1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. PROJECT NO. (If applicable) 0001 12/15/2022
6. ISSUED BY Code N40085 7. ADMINISTERED BY (If other than item 6.) Code
NAVFACSYSCOM
CONTRACTING CORE
9324 VIRGINIA AVENUE
NORFOLK, VA 23511
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NO.
N40085-23-R-2557
9B. DATED (SEE ITEM 11)
12/05/2022
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning _1 _ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14. ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATION CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER: (specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
N40085-23-R-2557, DESIGN-BUILD, P-1458, 2nd RADIO BATTALION COMPLEX, PHASE 2, MARINE CORPS BASE, CAMP LEJEUNE, NORTH CAROLINA
SEE SF 30 BLOCK 14 CONTINUATION PAGE
Contract POC: Brittany Cristelli; Email: brittany.n.cristelli.civ@us.navy.mil; Phone: 757-341-1978
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR (Same as Item 8)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.1-83) 0224-3(10-90)
PREVIOUS EDITION UNUSABLE Prescribed by GSA mailto:brittany.n.cristelli.civ@us.navy.mil
N40085-23-R-2557
SF 30 BLOCK 14 CONTINUATION PAGE
The purpose of this amendment is to provide the following:
1. Pre-Proposal Inquiry’s (PPI’s) Responses
2. Extend proposal due date from 19 January 2023 to 09 February 2023
ATTACHMENTS
1. Amendment 0001 – Attachment 1 – 01 78 00 PPI#3
2. Amendment 0001 – Attachment 2 - REGISTER
3. Amendment 0001 – Attachment 3 – Table of Contents
Question # Reference Question Government Response
Page Section Paragraph
Part 3 - Chapter
6/ESR G30 -
RFP states: "Provide site improvements that support project sustainability goals of
Part 2 Section 01 33 29.05 20, Sustainability Reporting for
Design Build. " However, Section 01 33 29.05 20 is missing from the RFP. Is this section forthcoming in an amendment or should we use the included Section 01 33 29?
Specification section 01 33
29.05 20 has been superseded by specification section 01 33
29. Use 01 33 29 -
Sustainability Requirements and Reporting found within the RFP.
Part 3 - Chapter
6/ESR G30 -
RFP states: "Provide site civil/mechanical utility systems and components that support project sustainability goals of
Part 2 Section 01 33 29.05 20, Sustainability Reporting for
Design Build." However, Section 01 33 29.05 20 is missing from the RFP. Is this section forthcoming in an amendment or should we use the included Section 01 33 29?
See PPI response no. 1
Part 2- Section
01 78 24.00 20 -
RFP states: "Provide an electronic, PDF copy of the
Record Drawings, prepared in accordance with FC 1-300-09N and 01 78 00 CLOSEOUT
SUBMITTALS.." However, Section 01 78 00 is missing from the RFP. Is this section forthcoming in an amendment?
See attached 01 78 00 -
Closeout Submittals.
3, 5 Part 6 Chapter J
This Chapter contains the existing stormwater permit documentation that was extended in 2020. However, there are no drawings or locations associated with the various designed and permitted stormwater control measures
(SCM) to decern what allowable built upon area is associated with which SCM. Please provide the drawings that were submitted and approved for the stormwater permit.
The stormwater documents can be downloaded from
NCDEQ's repository at the link below for SW Permit
SW8110906.
https://edocs.deq.nc.gov/Wate rResources/Browse.aspx?id=2
174677&dbid=0&repo=Water
Resources&cr=1
5 This Design-Build project requires the offerors to create design documents for pricing and the proposal including site plans, floor plans, elevation, and engineering drawings to provide the most economical price to the government. As a result time off during the holidays, the current bid date leaves little time for the teams to prepare the necessary documents and allow sufficient time for the market including
Subcontractors, vendors, and small businesses to prepare pricing. We respectfully ask for the bid date to be extended 3 weeks.
Proposal due date has been extended from 19 January
2023 to 09 February 2023.
(End of Summary Changes)