P702-1704807 MECH DWG.pdf
PDF 423 KB Posted
- Solicitation number
- N4008523R2562
View the file
Other files
Show 40 more
Latest 50 of 52 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
B
E
F
1 2 3 4 5 6 7
CF-1
C1
MI301
AC-1
ODU-3 ODU-4ODU-1ODU-2
1 1 1 1
B
TYP
B
B
B
B
B
2 TYP
B
B
B
B
B
B
B
B
B
B
"ø
S A
"ø
S A
"ø
S A
"ø
S A
CF-2
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
"ø
S A
"ø
S A
"ø
S A
"ø
S A
"ø
S A
"x
" R
A
DOAS-3
DOAS-4
2 TYP 2 TYP
AC-2
"x
" R
A
4 4 4 4
F
F 1240 F
F
C
D
DOAS-1
"ø
R A
"ø
R A
"ø
R A
"ø
R A
5 5 5 5
A1
MI301
101A
106B
100A
MI401
C1
DOAS-2
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G S
YS
TE
M S
C O
M M
AN
D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
N
AV
AL
S
TA
TI
O N
N
O R
FO
LK
, V A
AS NOTED
6/
/2
2:
:3
PM
C :\U se rs
\ra ym on d.
lim pi n\ D oc um en ts
\P
2-
7- M
_r ay m on d.
lim pi n.
rv t
MH101
P-
-S
UB
M
AR
IN
E
LO
G
IS
TI
CS
S
UP
PO
RT
F
AC
IL
IT
IE
S
FL
O
O R
PL
AN
DU
CT
W
O
RK
DGS
12873810
BPD DJM
09/08/2022
GEOFFREY MOSS, DIRECTOR OF
WARFARE REQUIREMENTS, VIA
WMS/GKC
NO
RF
OL
K, V
IR
GI
NI
A
NA
VA
L S
TA
TI
ON
N
OR
FO
LK
EJA
ALG
DSN
M
ID
LA
N
T D
C C
O R
E
M H
SCALE: 1/8" = 1'-0"
FLOOR PLAN - DUCTWORK
ROOM NAMES
100 HALLWAY
100A VESTIBULE
101 STORAGE
101A TEL COM.
102 OFFICE
103 WOMENS RESTROOM
103 WOMENS SHOWER
104 OFFICE
105 MENS RESTROOM
105 MEN SHOWER
106 LOUNGE
106B JAN. CL.
107 MECHANICAL ROOM
108 ELECTRICAL ROOM
109 FIRE PROTECTION ROOM
1 SEE DETAIL A2, PAD ON SLAB, SHEET MI501.
2 SEE DETAIL A1, TYPICAL DRUM LOUVER DETAIL, SHEET MI502.
3 SEE DETAIL C1, AIR CURTAIN FAN, SHEET MI501.
4 RETURN AIR LOUVER, SEE ARCHITECTURAL SHEET AE602 FOR MORE DETAIL.
5 DOAS SERVICE CLEARANCE SHOWN AT 3' FROM EDGES OF UNIT.
6 SEE DETAIL C1, TYPICAL EXTERIOR EQUIPMENT PAD (END VIEW), SHEET CM-501.
GENERAL NOTES KEYNOTES
GRAPHIC SCALE(S)
PLAN
NORTH
1. FOR ALL DUCTWORK EXPOSED TO THE OUTDOORS, PROVIDE
PREFABRICATED DOUBLE-WALL DUCTWORK WITH STAINLESS STEEL OUTER
SHELL (20 GAUGE MINIMUM) AND SOLID GALVANIZED STEEL INNER LINER (IN
ACCORDANCE WITH SMACNA), CONFIGURED AND SEALED FOR WEATHER
PROTECTION. PROVIDE 2 INCHES OF INSULATION BETWEEN THE OUTER
SHELL AND INNER LINER.
2. FOR ALL DUCTWORK INSIDE ROOM 101, PROVIDE PREFABRICATED DOUBLE-
WALL DUCTWORK WITH GALVANIZED STEEL OUTER SHELL AND SOLID
GALVANIZED METAL INNER LINER, IN ACCORDANCE WITH SMACNA.
PROVIDE 2 INCHES OF INSULATION BETWEEN THE OUTER SHELL AND INNER
LINER. PAINT THE OUTER SHELL IN ACCORDANCE WITH THE FINISH
SCHEDULE. COORDINATE WITH THE CONTRACTING OFFICER TO
DETERMINE PAINT COLOR.
3. ALL DUCTWORK AND EQUIPMENT SHOWN IS DIAGRAMMATIC. LOCATE ALL
DUCTWORK AND EQUIPMENT SO AS TO CLEAR ALL OBSTACLES.
4. PERFORM ALL WORK IN ACCORDANCE WITH APPLICABLE FEDERAL, STATE,
AND LOCAL CODES.
5. COORDINATE ALL HVAC INSTALLATIONS WITH ALL APPLICABLE TRADES.
6. VERIFY ALL DIMENSIONS AND CONDITIONS PRIOR TO THE START OF
INSTALLATION OF ALL MECHANICAL AND PLUMBING EQUIPMENT. BRING
DISCREPANCIES IN THE FIELD WITH CONTRACT DRAWINGS TO THE
ATTENTION OF THE CONTRACTING OFFICER IMMEDIATELY FOR
RESOLUTION.
7. COORDINATE ALL REQUIRED CONDUIT, PIPING AND CHASES FOR
GOVERNMENT FURNISHED GOVERNMENT INSTALLED EQUIPMENT WITH
THE CONTRACTING OFFICER.
8. LOCATE MANUAL BALANCING DAMPERS 2.5 DUCT DAMPERS AWAY FROM
DIFFUSER OR GRILLE TO ENSURE ACCESSIBILITY FOR O&M PERSONNEL
WITHOUT DAMPER NOISE FOR OCCUPANTS.
1/8" = 1' - 0" 0 5' 10' 15' 30'
SY
M
DE
S C
RI
PT
I O N
DA
TE
AP
PR
Am en dm en t 0
/14
/20
BP
D
100102
106B
A
B
E
F
1 2 3 4 5 6 7
IDU-1
ODU-2 ODU-3 ODU-4ODU-1
2 HP-3
HP-2
HP-1
MI401
A4
3TYP.
4TYP.
C
D
T
T
T
T T
RS/RL
101A
HF
DOAS-1
DOAS-3 DOAS-4
CONO2
DOAS-2
5 5 5 5
1 1 /2"
D
1 1 /2"
D
1 1 /2"
D
1 1 /2"
D
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G S
YS
TE
M S
C O
M M
AN
D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
N
AV
AL
S
TA
TI
O N
N
O R
FO
LK
, V A
AS NOTED
6/
/2
2:
:3
PM
C :\U se rs
\ra ym on d.
lim pi n\ D oc um en ts
\P
2-
7- M
_r ay m on d.
lim pi n.
rv t
MP101
P-
-S
UB
M
AR
IN
E
LO
G
IS
TI
CS
S
UP
PO
RT
F
AC
IL
IT
IE
S
FL
O
O R
PL
AN
M
EC
HA
NI
CA
L
PI
PI
NG
DGS
12873811
BPD DJM
09/08/2022
GEOFFREY MOSS, DIRECTOR OF
WARFARE REQUIREMENTS, VIA
WMS/GKC
NO
RF
OL
K, V
IR
GI
NI
A
NA
VA
L S
TA
TI
ON
N
OR
FO
LK
EJA
ALG
DSN
M
ID
LA
N
T D
C C
O R
E
M P1
SCALE: 1/8" = 1'-0"
FLOOR PLAN - MECHANICAL PIPING
ROOM NAMES
100 HALLWAY
100A VESTIBULE
101 STORAGE
101A TEL COM.
102 OFFICE
103 WOMENS RESTROOM
103 WOMENS SHOWER
104 OFFICE
105 MENS RESTROOM
105 MEN SHOWER
106 LOUNGE
106B JAN. CL.
107 MECHANICAL ROOM
108 ELECTRICAL ROOM
109 FIRE PROTECTION ROOM
1 SEE DETAIL B2, WALL PENETRIATION, SHEET MI501.
2 MOUNT IDU TO WALL. RUN CONDENSATE LINE TO MECHANICAL ROOM AND
CONNECT TO HP-1 CONDENSATE LINE. SIZE THE COMBINED LINES ACCORDINLY.
SEE DETAILS C2, DUCTLESS AC, SHEET M-501, AND A3, CONDENSATE DRAIN
PIPING DIAGRAM, SHEET M-502.
3 SEE DETAIL B2, PIPE SUPPORT STAND, SHEET MI502.
4 RS/RL TO INDOOR UNITS. SIZE LINES IN ACCORDANCE WITH MANUFACTURES
INSTRUCTIONS.
5 CONNECT CONDENSATE LINE TO STORM SEWER 4" PVC PIPE. PROVIDE AIR GAP
BETWEEN CONNECTION AT DOAS UNIT AND STORM SEWER PIPE.
PLAN
NORTH
GENERAL NOTES KEYNOTES
GRAPHIC SCALE(S)
1/8" = 1' - 0" 0 5' 10' 15' 30'
1. FOR ALL DUCTWORK EXPOSED TO THE OUTDOORS, PROVIDE
PREFABRICATED DOUBLE-WALL DUCTWORK WITH STAINLESS STEEL OUTER
SHELL (20 GAUGE MINIMUM) AND SOLID GALVANIZED STEEL INNER LINER (IN
ACCORDANCE WITH SMACNA), CONFIGURED AND SEALED FOR WEATHER
PROTECTION. PROVIDE 2 INCHES OF INSULATION BETWEEN THE OUTER
SHELL AND INNER LINER.
2. FOR ALL DUCTWORK INSIDE ROOM 101, PROVIDE PREFABRICATED DOUBLE-
WALL DUCTWORK WITH GALVANIZED STEEL OUTER SHELL AND SOLID
GALVANIZED METAL INNER LINER, IN ACCORDANCE WITH SMACNA.
PROVIDE 2 INCHES OF INSULATION BETWEEN THE OUTER SHELL AND INNER
LINER. PAINT THE OUTER SHELL IN ACCORDANCE WITH THE FINISH
SCHEDULE. COORDINATE WITH THE CONTRACTING OFFICER TO
DETERMINE PAINT COLOR.
3. ALL DUCTWORK AND EQUIPMENT SHOWN IS DIAGRAMMATIC. LOCATE ALL
DUCTWORK AND EQUIPMENT SO AS TO CLEAR ALL OBSTACLES.
4. PERFORM ALL WORK IN ACCORDANCE WITH APPLICABLE FEDERAL, STATE,
AND LOCAL CODES.
5. COORDINATE ALL HVAC INSTALLATIONS WITH ALL APPLICABLE TRADES.
6. VERIFY ALL DIMENSIONS AND CONDITIONS PRIOR TO THE START OF
INSTALLATION OF ALL MECHANICAL AND PLUMBING EQUIPMENT. BRING
DISCREPANCIES IN THE FIELD WITH CONTRACT DRAWINGS TO THE
ATTENTION OF THE CONTRACTING OFFICER IMMEDIATELY FOR
RESOLUTION.
7. COORDINATE ALL REQUIRED CONDUIT, PIPING AND CHASES FOR
GOVERNMENT FURNISHED GOVERNMENT INSTALLED EQUIPMENT WITH
THE CONTRACTING OFFICER.
SY
M
DE
S C
RI
PT
I O N
DA
TE
AP
PR
Am en dm en t 0
/14
/20
BP
D
1 1 1 1
E
HP-3
HP-2
HP-1
FD-3
107RS/RL
RS/RL
101A
106B
IDU-1
RS/RL
RS/RL
2" D
1 1/4" D
1 1/4" D
E
F
2 3 4 5 6
IDU-1
A
K
A
L
M
I
M
C
C
M 400
TYP
CH-1
CH-2
A
A
HP-1
HP-2
HP-3
UH-1
A
G
UH-3
UH-2
A
C
C 50H
H
C 110C 125G 125
101A
106B
J
G
G
C 125
C
9 9
DDC CONTROL PANEL
"x
" R
A
"x
" R
A
12"ø SA12"ø SA
10"x12" RA
10"ø SA
16"x12" RA
10"ø SA
12"x12" RA
7 5
E
E
D
D
8"ø SA
"ø
S A
"x
" R
A
8" ø
SA
100A
12"x10" RA
10"x10" RA
10"x10" RA
10"x10" RA
10"x10" RA
12"x10" RA
6"ø SA
10"ø SA
12"x10" RA
10"ø SA
8"ø SA
10"ø SA
10"x10" RA
10"x10" RA
8" ø
SA
6"ø SA
8"ø SA
10"x6" RA
10"x6" RA
8"ø SA
8"ø SA
4" ø
12"x12" RA
12"x12" RA
6" ø
SA
10"ø SA 6" ø
SA
8"ø SA
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G S
YS
TE
M S
C O
M M
AN
D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
N
AV
AL
S
TA
TI
O N
N
O R
FO
LK
, V A
AS NOTED
6/
/2
2:
:3
PM
C :\U se rs
\ra ym on d.
lim pi n\ D oc um en ts
\P
2-
7- M
_r ay m on d.
lim pi n.
rv t
MI401
P-
-S
UB
M
AR
IN
E
LO
G
IS
TI
CS
S
UP
PO
RT
F
AC
IL
IT
IE
S
EN
LA
RG
ED
F
LO
O R
PL
AN
S
DGS
12873813
BPD DJM
09/08/2022
GEOFFREY MOSS, DIRECTOR OF
WARFARE REQUIREMENTS, VIA
WMS/GKC
NO
RF
OL
K, V
IR
GI
NI
A
NA
VA
L S
TA
TI
ON
N
OR
FO
LK
EJA
ALG
DSN
M
ID
LA
N
T D
C C
O R
E
M I4
GENERAL NOTES KEYNOTES
GRAPHIC SCALE(S)
SCALE: 1/4" = 1'-0" (MP101)A4 ENLARGED FLOOR PLAN - MECHANICAL ROOM - PIPING
1 CONTRACTOR TO SUPPLY FIELD INSTALLED FRAME TO MOUNT UNIT TO THE FLOOR.
2 SEE DETAIL C4, TYPICAL DUCT BRANCH DETAIL, SHEET MI501.
3 SEE DETAIL A4, TYPICAL SUPPLY DIFFUSER INSTALLATION DETAIL, SHEET MI501.
4 SEE DETAIL B1, DUCT PENETRATION DETAIL, SHEET MI501.
5 WALL CAP WITH BIRD SCREEN AND BACKDRAFT DAMPER.
6 SEE DETAIL A1, ELECTRIC UNIT HEATER, SHEET MI501.
7 PROVIDE CLOTHES DRYER EXHAUST DUCT PENETRATION THROUGH EXTERIOR WALL AT HEIGHT OF CLOTHES DRYER EXHAUST DUCT OUTLET TO ENABLE MINIMUM
DUCT LENGTH WITHOUT TURNS IN THE DUCT.
8 SEE DETAIL B1, TRANSFER DUCT ELEVATION VIEW, SHEET MI502.
9 LOCATE THE EDGE OF THE FACE OF THE DIFFUSER OR GRILLE 4” FROM THE ADJACENT WALLS.
10 LOCATE THE EDGE OF THE FACE OF THE DIFFUSER OR GRILLE 18” FROM THE CLOSEST WALL; LOCATE THE CENTER OF THE DIFFUSER OR GRILLE HALF THE DISTANCE
BETWEEN WALLS ADJACENT TO THE CLOSEST WALL.
11 LOCATE THE EDGE OF THE FACE OF THE GRILLE 4” FROM THE EDGE OF THE SHOWER; LOCATE THE CENTER OF THE GRILLE ON THE CENTERLINE OF THE SHOWER.
12 LOCATE THE EDGE OF THE FACE OF THE DIFFUSER OR GRILLE 24” FROM THE CLOSEST WALL; LOCATE THE CENTER OF THE DIFFUSER OR GRILLE HALF THE DISTANCE
BETWEEN WALLS ADJACENT TO THE CLOSEST WALL.
1. ALL DUCTWORK AND EQIUPMENT SHOWN ON THIS DRAWING IS
DIAGRAMMATIC. LOCATE ALL DUCTWORK AND EQUIPMENT SO AS TO CLEAR
ALL OBSTACLES.
2. PERFORM ALL WORK IN ACCORDANCE WITH APPLICABLE FEDERAL, STATE,
AND LOCAL CODES.
3. COORDINATE ALL HVAC INSTALLATIONS WITH ALL APPLICABLE TRADES.
4. VERIFY ALL DIMENSIONS AND CONDITIONS PRIOR TO THE START OF
INSTALLATION OF ALL MECHANICAL AND PLUMBING EQUIPMENT. BRING ALL
CONSTRUCTION DISCREPANCIES TO THE IMMEDIATE ATTENTION OF THE
CONTRACTING OFFICER FOR A RESOLUTION.
5. COORDINATE ALL REQUIRED CONDUIT, PIPING AND CHASES FOR
GOVERNMENT FURNISHED GOVERMENT INSTALLED EQUIPMENT WITH THE
GOVERNMENT.
6. LOCATE MANUAL BALANCING DAMPERS 2.5 DUCT DAMPERS AWAY FROM
DIFFUSER OR GRILLE TO ENSURE ACCESSIBILITY FOR O&M PERSONNEL
WITHOUT DAMPER NOISE FOR OCCUPANTS.
SY
M
DE
S C
RI
PT
I O N
DA
TE
AP
PR
Am en dm en t 0
/14
/20
BP
D
SCALE: 1/4" = 1'-0"C1 ENLARGED FLOOR PLAN - DUCTWORK
1/4" = 1' - 0" 0 5' 10' 15'1'
(MH101)
| AMENDMENT 0005 MECHANICAL |
| MH101 - FLOOR PLAN - DUCTWORK |
| MP101 - FLOOR PLAN - MECHANICAL PIPING |
| MI401 - ENLARGED FLOOR PLANS |
File details come from the government source that posted it. Updated .