AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
INDEFINITE DELIVERY/INDEFINITE QUANTITY (IDIQ) MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR GENERAL CONSTRUCTION
PRIMARILY IN THE HAMPTON ROADS AREA OF RESPONSIBILITY (AOR), VIRGINIA
This procurement is being solicited as a small business set-aside.
All correspondence regarding this solicitation shall be directed via email to Jonathan Durham at jonathan.m.durham.civ@us.navy.mil
See Continuation Page
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 19-Jul-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008523R2562
X 9B. DATED (SEE ITEM 11)
04-May-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
19-Jul-2023
CODE
NAVFACSYSCOM MID-ATLANTIC
CONTRACTING CORE
9324 VIRGINIA AVENUE
NORFOLK VA 23511-3095
N40085 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008523R2562
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0014
The purpose of this amendment is to:
1. Incorporate J&A for Interior Finishes
2. Incorporate revised PPI response
3. Incorporate PPI response
1. Incorporate J&A for Interior Finishes is attached separately as P702 J&A Interior
Finishes_redacted
2. Incorporate revised PPI response for PPI #280
From:
PPI Reference Question Government Responses
280 PPI
Responses Question 166 refers to a P6 schedule.
Pleaseconfirm a schedule is not required at the time of proposal submission.
The schedule submitted for the seed project under Factor 3 does not need to be P6.
To:
PPI Reference Question Government Responses
280 PPI
Responses Question 166 refers to a P6 schedule.
Please confirm a schedule is not required at the time of proposal submission.
A schedule is not required. If one is submitted it does not need to be P6 and will be counted against page limits.
3. Incorporate PPI responses
PPI Reference Question Government Responses 285 Plan Sht -
AE302
Continued
KTR has has found a flaw in the solicitation bid documents. This flaw is specifically related to the drawings. Plan Sht AE302, Detail A2 does not show cold-formed metal framing between the girts of the pre-engineered metal building (PEMB). This type of framing will not be provided by the PEMB subcontractor.
Detail A2 also does not show any exterior sheathing that is required as a substrate to install the air barrier (note 17). The requirement for exterior sheathing is not included in the specifications. Plan AE502, Detail B1 confirms that Cold- Formed metal framing and exterior sheathing are not required for the exterior
The air barrier shown on the drawings is specifically designed for PEMB construction. The air barrier is a cross-woven non-perforated building wrap with a breathable polyolefin coating and is designed to perform as both a water-resistive barrier and as a breathable air barrier. This system can be purchased with the air barrier laminated on outer layer of fiberglass insulation which is installed over the exterior side of the
N4008523R2562 walls recieving metal wall panels. Again the air barrier cannot be installed without these framing and sheathing installations.
There is a section 05 40 00 included in the specifications . This section makes no mention of a requirement for design by the KTR. Plan Sht S-001 under "Delegated Engineered Systems" states
DESIGN RESPONSIBILITY FOR THE
FOLLOWING ENGINEERED
SYSTEMS AND COMPONENT PARTS
IS DELEGATED TO A QUALIFIED
REGISTERED PROFESSIONAL
ENGINEER SELECTED BY THE
CONTRACTOR.
A. STRUCTURAL STEEL MEMBERS
AND THEIR CONNECTIONS TO THE
METAL
BUILDING SYSTEM WHICH ARE
NOT DESIGNED, FABRICATED AND
ERECTED
BY THE METAL BUILDING SYSTEM
SUPPLIER.
1. WHERE SECTIONS AND DETAILS
DO NOT SHOW SPECIFIC
CONNECTION
COMPONENT INFORMATION,
CONNECTIONS SHOWN ARE
SCHEMATIC
REPRESENTATIONS.
2. MEMBER SIZES SHOWN ARE FOR
BIDDING PURPOSES ONLY. -----
Though specified in Division 5, Cold- Form metal framing is not technically structural steel. If the reqiuirement is to design the requirement for cold-rolled metal framing, then the designer should state this requirement in these notes and the specification. No members are shown and sizes have not been provided. There is no requirement shown for Framing or Sheathing behind the metal wall panels.
The KTR cannot design/cost/build a requirement the he cannot see on the plans or in the specifications.
girts or it can be used by itself as a sheet that is attached on the exterior side of the girts. There is no need for exterior sheathing or metal studs to use this system.
(End of Summary of Changes)