View the file

Other files

File Type Posted
Amendment 0018.pdf PDF
Amendment 0017.pdf PDF
Amendment 0016.pdf PDF
Amendment 0016 Revised Drawings.pdf PDF
Amendment 0016 Revised Specifications.pdf PDF
Amendment 0015.pdf PDF
Amendment 0014.pdf PDF
P702 JA Interior Finishes_redacted.pdf PDF
CU502_revised.pdf PDF
CM102_revised.pdf PDF
Amendment 0013.pdf PDF
Amendment 0012.pdf PDF
08 11 13_revised.pdf PDF
Amendment 0011.pdf PDF
Amendment 0010.pdf PDF
07 42 13 METAL WALL PANELS - Amendment 0010.pdf PDF
Arch Sheet - Amendment 0010.pdf PDF
41 22 13 15_Rev1.pdf PDF
13 34 19_Rev1.pdf PDF
P702 Structural Drawings.pdf PDF
Attachment E - Price Proposal Form Seed Project revised.docx DOCX document
Amendment 0008.pdf PDF
Amendment 0007.pdf PDF
Final FFE Package.pdf PDF
CIVIL SHEETS 007.pdf PDF
MECH SHEETS 0007.pdf PDF
P702-1704807-ELEC DWGS.pdf PDF
P702-1704807-CIVIL DWGS.pdf PDF
P702-Geotechnical Data Report.pdf PDF
VNG Natural Gas Line Agreement.pdf PDF
Gate 6 Site Characterization Report.pdf PDF
Amendment 0006.pdf PDF
P702-1704807 MECH DWG.pdf PDF
Amendment 0005.pdf PDF
Amendment 0004.pdf PDF
23R2562 P702 Site Visit Log.pdf PDF
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
Amendment 0001.pdf PDF
Attachment C - Construction and Design Experience Project Data Sheet.docx DOCX document
Attachment H - P702 Drawings.pdf PDF
P702 Specifications Amendment Section 01 50 00.pdf PDF
Attachment I - Approved Identity Proofing Documents.pdf PDF
N4008523R2562 SB MACC HR GEN CONSTR.pdf PDF
Attachment B - PIEE Vendor Access Instructions.pdf PDF
Attachment K - SECNAV 5512.pdf PDF
Attachment G - P702 Specifications.pdf PDF
Attachment E - Price Proposal Form Seed Project.docx DOCX document
Attachment J - Criteria for Denying Access to Navy Installations.pdf PDF
Attachment A - Pre-Proposal Inquiry Log Template.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 52 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

INDEFINITE DELIVERY/INDEFINITE QUANTITY (IDIQ) MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR GENERAL CONSTRUCTION

PRIMARILY IN THE HAMPTON ROADS AREA OF RESPONSIBILITY (AOR), VIRGINIA

This procurement is being solicited as a small business set-aside.

All correspondence regarding this solicitation shall be directed via email to Jonathan Durham at jonathan.m.durham.civ@us.navy.mil

See Continuation Page

1. CONTRACT ID CODE PAGE OF PAGES

J 1 26

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 03-Jul-2023

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008523R2562

X 9B. DATED (SEE ITEM 11)

04-May-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

03-Jul-2023

CODE

NAVFACSYSCOM MID-ATLANTIC

CONTRACTING CORE

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008523R2562

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0009

The purpose of this amendment is to:

1. Incorporate a revised price proposal form

2. Incorporate revised drawings

3. Incorporate revised specifications

4. Incorprate Pre-Proposal Inquiry Responses

1. Incorporate revised price proposal form

Attached separately as “Attachment E – Price Proposal Form Seed Project revised”

2. Incorporate revised drawings Attached separately as “P702 Structural Drawings”

DOCUMENT 00 01 15 LIST OF DRAWINGS

1.2 CONTRACT DRAWINGS

NAVFAC Dwg. Nos. 12873738, 12873749 are revised as of June 28, 2023. These revised drawings accompany this amendment.

On NAVFAC Dwg. 12873738 (S-001)

Revised design loads and criteria notes.

On NAVFAC Dwg. 12873743 (SB503)

Revised column footing schedule.

On NAVFAC Dwg. 12873749 (SF301)

Revised bridge crane notes.

3. Incorporate revised specifications

SECTION 10 28 13 TOILET ACCESSORIES

1.2 Submittals:

SD-03 Product Data Add: ‘Item Waste receptical, SS, Surface Mounted; G’ Add: ‘ Item Mirror, SS, Surface Mounted; G’

SD-10 Operation and Maintenance Data Add: ‘Item Waste receptical, SS, Surface Mounted; G’ Add: ‘ Item Mirror, SS, Surface Mounted; G’

2.1 Accessory Items:

Add: 2.1.13 Item Waste Receptical, SS, Surface Mounted

Seam welded stainless steel waste receptacle. Waste container: removable, leak-proof, rigid molded plastic. 6-Gallon capacity, stainless steel satin finish.

Add: 2.1.14 Item Mirror, SS, Surface Mounted

One-piece, ½” x 1/2” x 3/8” (13 x 13 x 9.5mm) channel-frame. Type 430 stainless steel with satin finish. Mitered corners. Frame screw permits replacement of glass, No. 1 quality, ¼” (6mm) glass mirror; Galvanized steel back. Secured to concealed wall hanger with theft-resistant mounting.

SECTION 13 34 19 METAL BUILDING SYSTEMS

1.6.4 Eliminate erector certification.

1.10.1 Change Building System Warranty to 5 years.

2.1.7 Clarification for primer on high strength bolts and structural steel.

2.1.10 Clarification for primer on high strength bolts and structural steel.

2.1.11 Clarification for primer on high strength bolts and structural steel.

SECTION 41 22 13.15 OVERHEAD CRANE

Changes to the specification include requirements for a patented track system for both the crane rails and crane bridge girder and for a licensed surveyor to perform the rail survey.

Specific Paragraphs are as follows:

1.3. Clarification for coordination with specification section 05 12 00.

1.6.5.b Includes requirement for a licensed surveyor to perform the crane rail alignment survey.

2.2 Includes reference MHI MH27.1 for the design of patented track and bridge girder systems.

2.2.1 Includes reference MHI MH27.1 for the design of patented track and bridge girder systems.

2.2.2 Includes reference MHI MH27.1 for the design of patented track and bridge girder systems.

2.2.3 Includes reference MHI MH27.1 for the design of patented track and bridge girder systems.

2.2.4 Includes reference MHI MH27.1 for the design of patented track and bridge girder systems.

2.2.5. Includes reference MHI MH27.1 for the design of patented track and bridge girder systems.

2.3.2 Includes reference MHI MH27.1 for the design of patented track and bridge girder systems.

3.4.1 Includes requirement for a licensed surveyor to perform the crane rail alignment survey.

3.4.5.2.1 Includes reference MHI MH27.1 for the design of patented track and bridge girder systems.

PPI RESPONSES

The response to PPI 98 on Amendment 007 has been updated by PPI 140 on the worksheet.

4. Incorporate Pre-Proposal Inquiry Responses Numbe r Reference Question Government

Response

Pg Sec Para

Elevations A1 and A2 on IN301 show wall tile being installed in the Lounge “kitchenette” area but wall finishes in this room per the finish schedule on IN601 are all painted walls, not a split installation like shown on the flooring. Please confirm if wall tile is to be installed, and if so please confirm extent of wall tile – IN501 shows floor tile area as 13’ x 7’ which is the limits of the millwork/kitchen equipment, but A1 and A2 on IN301 show wall tile extending past this point.

Wall tile will NOT be provided in room 106 Lounge

The safety stripe signage locations in Storage 101 does not match between sheets IN101 and AE101 – please confirm correct areas

Provide both areas of safety stripping in the storage area.

AE101 does not show a wall type being installed around the columns along the exterior wall, however IN101 appears to show a wall around these columns, is this correct?

Both are wall type A2

Window and Louver schedule on AE603 is inconsistent with the window and louver types. The schedule shows a Type C with a quantity of 1, the types does not show a Type C but has details for a Type B. It is also unclear where these windows/louvers are located – if they are meant to be the thru-wall louvers at the exterior wall on AE101 then the quantity should be 4 and not 1.

See response to

RFI #59.

A1/AE401 appears to show a recessed box in the Janitors room (Plan West Wall) – what is this?

See drawing sheet PJ401 and

PJ601 for information for washing machine box.

RFP

Please specify font and margin requirements for the technical portion of the MACC.

See Amendment

Attachme nt E

RFP

Option

Bid Notes

b. If awarded, line items will be funded separately after completion of FF&E design package review by the Government, and receipt of appropriate funding by the Government.

Requirements and details are provided in E20, FURNISHINGS and E10, EQUIPMENT. Documents E20, FURNISHINGS and E10, EQUIPMENT have not been provided with the RFP.

Please provide this information.

Requirements and Details are provided in Spec Section 01 30

01.00 22.

Documents E10 and E20 do not apply to this contract.

RFP

Option

Bid Notes

b. If awarded, line items will be funded separately after completion of FF&E design package review by the Government, and receipt of appropriate funding by the Government. Is the KTR responsible for FF&E Design cost and processes?

Refer to 01 30

01.00 22

RFP

Option

Bid Notes Has the FF&E Design been completed for this project?

Refer to 01 30

RFP

Option

Bid Notes Are the FF&E Design Costs included in the government estimate of $134,243.00?

No, refer to 01 30 01.00 22

RFP

Option

Bid Notes

If the KTR is responsible for FF&E Design Costs and these design costs not included in the government estimate.

Where should the KTR allocate these design costs?

The Design Fees are within the Base Contract.

Refer to 01 30

RFP

Option

Bid Notes

If the KTR is responsible for FF&E Design Costs and these design costs not included in the government estimate.

Where should the KTR allocate these design costs?

The Design Fees are within the Base Contract.

Refer to 01 30

RFP

Option

Bid Notes Please confirm that all sales taxes are included in the government estimate of

There is no sales tax in Virginia, however it is up

134,243.00. Will the KTR be responsible to the FF&E Sales Tax?

to the KTR to provide all the proper paperwork.

RFP

Option

Bid Notes

f. If awarded, the FF&E modification will be awarded at least six months prior to the contract completion date. A minimum of six months is required for the Contractor to purchase, deliver and install the FF&E without impacting the overall completion date of the project. The Contractor's schedule must assume the award of the FF&E as an option. KTR's experience indicates the six month duration is not adequate if standard FF&E Design and Procurement practices will be employed. Will the NAVFAC required Design and Procurement process for FF&E occur outside of the referenced six month duration?

The award of the

FF&E

Modification must be awarded at least 6 months prior. Design of the FF&E package must be conducted prior to award.

Contractor and Contractor's ID must provide a FF&E schedule for approval.

8 01 11 00 1.8

Does the Government anticipate retaining salvaged materials? If so, can a list be given so the KTR's can price the work accordingly.

We are not aware of any salvaged materials.

01 32

17.00 20 1.8

Please confirm the Schedule for the project must be Primavera P6. Confirmed

17.00 20 1.10.1.10

Please confirm the P6 schedule is to be cost-loaded.

Confirmed

17.00.20 1.10.1.10.

States that the value of Commissioning, testing and closeout may not be less than 10% of the total costs for procurement and construction activities. This is an extreme amount for a project of this size and cost. Will the Government change this requirement to the actual costs associated with these items?

The specifications are standard, and will not be changed for this contract.

195 01 33 29 1.5.3.2 d Please confirm a "third party" is required for Certification of the Design Compliance Report.

Bid per RFP

Please confirm the roles of Superintendent, SSHO, and QCM must be performed by 3 individuals.

Confirmed

Please confirm a third party FPQC is required.

A third party FPQC is required.

Cyber Security

Will the use of wifi cards be permitted to be used onsite during construction? If not, will the gov't allow internet to be hard wired onsite for superintendent/SSHO use?

Refer to Specification

Section 01 50 00, section 1.6, for requirements for contractor furnished temporary IP networks.

AE701

Interior Signage

Signage Schedule

Sign Type A at the Electrical Room is shown to be an interior type sign as it is not noted to be exterior grade material on the schedule. However, they Type A sign at the Fire Pump Room, Mechanical Room and Lounge are all noted as exterior material. Can it be assumed that the Type A sign at the Electrical Room is to be an exterior grade material as well?

See signage schedule on sheet AE701.

The schedule shows both type 'A' signs at room 107 as exterior grade.

IN 101

Finish Plan

Please provide dimensions for Walk-off

Mat in Vestibule.

Walk Off Mat Dimensions: 6' x

4'-5"

175 AE302

Please confirm if dampproofing is required at all footings.

Yes, dampproofing is required at all footings

Spec Section 08 11 13

Paragraph

2.9.4 /

IN601

Spec Section 08 11 13 Paragraph 2.9.4 requires hollow metal doors to have a factory applied enamel finish. Drawing IN601 Finish Schedule Note 8 requires field painting of hollow metal doors. Due to setup cost for such a small quantity of doors, factory applied finishing will be cost prohibitive. Please confirm that field painting doors in accordance with Drawing IN601 is acceptable.

Field application is not acceptable, doors must be factory finished.

Spec section 01 30 01.00 paragraph 1.3 General Requirements - The GOVT has provided an FF&E fee to carry of $134,243.00 plus HAR. After award, if after the design of the final approved FF&E package, the$134,243.00 total is to low, will the GOVT accept a modification to the pricing to reflect accurate numbers?

The HAR is a percentage, not to exceed 5% of the final FF&E

Cost. The amount provided is an estimate.

Sheet

IF001

The FF& E schedule shows the X01 Vending Beverage and X02 Vending

Snack as GFGI. Please confirm that X01 and X02 are not part of the option FFE cost.

Correct

Spec section 01

Design, Procurement & Installation of FF and E - How many onsite FF & E meetings should the interior designer of record anticipate attending for this project?

Refer to 01 30

Spec section 01 and E - paragraph 1.4.4 FF&E and CEQ

Services letter a. states that the contractor's interior designer is responsible for creating an inventory of existing CEQ equipment to be relocated to the new facility and incorporating new and existing CEQ into the FF&E plans.

Where is the existing CEQ equipment currently being stored, is it off site and will need to be transported onto the job site? If so, who is responsible for loading, transporting and unloading the existing CEQ equipment into the new facility?

Contractor's Interior Designer must verify with the customers whether there is existing furniture or equipment, if information is not on drawings.

Spec section 01 and E - paragraph 1.5.4 Best Value

Determination pricing solicitation/"over the shoulder review" letter a. number 1.

states "all anticipated price increases during the "pricing hold" period must be funded in the FF&E option item. Does that mean the contractor is to modify the $134,243.00 price that has been issued, prior to bid?

The amount provided is an estimate. Final cost requires anticipated price increases

Spec section 01

Once the base bid contract is awarded, is the contractor required to start the design of the FF and E package and have it approved prior to the FF and E option being awarded. The design of the FF and E package is part of the base bid correct?

Correct

Spec section 01

Please confirm that the FF and E option price of $134,243.00 includes tax, shipping, freight, handling and installation?

The amount provided is an estimate. Final cost must include all fees.

Spec section 01

Will the contractor be required to put a deposit on the FF and E materials once the option package as stated in paragraph 2.1.4, is awarded and if so, can the contractor bill for the deposit as a 50% deposit on 134K is a lot of money to carry over a 30 plus calendar day period.

The deposit must be worked out between the

Contractor and the Vendor

185 11 4

Would the government consider amending the Factor 1 Corporate Experience criteria to also permit projects substantially completed (e.g. >80%) as of the date of the solicitation?

Projects must be completed at the date of issuance of this RFP.

09 67 23.16

There is a specification provided for resistive fuel epoxy; however, this is not shown on the drawings. Please clarify where the resistive fuel epoxy is to be installed?

This is the product referenced as CLIN 2 Option 1 and is installed in Storage Room 101.

AE201 -

AE 202

13-34-19 2.4.2

Key notes 1-4 on AE 201 STATE TO

MATCH WHITE COLOR PANELS

AND TRIMS. The CENTRIA P762 Cambridge White Color does not exist.

Paragraph 2.4.2 of Section 13-34-19 says that the color will be chosen from manufacturer's color charts and chips.

Please confirm that standard manufacturers' colors are to be chosen since there is not a Centria P762 Cambridge White.

Colors are to match building CEP 209 Tower Addition. The panel used on that project was Centra's

Cambridge White. Use the metal building manufactures standard colors to color match with CEP 209.

188 13-34-19 1.6.4

The specification states the erector for metal buildings has to be certified by the metal building companies. There is not a certification by the metal buildings manufacturer. They only provide training classes and our metal building subs have a proven history of successful projects.

Please clarify this requirement.

Many metal building manufacturers provide certifications for installation of their building products.

189 07-42-13 2.2.2.3

Please confirm that Plastisol coating on roof and wall panel is really required. It is very expensive and is not a normal application by the metal building manufacturer. Please confirm if this is required. Since NAVFAC is getting the manufacturer's warranty anyway, and this does not extend a warranty coverage in any way.

Specification Section 07 42 13 is for the metal wall panels only.

Paragraph

2.2.2.3 further describes the factor finishing process for the exterior finish coating. The parenthesis describes the requirement if

Vinyl Plastisol is used. Paragraph

2.2.2 requires a factory applied polyvinylidene floride finish.

CLIN

SHEET

and

IN101

CLIN 0002 Option Item No. 1 states, "Price for providing all work in connection with Maintenance Bay Floor Finish Upgrade, complete in accordance with the drawings and specifications, but excluding work provided in another Priced line item." Please explain what specifically is being upgraded. Also, please confirm that the Maintenance bay floor is listed as "Storage 101" on drawing IN101.

Confirm Maintenance Bay is Room Storage 101.

Floor upgrade is as stated on

Sheet IN 601 First Floor

Interior Finish Schedule and

Legend - Finish Schedule Notes

#10 - "EPX2/3

Flooring in Lieu of SC & Paint if

Bid Option is Accepted"

IN101

and

IN601

Floor Finish Plan (IN101) & Finish Schedule (IN601) EPX2 & 3 is an option in lieu of SC & Paint. In the finish legend, for finish tag EXP2, it says "Shop Floor/ Epoxy nonskid" & for finish tag EPX3 it states "ship floor (safety stripe)/epoxy nonskid"; however, on the floor finish plan it does not show a shop floor. Is the storage the same as shop?

Correct

192 13-34-19 1.10.2

Paragraph 1.10.2 of Section 13 34 19 states that “Repairs that become necessary because of defective materials and workmanship while roof panel system is under warranty are to be performed within 24 hours after notification, unless additional time is approved by the Contracting Officer. Failure to perform repairs within 24 hours of notification will constitute grounds for having emergency repairs performed by others and not void the warranty. Immediate follow-up and completion of permanent repairs must be performed within 10 days from date of notification.” The metal building manufacturer's standard warranty does not address any time of performance requirements. Please confirm these requirements can be removed wherever found in specification sections 07 41 13, 07 42 13, and 13 34 19.

The contracting officer has the authority to extend the amount of time for repairs for defective materials and workmanship.

The requirement will not be removed.

13-34-19, 07-41-13, 07-42-13

1.8.3, 1.8.1

Paint finish warranties for the roof and wall panels are to be provided by the metal building manufacturer per Paragraph 1.8.3 of Section 07 41 13 (Metal Roof Panels), Paragraph 1.8.1 of Section 07 42 13 (Metal Wall Panels), and Paragraph 1.10.3 of Section 13 34 19 (Metal Building Systems. Due to this project's proximity to a body of saltwater (less than 1,000 feet), the metal building manufacturer will not be able to provide a finish warranty for the metal roof panels. Please clarify.

Provide standing seam metal roofing per specification section 07 41 13, paragraph 2.1.2 and wall panels per specification section 07 42 13, paragraph 2.2.1.

Roof and wall panels must be aluminum-zinc alloy coated steel conforming to

ASTM

A792/A792M, AZ 55. Hot-dip galvanized coating ASTM A653 G90 must not be premitted.

Provide PVDF coating system per specification section 07 41 13, para. 2.2 and 07

42 13, para.

2.2.2.

07-41-

13/13-34-

1.8.1, 1.10.2

Roof weathertightness warranties are covered under Paragraph 1.8.1 of Section 07 41 13 and Paragraph 1.10.2 of Section 13 34 19, each with carrying information. Please advise which section we should use for the weathertightness warranty.

Provide standing seam metal roofing per specification section 07 41 13, paragraph 2.1.2 and wall panels per specification section 07 42 13, paragraph 2.2.1.

Roof and wall panels must be aluminum-zinc alloy coated steel conforming to

ASTM

A792/A792M, AZ 55. Hot-dip galvanized coating ASTM A653 G90 must not be premitted.

Provide PVDF coating system per specification section 07 41 13, para. 2.2 And 07

42 13, para.

2.2.2.

CLIN

Please verify if the contractor is to include just the HAR percent in CLIN 0004 or if the contractor is to include the government estimated price plus HAR in

CLIN 0004.

The HAR is a percentage, not to exceed 5% of the final FF&E

Cost. The amount provided is an estimate.

196 SB501

Please provide the location(s) of CF3.0 and CF4.0 as required per the column footing schedule as they do not appear on drawing SB101.

CF3.0 and CF4.0 are not required.

197 AE510

Please verify if all CMU partitions are to be fully grouted or if only the reinforced cells are to be grouted.

All CMU partitions do not need to be fully grouted. Fire rated partitions are to be constructed per the UL rating noted on the drawings.

198 SB401

Please verify the thickness of the rigid insulation is 3"as required per details C1, C3 and A4/SB401 and details C1 and C2 on SB402.

Keynote 22 on AE302 and AE303 indicate 3”

199 SF101

Please provide a bracing detail for the overhead clearance bar support per detail A3/SF201, if required. It appears to be a freestanding structure per the detail.

Bracing not required.

Clearance bar is freestanding.

200 SF101

Please provide the number of overhead clearance bars as required per detail

A3/SF201.

201 SF301

Please provide the total travel height of the crane hook as required per SF301.

19’-8”. Hook must travel from 2’-0” above finish floor to 21’-8” above finish floor.

202 AE502

Please provide the spacing, height and thickness of the hat channel that is to be installed on the CMU /rigid insulation for new metal panels to be installed per detail A1/AE502.

7/8" hat channel, 18 gauge. The spacing of the hat channel is dependent on the metal panel manufacturers’ attachment requirements.

203 AE302

Please verify that rigid insulation is required under the slab on grade as it is not shown on the structural drawings. If so, please verify that this is to be installed for the entire perimeter of the building and please provide the thickness of the rigid insulation.

Perimeter insulation is required. R-15 for 24 in. Refer to note 24 on Sheet AE302 and specification section 07 21 13 for insulation requirements.

204 AE101

Please provide a specification and size of the walk-off mat required per keynote 9 on AE101.

Refer to Finish Schedule Sheet IN601 for Walk

Off Mat manufacturer and model. Walk Off Matt

Dimensions: 6' x 4'-5"

205 AE510

Please provide the size and spacing of the stud for wall type A as required per

AE510.

Partition Type - A: 3 5/8" Metal Stud @ 16" o.c.

As shown on sheet AE501

206 AE510

Please verify the thickness of partition A2. It appears that this should be 3-1/8" thick. If not, please provide the thickness of the drywall required for this partition type. Drawing AE101 requires type A partitions.

Partition Type - A2: 2-1/8" Metal stud with 5/8" drywall. Total width 3-1/8"

207 AE510

Please provide the masonry size, total wall thickness and fire rating for wall type C as required per AE510. Drawing AE401 shows partition type C at most locations.

Please see the notes on the wall type section for information for Partition Type - C.

208 042000

Please provide all location(s) of lintels and masonry lintels as required per section 042000 3.3.6.1 in the specifications.

Refer to AE101 for size and locations of openings in CMU walls and SB503 for lintel notes and details.

209 AE501

Please provide the location(s) of the 2- 1/2" stud wall per detail A1/AE501.

There is not a stud wall shown in the electrical room per drawing AE101.

The locations are shown on AE101. See Office 102 and

210 AE401

Please provide a specification for the shower grab bar, soap dispenser, waste receptacle and mirror as required per AE401. Specification 102813 does not include these items.

The shower grab bar is listed in specification section 10 28 13 paragraph 2.1.8.

Waste receptacle and mirror to be added to Specification 10

28 13 see Continuation

Sheet

211 102113 Please provide the location(s) of all room entrance screens as required per specification 102113 2.3.2.

No Room Entrance Screens shall be required.

212 AE401

Please verify that the new lockers, as required per keynote 5 on AE401, is to be provided and installed per CLIN 0004. If not, please verify that the lockers are to be provided/installed by the contractor. If so, please provide a specification for the lockers required.

Provide lockers as part of the

FF&E Package.

213 AE603

Please provide the glazing type and thickness for the windows as required per detail D1/AE603.

Minimum 1" thick insulated glazing unit.

214 AE603

Please provide the location(s) of type C window or lover as required per detail

D1/AE603.

See PPI #65 for response

215 AE202

Please provide keynotes 9 and 11 as required per detail C1/AE202.

See sheet AE201 for keynotes 9 and 11.

216 AE502

Please provide the location of detail A5/AE502 as this detail is not referenced in the plan views on AE101.

This is the prefinished metal downspout and boot detail see note #10 AE302

217 AE601

Please provide a specification for wood doors as required per the door schedule on AE601.

Replace reference to wood doors with steel. Standard duty doors.

218 081113

Please provide all location(s) of all standard steel doors, heavy duty doors, maximum duty doors and insulated steel doors as required per 081113.

Insulated steel doors: D101A, D101E, D100B, D106A, D108, D109, D107A, D107, D100, D106, D101C.

Maximum Duty Doors: D100, D106. Standard Duty: D101C, 106B, 219 081113

Please provide the gauge required for the door frames. All doors appear to be the same per the door schedule on AE601.

See Spec. 08 11 13, paragraph 2.7 for exterior frame gauge.

Interior frames must be 16 gauge.

220 IF101

Please verify that the contractor is not to include items tagged with GFCI as required per general note 3 on IF101 in the base bid as stated in general note 3 on IF101. If the contractor is to include the GFCI items in the base bid, please provide a list of items that are GFCI.

There are no GFCI items.

Note 3 on Sheet IF 101 is void

221 IN601

Please provide a specification for the plywood that is to be installed per the finish schedule on IN601.

Provide 3/4 in.

CDX interior fire treated plywood for rack backer board.

222 IN601

Please provide a specification for the sealed concrete as required per the finish schedule on IN601.

See specification section 03 30 00, paragraph 2.4.3.1 for sealed concrete floor finish.

096723.1

Please provide the location(s) of the fuel resistive resinous flooring, 5 coat system as required per section 096723.16. It is not shown on the finish schedule on

IN601.

The fuel resistive resinous flooring is CLIN 002, Bid

Option 1 to be installed in

Storage Room

224 104416

Please provide the location(s) of all fire extinguisher cabinets as required per 104416 2.1.1.

See drawing GI101 for fire extinguisher locations.

225 GI101

Please provide the size of the fire extinguisher that the contractor is required to supply/install per drawing

GI101.

Fire extinguishers are part of FF&E.

KTR is to supply the fire extinguisher brackets/ cabinets in the locations shown on the drawings.

Fire extinguisher rating 2-A:40- B:C min.

226 AE302

Drawing AE 302 section A2 note 18 calls out wall insulation system of R-37 fiberglass insulation, spec section 13 34 19 item 1.2.3.2 calls out R-0 + R-15.8.

Please verify which is correct.

The metal building walls must be as described in note #18 on drawing

AE 302. The specification requirement is correct, the walls of the metal building require R-0 + R-15.8 c.i.

R-37 fiberglass insulation system with thermal blocks at the girts meets the

15.8 c.i.

requirement.

227 AE504

Drawing AE 504 detail B3 indicated an R-29 roof insulation system, spec section 13 34 19 1.2.3.1 indicates an R-30 or R- 33 insulation rating. Please verify which R value shall be used.

Roof insulation minimum R-

Value must be R-19 + R-11 Ls Provide R-30 insulation system.

228 AE502

Please see the attached detail. Please verify that the detail shown on the attached drawing which uses a “spray foam” system to insulate the masonry wall with embedded Z girts an acceptable option to the rigid board design on the project.

Z girts must be non-conductive material or have a thermal break.

"Spray foam" must provide the same R-value required for wall construction. The minimum R-value for wall construction is

R-9.5 c.i.

229 133419

Spec section 5 12 item 2.1 indicates Structural steel including shop primer and galvanizing where indicated complete and ready for use. Please verify the required finish on the primary and secondary steel for this structure.

Primary and secondary steel are to be primed and finished in accordance with Specification section 13 34 19 and 09 90 00.

Exposed main frame steel and bracing are to be painted in accordance with note 4 on AE302 and note 3 on

IN601.

230 133419

Please verify if the structural steel specification will be used in conjunction with spec section 13 for the Structural steel on this project. Please note the following: Spec section 13 34 19 item

2.3.1 calls out a 1 shop coat of primer, only mention of hot dipped galvanizing is in spec section 13 34 19 item 2.1.7 concerning high strength bolts being provided with a Hot dipped zinc coating, the typical building fabrication bolts are not hot dip coated unless the steel frame is hot dipped galvanized.

Specification section 13 34 19 is intended for the components to be designed, fabricated and erected as part of the metal building system.

Specification section 05 12 00 is intended for structural steel designed, fabricated and erected subsequent and/or independently of the metal building system.

Provide plain finish for high strength bolts.

231 133419

Spec section 13 34 19 item 2.3.3 g.

indicates to use galvanized clips where clips are connected to galvanized framing members. Please verify that a primer finish for the secondary steel framing member purlins is acceptable.

Primer finish is acceptable for secondary steel framing members concealed by the insulation system.

232 133419

Spec section 13 34 19 item 2.4.1 indicates a 22 gauge liner panel, yet the drawings do not indicate a metal liner panel on any of the wall sections. Please verify that a liner panel will not be required. If it is, please revise the drawings and please indicate if the membrane on the inboard side of the insulation is required.

Provide liner panel from the top of the masonry knee wall. The panel must be a minimum of 4'- 0" in height.

Provide on all interior walls of storage room

101. Do not provide at full height CMU walls. The insulation membrane is required, it is part of the wall insulation system.

233 133419

For the roof and wall panels, please verify if spec sections 7 41 13 roof panel, and 7 42 13 wall panel to be used in conjunction with spec section 13 34 19.

If so, and one contradicts the other, please verify which specification the contractor should follow.

Use specification 07 41 13 and 07

42 13 for the metal roof and wall panels.

234 H-501

Please provide the projected flow rate of water for the mobile groundwater contaminant removal system as required on H-501, for bidding purposes.

The flow rate is dependent on means and methods of construction and cannot be defined by the government. An estimate must be determined by the construction contractor and included within their base bid.

235 H-501

Please verify what purity the contractor will need to achieve and the projected ppm particles of existing contaminated water.

See discharge limits included under the assumed dewatering permit required for this project:

https://law.lis.vir ginia.gov/adminc ode/title9/agency 25/chapter120/se ction80/

236 H-501

Please provide the testing requirements of the mobile groundwater contaminant system required per H-501.

See discharge limits included under the assumed dewatering permit required for this project:

https://law.lis.vir ginia.gov/adminc ode/title9/agency 25/chapter120/se ction80/ in addition to the PFAS testing requirements defined within 01 57 19.

Please advise where the Helical Piles will be required, Loads on the Grade beams/Columns. Are there any spacing requirements?

Helical Piles will not be used on this project. Bid per the project plans and specifications.

238 AE402

We cannot locate Item 8 -5'x2' Mirror.

Please advise where this is to be installed.

Women’s Room:

See elevation

A3/AE402,

locate mirror on the wall between the shower and lockers. Men’s

Room: locate the mirror outside the shower on the shower seat side midway between the cased opening

239 AE402

We cannot locate Item 11 Bench. Please advise where this is to be installed.

The bench should be free standing and not attached to the floor

240 AE302

Drawing AE 302 section A2 note 18 calls out wall insulation system of R-37 fiberglass insulation, spec section 13 34 19 item 1.2.3.2 calls out R-0 + R-15.8, is this a typo in the spec?

See response to

PPI #221

241 AE504

Drawing AE 504 detail B3 indicated an R-29 roof insulation system, spec section 13 34 19 1.2.3.1 indicates an R- 30 or R-33 insulation rating, which R value shall be used?

See response to

PPI #222

AE303

Attached

Is the detail shown on the attached drawing which uses a “spray foam” system to insulate the masonry wall with embedded Z girts an acceptable option to the rigid board design on the project? See note 14 on the attached drawing, the spray foam was used all the way down the masonry block.

See response to

PPI #223

243 05 12 00 2.1

Spec section 05 12 00 item 2.1 indicates Structural steel including shop primer and galvanizing where indicated complete and ready for use. What is the required finish on the primary and secondary steel for this structure? Will Division 05 Metals be used in conjunction with Division 13 Metal Building System for the Structural steel on this project? Spec section 13 34 19 item 2.3.1 calls out a 1 shop coat of primer, only mention of hot dipped galvanizing is in spec section 13 34 19 item 2.1.7 concerning high strength bolts being provided with a Hot dipped zinc coating, the typical building fabrication bolts are not hot dip coated unless the steel frame is hot dipped galvanized.

See items 225, 226 and 227

244 13 34 19 2.3.3g

Spec section 13 34 19 item 2.3.3 g.

indicates to use galvanized clips where clips are connected to galvanized framing members. Are the secondary steel framing member purlins and girts to be pre-galvanized or is primer finish acceptable?

See response to

PPI 227

245 13 34 19 2.4.1

Spec section 13 34 19 item 2.4.1 indicates a 22 gauge liner panel, yet the drawings do not indicate a metal liner panel on any of the wall sections. Is a liner panel requested?

Provide liner panel from the top of the masonry knee wall. The panel must be a minimum of 4'- 0" in height.

Provide on all interior walls of storage room

101. Do not provide at full height CMU walls.

246 07 41 13

For the roof and wall panels are spec sections 07 41 13 roof panel, and 07 42 13 wall panel to be used in conjunction with spec section 13 34 19?

See response to

PPI #228

For most PEMB it is atypical to include a grout bed under the columns, typically columns are mounted directly to the flat slab or pier. Is the grout bed a requirement?

See response to

PPI 230

248 bid form

0001L

"Contractor to designate the subcontractor to be used when need";

Will the government provide that sub prior to bid so the line item pricing may be included or is the government providing that cost to every bidder?

See amendment

249 page 5 09 67 23.16

1.3.5.3 Does the coating inspector have to be first tier? No

page

1210, 82, 13 34 19, AE302,

AE303

2.8.3.1, Keynote 18 & 28, Keynote 18 & 28

Specs state roof insulation R30 and drawings state R37. Which is it? What is the wall insulation thickness? See response to

PPI #221

251 page 1207 13 34 19 2.4.1 Specs state 22 ga liner panel but drawings do not show liner panel.

See response to

PPI #243

page 907, 07 41 13, 13 34 19

2.2, 2.4.2

What spec for the roof and wall panels takes priority? There are conflicting specifications with division 13 metal roof and wall coatings. Plastisol is extremely expensive vs the Kynar 500 finish.

See response to

PPI # 145

253 13 34 19 Typical metal buildings columns sit flush with SOG. Is it necessary for the 2” grout and leveling nuts?

See response to

PPI 230

254 13 34 19

Can galvalume gutter and downspouts (PEMB standard) be substituted for aluminum gutters? This will match the standard trims provided by the PEMB mfg?

aluminum-zinc alloy coated steel gutters can be provided if it conforms to

ASTM

A792/A792M, AZ 55. Hot-dip galvanized coating ASTM A653 G90 must not be premitted.

Provide PVDF coating system per specification.

nt E

CLIN

GENERA

L BID

NOTES

a.)

In reference to CLIN 0001 BASE Price, please confirm the Total price for CLIN 0001 is to be the sum of Contract Line Items 0001A, 0001B, 0001C, 0001D, 0001E, 0001F, 0001G, 0001H, 0001I, 0001J, 0001K, 0001L, and 0001M?

See General Bid Note a.

Attachme nt E

0001I

Please confirm if the General Contractor is to include costs associated with the connectivity of the telephone network outside the building by the government’s subcontractor? If so, we suggest an allowance be provided or at a minimum request the contact information for the government’s subcontractor to accurately verify the associated cost?

This CLIN is an allowance allocated for the Contractor to provide the telephone infrastructure as required by

NCTAMS-

LANT and hire

NCTAMS-

LANT

government subcontractor to provide connectivity.

Attachme nt E

0001J connectivity of the fire alarm outside the building by the government’s subcontractor? If so, we suggest an allowance be provided or at a minimum request the contact information for the government’s subcontractor to accurately verify the associated cost?

This CLIN is an allowance allocated for the Contractor to provide the fire alarm service infrastructure outside the building as required by the Naval Station Fire Chief and hire a qualified subcontractor to provide connectivity.

Attachme nt E

0001K termination, relocation, replacement and connectivity of the fiber network outside the building by the government’s subcontractor? If so, we suggest an allowance be provided or at a minimum request the contact information for the government’s subcontractor to accurately verify the associated cost?

This CLIN is an allowance allocated for the Contractor to provide coordination services for the fiber service and infrastructure required by Cox or other providers and hire the provider or qualified contractor as necessary to provide connectivity.

Attachme nt E

0001L termination, relocation, replacement and connectivity of the NMCI network outside the building by the government’s subcontractor? If so, we suggest an allowance be provided or at a minimum request the contact information for the government’s subcontractor to accurately verify the associated cost?

This CLIN is an allowance allocated for the Contractor to provide coordination services for the NMCI network and infrastructure required by NMCI and hire NMCI or qualified contractor as necessary to provide connectivity.

Attachme nt E

0001M connectivity of the natural gas outside the building by the government’s subcontractor? If so, we suggest an allowance be provided or at a minimum request the contact information for the government’s subcontractor to accurately verify the associated cost?

This CLIN is an allowance allocated for the Contractor to provide coordination services for the natural gas service and infrastructure required by VNG and hire VNG or qualified contractor as necessary to provide connectivity.

261 11 of 60

Factor 1 - Corporate Experien ce

Sentence following

Notes

Factor 1 - Corporate Experience of the RFP states, "projects submitted for the Offeror shall be completed within the past five (5) years of the date of issuance of this RFP."

May projects submitted be ongoing?

Projects must be completed at the date of issuance of this RFP.

262 12 01 57 19 1.4.1.1

Please confirm all employees in contact with soils onsite will require 40HR HAZWOPER Certification regardless if soils are contaminated or not.

all employees excavating and coming in contact with on-site soils must be

HAZWOPER

certified.

263 Page 11 Notes 1

In order for a project to be considered relevant as new construction/addition work, the value of the new construction/addition work must independently meet project size and scope/complexity requirements.

Likewise, in order for a project to be considered relevant as renovation work, the value of the renovation work must independently meet project size and scope/complexity requirements.

Do we take this to mean that a project must combine at least $5M in new construction/addition work and $5M for renovation work for a project total of $10M to be valid or $2.5M in new construction/addition work and $2.5M for renovation work for a project total of $5M to be valid?

The value of new construction and renovation cannot be combined to meet the size standard of $5M.

New construction and renovation portions of a project must meet the size standard independently.

Amd

Amendment 3 states "Submit […] both interim and final, completed CPARS." In some cases, especially for older projects, we only retain the Final CPAR in perpetuity. Please advise if any lack of Interim CPARs will be evaluated negatively.

Bid per RFP page 10-

Corporate Experien ce

Would the governement consider construction experience of a project that has been under construction for over 1 year (but not 100% complete), due to extensive governement delays, lack funding/government staffing and/or manufacturer delays?

Projects must be complete at time of RFP issuance.

266 14 of 60

Factor 1 - Corporate Experien ce

(ii) Basis of

Evaluatio n

Factor 1, Corporate Experience, Basis of Evaluation section of the RFP states, “Relevant projects that demonstrate the ability to perform multiple projects simultaneously may be considered more favorably than those who do not have experience performing multiple simultaneous projects.” However, the Factor 1, Corporate Experience, Notes section of the RFP states, “A project is defined as a construction project performed under a single task order or contract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project and will not be considered.”

Is it the intention of the Government to receive program examples in Factor 1 – Corporate Experience “Data Sheets” that demonstrate Offerors capabilities to perform multiple concurrent task orders?

Or is it the intention for Offerors to include examples in narrative form in a separate section under Corporate Experience tab?

Where shall offerors provide information demonstrating Offeror's ability to perform multiple projects simultaneously?

267 15 of 60

Factor 2 - Safety -

Technical Approach to Safety

3.d

1. Factor 2, Safety section of the RFP states, that the Technical Approach to Safety narrative be limited to two (2) single side pages. The narrative requests a total of 8 subjects, listed below:

2.2.1 Approach to Implementing and

Executing a Safety Management System

(SMS)

2.2.1.1 Management and Leadership

Involvement

2.2.1.2 Employee Involvement

2.2.1.3 Hazard Prevention/Control

2.2.1.4 Worksite Analysis

2.2.1.5 Safety and Health Training

2.2.2 Evaluation Process Used to Select

Subcontractor

2.2.3 Process for Prime Oversight of

Subcontractor Safety Compliance The current page limitation greatly restricts Offeror's ability to respond to this section. Company Safety Programs are compromised of elaborate systems and processes that would be limited in detail when restricted to two (2) single pages.

May the Government please consider removing the page limitations for this section?

Bid per RFP

268 11 of 60

Factor 1 - Corporate Experien ce

2nd to last paragraph

Factor 1, Corporate Experience section of the RFP requires Construction & Design Experience Data Sheets be limited to two

(2) single side pages of an RFP attachment form provided - Attachment C - Construction & Design Experience Project Data Sheet. The requirement for projects over $5M and a single project with value of $10M is difficult to provide full descriptions of projects this size with the current page limitations. The project details are also required to be provided in Attachment C table format which also reduces amount of words available per page. A project's general information for the Title, Value, Performance Periods, Point of Contact Information, etc. take up the first page and a quarter of the second page. This data sheet requests project description and relevancy to the project requirements, description of design effort, identification/scope of each building system, unique features to be described in one quarter of second page.

In the second quarter of the data sheet the self-performance narrative is to be provided. And in the last quarter of the second page Other Information is requested, no description. This volume of information requested for projects valued from $5 - $10M will require more room to describe projects and is not achieveable within the current limitations. Offerors will be greatly disadvantaged with the current page limitations.

May the Government please consider removing the current page limitations for this section?

269 16 of 60

Factor 3 - Managem ent Approach

(i) Solicitatio n Submittal Requirem ents

Factor 3 - Management Approach requests a detailed Management Approach narrative to include the following 14 topics:

3.1 Strategy for Successful Execution of

Work Awarded

3.1.1 Management of Multiple Award

Concurrent Projects

3.1.2 Managing the Geographic

Coverage of the Contract Requirements

3.2 Plan for Accomplishing the Varied

Scope of Work

3.2.1 Design Build Approach

3.2.2 Design Bid Build Approach

3.3 Roles, Responsibilities and

Contractual Relationships between Teaming Members

3.3.1 Organizational Chart (does not

count towards page count)

3.3.2 Organizational Narrative

3.4 Strategy for Quality Control

3.4.1 Compliance with Contract

Documents

3.4.2 Cost/Budget Management

3.4.3 Subcontractor Management

3.4.4 Schedule Requirements

The current page limitations greatly restrict Offeror's ability to properly respond to each of the above important topics without limiting each topic to a brief general response. There are 14 topics required to be addressed over a total of six (6) single sided pages. The current page restrctions will limit each topic to less than a half page per topic.

Offerors would not be able to sufficiently describe management processes and procedures for these integral project management systems for cost/budget management, subcontractor management, schedule management, multiple concurrent project management and design build approach within less than half of a page. Offerors will be greatly disadvantaged by the current page limitations.

May the Government please consider removing the page limitations for the Factor 3 - Management Approach section?

270 17 of 60

Factor 4 - Past

Performa nce

(1) Solicitatio n Submittal Requirem ents

Factor 4 - Past Performance section requests completed CPARS evaluations and if no CPARS are available, Offeror's are to submitt completed PPQ's or reference information. We have clients like Leidos Biomedical Research (former SAIC-Frederick) and Smithsonian Institution that do not access CPARS databases. Repeat requests for PPQ's sometimes go unanswered when there are previously completed PPQ's available for the project. We would like to request that the Government consider allowing previously completed PPQ's.

May previously completed PPQ's be submitted?

Previously completed PPQs can be submitted.

271 17 of 60

Factor 4 - Past

Performa nce

(i) Solicitatio n Submittal Requirem ents

Factor 4 - Past Performance does not specify if this is a requirement is for both construction and design experience.

Are Past Performance/CPARS required for design experience as well? If yes, we will also need to submit letters acknowledging Prime ability to…