1. CONTRACT ID CODE PAGE OF PAGES
J 1 9
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ.
NO.
PROJECT NO. (If applicable)
0006 01/19/2023
6. ISSUED BY Code N40085 7. ADMINISTERED BY (If other than item 6.) Code
NAVFACSYSCOM MID-ATLANTIC
CONTRACTING CORE
9324 VIRGINIA AVENUE
NORFOLK, VA 23511
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NO.
N40085-23-R-2557
9B. DATED (SEE ITEM 11)
12/05/2022
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning _1 _ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14. ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATION CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER: (specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
N40085-23-R-2557, DESIGN-BUILD, P-1458, 2nd RADIO BATTALION COMPLEX, PHASE 2, MARINE CORPS BASE, CAMP LEJEUNE, NORTH CAROLINA
SEE SF 30 BLOCK 14 CONTINUATION PAGE
Contract POC: Brittany Cristelli; Email: brittany.n.cristelli.civ@us.navy.mil; Phone: 757-341-1978
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR (Same as Item 8)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.1-83) 0224-3(10-90)
PREVIOUS EDITION UNUSABLE Prescribed by GSA mailto:brittany.n.cristelli.civ@us.navy.mil
N40085-23-R-2557
SF 30 BLOCK 14 CONTINUATION PAGE
The purpose of this amendment is to provide the following:
1. Pre-Proposal Inquiry (PPI) Responses: Questions 47 and 96 through 142
2. Attachment F – DFARS Provision 252.225-7059 & DFARS Clause 252.225-7060
ATTACHMENTS
1. Amendment 0006 – Attachment F – DFARS Provision 252.225-7059 and 7060
2. Amendment 0006 – PPI 129 - Estimated Electrical Loads - Combined Facility
3. Amendment 0006 – PPI 129 - Supply Warehouse Affinity Diagram
4. Amendment 0006 – PPI 129 - Supply Warehouse Space Tabulation
The following has been revised (in red):
Price
Price binder: Price shall be submitted on the Price Proposal Form included in the solicitation. The offeror shall submit one
(1) original, marked “Original”, and one (1) copy, marked “Copy”, each in a separate three ring binder with the following:
Cover page with solicitation number, solicitation title, offeror name, address, phone number, fax number, Unique
Entity Identifier in SAM, CAGE code, Point of Contact (POC), POC phone number, and POC email address;
All amendments acknowledged;
Price Proposal Form;
Copy of Representation and Certifications and proof of registration in System for Award Management (SAM);
Confirmation of filing of Veterans’ Employment and Training (VETS) VETS-4212 for the 2022 filing cycle;
Bid Guarantee in accordance with FAR Clause 52.228-1, Bid Guarantee. Amount shall be at least 20 percent of the proposed price, but shall not exceed $3 million; and
DFARS 252.225-7059 Certification (Attachment F)
Question
Reference Question Government Response
Page Section Paragraph
47 1 Part 3, Chapter 6
ESR A10
A10 Foundations states that the Parachute
Maintennace Facility piles must be driven to a minimum tip elevation of -25 feet NAVD88 or to a
Government approved refusal driving rate and pile tip elevation above the specified minimum tip elevation. How is pricing to be handled for piles that are found to need to go deeper as there is not a
CLIN set up for a LF of pile?
The contractor is responsible for all foundation costs if their designer of record determines that deeper or larger piles are necessary to achieve the design geotechnical and/or structural pile capacities.
Part 6, Chapter B
Can the Government provide CAD files for the
2022 "Partial Survey" provided in the RFP, Part 6, Chapter B.
CAD Files are available and will be provided after award.
126 Part 2 -
Section 01 33
1.6.24.1.1 01 33 29 - 1.6.24.1.1 notes to register and achieve
Third Party Certifiation by meeting all TPC and project requirements to achieve LEED v4 BD+C
Silver, GP Assessment (DOD), GBI DOD GP
Compliance, GBI Green Globes for NC Two
Globes, or Government-approved equivalent TPC sustainability certification, assessment, or validation. The NAVFAC HPSB Checklist for each building included at the end of the seciton has the USGBC "Guiding Priciples Assessment" checked for the TPC rating. Please confirm if
USGBC "Guiding Pricples Assessment" is what is required for TPC.
PENDING RESPONSE
8 RFP -
General
Requirements
Page 8 of the RFP Price Proposal requirements requires Confirmation of Filing of Veterans'
Employment and Training (VETS) VETS-4112 for the 2021 filing cycle. Please confirm that this should be the 2022 filing cycle.
Confirmed.
6 RFP General
Requirements
On Page 6 of the RFP under the Heading
"Evaluation Factors For Award" it lists Factor 1 as
Past Peformance and Factor 2 as Technical
Solution. Then below, under heading "Non-
Cost/Price Evaluation Factors" it lists Factor 1 as
Technical Solution and Factor 2 as Past
Performance. Please confirm that Factor 1 is to be
Technical Solution and Factor 2 is to be Past
Performance.
See revised General Requirements issued with Amendment 0003.
2 Part 3, Chapter 2
Part 3, Chapter 2 - Equipment List for Laydown
Area indicates forty-two (42) 15'x40' stalls. Part 3, Chapter 3, Page 5 and Chapter 6 / ESR G20 for the
"Southeast Site" indicates forty-five (45) 15'x40' spaces. Please clarify how many 15'x40' stalls are required.
Forty-two (42) 15'x40' stalls as indicated in Part 3, Chapter 2 -
Equipment List for Laydown Area
Part 3 Chapter 4 Space Tabulation Sheet provided in Part 3 Chapter
4 (page 515 of 1434 PDF) does not show a
Mothers Room in the calculated SQF for the
Parachute Maintenance with Paraloft, but the Part
3 Chapter 5 Room Requirements show one for the
Paraloft. Can you please confirm a Mothers Room is to be provided? If so, please provide a revised
Space Tabulation Sheet for the Parachute
Maintenance with Paraloft building.
A Mother's Room is no required inside the Parachute Maintenance with Paraloft
Part 3 Chapter 5 Parachute
Drying
Tower
It is noted in Part 3, 5.0 Room Requirements for the Parachute Drying Tower "All exposed metals in the building to be corrosion resistant per the high levels of humidity, use the Environmental Severity
Classification of C5 per UFC 1-200-01 for this space". UFC 1-200-01 notes "Coat Galvanized steel with an industrial coating". Please verify all primary and secondary steel in the Parachute
Drying Tower must be hot dipped galvanized and then also coating with industrial coating.
All primary and secondary steel in the Parachute Drying Tower must be hot dipped galvanized and coatied with an industrial coating.
Part 3 Chapter 5 Parachute
Drying
Tower
Please clarify which UFGS specification shall be used for the industrial coating described for the
Parachute Drying Tower metals.
The Contractor must submit a
UFGS specification that correctly specifies the industrial coating.
Part 3, Chapter 5
Room
Requirements and Affinity
Diagrams
Parachute
Maintenance with Paraloft
Facility
RFP makes reference to Break Room, but Break room is not included in Space Tabulation and there are no Room Requirements. Please confirm programmed square footage for break room and room requirements.
A Break Room is no required inside the Parachute Maintenance with Paraloft
Part 3, Chapter 5
Room
Requirements and Affinity
Diagrams
Combined
Facility -HQ
CO Radio
Shops
Room requirements call out minimum 1 exterior window to meet daylight requirements. Affinity diagram shows 2 Radio shops with only one having perimeter wall and possibility for window(s).
Please confirm that Radio Shop with no exterior wall is allowed to have borrowed light from adjacent Radio Shop with window(s).
Affinity diagrams illustrate user preferred functional relationships.
The contractor must comply with requirements outlined in the
BEAP.
Part 3, Chapter 5
Room
Requirements
Parachute
Maintenance with Paraloft
Facility
Parachute Inspection and Packing Area - Special
Requirements call out 2 rows of tables with 7' clear on long sides. Please clarify if 7' clear could be shared between 2 rows of tables or each needs 7' clear. Also, please clarify clearances on short ends of tables.
7' clear may be shared between 2 rows of tables; 10' adjacent to
Packout Staging Area.
Part 3, Chapter 5
Room
Requirement s
All facilities - Room Requirements call out all partitions to be masonry or concrete walls with high performance interior acrylic coating, including admin areas, break rooms, heads(tile finishes), and mother rooms. Please confirm that any of these rooms do not require gypsum board furred out in front of concrete of masonry. On rooms where gyp board is intended to be interior wall surface, can concrete or masonry back up be omitted?
Comply with RFP requiremetns.
RFP makes several references to elevator and stair at Combined Facility Admin area. Please confirm that Combined Facility is one-story structure, and that elevator and stair are not required at any part of the building.
Elevator and stairs may be included at Contractor's option to provide a two story facility.
RFP makes several references to impact resistant gypsum board. Please clarify use of impact resistant gypsum board.
Furred walls in offices, break rooms, mother's room and other similar spaces to include impact resisant gypsum board.
Part 02 of 03 and Part 3, Chapter 5
Affinity
Diagrams and Room
Requirement s
Combined Facility - Affinity Diagram shows only exterior access to Storage. Room Requirements call out interior doors as well. Please clarify if interior access to storage is required or not.
Boat Operations Storage Room
(B3) requires both interior and exterior access.
Part 3, Chapter 5
Room
Requirement s
Combined Facility, Storage - Minimum10'-0' ceiling height is stated in Space Characteristics.
Further down, description for ceiling shows use of
ACT at 9'-0" high min. Please clarify ceiling height requirement.
Minimum ceiling heights vary depending on fuction of space.
Comply with RFP requirements.
Part 02 of 03 and Part 3, Chapter 5
Affinity
Diagrams and Room
Requirement s
Combined Facility, MAG TF OVE - Room requirements show use of (2) overhead doors.
However, from what is understood at Affinity
Diagram to be MAG TF OVE, there are no OH door at exterior wall. Please clarify if OH door is required.
Room Requirements for MAG TF do not indicate quantiy of OH doors. Affinity diagram for MAG
TF OVE (B1) indicates one exterior man door. Overhead doors is not required for the function.
Part 02 of 03 and Part 3, Chapter 5
Affinity
Diagrams and Room
Requirement s
Combined Facility, MEU Support - Room requirements show use of (2) overhead doors.
However, from what is understood at Affinity
Diagram to be MEU Support, there are no OH door at exterior wall. Please clarify if OH door is required.
Room Requirements for MEU
Support do not indicate quantiy of
OH doors. Affinity diagram for
MEU Support (B2) indicates one exterior man door. Overhead doors is not required for the function.
Part 02 of 03 and Part 3, Chapter 5
Affinity
Diagrams, Space
Tabulation and Room
Requirement s
Combined Facility - Room requirements include
Vehicle Maintenance MAG TH OVE and MEU
Support, but not for Boat Operations. Space
Tabulation shows Vehicle Maintenance OVE and
Boat Operations MAG TH OVE and MEU
Support. Our understanding of Affinity Diagram is that Vehicle Maintenance part of the facility has
OVE and Boat Operations has MAG TH OVE and
MEU Support. Please clarify space requirements, room requirements and affinity diagrams.
Incorrect. Combined Facility has three distinct units, Boat
Operations, Vehicle Maintenance, and Electric Communications.
Shared Spaces are common to the three units. Units may not have contiguous functions within the facility. Comply with Room
Requirements and user preferences illustrated within the
Affinity Diagrams.
Part 02 of 03 Affinity
Diagrams
Combined Facility – Electronic/Comm part of the facility has its own separate entrance. Please confirm that there is no interior connection to the rest of the facility to access break room and/or mother’s room.
Vehicle Maintenance and Boat
Operations should have access to the Break and Mother's Room thru exterior doors leading to internal circulation outside the
Electric Communications area.
Part 02 of 03 Affinity
Diagrams
Combined Facility - Affinity diagrams show room
C6 which doesn’t align with space tabulation.
Please explain intended use of the room.
Part 3, Chapter 4, Vehicle
Maintenance Facility Space
Tabulation identifies Petroleum, Oil and Lubricant (POL) (C6)
Part 02 of 03 Affinity
Diagrams
Combined Facility - Affinity diagrams show room
D9 which doesn’t align with space tabulation.
Please explain intended use of the room.
D9 is a shared space identified as the Mechanical Heating Room.
Shared spaces such as this are not programmed square footage and are include in the facility grossing factor.
Part 3, Chapter 5
Room
Requirement s
Combined Facility - Please confirm if there is any cart, dolly of equipment requirement which dictates min width of the corridors.
Dolly / cart traffic should be anticipated.
Part 6, Chapter C;
Section 27 10
00, 2.4
Affinity
Diagrams
Parachute Maintenance with Paraloft - Section 27
10 00, 2.4 Telecommunications Spaces, requires access to Telecommunications Rooms from a common area such as a hallway and door must swing out. Please confirm if the four rooms (15
Telecom, 10 Female Head, 9 Male Head, and 4
Secure Parachute Storage) are to be accessed from a hallway, without having to enter the Room 3
Parachute Inspection and Packing Area.
The Parachute Inspection and
Packing Area is considered to be a common area
Part 6, Chapter C;
Section 27 10
00, 2.4
Affinity
Diagrams
Parachute Maintenance with Paraloft - If the intent is for Rooms 15, 10, 9 and 4 to be accessed from a hallway, then please confirm whether the entry doors for these rooms are to be located directly across the hallway from four (4) doors accessing the Room 3 Parachute Inspection and Packing
Area.
Accessing rooms 15, 10, 9 and 4 from a hallway is acceptable.as long as the total gross area is not exceeded.
Part 3, Chapter 2;
Part 6, Chapter F
Estimated
Electrical
Loads
Part 3, Chapter 2, Space Tabulations identifies 240
Total SF (Net) for the Paraloft Packout Staging
Area. Part 6, Chapter F – Electrical, Estimated
Electrical Load – Paraloft and Supply Warehouse appears to be missing the electrical load requirements for the Paraloft Packout Staging
Area. Please provide the estimated electrical load for the Paraloft Packout Staging Area.
Electrical loads for the Paraloft and Supply Warehouse are found on page 1857/2479 of the RFP.
Part 3, Chapter 3 &
5; Part 6, Chapter C
Room
Requirement s and
Affinity
Diagrams
Parachute Maintenance with Paraloft - Part 3, Chapter 5 Room Requirements specifies a Mother's
Room that is directly accessed from Break Room.
The Paraloft Facility - Part 3, Chapter 3 Space
Tabulation and Part 6, Chapter C Affinity Diagram does not include a Mother's Room and Break
Room. Please confirm whether a Mother's Room and Break Room are to be included in this facility, and provide the program requirements for each room.
A Mother's and Break Room are not required in the Parachute
Maintenance with Paraloft.
Chapter 3;
Part 3, Chapter 5
Space
Tabulation;
Room
Requirement s
Parachute Maintenance with Paraloft - Space tabulation includes a Mechanical Mezzanine and notes "(SQFT not counted per" . Part 3, Chapter 5
Room Requirements - Parachute Drying Tower
(D502001) also references a mechanical mezzanine. Please confirm if the base wants a mechanical mezzanine, and whether a mechanical mezzanine is to be provided in the Parachute
Drying Tower.
A mechanical mezzanines are unacceptable.
General
Requriements
,Part 3, Chapter 2
2.4
Appropriate
Design
The RFP General Requirements, Description of the
Work states the Building Architecture should be
Georgian or Colonial revival in classification as defined by the BEAP for Hadnot Point. Part 3, Chapter 2, 2.4 states the Building Architecture must be Georgian or Colonial revival in classification as defined by the BEAP for Wallace
Creek.
Please confirm the project should comply with the
BEAM for Wallace Creek.
The project must comply with the
BEAP for Wallace Creek
Part 3, Chapter 3;
Part 3, Chapter 5
Space
Tabulation;
Room
Requirement s
HRST - Part 3, Chapter 3 Space Tabulation calls out for the HSRT to be 255 Total SF (Net) but the
Part 3, Chapter 5 Room Requirements call out its dimensions to be 13’ x 38’ (494 SF). Please clarify the required HRST Total SF and room dimensions.
Part 3, Chapter 3 Space
Tabulation for the HSRT is correct.
ESR D30
Part 3, Chapter 6;
D305006 The requirements for the parachute drying tower require that dry air packaged unit be sized "to provide appropriate air volume for a parachute dry time of 24 hours". This is not a quantifiable performance requirement. What size is the parachute and how much water does it hold when wet? Provide additional parameters so that this equipment can be sized properly.
Parachutes are T-10 personnel parachutes
Part 3, 5.0
Room
Requirements and Part 3-
Chapter
6/ESRB2010
Part 3 5.0 Room Requirements Parachute Drying
Tower notes the walls to be CMU finish. B201002
Exterior Wall Back-Up Construction notes to provide cast-in-place concrete or unit masonry wall systems w/ insulation. Typical veneer on the buildings is noted to be brick masonry, but the
BEAP does reference metal panel on page 111.
The Parachute Drying Tower is 70' high creating some structural design challenges. Based on the requirements referenced above, it appears the interior wall must be either cast-in-place or CMU
(back-up wall) and must be used the entire height of the drying tower. If the interior CMU height can be reduced to 10' high, a steel structure clad w/ a pre-insulated metal panels could be designed potentially creating savings. Can you please verify the height of the back-up wall for the Parachute
Drying Tower is full height? Please clarify if use of a non-cavity wall, insulated metal wall panel system is acceptable to used for the exterior enclosure of the Parachute Drying Tower.
Comply with the BEAP and heights identified in the RFP.
Part 3, Chapter 5;
Part 3, Chapter 6 /
ESR D4020
Room
Requirement s; Fire
Suppression
Water
Supply and
Equipment
Please clarify if an emergency generator is required for the fire pumps in the Parachute Maintenance and Paraloft Facility and the Supply Warehouse.
Emergency Generators are not required.
Chapter 3;
Part 3, Chapter 5;
Part 3, Chapter 6 /
ESR D4020;
Part 6, Chapter C;
Part 6, Chapter F
Space
Tabulation;
Room
Requirement s; Affinity
Diagram;
Estimated
Electrical
Load;
Supply Warehouse - The Part 3, Chapter 5 Room
Requirements and Part 3, Chapter 6 / ESR D4020 identify a Fire Pump Room in the Supply
Warehouse. This Fire Pump Room is missing on the Supply Warehouse Affinity Diagram and
Estimated Electrical Load. Please confirm if a fire pump and Fire Pump Room is to be provided for the Supply Warehouse. If required, please provide the Affinity Diagram and Estimated Electrical Load for the Supply Warehouse Fire Pump Room.
Fire flow tests indicate fire pumps will be required to meet the demand for the Supply
Warehouse. Attached is an updated Affinity Diagram for the
Supply Warehouse.
Part 6, Chapter B -
Drawings
Sheet C250
Overall Site
Plan; C251
Southwest
Site Plan
Parachute Maintenance and Paraloft Facility -
Sheet C250 and C251 show an Exterior Training
Area located west of the heavy duty concrete pavement and within the decorative security fence.
Please clarify the programmatic requirements for this Exterior Training Area - paving, landscaping, site lighting and FF&E, etc.
The exterior training area is where
Marines learn to exit aircraft when parachuting. The area should be a relatively flat grassy area. Site lighting and FF&E are not required. The Govt. will provide training props.
General
Requirements
- Factor 1
Technical
Solution
The RFP for Factor 1 Technical Solution notes offerors shall provided up to 8 conceptual drawings to supplement the narrative for facility floor plans per level, all exterior elevations for each facility, and site plans.
There are a minimum of 3 main buildings;
Combined Electronics/Communications/
Vehicle/Boat Maintenance Facility, Supply Ware
House, and Parachute Maintenance facility. With an additional 2 other ancillary facilities for the
Hazmat Storage and Wash Rack. If the offerors minimize to fit as much information as possible on a single page the team would still be over minimum
8 pages if this information is required for each facility.
1 - Please confirm the team should provide drawings requested (floor plans, elevations, & site plan) for each facility not just the base bid, Combined Electronics/Communications/
Vehicle/Boat Maintenance Facility?
2 - If drawings should be provided for all facilities both the base bid and options, please consider allowing up to 13 drawings.
Confirmed - The team should provide drawings for each facility.
Up to 15 drawings total will be allowed.
01 33 29 Paragraph
1.5.3.2
RFP 01 33 29, Paragraph 1.5.3.2 and subparagraphs lists the Submittal Schedule for the
Sustainability eNotebook. Both the Interim Design
Sustainability eNotebook (1.5.3.2.b) and Final
Design Sustainability eNotebook (1.5.3.2.c) are listed as required to be submitted “with the final design.” Please clarify if both of these submittals of the eNotebook are required, and if so, when they are required to be submitted.
Interim Design Sustainability eNotebook should be submitted with the Design Development
Submittal (35% - 50%).The Final
Design Sustainability eNotebook
(1.5.3.2.c) should be submitted with the Final Design Submittal
(100%).
01 33 29 Paragraph
1.6.24.1.1
RFP 01 33 29, Paragraph 1.6.24.1.1, lists four acceptable Third Party Certifications (TPC) that the project may utilize. The 01 33 29 Attachment, NAVFAC HPSB Checklist – GOALS, list USGBC
Guiding Principles Assessment as the selected
TPC. Please confirm if USGBC Guiding Principles
Assessment is the required TPC for the project or if project teams may select any one of the TPC programs listed in 01 33 29, Paragraph 1.6.24.1.1 for the project.
PENDING RESPONSE
Chapter 2
Para. 2.3.1 RFP Part 3, Chapter 2, Para. 2.3.1, states that one of the standards the project must comply with is
ASHRAE 189.1 (as required by UFC 1-200-02).
Additionally, the Table following Para. 2.3.1 lists
ASHRAE 189.1 for various sustainability criteria.
Current issuance of UFC 1-200-02 replaced all
ASHRAE 189.1 references with IgCC 2018. Please confirm IgCC 2018 is the correct required reference throughout.
I find no mention in UFC 1-200-
02 Change 2 dated 6/1/22 discussing IgCC 2018.
RFP Part 3, Chapter 4, Space
Tabulation
RFP Part 3, Chapter 4, Space Tabulation, indicates total GSF for the Paraloft/Parachute Maintenance
Facility is 6,770 GSF. RFP 01 33 29, HPSB
Checklist – GOALS attachment indicates Third-
Party Certification is required for this building.
However, current UFC 1-200-02, Table 1-1, indicates that compliance with UFC 1-200-02
Chapter 4 for HPSB Tracking/Documentation and
Third-Party Certification are only applicable to buildings 10,000 GSF and larger. Please confirm that UFC 1-200-02 Chapter 4, HPSB Tracking/
Documentation and Third-Party Certification are
Not Applicable for the Paraloft/Parachute
Maintenance facility.
Only two facilities will need
TPC, the Supply Warehouse, and the Combined facility.
Part 3, Chapter 4, Space
Tabulation
RFP Part 3, Chapter 4, Space Tabulation, indicates total GSF for the Hazmat Storage Facility is 947
GSF. Please confirm that, per RFP 01 33 29, HPSB
Checklist – GOALS attachment (Hazmat storage facility) and UFC 1-200-02 Table 1-1, this building is not required to meet UFC 1-200-02 Chapter 4, HPSB Tracking/Documentation or Third Party
Certification, as the 10,000 GSF threshold is not met.
Only two facilities will need
TPC, the Supply Warehouse, and the Combined facility.
RFP Part 3, Chapter 2
Para. 2.3.1 RFP Part 3, Chapter 2, Para. 2.3.1, Table
“Optimize Energy Performance” states “On-site renewable energy generation technology have been evaluated and determined not to be lifecycle cost effective.” RFP Part 2, 01 33 29, Paragraph
1.6.5.1, On-Site Renewable Energy, requires that design submittal documentation include a LCCA.
Please confirm that the Government will provide the applicable LCCA performed in RFP development to the selected Offeror, in order to satisfy this requirement.
Contractor to provide on-site renewable energy LCCA design submittal documentation
RFP Part 3, Chapter 2
Para. 2.3.1 RFP Part 3, Chapter 2, Para. 2.3.1, Table
“Optimize Energy Performance” states “Solar hot water heating systems have been evaluated and determined not to be lifecycle cost effective.” RFP
Part 2, 01 33 29, Paragraph 1.6.6.1, Solar Domestic
Hot Water, requires that design submittal documentation include a LCCA. Please confirm that the Government will provide the applicable
LCCA performed in RFP development to the selected Offeror, in order to satisfy this requirement.
Contractor to provide Solar hot water heating systems LCCAs design submittal documentation.
Per current UFC 1-200-02, Paragraph A-2 for
Design-Build Projects, “the LCCA is prepared during the development of the solicitation package, or Request for Proposal (RFP). The resulting system and feature selections are incorporated as requirements in the DB RFP.” Please confirm that
LCCAs were conducted as required in the development of the RFP for all of: HVAC system selection, on-site renewable energy technologies, solar domestic hot water, and alternative water.
Also confirm that these LCCAs will be provided to the selected Offeror to (1) demonstrate compliance with UFC 1-200-02 requirements and (2) provide to the selected TPC organization as may be required by their documentation protocols.
RFP was prepared under UFC 1-
200-02 dated 10/1/2017.
Contractor to provide all LCCAs design submittal documentation.
Part 3 5.0, Room
Requirement
Sheets -
Cranial
Boards
Various Room Requirement sheets for the VMF, Supply Warehouse, and Paraloft buildings call for
C103090 Cranial Boards which accommodate helmets and eye/ear protection. There is no information listed in Part 3 6.0 ESR C103090 for this item or in Part 4 C103090. Please provide specifications for this item including size requirements so that they are accurately provided.
The storage of helmets and eye/ear protection would be a shelf or rack secured to the wall.
Quantity of head gear to store is outlined in the RFP.
Part 3 5.0
Room
Requirement
Sheet - EC /
VMF Private
Offices
Private Office Clarification - Room Requirements calls out (5) private offices total in the EC / VMF
Building and the Amendment 003 Affinity
Diagram call out (3) private offices and (1) open office area for the EC Admin Space and (5) private offices for the VMF. Please confirm the following:
a) There are to be (3) Private offices for the HQ
Admin Area each with one occupant. b) There are
(5) private offices for the VMF. Four private offices have (2) occupants each as outlined in the
Attachment G FF&E Cost Estimate and One office has a single occupant.
There are 3 Private offices for the
HQ EC Admin Area. There are 5
Private Offices for the VMF.
Each office is a Private Office.
Part 3 4.0
Space
Tabulation
Paraloft / 5.0
Room
Requirement
Sheet -
Paraloft
Parachute
Repair Room
/ E102009
The square footage listed in the Space Tabulation sheet for the Parachute Repair Room is 230SF. The
Room Requirements call out that there are to be (3) sewing tables with a footprint of 30" x 72" with a
24" clearance (27 sf each) (3) Storage Shelving 3' x 6' with a 3' clearance (36 SF each); (2) Parts Bins
36" x 18"D with 24" clearance (10.5 SF each), (4)
72" x 24" tables on casters, and (1) 36" x 36" table.
Just these items alone occupy 261SF. That doesn't include any clearance space around the tables or the additional (3) task chairs and bookcase needed in this space. Please confirm that the 230 SF as called out in the Space Tabulation Sheet is correct and provide the items that are to be omitted from this space to stay within the allotted square footage requirement.
230 sf is the correct size for the space. Clearance space can overlap. Eliminate four tables
(24" x 72") and a bookcase from the FF&E listing. Contractor to validate during CDW.
(End of Summary Changes)