Construction primarily in the Hampton Roads Area of Responsibility, Virginia
Solicitation number
N4008523R2562
Issued by

View the file

Other files

File Type Posted
Amendment 0018.pdf PDF
Amendment 0017.pdf PDF
Amendment 0016.pdf PDF
Amendment 0016 Revised Drawings.pdf PDF
Amendment 0016 Revised Specifications.pdf PDF
Amendment 0015.pdf PDF
Amendment 0014.pdf PDF
P702 JA Interior Finishes_redacted.pdf PDF
CU502_revised.pdf PDF
CM102_revised.pdf PDF
Amendment 0013.pdf PDF
Amendment 0012.pdf PDF
08 11 13_revised.pdf PDF
Amendment 0011.pdf PDF
Amendment 0010.pdf PDF
07 42 13 METAL WALL PANELS - Amendment 0010.pdf PDF
Arch Sheet - Amendment 0010.pdf PDF
41 22 13 15_Rev1.pdf PDF
13 34 19_Rev1.pdf PDF
P702 Structural Drawings.pdf PDF
Amendment 0009.pdf PDF
Amendment 0008.pdf PDF
Amendment 0007.pdf PDF
Final FFE Package.pdf PDF
CIVIL SHEETS 007.pdf PDF
MECH SHEETS 0007.pdf PDF
P702-1704807-ELEC DWGS.pdf PDF
P702-1704807-CIVIL DWGS.pdf PDF
P702-Geotechnical Data Report.pdf PDF
VNG Natural Gas Line Agreement.pdf PDF
Gate 6 Site Characterization Report.pdf PDF
Amendment 0006.pdf PDF
P702-1704807 MECH DWG.pdf PDF
Amendment 0005.pdf PDF
Amendment 0004.pdf PDF
23R2562 P702 Site Visit Log.pdf PDF
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
Amendment 0001.pdf PDF
Attachment C - Construction and Design Experience Project Data Sheet.docx DOCX document
Attachment H - P702 Drawings.pdf PDF
P702 Specifications Amendment Section 01 50 00.pdf PDF
Attachment I - Approved Identity Proofing Documents.pdf PDF
N4008523R2562 SB MACC HR GEN CONSTR.pdf PDF
Attachment B - PIEE Vendor Access Instructions.pdf PDF
Attachment K - SECNAV 5512.pdf PDF
Attachment G - P702 Specifications.pdf PDF
Attachment E - Price Proposal Form Seed Project.docx DOCX document
Attachment J - Criteria for Denying Access to Navy Installations.pdf PDF
Attachment A - Pre-Proposal Inquiry Log Template.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 52 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRICE PROPOSAL FORM

Provide line item prices, where indicated by blank underlines, for the following items:

Line Item
Description
Quantity
Unit
Unit Price
Sub-Total
Total Price
CLIN 0001
BASE PRICE: Total Price for the entire work for Project P702 – Submarine Logistics Support Facilities, in accordance with the drawings and specifications, complete, but excluding work provided in another Priced line item.
1
EA
CLIN 0001A
Subtotal of Base Price for the entire work for P702 building complete to the 5-foot line outside of the building in accordance with the drawings and specifications, but excluding work provided in another line item.
1
EA
CLIN 0001B
Subtotal of Base Price for the entire project sitework, outside the facility 5-foot line, for P702 site, complete in accordance with the drawings and specifications, but excluding work described in another line item.
1
EA
CLIN 0001C
Unit Price for undercut of geotechnically unsuitable subgrade and replacement with imported structural fill material, complete in accordance with the drawings and specifications, but excluding work provided in another line item.
750
CY
$
$

For CLIN 0001C, undercut and replacement of geotechnically unsuitable subgrade: Unit price for all work in connection with the undercut of geotechnically unsuitable soil (e.g. soft subgrade soils) not identified in the Contract Documents, and replacement with imported select material. Unsuitable soil determinations will be confirmed by the Government Geotechnical Engineer and approved by the Contracting Officer. The price shall include removal of geotechnically unsuitable soils encountered at planned subgrade elevations within planned excavation limits after proper completion of work specified, and backfilling the excavation with compacted imported select material. Soils disturbed by Contractor's construction activities, or that are excessively wet or soft due to lack of proper site maintenance, lack of proper site drainage, or lack of proper dewatering, will not be considered unsuitable. The volume of material removed and imported backfill required shall be determined based on field measurements (length x width x depth) of the completed excavation to remove the unsuitable soil, and approved by the Contracting Officer. Work under this line item will not proceed without prior field verification and written approval from the Contracting Officer.

Line Item
Description
Quantity
Unit
Unit Price
Sub-Total
Total Price
CLIN 0001D
Unit Price for demolition, excavation and disposal of buried structures, pipes and debris 1 CY and larger in size encountered within planned excavation limits, complete in accordance with the drawings and specifications, but excluding work provided in another line item.
250
TON
$
$

For CLIN 0001D, demolition, excavation and disposal of buried structures, pipes and debris: Unit price for providing demolition and excavation of buried structures, pipes and debris, including creosote treated timber, 1 cubic yard and larger in size that is encountered within planned excavation limits and not identified in the Contract Documents for demolition. Structures, pipes and pieces of buried debris, including creosote treated timber, smaller than 1 cubic yard in size encountered within planned excavation limits will be considered incidental to the work. Unit price shall include removal and disposal at an off-site licensed disposal facility that is permitted to receive creosote treated and inert, non-hazardous material. Unit price shall include handling and transportation. Backfill of any over excavation beyond planned excavation required to be made for removal will be paid for separately using Line Item 1C. The volume of material removed will be determined based on certified truck scale measurement (tons) of material disposed at the receiving facility, and approved by the Contracting Officer. Work under this CLIN will not proceed without prior field verification and written approval from the Contracting Officer.

CLIN 0001E
Unit Price for handling, storage, sampling, analysis, and disposal of all excavated soil, complete in accordance with the drawings and specifications, but excluding work provided in another line item.
6,800
TON
$
$

For CLIN 0001E, removal and disposal of all excavated soil. All excavated soil is considered non-hazardous contaminated soil media: Unit price for providing all work in connection with handling, storage, sampling, analysis, transportation, treatment and disposal of non-hazardous contaminated soil media encountered within the limits of planned excavations. Sampling and testing shall be performed in accordance with Specification Section 01 57 19.01 20, and must include any other analyses required by the Contractor’s selected treatment/disposal facility. Unit price shall include all work in connection with evaluation and handling, any necessary storage, stockpiling and related storage maintenance and transportation, and delivery to a permitted licensed treatment/disposal facility. Removal and disposal under this Line Item is limited to planned excavations and approved excavation to remove geotechnically unsuitable subgrade. Any other over-excavation to remove contaminated soil media is prohibited. The volume of material removed will be determined based on certified truck scale measurement (tons) of material disposed at the receiving facility, and approved by the Contracting Officer. Work under this Line Item will not proceed without prior field verification and written approval from the Contracting Officer.

CLIN 0001F
Unit Price for removal and disposal of asbestos containing pipe insulation within the existing building (insulation up to 8” in diameter) complete in accordance with the drawings and specifications, but excluding work provided in another line item.
50
LF
$
$

For CLIN 0001F: removal and disposal of asbestos containing pipe insulation within the existing building: Unit price for providing all work in connection with sampling, removal, and disposal of asbestos containing pipe insulation within the existing building. Pipe insulation and pipe fitting insulation in the building tested negative for asbestos content. However, if suspect pipe insulation or pipe fitting insulation is encountered in concealed spaces the contractor must stop work in the area until the material is properly identified (sampled) and addressed. The Contracting Officer and Government Environmental Design Specialist must be notified prior to sampling the pipe insulation/pipe fitting insulation. The quantity will be determined based on field measurements that are agreed upon by the Contracting Officer, Government Environmental Design Specialist, and the Contractor. Work from this line item will not proceed without prior field verification and written approval from the Contracting Officer.

CLIN 0001G
Unit Price for removal and disposal of buried (below grade) asbestos containing pipe insulation (insulation up to 24” in diameter) complete in accordance with the drawings and specifications, but excluding work provided in another line item.
200
LF
$
$

For CLIN 0001G: removal and disposal of buried asbestos containing pipe insulation: Unit price for providing all work in connection with sampling, removal, and disposal of buried asbestos containing pipe insulation. Pipe insulation and pipe fitting insulation in the building tested negative for asbestos content. However, if suspect pipe insulation or pipe fitting insulation is encountered during excavation the contractor must stop work in the area until the material is properly identified (sampled) and addressed. The Contracting Officer and Government Environmental Design Specialist must be notified prior to sampling the pipe insulation/pipe fitting insulation. The quantity will be determined based on field measurements that are agreed upon by the Contracting Officer, Government Environmental Design Specialist, Installation asbestos manager, and the Contractor. Work from this line item will not proceed without prior field verification and written approval from the Contracting Officer.

CLIN 0001H
Price for providing work in connection with labor, material, equipment, transportation and supervision required to increase isolated footing size based on actual foundation reactions submitted by metal building manufacturer. Unit price is based on an increased footing size of 9’x9’x18” deep, reinforced with 9 #6 bars, each way, top and bottom. Footing size increase occurs at 10 locations.
10
EA
$
$
CLIN 0001I
Lump Sum Price for provision for NCTAMS LANT coordination and government subcontractor, only, for connectivity of the telephone network outside of the building. All other work in accordance with the drawings and specifications shall be included in the base bid.
1
LS
$10,000
$10,000
CLIN 0001J
Lump Sum Price for provision of the Government Fire Alarm coordination and subcontractor, only, for connectivity of the fire alarm outside of the building. All other work in accordance with the drawings and specifications shall be included in the base bid.
1
LS
$10,000
$10,000
CLIN 0001K
Lump Sum Price for provision for termination, relocation, replacement and connectivity of the fiber network outside of the building in accordance with the drawings and specifications. The Government will designate the subcontractor to be used when needed when needed. All other work in accordance with the drawings and specifications shall be included in the base bid.
1
LS
$15,000
$15,000
CLIN 0001L
Lump Sum Price for provision for termination, relocation, replacement and connectivity of the NMCI network outside of the building in accordance with the drawings and specifications. The Government will designate the subcontractor to be used when needed when needed.
1
LS
$50,000
$50,000
CLIN 0001M
Lump Sum Price for provision for VNG coordination and government subcontractor, only, for connectivity of the natural gas utility outside of the building. All other work in accordance with the drawings and specifications shall be included in the base bid.
1
LS
$15,000
$15,000
CLIN 0002
Option Item No. 1: Price for providing all work in connection with Maintenance Bay Floor Finish Upgrade (Storage 101), complete in accordance with the drawings and specifications, but excluding work provided in another Priced line item.
1
EA
CLIN 0003
Option Item No. 2: Price for providing all work in connection with Redundant Power Feed, complete in accordance with the drawings and specifications, but excluding work provided in another Priced line item.
1
EA
CLIN 0004
Option Item 3: Price for providing work in connection with labor, material, equipment, transportation and supervision required for the Furniture, Fixtures, and Equipment (FF&E), complete in accordance with the drawings and specifications, but excluding work provided in another Priced line item.
Government Estimated Price:

$134,243 HAR Percent (NTE 5%)

HAR Subtotal

Total FF&E Estimated Price

GENERAL BID NOTES

a) Award will be made on the price proposed for CLIN 0001 and all Options. CLIN 0001 consists of Contract Line Items 0001A, and 0001B, as well as the sum of the extended prices for Contract Line Items 0001C, 0001D, 0001E, 0001F, 0001G, 0001H, 0001I, 0001J, 0001K, 001L, and 0001M. For CLINs 0001C thru 0001M, enter unit prices and extended totals in spaces provided. If there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid and the total recomputed accordingly. If an Offeror provides a total but fails to enter a unit price, the total divided by the specified quantity will be held to be the intended unit price.

b) Evaluation of Options (JUL 1990). Except when it is determined in accordance with FAR 17.206(b) Evaluation not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the price for the Option(s) to the total price for CLIN 0001. In accordance with FAR 52.217-5 Evaluation of Options, evaluation of options will not obligate the Government to exercise the Option(s).

c) The Government may reject an offer as nonresponsive if it is materially unbalanced as to prices for the basic requirement and the option quantities. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.

d) Failure to enter a price for any CLIN will result in a proposal being rejected.

e) The Government reserves the unilateral right to award CLINs 0002, 0003, 0004 to the Contractor at the proposed price within 90 calendar days after the contract award. A firm fixed proposed price is required for CLINs 0001, 0002, 0003, 0004. The Contract Completion Date (CCD) does not change if any or all the bid options are awarded.

f) If CLINs 0002, 0003, 0004 are exercised, additional bonding and consent of surety is required. Consequently, the Performance Bond must reflect 100 percent of the aggregate amount of all items.

OPTION BID NOTES

These notes apply to FFE CLIN 0004.

a. The estimated amount for FF&E has been supplied by the Government, to provide offerors with the projected magnitude of effort. The estimated amount includes the actual cost of the FF&E including freight and installation charges. The Government FF&E Estimate is only an estimated amount.

b. If awarded, line items will be funded separately after completion of FF&E design package review by the Government, and receipt of appropriate funding by the Government.

c. Bonding

i. No Bonding for FF&E at Time of Construction Contract Award

FAR 28.102-1(a) requires that performance and payment bonds be included in all construction contracts exceeding the SAT, except under the conditions listed. Since the FF&E Option Item is not part of the original contract award, the Construction Contractor must not be required to secure bond for the FF&E at the time the basic contract is awarded.

ii. Additional Bond at FF&E Option Item Award

FAR 28.102-2(d) requires the Government to secure additional bond from the Construction Contractor for any contract price increases. Therefore, an increase to the original contract bond is required at the time of the FF&E Option Item award, to protect the Government against the Construction Contractor not providing FF&E ordered and to ensure that the FF&E vendor(s) receive payment if the Construction Contractor goes out of business. The increased cost of the bond must come from the FF&E funding source and is not a part of the Construction Contractor’s HAR.

iii. Bonds Required by the Construction Contractor

If the Construction Contractor requires bonding from the FF&E subcontractor(s), the cost must be covered in the Construction Contractor’s HAR.

d. Offerors may propose a Handling and Administration Rate (HAR) for the FF&E not to exceed 5 percent. This fee will account for all administrative costs, overhead, bonding fees, administration of subcontracts, profit, and any other costs associated with and related to the coordination and processing of the procurement and installation of FF&E. The proposed HAR percentage will be incorporated into the contract award and will not be adjusted regardless of fluctuations from the estimate amount for the FF&E. The proposed HAR is a fixed rate.

e. The Government is not obligated to award the Option line item(s). Should the Government choose to award the FFE, the line item will be awarded as a negotiated option to the contract/task order. The Contractor's proposed HAR will be applied to all vendor/supplier costs for the FF&E.

f. If awarded, the FF&E modification will be awarded at least six months prior to the contract completion date. A minimum of six months is required for the Contractor to purchase, deliver and install the FF&E without impacting the overall completion date of the project. The Contractor's schedule must assume the award of the FF&E as an option. No schedule extensions will be granted if the option is awarded at least six months prior to the contract completion date. If the Government decides to negotiate and award the furniture modification with less than six months prior to the contact completion date, the Contractor may be entitled to a contract extension and extended field overhead. A contract extension and extended field overhead will only be granted in those cases where the Contractor demonstrates that an accepted Final FF&E packages were submitted within the approved schedule deadlines and sufficient lead time for the FF&E is not available and the Government's award of the option is in the last six months of the contract.