Amendment 0010 - Attachment B - Price Proposal Form - REV 3.docx

DOCX document 40 KB Posted

Attached to
DESIGN-BUILD, P-1458 2ND RADIO BATTALION COMPLEX, PHASE 2 MARINE CORPS BASE, CAMP LEJEUNE, NORTH CAROLINA
Solicitation number
N4008523R2557
Issued by

View the file

Other files

File Type Posted
AMENDMENT 0010.pdf PDF
Amendment 0009 - 23 09 23.13 - BACNET DIRECT DIGITAL CONTROL SYSTEMS FOR HVAC.pdf PDF
Amendment 0009 - PPI 393 2015-2020_MCBCL_INRMP_MASTER.pdf PDF
Amendment 0009 - 25 05 11.00 - CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS - ISOLATED SYSTEMS.pdf PDF
Amendment 0009 - 01 78 23 - OPERATION AND MAINTENANCE DATA.pdf PDF
Amendment 0009 - 01 78 30.00 22 - GIS DATA DELIVERABLES.pdf PDF
AMENDMENT 0009.pdf PDF
Amendment 0009 - Attachment B - Price Proposal Form - REV 2.docx DOCX document
Amendment 0009 - 01 31 23.13 20 - ELECTRONIC CONSTRUCTION AND FACILITY SUPPORT CONTRACT MANAGEMENT SYSTEM.pdf PDF
Amendment 0009 - 6_ESR_E20 - Furnishings.pdf PDF
Amendment 0009 - 01 78 00 - CLOSEOUT SUBMITTALS.pdf PDF
Amendment 0008.pdf PDF
Amendment 0007.pdf PDF
Amendment 0006 - PPI 129 - Supply Warehouse Space Tabulation.pdf PDF
Amendment 0006 - Attachment F - DFARS 252.225-7059 AND 7060.pdf PDF
Amendment 0006 - PPI 129 - Estimated Electrical Loads - Combined Facility.pdf PDF
Amendment 0006 - PPI 129 - Supply Warehouse Affinity Diagram.pdf PDF
Amendment 0006.pdf PDF
Amendment 0005.pdf PDF
Amendment 0004.pdf PDF
Amendment 0003.pdf PDF
Amendment 0003 - Attachment 1 - Combined Vehicle Maintenace Facility and Boat Operations Facility.pdf PDF
Amendment 0003 - P1458 MACC General Requirements - Rev 1.pdf PDF
Amendment 0002.pdf PDF
Amendment 0002 - Site Visit Roster P-1458.pdf PDF
Amendment 0001 - Attachment 1 - 01 78 00 PPI 3.pdf PDF
Amendment 0001 - Attachment 2 - REGISTER.pdf PDF
Amendment 0001.pdf PDF
Amendment 0001 - Attachment 3 - Table of Contents.pdf PDF
P1458 MACC General Requirements.pdf PDF
Attachment E - PIEE Vendor Access Instructions.pdf PDF
Attachment C - Pre-Proposal Inquiry (PPI) Form.xlsx XLSX spreadsheet
Attachment A - 1397586rfp02of03.pdf PDF
Attachment A - 1397586rfp01of03.pdf PDF
Attachment A - 1397586rfp03of03.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

[Type here]

ATTACHMENT B – REV 3

PRICE PROPOSAL FORM

Provide line item prices, where indicated by blank underlines, for the following items:

Line Item
Description
Quantity
Unit
Unit Price
Sub-Total
Total Price
1
BASE PRICE: Total Price for the entire work for Project P1458 2ND RADIO BN COMPLEX in accordance with the RFP complete, but excluding work provided in another Priced line Item.
1
EA
1A
Subtotal of Base Price for the entire work for combined Electrical/Communication Maintenance/Boat Maintenance/Vehicle Maintenance facility complete to the 5-foot line outside of the building in accordance with the RFP, but excluding work provided in another line item.
1
EA
1B
Subtotal of Base Price for the entire work for Hazardous Material Storage facility complete to the 5-foot line outside of the building in accordance with the RFP, but excluding work provided in another line item
1
EA
1C
Subtotal of Base Price for the entire project sitework, outside the facility line, complete in accordance with the RFP, but excluding work described in another line Item.
1
EA
1D
Subtotal of Base Price for entire Design of the Project, complete, but excluding work provided in another line item.
1
EA
1E
Unit Price for undercut and disposal of geotechnically unsuitable subgrade soils and replacement with imported structural fill material or with NCDOT #57 crushed stone, complete in accordance with the drawings and specifications, but excluding work provided in another line item.
2,000
CY
$____
$_____

For 1E: Geotechnically Unsuitable Subgrade Soil Removal, Disposal, and Replacement: Unit price for all work in connection with the removal, disposal, and replacement of geotechnically unsuitable subgrade soil (i.e. soft subgrade soils) with imported structural backfill or imported aggregate as specified. Unsuitable subgrade soil determinations shall be made by the Government Geotechnical Engineer and approved by the Contracting Officer. The price shall include removal of geotechnically unsuitable soils encountered at the planned footing subgrades or identified during proofrolling of planned subgrades, disposal at the specified disposal facility, and backfilling the excavation with compacted imported structural backfill or imported aggregate. Soils disturbed by the contractor’s construction activities, or that are excessively wet and soft due to lack of proper site maintenance and protection measures, and lack of specified drainage or excavation dewatering will not be considered unsuitable. Unit price shall include all handling and transportation. The volume of material removed and imported backfill required shall be neat quantities determined based on field measurements (length x width x depth) of the completed excavation to remove the unsuitable soil as approved by the Contracting Officer. Any work under this CLIN will not proceed without prior written approval of the Contracting Officer and direction of the Government Geotechnical Engineer.

1F
Unit Price for demolition, excavation and disposal of buried concrete and debris greater than 1 cubic yard in size, encountered within planned excavation limits and not identified in the Contract Documents, complete in accordance with the drawings and specifications, but excluding work provided in another line item. (Note: Pieces of buried concrete and debris encountered within the planned excavation limits smaller than 1 cubic yard in size shall be considered to be incidental to the work)
500
Tons
$____
$_____

For 1F: Unit price for providing demolition and excavation of buried concrete and debris that is encountered within planned excavation limits and not identified in the Contract Documents for demolition, greater than 1 cubic yard in size. Buried concrete and debris meeting the specified criteria must be field verified by the Contracting Officer prior to removal and must be segregated from the surrounding soil during demolition and excavation operations. Pieces of buried concrete and debris encountered within the planned excavation limits smaller than 1 cubic yard in size shall be considered to be incidental to the work (i.e., at no cost to the Government). Unit price shall include all work in connection with buried concrete and debris removal and disposal and replacement with clean imported structural backfill or other material specified. Unit price shall include removal and disposal of buried concrete and debris encountered within planned excavations at a permitted licensed disposal facility and backfilling the excavation with compacted clean imported structural backfill or other material specified. Unit price shall include handling and transportation. The volume of buried concrete and debris removed will be based on approved truck scale measurement and the quantity must be approved by the Contracting Officer. Any work under this CLIN will not proceed without prior written approval and field verification from the Contracting Officer.

1G
Unit Price for excavation, handling, storage, sampling, analysis, treatment and disposal of non-hazardous contaminated soil media at a permitted licensed facility, complete in accordance with the drawings and specifications, but excluding work provided in another line item.
500
Tons
$
$

For 1G: Unit price for providing all work in connection with excavation, handling, storage, sampling, analysis, transportation, any necessary treatment and disposal of non-hazardous contaminated soil media at a permitted licensed facility. Sampling shall be performed in accordance with Specification Section 01 57 19 01.20, plus any other analytes required by the treatment/disposal facility. Assume testing frequency of one, five-point composite sample for every 250cy. Unit price shall include all work in connection with removal, testing, treatment and disposal of non-hazardous contaminated soils encountered within planned excavations, at a permitted licensed treatment/disposal facility and backfilling the excavation with compacted clean imported structural backfill. Unit price shall include all work in connection with evaluation and handling, any necessary storage, stockpiling and related storage maintenance and transportation, and all that entails. The volume of contaminated soil removed will be based on approved truck scale measurement and the quantity will be approved by the Contracting Officer. Any work under this CLIN will not proceed without prior written approval and field verification from the Contracting Officer. Removal and disposal of all surplus non-contaminated soil media encountered within the planned excavations is covered under the Base Bid. The Contractor is not entitled to any additional compensation for proper disposal of soil media at a properly licensed receiving facility off Government property as required per the specifications.

2
Total Price for Option Item No. 1, Parachute Maintenance with Paraloft in accordance with the RFP complete, but excluding work provided in another Priced line Item.
1
EA
2A
Subtotal of Option Item No. 1 price for the entire work for the Parachute Maintenance with Paraloft facility complete to the 5-foot line outside of the building in accordance with the RFP, but excluding work provided in another line item.
1
EA
2B
Subtotal of Option Item No. 1 price for the Parachute Maintenance with Paraloft facility sitework, inside the fence line, but outside the facility line, complete in accordance with the RFP, but excluding work described in another line Item.
1
EA
2C
Subtotal of Base Price for entire Design of the Option, complete, but excluding work provided in another line item.
1
EA
3
Total Price for Option Item No. 2, Supply Warehouse in accordance with the RFP complete, but excluding work provided in another Priced line Item.
1
EA
3A
Subtotal of Option Item No. 2 price for the entire work for Supply Warehouse facility complete to the 5-foot line outside of the building in accordance with the RFP, but excluding work provided in another line item.
1
EA
3B
Subtotal of Option Item No. 2 price for the Supply Warehouse facility sitework, inside the fence line, but outside the facility line, complete in accordance with the RFP, but excluding work described in another line Item.
1
EA
3C
Subtotal of Base Price for entire Design of the Option, complete, but excluding work provided in another line item.
1
EA
4
Option Item No. 3: Unit Price for replacing chain link fence with decorative fencing in accordance with the RFP, but excluding work provided in another line item.
1,357
LF
$____

Option Item No. 4: Price for providing Audio Visual System (A/V) Equipment, testing, and associated training in accordance with the RFP, but excluding work provided in another Priced line item. Equipment includes, but is not limited to, items such as flat panel monitors, projectors, wall input boxes, touch screens, push button control panels, video teleconferencing codecs, microphones, speakers and the communication cabling connecting these devices together.

Include the price for supporting, permanent infrastructure under the Base Price. Interior supporting infrastructure includes items such as conduit, junction boxes, mounting hardware, and power connections.

Government Estimated Price:

$71,536 HAR Percent (NTE 5%)

HAR Subtotal

Total FF&E Estimated Price

6
Option Item No. 5: Price for providing work in connection with labor, material, equipment, transportation and supervision required for the Furniture, Fixtures, and Equipment (FF&E), complete in accordance with the RFP, but excluding work provided in another Priced line item.
Government Estimated Price:

$541,553 HAR Percent (NTE 5%)

HAR Subtotal

Total FF&E Estimated Price

TOTAL PRICE FOR CLINs 0001 - 0006 $___________________

GENERAL BID NOTES

a. Award will be made on the total sum of Contract Line Item (CLIN) 0001, 0002, 0003 and 0004; and the extended total under Contract Line item 1E, 1F, 1G and 4. For CLIN 1E, 1F, 1G, and 4, enter unit price and extended total in space provided. If there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid and the total recomputed accordingly. If an Offeror provides a total but fails to enter a unit price, the total divided by the specified quantity will be held to be the intended unit price.

b. The Government reserves the unilateral right to award CLIN 0002, CLIN 0003, and CLIN 0004 to the Contractor at the proposed price within 60 calendar days after the contract award. A firm fixed proposed price is required for CLIN 0001, CLIN 0002, CLIN 0003, and CLIN 0004. No provision is made for economic price adjustment. If Options are exercised, the contract completion date remains 1,110 calendar days after award of the contract.

c. Evaluation of Options (JUL 1990). Except when it is determined in accordance with FAR 17.206(b) Evaluation not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the price for the Option(s) to the total price for CLIN 0001. In accordance with FAR 52.217-5 Evaluation of Options, evaluation of options will not obligate the Government to exercise the Option(s).

d. The Government may reject an offer as nonresponsive if it is materially unbalanced as to prices for the basic requirement and the option quantities. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.

e. If CLIN 0002, CLIN 0003, and CLIN 0004 are exercised, additional bonding and consent of surety is required. Consequently, the Performance Bond must reflect 100 percent of the aggregate amount of all Items.

OPTION BID NOTES

THESE NOTES APPLY TO OPTIONS 4 AND 5 (CLINS 0005 AND 0006) ONLY.

a. The estimated amount for FF&E and AV has been supplied by the Government, to provide offerors with the projected magnitude of effort. The estimated amount includes the actual cost of the FF&E including freight and installation charges. The Government FF&E and AV Estimate is only an estimated amount.

b. If awarded, line items will be funded separately after completion of FF&E and AV design package review by the Government, and receipt of appropriate funding by the Government. Requirements and details are provided in E20, FURNISHINGS and E10, EQUIPMENT.

c. Bonding

i. No Bonding for FF&E at Time of Construction Contract Award

FAR 28.102-1(a) requires that performance and payment bonds be included in all construction contracts exceeding the SAT, except under the conditions listed. Since the FF&E Option Item is not part of the original contract award, the Construction Contractor must not be required to secure bond for the FF&E at the time the basic contract is awarded.

ii. Additional Bond at FF&E Option Item Award

FAR 28.102-2(d) requires the Government to secure additional bond from the Construction Contractor for any contract price increases. Therefore, an increase to the original contract bond is required at the time of the FF&E Option Item award, to protect the Government against the Construction Contractor not providing FF&E ordered and to ensure that the FF&E vendor(s) receive payment if the Construction Contractor goes out of business. The increased cost of the bond must come from the FF&E funding source and is not a part of the Construction Contractor’s HAR.

iii. Bonds Required by the Construction Contractor

If the Construction Contractor requires bonding from the FF&E subcontractor(s), the cost must be covered in the Construction Contractor’s HAR.

d. Offerors may propose a Handling and Administration Rate (HAR) for the FF&E and AV not to exceed 5 percent. This fee will account for all administrative costs, overhead, bonding fees, administration of subcontracts, profit, and any other costs associated with and related to the coordination and processing of the procurement and installation of FF&E and AV. The proposed HAR percentage will be incorporated into the contract award and will not be adjusted regardless of fluctuations from the estimate amount for the FF&E and AV. The proposed HAR is a fixed rate.

e. The Government is not obligated to award the Option line item(s). Should the Government choose to award Option 4 and/or Option 5, the line item will be awarded as a negotiated modification to the contract/task order. The Contractor's proposed HAR will be applied to all vendor/supplier costs for the FF&E and AV.

f. If awarded, the FF&E and AV modification will be awarded at least six months prior to the contract completion date. A minimum of six months is required for the Contractor to purchase, deliver and install the FF&E and AV without impacting the overall completion date of the project. The Contractor's schedule must assume the award of the FF&E and AV as a modification. No schedule extensions will be granted if the modification is awarded at least six months prior to the contract completion date. If the Government decides to negotiate and award the furniture modification with less than six months prior to the contact completion date, the Contractor may be entitled to a contract extension and extended field overhead. A contract extension and extended field overhead will only be granted in those cases where the Contractor demonstrates that an accepted Final FF&E and AV packages were submitted within the approved schedule deadlines and sufficient lead time for the FF&E and AV is not available and the Government's award of the modification is in the last six months of the contract.

g. The Contractor and the Contractor's Interior Designer must strictly adhere to the FF&E submittal schedule defined prior to the 35% design development to ensure that the final FF&E package endorsement is completed at least 9 months prior to Beneficial Occupancy Date (BOD). If projected final FF&E package endorsement date falls between 15 July and 15 November, then endorsement must occur no later than 10 July for any given calendar year.

h. The Contractor and the Contractor's Interior Designer must strictly adhere to the A/V submittal schedule defined prior to the 35% design development to ensure that the final A/V package endorsement is completed at least 12 months prior to Beneficial Occupancy Date (BOD). If projected final A/V package endorsement date falls between 15 July and 15 November, then endorsement must occur no later than 10 July for any given calendar year.