View the file

Other files

File Type Posted
AMENDMENT 0010.pdf PDF
Amendment 0010 - Attachment B - Price Proposal Form - REV 3.docx DOCX document
Amendment 0009 - 23 09 23.13 - BACNET DIRECT DIGITAL CONTROL SYSTEMS FOR HVAC.pdf PDF
Amendment 0009 - PPI 393 2015-2020_MCBCL_INRMP_MASTER.pdf PDF
Amendment 0009 - 25 05 11.00 - CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS - ISOLATED SYSTEMS.pdf PDF
Amendment 0009 - 01 78 23 - OPERATION AND MAINTENANCE DATA.pdf PDF
Amendment 0009 - 01 78 30.00 22 - GIS DATA DELIVERABLES.pdf PDF
AMENDMENT 0009.pdf PDF
Amendment 0009 - Attachment B - Price Proposal Form - REV 2.docx DOCX document
Amendment 0009 - 01 31 23.13 20 - ELECTRONIC CONSTRUCTION AND FACILITY SUPPORT CONTRACT MANAGEMENT SYSTEM.pdf PDF
Amendment 0009 - 6_ESR_E20 - Furnishings.pdf PDF
Amendment 0009 - 01 78 00 - CLOSEOUT SUBMITTALS.pdf PDF
Amendment 0008.pdf PDF
Amendment 0007.pdf PDF
Amendment 0006 - PPI 129 - Supply Warehouse Space Tabulation.pdf PDF
Amendment 0006 - Attachment F - DFARS 252.225-7059 AND 7060.pdf PDF
Amendment 0006 - PPI 129 - Estimated Electrical Loads - Combined Facility.pdf PDF
Amendment 0006 - PPI 129 - Supply Warehouse Affinity Diagram.pdf PDF
Amendment 0005.pdf PDF
Amendment 0004.pdf PDF
Amendment 0003.pdf PDF
Amendment 0003 - Attachment 1 - Combined Vehicle Maintenace Facility and Boat Operations Facility.pdf PDF
Amendment 0003 - P1458 MACC General Requirements - Rev 1.pdf PDF
Amendment 0002.pdf PDF
Amendment 0002 - Site Visit Roster P-1458.pdf PDF
Amendment 0001 - Attachment 1 - 01 78 00 PPI 3.pdf PDF
Amendment 0001 - Attachment 2 - REGISTER.pdf PDF
Amendment 0001.pdf PDF
Amendment 0001 - Attachment 3 - Table of Contents.pdf PDF
P1458 MACC General Requirements.pdf PDF
Attachment E - PIEE Vendor Access Instructions.pdf PDF
Attachment C - Pre-Proposal Inquiry (PPI) Form.xlsx XLSX spreadsheet
Attachment A - 1397586rfp02of03.pdf PDF
Attachment A - 1397586rfp01of03.pdf PDF
Attachment A - 1397586rfp03of03.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. CONTRACT ID CODE PAGE OF PAGES

J 1 9

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ.

NO.

PROJECT NO. (If applicable)

0006 01/19/2023

6. ISSUED BY Code N40085 7. ADMINISTERED BY (If other than item 6.) Code

NAVFACSYSCOM MID-ATLANTIC

CONTRACTING CORE

9324 VIRGINIA AVENUE

NORFOLK, VA 23511

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NO.

N40085-23-R-2557

9B. DATED (SEE ITEM 11)

12/05/2022

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning _1 _ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14. ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATION CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER: (specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

N40085-23-R-2557, DESIGN-BUILD, P-1458, 2nd RADIO BATTALION COMPLEX, PHASE 2, MARINE CORPS BASE, CAMP LEJEUNE, NORTH CAROLINA

SEE SF 30 BLOCK 14 CONTINUATION PAGE

Contract POC: Brittany Cristelli; Email: brittany.n.cristelli.civ@us.navy.mil; Phone: 757-341-1978

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR (Same as Item 8)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.1-83) 0224-3(10-90)

PREVIOUS EDITION UNUSABLE Prescribed by GSA mailto:brittany.n.cristelli.civ@us.navy.mil

N40085-23-R-2557

SF 30 BLOCK 14 CONTINUATION PAGE

The purpose of this amendment is to provide the following:

1. Pre-Proposal Inquiry (PPI) Responses: Questions 47 and 96 through 142

2. Attachment F – DFARS Provision 252.225-7059 & DFARS Clause 252.225-7060

ATTACHMENTS

1. Amendment 0006 – Attachment F – DFARS Provision 252.225-7059 and 7060

2. Amendment 0006 – PPI 129 - Estimated Electrical Loads - Combined Facility

3. Amendment 0006 – PPI 129 - Supply Warehouse Affinity Diagram

4. Amendment 0006 – PPI 129 - Supply Warehouse Space Tabulation

The following has been revised (in red):

Price

Price binder: Price shall be submitted on the Price Proposal Form included in the solicitation. The offeror shall submit one

(1) original, marked “Original”, and one (1) copy, marked “Copy”, each in a separate three ring binder with the following:

Cover page with solicitation number, solicitation title, offeror name, address, phone number, fax number, Unique

Entity Identifier in SAM, CAGE code, Point of Contact (POC), POC phone number, and POC email address;

All amendments acknowledged;

Price Proposal Form;

Copy of Representation and Certifications and proof of registration in System for Award Management (SAM);

Confirmation of filing of Veterans’ Employment and Training (VETS) VETS-4212 for the 2022 filing cycle;

Bid Guarantee in accordance with FAR Clause 52.228-1, Bid Guarantee. Amount shall be at least 20 percent of the proposed price, but shall not exceed $3 million; and

DFARS 252.225-7059 Certification (Attachment F)

Question

Reference Question Government Response

Page Section Paragraph

47 1 Part 3, Chapter 6

ESR A10

A10 Foundations states that the Parachute

Maintennace Facility piles must be driven to a minimum tip elevation of -25 feet NAVD88 or to a

Government approved refusal driving rate and pile tip elevation above the specified minimum tip elevation. How is pricing to be handled for piles that are found to need to go deeper as there is not a

CLIN set up for a LF of pile?

The contractor is responsible for all foundation costs if their designer of record determines that deeper or larger piles are necessary to achieve the design geotechnical and/or structural pile capacities.

Part 6, Chapter B

Can the Government provide CAD files for the

2022 "Partial Survey" provided in the RFP, Part 6, Chapter B.

CAD Files are available and will be provided after award.

126 Part 2 -

Section 01 33

1.6.24.1.1 01 33 29 - 1.6.24.1.1 notes to register and achieve

Third Party Certifiation by meeting all TPC and project requirements to achieve LEED v4 BD+C

Silver, GP Assessment (DOD), GBI DOD GP

Compliance, GBI Green Globes for NC Two

Globes, or Government-approved equivalent TPC sustainability certification, assessment, or validation. The NAVFAC HPSB Checklist for each building included at the end of the seciton has the USGBC "Guiding Priciples Assessment" checked for the TPC rating. Please confirm if

USGBC "Guiding Pricples Assessment" is what is required for TPC.

PENDING RESPONSE

8 RFP -

General

Requirements

Page 8 of the RFP Price Proposal requirements requires Confirmation of Filing of Veterans'

Employment and Training (VETS) VETS-4112 for the 2021 filing cycle. Please confirm that this should be the 2022 filing cycle.

Confirmed.

6 RFP General

Requirements

On Page 6 of the RFP under the Heading

"Evaluation Factors For Award" it lists Factor 1 as

Past Peformance and Factor 2 as Technical

Solution. Then below, under heading "Non-

Cost/Price Evaluation Factors" it lists Factor 1 as

Technical Solution and Factor 2 as Past

Performance. Please confirm that Factor 1 is to be

Technical Solution and Factor 2 is to be Past

Performance.

See revised General Requirements issued with Amendment 0003.

2 Part 3, Chapter 2

Part 3, Chapter 2 - Equipment List for Laydown

Area indicates forty-two (42) 15'x40' stalls. Part 3, Chapter 3, Page 5 and Chapter 6 / ESR G20 for the

"Southeast Site" indicates forty-five (45) 15'x40' spaces. Please clarify how many 15'x40' stalls are required.

Forty-two (42) 15'x40' stalls as indicated in Part 3, Chapter 2 -

Equipment List for Laydown Area

Part 3 Chapter 4 Space Tabulation Sheet provided in Part 3 Chapter

4 (page 515 of 1434 PDF) does not show a

Mothers Room in the calculated SQF for the

Parachute Maintenance with Paraloft, but the Part

3 Chapter 5 Room Requirements show one for the

Paraloft. Can you please confirm a Mothers Room is to be provided? If so, please provide a revised

Space Tabulation Sheet for the Parachute

Maintenance with Paraloft building.

A Mother's Room is no required inside the Parachute Maintenance with Paraloft

Part 3 Chapter 5 Parachute

Drying

Tower

It is noted in Part 3, 5.0 Room Requirements for the Parachute Drying Tower "All exposed metals in the building to be corrosion resistant per the high levels of humidity, use the Environmental Severity

Classification of C5 per UFC 1-200-01 for this space". UFC 1-200-01 notes "Coat Galvanized steel with an industrial coating". Please verify all primary and secondary steel in the Parachute

Drying Tower must be hot dipped galvanized and then also coating with industrial coating.

All primary and secondary steel in the Parachute Drying Tower must be hot dipped galvanized and coatied with an industrial coating.

Part 3 Chapter 5 Parachute

Drying

Tower

Please clarify which UFGS specification shall be used for the industrial coating described for the

Parachute Drying Tower metals.

The Contractor must submit a

UFGS specification that correctly specifies the industrial coating.

Part 3, Chapter 5

Room

Requirements and Affinity

Diagrams

Parachute

Maintenance with Paraloft

Facility

RFP makes reference to Break Room, but Break room is not included in Space Tabulation and there are no Room Requirements. Please confirm programmed square footage for break room and room requirements.

A Break Room is no required inside the Parachute Maintenance with Paraloft

Part 3, Chapter 5

Room

Requirements and Affinity

Diagrams

Combined

Facility -HQ

CO Radio

Shops

Room requirements call out minimum 1 exterior window to meet daylight requirements. Affinity diagram shows 2 Radio shops with only one having perimeter wall and possibility for window(s).

Please confirm that Radio Shop with no exterior wall is allowed to have borrowed light from adjacent Radio Shop with window(s).

Affinity diagrams illustrate user preferred functional relationships.

The contractor must comply with requirements outlined in the

BEAP.

Part 3, Chapter 5

Room

Requirements

Parachute

Maintenance with Paraloft

Facility

Parachute Inspection and Packing Area - Special

Requirements call out 2 rows of tables with 7' clear on long sides. Please clarify if 7' clear could be shared between 2 rows of tables or each needs 7' clear. Also, please clarify clearances on short ends of tables.

7' clear may be shared between 2 rows of tables; 10' adjacent to

Packout Staging Area.

Part 3, Chapter 5

Room

Requirement s

All facilities - Room Requirements call out all partitions to be masonry or concrete walls with high performance interior acrylic coating, including admin areas, break rooms, heads(tile finishes), and mother rooms. Please confirm that any of these rooms do not require gypsum board furred out in front of concrete of masonry. On rooms where gyp board is intended to be interior wall surface, can concrete or masonry back up be omitted?

Comply with RFP requiremetns.

RFP makes several references to elevator and stair at Combined Facility Admin area. Please confirm that Combined Facility is one-story structure, and that elevator and stair are not required at any part of the building.

Elevator and stairs may be included at Contractor's option to provide a two story facility.

RFP makes several references to impact resistant gypsum board. Please clarify use of impact resistant gypsum board.

Furred walls in offices, break rooms, mother's room and other similar spaces to include impact resisant gypsum board.

Part 02 of 03 and Part 3, Chapter 5

Affinity

Diagrams and Room

Requirement s

Combined Facility - Affinity Diagram shows only exterior access to Storage. Room Requirements call out interior doors as well. Please clarify if interior access to storage is required or not.

Boat Operations Storage Room

(B3) requires both interior and exterior access.

Part 3, Chapter 5

Room

Requirement s

Combined Facility, Storage - Minimum10'-0' ceiling height is stated in Space Characteristics.

Further down, description for ceiling shows use of

ACT at 9'-0" high min. Please clarify ceiling height requirement.

Minimum ceiling heights vary depending on fuction of space.

Comply with RFP requirements.

Part 02 of 03 and Part 3, Chapter 5

Affinity

Diagrams and Room

Requirement s

Combined Facility, MAG TF OVE - Room requirements show use of (2) overhead doors.

However, from what is understood at Affinity

Diagram to be MAG TF OVE, there are no OH door at exterior wall. Please clarify if OH door is required.

Room Requirements for MAG TF do not indicate quantiy of OH doors. Affinity diagram for MAG

TF OVE (B1) indicates one exterior man door. Overhead doors is not required for the function.

Part 02 of 03 and Part 3, Chapter 5

Affinity

Diagrams and Room

Requirement s

Combined Facility, MEU Support - Room requirements show use of (2) overhead doors.

However, from what is understood at Affinity

Diagram to be MEU Support, there are no OH door at exterior wall. Please clarify if OH door is required.

Room Requirements for MEU

Support do not indicate quantiy of

OH doors. Affinity diagram for

MEU Support (B2) indicates one exterior man door. Overhead doors is not required for the function.

Part 02 of 03 and Part 3, Chapter 5

Affinity

Diagrams, Space

Tabulation and Room

Requirement s

Combined Facility - Room requirements include

Vehicle Maintenance MAG TH OVE and MEU

Support, but not for Boat Operations. Space

Tabulation shows Vehicle Maintenance OVE and

Boat Operations MAG TH OVE and MEU

Support. Our understanding of Affinity Diagram is that Vehicle Maintenance part of the facility has

OVE and Boat Operations has MAG TH OVE and

MEU Support. Please clarify space requirements, room requirements and affinity diagrams.

Incorrect. Combined Facility has three distinct units, Boat

Operations, Vehicle Maintenance, and Electric Communications.

Shared Spaces are common to the three units. Units may not have contiguous functions within the facility. Comply with Room

Requirements and user preferences illustrated within the

Affinity Diagrams.

Part 02 of 03 Affinity

Diagrams

Combined Facility – Electronic/Comm part of the facility has its own separate entrance. Please confirm that there is no interior connection to the rest of the facility to access break room and/or mother’s room.

Vehicle Maintenance and Boat

Operations should have access to the Break and Mother's Room thru exterior doors leading to internal circulation outside the

Electric Communications area.

Part 02 of 03 Affinity

Diagrams

Combined Facility - Affinity diagrams show room

C6 which doesn’t align with space tabulation.

Please explain intended use of the room.

Part 3, Chapter 4, Vehicle

Maintenance Facility Space

Tabulation identifies Petroleum, Oil and Lubricant (POL) (C6)

Part 02 of 03 Affinity

Diagrams

Combined Facility - Affinity diagrams show room

D9 which doesn’t align with space tabulation.

Please explain intended use of the room.

D9 is a shared space identified as the Mechanical Heating Room.

Shared spaces such as this are not programmed square footage and are include in the facility grossing factor.

Part 3, Chapter 5

Room

Requirement s

Combined Facility - Please confirm if there is any cart, dolly of equipment requirement which dictates min width of the corridors.

Dolly / cart traffic should be anticipated.

Part 6, Chapter C;

Section 27 10

00, 2.4

Affinity

Diagrams

Parachute Maintenance with Paraloft - Section 27

10 00, 2.4 Telecommunications Spaces, requires access to Telecommunications Rooms from a common area such as a hallway and door must swing out. Please confirm if the four rooms (15

Telecom, 10 Female Head, 9 Male Head, and 4

Secure Parachute Storage) are to be accessed from a hallway, without having to enter the Room 3

Parachute Inspection and Packing Area.

The Parachute Inspection and

Packing Area is considered to be a common area

Part 6, Chapter C;

Section 27 10

00, 2.4

Affinity

Diagrams

Parachute Maintenance with Paraloft - If the intent is for Rooms 15, 10, 9 and 4 to be accessed from a hallway, then please confirm whether the entry doors for these rooms are to be located directly across the hallway from four (4) doors accessing the Room 3 Parachute Inspection and Packing

Area.

Accessing rooms 15, 10, 9 and 4 from a hallway is acceptable.as long as the total gross area is not exceeded.

Part 3, Chapter 2;

Part 6, Chapter F

Estimated

Electrical

Loads

Part 3, Chapter 2, Space Tabulations identifies 240

Total SF (Net) for the Paraloft Packout Staging

Area. Part 6, Chapter F – Electrical, Estimated

Electrical Load – Paraloft and Supply Warehouse appears to be missing the electrical load requirements for the Paraloft Packout Staging

Area. Please provide the estimated electrical load for the Paraloft Packout Staging Area.

Electrical loads for the Paraloft and Supply Warehouse are found on page 1857/2479 of the RFP.

Part 3, Chapter 3 &

5; Part 6, Chapter C

Room

Requirement s and

Affinity

Diagrams

Parachute Maintenance with Paraloft - Part 3, Chapter 5 Room Requirements specifies a Mother's

Room that is directly accessed from Break Room.

The Paraloft Facility - Part 3, Chapter 3 Space

Tabulation and Part 6, Chapter C Affinity Diagram does not include a Mother's Room and Break

Room. Please confirm whether a Mother's Room and Break Room are to be included in this facility, and provide the program requirements for each room.

A Mother's and Break Room are not required in the Parachute

Maintenance with Paraloft.

Chapter 3;

Part 3, Chapter 5

Space

Tabulation;

Room

Requirement s

Parachute Maintenance with Paraloft - Space tabulation includes a Mechanical Mezzanine and notes "(SQFT not counted per" . Part 3, Chapter 5

Room Requirements - Parachute Drying Tower

(D502001) also references a mechanical mezzanine. Please confirm if the base wants a mechanical mezzanine, and whether a mechanical mezzanine is to be provided in the Parachute

Drying Tower.

A mechanical mezzanines are unacceptable.

General

Requriements

,Part 3, Chapter 2

2.4

Appropriate

Design

The RFP General Requirements, Description of the

Work states the Building Architecture should be

Georgian or Colonial revival in classification as defined by the BEAP for Hadnot Point. Part 3, Chapter 2, 2.4 states the Building Architecture must be Georgian or Colonial revival in classification as defined by the BEAP for Wallace

Creek.

Please confirm the project should comply with the

BEAM for Wallace Creek.

The project must comply with the

BEAP for Wallace Creek

Part 3, Chapter 3;

Part 3, Chapter 5

Space

Tabulation;

Room

Requirement s

HRST - Part 3, Chapter 3 Space Tabulation calls out for the HSRT to be 255 Total SF (Net) but the

Part 3, Chapter 5 Room Requirements call out its dimensions to be 13’ x 38’ (494 SF). Please clarify the required HRST Total SF and room dimensions.

Part 3, Chapter 3 Space

Tabulation for the HSRT is correct.

ESR D30

Part 3, Chapter 6;

D305006 The requirements for the parachute drying tower require that dry air packaged unit be sized "to provide appropriate air volume for a parachute dry time of 24 hours". This is not a quantifiable performance requirement. What size is the parachute and how much water does it hold when wet? Provide additional parameters so that this equipment can be sized properly.

Parachutes are T-10 personnel parachutes

Part 3, 5.0

Room

Requirements and Part 3-

Chapter

6/ESRB2010

Part 3 5.0 Room Requirements Parachute Drying

Tower notes the walls to be CMU finish. B201002

Exterior Wall Back-Up Construction notes to provide cast-in-place concrete or unit masonry wall systems w/ insulation. Typical veneer on the buildings is noted to be brick masonry, but the

BEAP does reference metal panel on page 111.

The Parachute Drying Tower is 70' high creating some structural design challenges. Based on the requirements referenced above, it appears the interior wall must be either cast-in-place or CMU

(back-up wall) and must be used the entire height of the drying tower. If the interior CMU height can be reduced to 10' high, a steel structure clad w/ a pre-insulated metal panels could be designed potentially creating savings. Can you please verify the height of the back-up wall for the Parachute

Drying Tower is full height? Please clarify if use of a non-cavity wall, insulated metal wall panel system is acceptable to used for the exterior enclosure of the Parachute Drying Tower.

Comply with the BEAP and heights identified in the RFP.

Part 3, Chapter 5;

Part 3, Chapter 6 /

ESR D4020

Room

Requirement s; Fire

Suppression

Water

Supply and

Equipment

Please clarify if an emergency generator is required for the fire pumps in the Parachute Maintenance and Paraloft Facility and the Supply Warehouse.

Emergency Generators are not required.

Chapter 3;

Part 3, Chapter 5;

Part 3, Chapter 6 /

ESR D4020;

Part 6, Chapter C;

Part 6, Chapter F

Space

Tabulation;

Room

Requirement s; Affinity

Diagram;

Estimated

Electrical

Load;

Supply Warehouse - The Part 3, Chapter 5 Room

Requirements and Part 3, Chapter 6 / ESR D4020 identify a Fire Pump Room in the Supply

Warehouse. This Fire Pump Room is missing on the Supply Warehouse Affinity Diagram and

Estimated Electrical Load. Please confirm if a fire pump and Fire Pump Room is to be provided for the Supply Warehouse. If required, please provide the Affinity Diagram and Estimated Electrical Load for the Supply Warehouse Fire Pump Room.

Fire flow tests indicate fire pumps will be required to meet the demand for the Supply

Warehouse. Attached is an updated Affinity Diagram for the

Supply Warehouse.

Part 6, Chapter B -

Drawings

Sheet C250

Overall Site

Plan; C251

Southwest

Site Plan

Parachute Maintenance and Paraloft Facility -

Sheet C250 and C251 show an Exterior Training

Area located west of the heavy duty concrete pavement and within the decorative security fence.

Please clarify the programmatic requirements for this Exterior Training Area - paving, landscaping, site lighting and FF&E, etc.

The exterior training area is where

Marines learn to exit aircraft when parachuting. The area should be a relatively flat grassy area. Site lighting and FF&E are not required. The Govt. will provide training props.

General

Requirements

- Factor 1

Technical

Solution

The RFP for Factor 1 Technical Solution notes offerors shall provided up to 8 conceptual drawings to supplement the narrative for facility floor plans per level, all exterior elevations for each facility, and site plans.

There are a minimum of 3 main buildings;

Combined Electronics/Communications/

Vehicle/Boat Maintenance Facility, Supply Ware

House, and Parachute Maintenance facility. With an additional 2 other ancillary facilities for the

Hazmat Storage and Wash Rack. If the offerors minimize to fit as much information as possible on a single page the team would still be over minimum

8 pages if this information is required for each facility.

1 - Please confirm the team should provide drawings requested (floor plans, elevations, & site plan) for each facility not just the base bid, Combined Electronics/Communications/

Vehicle/Boat Maintenance Facility?

2 - If drawings should be provided for all facilities both the base bid and options, please consider allowing up to 13 drawings.

Confirmed - The team should provide drawings for each facility.

Up to 15 drawings total will be allowed.

01 33 29 Paragraph

1.5.3.2

RFP 01 33 29, Paragraph 1.5.3.2 and subparagraphs lists the Submittal Schedule for the

Sustainability eNotebook. Both the Interim Design

Sustainability eNotebook (1.5.3.2.b) and Final

Design Sustainability eNotebook (1.5.3.2.c) are listed as required to be submitted “with the final design.” Please clarify if both of these submittals of the eNotebook are required, and if so, when they are required to be submitted.

Interim Design Sustainability eNotebook should be submitted with the Design Development

Submittal (35% - 50%).The Final

Design Sustainability eNotebook

(1.5.3.2.c) should be submitted with the Final Design Submittal

(100%).

01 33 29 Paragraph

1.6.24.1.1

RFP 01 33 29, Paragraph 1.6.24.1.1, lists four acceptable Third Party Certifications (TPC) that the project may utilize. The 01 33 29 Attachment, NAVFAC HPSB Checklist – GOALS, list USGBC

Guiding Principles Assessment as the selected

TPC. Please confirm if USGBC Guiding Principles

Assessment is the required TPC for the project or if project teams may select any one of the TPC programs listed in 01 33 29, Paragraph 1.6.24.1.1 for the project.

PENDING RESPONSE

Chapter 2

Para. 2.3.1 RFP Part 3, Chapter 2, Para. 2.3.1, states that one of the standards the project must comply with is

ASHRAE 189.1 (as required by UFC 1-200-02).

Additionally, the Table following Para. 2.3.1 lists

ASHRAE 189.1 for various sustainability criteria.

Current issuance of UFC 1-200-02 replaced all

ASHRAE 189.1 references with IgCC 2018. Please confirm IgCC 2018 is the correct required reference throughout.

I find no mention in UFC 1-200-

02 Change 2 dated 6/1/22 discussing IgCC 2018.

RFP Part 3, Chapter 4, Space

Tabulation

RFP Part 3, Chapter 4, Space Tabulation, indicates total GSF for the Paraloft/Parachute Maintenance

Facility is 6,770 GSF. RFP 01 33 29, HPSB

Checklist – GOALS attachment indicates Third-

Party Certification is required for this building.

However, current UFC 1-200-02, Table 1-1, indicates that compliance with UFC 1-200-02

Chapter 4 for HPSB Tracking/Documentation and

Third-Party Certification are only applicable to buildings 10,000 GSF and larger. Please confirm that UFC 1-200-02 Chapter 4, HPSB Tracking/

Documentation and Third-Party Certification are

Not Applicable for the Paraloft/Parachute

Maintenance facility.

Only two facilities will need

TPC, the Supply Warehouse, and the Combined facility.

Part 3, Chapter 4, Space

Tabulation

RFP Part 3, Chapter 4, Space Tabulation, indicates total GSF for the Hazmat Storage Facility is 947

GSF. Please confirm that, per RFP 01 33 29, HPSB

Checklist – GOALS attachment (Hazmat storage facility) and UFC 1-200-02 Table 1-1, this building is not required to meet UFC 1-200-02 Chapter 4, HPSB Tracking/Documentation or Third Party

Certification, as the 10,000 GSF threshold is not met.

Only two facilities will need

TPC, the Supply Warehouse, and the Combined facility.

RFP Part 3, Chapter 2

Para. 2.3.1 RFP Part 3, Chapter 2, Para. 2.3.1, Table

“Optimize Energy Performance” states “On-site renewable energy generation technology have been evaluated and determined not to be lifecycle cost effective.” RFP Part 2, 01 33 29, Paragraph

1.6.5.1, On-Site Renewable Energy, requires that design submittal documentation include a LCCA.

Please confirm that the Government will provide the applicable LCCA performed in RFP development to the selected Offeror, in order to satisfy this requirement.

Contractor to provide on-site renewable energy LCCA design submittal documentation

RFP Part 3, Chapter 2

Para. 2.3.1 RFP Part 3, Chapter 2, Para. 2.3.1, Table

“Optimize Energy Performance” states “Solar hot water heating systems have been evaluated and determined not to be lifecycle cost effective.” RFP

Part 2, 01 33 29, Paragraph 1.6.6.1, Solar Domestic

Hot Water, requires that design submittal documentation include a LCCA. Please confirm that the Government will provide the applicable

LCCA performed in RFP development to the selected Offeror, in order to satisfy this requirement.

Contractor to provide Solar hot water heating systems LCCAs design submittal documentation.

Per current UFC 1-200-02, Paragraph A-2 for

Design-Build Projects, “the LCCA is prepared during the development of the solicitation package, or Request for Proposal (RFP). The resulting system and feature selections are incorporated as requirements in the DB RFP.” Please confirm that

LCCAs were conducted as required in the development of the RFP for all of: HVAC system selection, on-site renewable energy technologies, solar domestic hot water, and alternative water.

Also confirm that these LCCAs will be provided to the selected Offeror to (1) demonstrate compliance with UFC 1-200-02 requirements and (2) provide to the selected TPC organization as may be required by their documentation protocols.

RFP was prepared under UFC 1-

200-02 dated 10/1/2017.

Contractor to provide all LCCAs design submittal documentation.

Part 3 5.0, Room

Requirement

Sheets -

Cranial

Boards

Various Room Requirement sheets for the VMF, Supply Warehouse, and Paraloft buildings call for

C103090 Cranial Boards which accommodate helmets and eye/ear protection. There is no information listed in Part 3 6.0 ESR C103090 for this item or in Part 4 C103090. Please provide specifications for this item including size requirements so that they are accurately provided.

The storage of helmets and eye/ear protection would be a shelf or rack secured to the wall.

Quantity of head gear to store is outlined in the RFP.

Part 3 5.0

Room

Requirement

Sheet - EC /

VMF Private

Offices

Private Office Clarification - Room Requirements calls out (5) private offices total in the EC / VMF

Building and the Amendment 003 Affinity

Diagram call out (3) private offices and (1) open office area for the EC Admin Space and (5) private offices for the VMF. Please confirm the following:

a) There are to be (3) Private offices for the HQ

Admin Area each with one occupant. b) There are

(5) private offices for the VMF. Four private offices have (2) occupants each as outlined in the

Attachment G FF&E Cost Estimate and One office has a single occupant.

There are 3 Private offices for the

HQ EC Admin Area. There are 5

Private Offices for the VMF.

Each office is a Private Office.

Part 3 4.0

Space

Tabulation

Paraloft / 5.0

Room

Requirement

Sheet -

Paraloft

Parachute

Repair Room

/ E102009

The square footage listed in the Space Tabulation sheet for the Parachute Repair Room is 230SF. The

Room Requirements call out that there are to be (3) sewing tables with a footprint of 30" x 72" with a

24" clearance (27 sf each) (3) Storage Shelving 3' x 6' with a 3' clearance (36 SF each); (2) Parts Bins

36" x 18"D with 24" clearance (10.5 SF each), (4)

72" x 24" tables on casters, and (1) 36" x 36" table.

Just these items alone occupy 261SF. That doesn't include any clearance space around the tables or the additional (3) task chairs and bookcase needed in this space. Please confirm that the 230 SF as called out in the Space Tabulation Sheet is correct and provide the items that are to be omitted from this space to stay within the allotted square footage requirement.

230 sf is the correct size for the space. Clearance space can overlap. Eliminate four tables

(24" x 72") and a bookcase from the FF&E listing. Contractor to validate during CDW.

(End of Summary Changes)