Amendment 0007.pdf
PDF 443 KB Posted
- Attached to
- DESIGN-BUILD, P-1458 2ND RADIO BATTALION COMPLEX, PHASE 2 MARINE CORPS BASE, CAMP LEJEUNE, NORTH CAROLINA
- Solicitation number
- N4008523R2557
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. CONTRACT ID CODE PAGE OF PAGES
J 1 26
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. PROJECT NO. (If applicable) 0007 01/30/2023
6. ISSUED BY Code N40085 7. ADMINISTERED BY (If other than item 6.) Code
NAVFACSYSCOM MID-ATLANTIC
CONTRACTING CORE
9324 VIRGINIA AVENUE
NORFOLK, VA 23511
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NO.
N40085-23-R-2557
9B. DATED (SEE ITEM 11)
12/05/2022
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning _1 _ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14. ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATION CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER: (specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
N40085-23-R-2557, DESIGN-BUILD, P-1458, 2nd RADIO BATTALION COMPLEX, PHASE 2, MARINE CORPS BASE, CAMP LEJEUNE, NORTH CAROLINA
SEE SF 30 BLOCK 14 CONTINUATION PAGE
Contract POC: Brittany Cristelli; Email: brittany.n.cristelli.civ@us.navy.mil; Phone: 757-341-1978
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR (Same as Item 8)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.1-83) 0224-3(10-90)
PREVIOUS EDITION UNUSABLE Prescribed by GSA mailto:brittany.n.cristelli.civ@us.navy.mil
N40085-23-R-2557
SF 30 BLOCK 14 CONTINUATION PAGE
The purpose of this amendment is to provide the following:
1. Pre-Proposal Inquiry (PPI) Responses: Questions 144 through 308
Question
Reference Question Government Response
Page Section Paragraph
126 Part 2 -
Section 01 33
1.6.24.1.1 01 33 29 - 1.6.24.1.1 notes to register and achieve
Third Party Certifiation by meeting all TPC and project requirements to achieve LEED v4 BD+C
Silver, GP Assessment (DOD), GBI DOD GP
Compliance, GBI Green Globes for NC Two
Globes, or Government-approved equivalent TPC sustainability certification, assessment, or validation. The NAVFAC HPSB Checklist for each building included at the end of the seciton has the USGBC "Guiding Priciples Assessment" checked for the TPC rating. Please confirm if
USGBC "Guiding Pricples Assessment" is what is required for TPC.
PENDING RESPONSE
01 33 29 Paragraph
1.6.24.1.1
RFP 01 33 29, Paragraph 1.6.24.1.1, lists four acceptable Third Party Certifications (TPC) that the project may utilize. The 01 33 29 Attachment, NAVFAC HPSB Checklist – GOALS, list USGBC
Guiding Principles Assessment as the selected
TPC. Please confirm if USGBC Guiding Principles
Assessment is the required TPC for the project or if project teams may select any one of the TPC programs listed in 01 33 29, Paragraph 1.6.24.1.1 for the project.
PENDING RESPONSE
Part 2, Spec
Section 01 30
00 1.8, 1.9 and 01 31
19.05
PLEASE CONFIRM THAT BOTH THE DP/D
AND THE CDW ARE REQUIRED AS
SEPARATE MEETINGS/DELIVERABLES OR
clarify if the intent is to be only (1) DESIGN
MEETING as IDENTIFIED BY THE
FOLLOWING:
01 30 00 1.8 POST AWARD KICKOFF (PAK)
MEETING: STATES THAT THE PAK MUST BE
HELD WITHIN 35 CALANDER DAYS AFTER
CONTRACT AWARD AND MAY BE HELD
CONCURRENTLY WITH THE DESIGNED
PRESENTATION/DESIGN DEVELOPMENT
MEETING OR THE CONCEPT DESIGN
WORKSHOP (CDW) WHICHEVER IS
REQUIRED.
INDICATING THAT ONLY ONE WOULD BE
APPLICABLE, HOWEVER BOTH ARE
INDICATED AS FOLLOWS:
01 30 00 1.9 DESIGN
PRESENTATION/DEVELOPMENT (DP/D) IS
REQUIRED
01 31 19.05 20 CONCEPT DESIGN WORKSHOP
(CDW) IS REQUIRED WITH A 14 DAY
REVIEW OF ALL DOCUMENTS
PENDING RESPONSE
144 18 Part 3, Chapter 2 2.5.2
The Hazardous Materials Storage Facility includes in table 2.5.2 Staffing/Occupancy a reference to a Maximum Occupancy of 2 persons in this building. Please confirm this building is
Confirmed utilized for storage only, as indicated in the
Description of Activity, and that none of the spaces will be regularly occupied, and that a restroom is not required for this facility.
145 5
Part 3, Chapter 6 /
ESR C10
C103014
Entrance
Floor Grilles and Mats
RFP Part 3, Chapter 6, ESR C103014 states, "Provide recessed floor mats at main building entrances. Provide surface floor mats at other building entrances." Please confirm that only the primary building entry to all facilities are to have recessed floor walk-off mats included as part of construction and that all other exterior doors to receive FF&E loose-lay mats.
Confirmed
146 4 Part 3, Chapter 3
3.1.3.2 New
Site Work
Southwest Site, last paragraph states, "Adequate space for future building expansion must be provided inside the fence, as well as a mechanical yard and a 6,400 square foot space for training" referencing the Parachute Maintenance and
Paraloft facility. Part 6 Attachments, Chapter B -
Drawings, C250 Overall Site Plan shows an unidentified square within the secure fenced perimeter of the referenced facility. Part 6
Attachments, Chapter C - Affinity Diagram for the referenced facility shows a dash line with a note that reads, "clear area on site to accommodate future expansion of the parachute inspection and packing area."
Please confirm the following:
a) Is the unidentified square on the C250 Overall
Site Plan the referenced location and configuration of the 6,400 s.f. training area?
b) Please provide any additional basis of design criteria related to the design and construction of the
6,400 s.f. outdoor training space.
c) No additional scope is required of this project outside of providing a 'clear area on site' in support of the future expansion of the Parachute Inspection and Packing Area.
a. The 6,400 sf Training Area is identified by note 15 on drawing
C251. b). See response to PPI
130. c). Sitework includes roadways, storm water detention, fencing and areas inside the fence.
Part 3, Chapter 5
Room
Requirement s
The Combined Electronics/Comm/Vehicle
Maintenance & Boat Ops Facility Room
Requirements for the Male Head, Uniformat
Section C103008 indicate a minimum of 3 sinks to be provided at the solid surface countertop.
Please confirm if each Male Head requires a minimum of three (3) sinks or if fixture quantity/ distribution can be based on code/UFC requirements.
Provide three lavataories or quantity of lavatories required by code, whichever is greater.
148 4
Part 3, Chapter 6 /
ESR G20
G2020
Parking Lots
G2020 Parking Lots, paragraph titled 'Southeast
Site' states that there are 'eighteen shelters' to be stored inside the fence and each shelter to have a
12'x22' space and available 3 phase power. RFP, Part 6 Attachments, Chapter C Affinity Diagram for the Combined Electronics/Comm/Vehicle
Maintenance & Boat Ops facility graphically shows only 13 shelters.
Please confirm which number of shelters is correct.
13 shelters is the correct quantity.
149 2 Part 3, Chapter 2 2.1.1
The Equipment List for Laydown Area does not include any stalls in the Total Count for Stall Size
1 = 9'x20'. However, Part 3 - Chapter 3 - 3.1.3.2
New Site Work - Southeast Site states, "Provide...seventy-six 9' x 20' parking spaces for trailers with thirty foot drive aisles..." Please confirm that (76) 9' x 20' parking spaces are to be
Provide 76 - 9' x 20' parking spaces.
provided at the Tactical Vehicle Parking area
150 2 Part 3, Chapter 2 2.1.1
The Equipment List for Laydown Area includes 42 in the Total Count for Stall Size 3 = 15'x40'.
However, Part 3 - Chapter 3 - 3.1.3.2 New Site
Work - Southeast Site states, "The tactical vehicle parking area must provide forty-five 15' x 40' parking spaces for MTVR/LAVs with forty foot drive aisles..." Please clarify whether (42) or (45)
15' x 40' parking spaces are to be provided at the
Tactical Vehicle Parking area.
Provide 45 - 15' x 40' parking spaces.
151 1
Part 3, Chapter 6 /
ESR B20
B201001
B201001 states, " Provide brick masonry details consistent with the existing adjacent buildings in the complex including Phase 1 P1280." Please confirm that the Part 3 - Chapter 3 - 3.2 Site Photo
- Elevation of Adjacent Facility is part of Phase 1
P1280 and provide additional photos for architectural context to assist in the exterior design for bidding purposes.
Match brick detailing of the facility depicted in the photograph. No other photographs are available,.
152 1
Part 3, Chapter 6 /
ESR B20
B201001
B201001 states, "Provide a cast-in-place or precast concrete water table to match existing adjacent structures" AND "Provide architectural precast concrete veneer water table to match existing adjacent structures". The BEAP section 4.6
Wallace Creek Body and Roof Materials states
"Base foundations shall be architectural concrete block" and Colors Wallace Creek indicates the
Base Foundation to be "white split face, white mortar". Additionally, Part 3 - Chapter 3 - 3.2 Site
Photo - Elevation of Adjacent Facility seems to show white split face concrete block per the BEAP.
Please confirm that the water table is to be white split face concrete block per the BEAP.
Water table is to be white split face concrete block per the
BEAP.
Parachute
Inspection and
Packing
Area/
Paraloft
Pack-out
Staging
Area
Part 3, 5.0
Room
Requirement s, Parachute
Maintenance with Paraloft
Facility
Room
Requirement s
Per Part 3, Chapter 5, Room Requirements, Parachute Inspection and Packing Area/ Paraloft
Pack-out Staging Area, Acoustics requires, "Wall minimum STC 50". Please confirm that the intention is for all walls shared with adjacent rooms - Parachute Repair Room, Training, HRST, Telecom, Janitor, Female and Male Heads, Parachute Secure Storage, and Admin Open Office
- are to be STC 50 rated.
Special STC requirements are identified in the Room
Requiremnts. When STC rating is not identified, follow acoustical requiremetns identified in UFC 3-
101-01 - Architecture.
Parachute
Inspection and
Packing
Area
Part 3, 5.0
Room
Requirement s, Parachute
Maintenance with Paraloft
Facility
Room
Requirement s
Parachute Inspection and Packing Area, C102001
Standard Interior Door and Hollow Metal Frame states, "STC rated Solid Core Flush wood doors..."
Please confirm that the intention is for all doors to all adjacent rooms - Parachute Repair Room, Training, HRST, Telecom, Janitor, Female and
Male Heads, Parachute Secure Storage, and Admin
Open Office - are to be STC rated.
Follow acoustical requirements for doors identified in UFC 3-
101-01 - Architecture.
155 1, 2, 6
Part 3, Chapter 6 /
ESR B30 and
ESR D20
B301001, B301002, D204002
B301001 Steep Slope Roofing Systems states, "Steep slope roofing systems are preferred over low slope roofing systems." B301002 Low Slope
Roofing Systems states, "Low Slope Roofing
Systems are not permitted." D204002 Roof Drains states, "If flat roofs are provided, provide roof drains interior to the building with primary and secondary roof leaders." Please clarify whether or not low slope roofs are permitted, such as at the
Parachute Drying Tower.
Comply with ESR B30, para.
B301002.
Parachute
Inspection and
Packing
Part 3, 5.0
Room
Requirement s, Parachute
Please confirm that the Room Requirements for
Parachute Inspection and Packing Area applies to the "Circulation" identified on the Parachute
Maintenance with Paraloft Affinity Diagram. If
Room finishes outlined in the
Parachute Inspection and Packing area would apply to the vestibule
(circulation) adjacent to the
Area/
Circulation
Maintenance with Paraloft
Facility these Room Requirements do not apply, please provide Room Requirements for this space.
Paraloft Packout Staging Area,.
157 2
Part 3, Chapter 6 /
ESR C10
C102002
C102002 Glazed Interior Doors states, "Provide vision glazing in doors where it is required by the
“Room Requirements” portion of this RFP, or it is deemed advantageous to be able to see through the door, either for safety of pedestrian traffic, or other functional reason." For bidding purposes, please identify any additional doors that will require vision glazing that are not identified in the Room
Requirements.
Refer to uniformat code C102001 within Room Requirements.
158 5
Part 3, Chapter 6 /
ESR E10
E1030
E1030 Vehicular Equipment - Please identify locations and quantities of vehicle lifts, floor jacks, transmission jacks, jack stands, drain pans, and refrigerant recovery units and identify any that are to be included in the construction contract.
Vehicle lifts, floor jacks, transmission jacks, and jack stands, and refrigerant recovery units are not CFCI. Refer to Part
3, Chapter 6, ESR D30 for drain pans.
159 6
Part 3, Chapter 6 /
ESR E10
E1040
E1040 Government Furnished Equipment - Please identify any Government furnished equipment to be accommodated.
Refrigerators and micorwaves are in the FF&E package.
160 1
Part 3, Chapter 6 /
ESR F10
F101001
F101001 Metal Building Systems (Pre-Engineered)
- Please identify any Pre-Engineered Metal
Building Systems in the project and if Pre-
Engineered Metal Building Systems are allowed does this include the use of alternative exterior finishes such as metal panel and/or a combination of metal panel/CMU/Brick?
Refer to PPI response no. 50.
Entry
Corridor
Part 3, 5.0
Room
Requirement s, Combined
Electronics/
Comm/
Vehicle
Maintenance
& Boat Ops
Facility
C203001
Entry Corridor, B203001 Solid Exterior Doors states, "Provide insulated exterior doors and frames." However, Chapter 6 ESR B2030 Exterior
Doors states, "Provide solid door assemblies other than at the main entrances." Please confirm whether a solid exterior door is to be provided per
Chapter 6 ESR B203001 or a Glazed Door per ESR
B203002 at the Entry Corridor.
A glazed door per ESR B203002 is required at the primary entrance. (3 at combined facility).
Combined
Facilities -
Shared
Spaces
Part 3, 4.0
Space
Tabulation
Main
Entrance
Canopy
Under Combined Facilities - Shared Spaces, One
Main Entrance Canopy is listed in the Space
Tabulation. Please clarify which entry per Part 6 -
Chapter C Affinity Diagrams is considered the
Main Entrance for the Combined
Electronics/Comm/Vehicle Maintenance & Boat
Ops Facility.
Provide Main Entrance Canopy at each department; Electric
Communicaitons, Boat
Operations, and Vehicle
Maintenance, Entry
Corridor
Part 3, 5.0
Room
Requirement s, Combined
Electronics/
Comm/
Vehicle
Maintenance
& Boat Ops
Facility
Do the 5.0 Room Requirements for Entry Corridor apply to both Corridor-One and Corridor-Two listed in the 4.0 Space Tabulation, Combined
Facilities, Shared Spaces?
Yes.
Entry
Corridor
Part 3, 5.0
Room
Requirement s, Combined
Electronics/
Comm/
Vehicle
Maintenance
& Boat Ops
Facility
C103014
Entry Corridor, C103014 Entrance Floor Grilles and Mats states, "Provide surface mounted/loose-lay entrance mat at exterior door." However, Chapter 6 ESR 103014 Entrance Floor Grilles and
Mats states, "Provide recessed floor mats at main building entrances. Provide surface floor mats at other building entrances." Please clarify which entry is considered the main entrance and whether a recessed floor mat or surface floor mat is required."
Refer to PPI resposnonse no. 162.
Recess floor mats to be provided at each main entry. Surface floor mats to be provided at other entries.
HQ CO
Receiving
Shop
Section
Part 3, 5.0
Room
Requirement s, Combined
Electronics/
Comm/
Vehicle
Maintenance
& Boat Ops
Facility
Other
Special
Requirement s
HQ CO Receiving Shop Section, Other/ Special
Requirements states, "Also Provide HQ CO, MEU and MAGTF cages within open HQ Work Shop
Area." Please provide the overall dimensions and gate size and configuration for each of these required cages.
EM cage within HQ Work Shop
Area is 736 sf to accommodate
E102001 found within Room requirements. Provide pair of 3' lockable gates.
166 Storage
Part 3, 5.0
Room
Requirement s, Combined
Electronics/
Comm/
Vehicle
Maintenance
& Boat Ops
Facility
B203004
Storage, B203004 Overhead or Roll-Up Doors states, "Qty 2." However, there is only one
Overhead Door Connector required per Part 6 -
Chapter C - Affinity Diagrams. Please confirm the number of Overhead or Roll-Up Doors required at
Storage.
Provide one overhead door, one man door to the exterior, and one man door to an interior corridor.
Vehicle
Maintenan ce MAG
TF
Onboard
Vehicle
Equipment
(OVE)
Part 3, 5.0
Room
Requirement s, Combined
Electronics/
Comm/
Vehicle
Maintenance
& Boat Ops
Facility
Please confirm that the Room Requirements for
Vehicle Maintenance MAG TF Onboard Vehicle
Equipment (OVE) applies to the "OVE" of 370 SF listed on the 4.0 Space Tabulation for Combined
Facilities - Vehicle Maintenance Facility. If these
Room Requirements do not apply, please provide
Room Requirements for this space.
Boat Operations MAGTF OVE and Vehicle Maintenance OVE use the same Room
Requirements.
Combined
Facilities -
Boat
Operations
Part 3, 4.0
Space
Tabulation
MAGTF
OVE
Please provide Room Requirements for or clarify which Room Requirements apply to the "MAGTF
OVE" of 150 SF listed on the 4.0 Space Tabulation for Combined Facilities - Boat Operations.
Refer to PPI resposne 167.
Vehicle
Maintenan ce MEU
Support
Space
Part 3, 5.0
Room
Requirement s, Combined
Electronics/
Comm/
Vehicle
Maintenance
& Boat Ops
Facility
B203004
B203004 Overhead or Roll-Up Doors is included in the Room Requirements for the Vehicle
Maintenance MEU Support Space. However, there are no Overhead Door Connectors required per Part
6 - Chapter C - Affinity Diagrams. Please confirm if an Overhead or Roll-Up Doors required at
Vehicle Maintenance MEU Support Space.
Overhead doors are not required for MEU Support
Combined
Facilities -
Electronic/
Communic ation
Maintenan ce Facility
Part 3, 4.0
Space
Tabulation
Maint Bay
Circulation
Please provide Room Requirements for or clarify which Room Requirements apply to the "Maint
Bay Circulation" of 333 SF listed on the 4.0 Space
Tabulation for Combined Facilities - Electronic/
Communication Maintenance Facility.
Refer to PPI 75 response.
Combined
Facilities -
Electronic/
Communic ation
Maintenan ce Facility
Part 3, 4.0
Space
Tabulation
Maint Bay
Circulation
There is Quantity of 1 Maint Bay Circulation of
333 SF indicated for the Electronic/
Communication Maintenance Facility. However, there are two Maintenance Bay Circulation areas required per Part 6 - Chapter C - Affinity Diagrams
(assuming Maint Bay Circulation is A10). Please confirm that the 333 SF allocated for Maint Bay
Circulation is to be divided into two spaces of approximately 166 SF each and distributed per the
Affinity Diagram.
Allocate half of the 333 sf circulaton to each end of the
Maintenance Bays in front of exterior doors.
Compresso r Room
Part 3, 5.0
Room
Requirement s, Combined
Acoustics
Acoustics states, "Locate space at the end of
Maintenance Bay to minimize noise intrusion into building." However, Functional/ Adjacencies states, "See Affinity Diagrams (Part 6, Chapter
If Compressor Room is located as indicted in Affinity Diagram.
Ensure acousitical separation between Compressor Room and
Electronics/
Comm/
Vehicle
Maintenance
& Boat Ops
Facility
C)." Per Part 6 - Chapter C - Affinity Diagrams
(assuming Compressor Room is C5) the
Compressor Room is not isolated at the far end of either the Vehicle Maintenance Bays or Electrical/
Comm Maintenance Bays, but rather more centrally located to serve both areas. Please confirm that the Compressor Room may be located per the Affinity Diagram with appropriate acoustical separation.
adjacent spaces.
173 1
Part 3, Chapter 6 /
ESR C10
C101001
Fixed
Partitions
Please confirm whether or not an Air Installation
Compatible Use Zones (AICUZ) map is available for this site. If an AICUZ map is not available, please provide Day Night Average Sound Level
(DNL) or Community Noise Level (CNEL) level of the project site.
PENDING RESPONSE
174 23
UFC 3-101-
Architecture, with Change
3-8.1
Design.
If the DNL or CNEL level of the project site is not available, for bidding purposes please provide the required composite Outdoor Transmission Class
(OITC) values for the building envelope.
PENDING RESPONSE
Petroleum, Oil and
Lubricant
(POL)
Part 3, 5.0
Room
Requirement s, Combined
Electronics/
Comm/
Vehicle
Maintenance
& Boat Ops
Facility
A103004
Petroleum, Oil and Lubricant (POL), A103004
Hazardous material containment states, "…The well to be capable of containing 150% of the stored materials; verify likely amount of stored materials with Tenant." Please provide an amount of stored materials for bidding purposes.
32 barrels of oil
Battery
Charging
Room
Part 3, 5.0
Room
Requirement s, Combined
Electronics/
Comm/
Vehicle
Maintenance
& Boat Ops
Facility
A103004
Battery Charging Room, A103004 Hazardous material containment states, "…The well to be capable of containing 150% of the stored materials;
verify likely amount of stored materials with
Tenant." Please provide an amount of stored materials for bidding purposes.
100 Gallons. Ventilate space to exterior at 1 cfm/sf.
177 Page 12 Part 2, Chapter 2
2.3.5
Accessibility
Requirement s
Benches are required at Male and Female Heads with lockers per the ABA standards. Please provide requirements for these benches.
Male / Female Locker Rooms to provide benches IAW ABA para.
903.
Entry
Corridor
Part 3, 5.0
Room
Requirement s, Combined
Electronics/
Comm/
Vehicle
Maintenance
& Boat Ops
Facility
Entry Corridor, D304007 HVAC indicates "Air conditioned space." Per ASHRAE 90.1, Section
5.4.3.4 Vestibules: "Building entrances that
separate condition space from the exterior shall be protected with an enclosed vestibule..."
a) Please confirm the floor area footprint needed to comply with the aforementioned ASHRAE 90.1 code criteria for vestibules at Corridors D1 and D2 can be taken from the corridors.
b) Please provide room requirements for the vestibules.
Square footage for code required enclosed vestibules is to be subtracted from ciruclation space
(Corridors). Room requiremetns for vestibules shall match those of the corridors with C102002 glazed interior doors and
C102007 interior door hardware
179 --
Part 6, Chapter A, Possible
Value
Engineering
Please clarify the intent of the listed Possible Value
Engineering items and how we are to incorporate this into our proposal/bid.
PENDING RESPONSE
180 Page 6
Part 3, Chapter 6 /
ESR G20
G2030
G2030 Pedestrian Paving states, "Provide, as indicated in BEAP 3.2.8 PLAZAS AND
COURTYARDS - EXTERIOR USE AREAS,
entrance plazas and pedestrian spaces to create outdoor meeting spaces and reinforce the arrival
Each facility to provide entrance plazas at facility entrances. IAW
G2030. Hazardous Material
Storage Facility does is not required to meet this requirement.
sequence from parking lot to building entrance(s)."
With the extensive surrounding heavy-duty concrete pavement supporting the building functions at the Supply Warehouse, Combined
Electronics/ Comm/ Vehicle Maintenance & Boat
Ops Facility, and Hazardous Material Storage
Facility, for purposes of bidding, please confirm and identify the requirements for entrance plazas at these buildings.
181 Page 3
Part 3, Chapter 6 /
ESR B20
B201011
B201001 Sun Control Devices (Exterior) states, "Provide fixed horizontal type. Detail sun control devices to integrate with the architectural character of wall system." However per 3.2 Site Photos, Elevation of Adjacent Facilities, there are no Sun
Control Devices on the adjacent buildings.
Additionally, horizontal Sun Control Devices do not match the historic character seen in Georgian and Colonial Revival Architecture. Please confirm the requirement for Sun Control Devices.
Sun control devices are unecesary to achieve Georgian and Colonial
Revival historic character
182 Page 1
Part 3, Chapter 6 /
ESR B20
B201001
Please confirm if an insulated metal panel system with an interior liner panel would be an acceptable
Exterior Closure at the Parachute Drying Tower in lieu of brick veneer and acrylic coated/filled CMU
70' tall walls.
No.
183 Page 10
3.1.3.7
Geotechnical
Earthwork
Requirement s Part 3, Chapter 3
Based on the RFP documents for the project, we understand the requirements for structural fill are liquid limits less than 30, plasticity index less than
6, and a percent finer than the #200 sieve of less than 20 percent. The RFP document states that import fill is to meet this requirement and that the on-site soil is not suitable for use as structural fill.
The lab data provided in the RFP geotechnical reported performed by AMEC Foster Wheeler
Environment & Infrastructure indicates a majority of the near surface soils at boring locations B-3 through B-18 and BMP-2 (the project site) meets the requirements for structural fill and are designated as soil types SP, SP-SM, and SM.
Provided the soils are tested and meet the requirements of structural fill, can the on-site soils that are consistent with the soils encountered in the
RFP geotechnical report be re-used as structural fill?
NAVFAC. Part 3 Chapter 3 indicates select fill must be imported.
184 2 Part 3, Chapter 3 3.1.1
3.1.1 Existing Site Conditions state that no
disturbance is allowed within the 50' wetlands buffer. Has NCDEQ and USACE been contacted already in determining that no disturbance is allowed even for the foundations of the bridge/culvert?
PENDING RESPONSE
C250
Overall
Site Plan
Part 6
Attachments
Chapter C -
Affinity
Diagrams
Has the Wetlands boundary already been surveyed or is it the contractors responsibility to determine the wetland boundary for location of the buffer zones?
Wetland boundaries are indicated in Part 6, Chapter B, "Partial
Resurvey".
186 321
Part 6
Chapter C:
Attachments
Parachute
Maintenance and Paraloft
Bubble diagram shows an overhead door connector out of paraloft packout staging area to the front of the building. Does this need to be accessible by fork lift as the site plan doesn't show access for a fork lift or a gate for a fork lift on fin front of the building
Fork lift access is not required.
187 483
2.1.5 Wash
Rack and
Wash Pad
4, 5, and 6
Please clarify the number of lanes for the wash rack and wash pad. RFP paragraph 4 requests 4 lanes total: two elevated and two at grade lanes.
Paragraph 5 states one wash rack must be elevated at 6' and paragraph 6 states the wash pad must be one lane
The number of lanes for the wash rack and wash padis 2 lanes total:
one elevated and one at grade.
188 751
Part 3 -
Chapter 6 /
ESR10 -
E109002
For the Boat Operations, E109002 Residential or
Light Commercial Electric Kitchen Equipment lists room names that are not listed in the 5.0 Room
Requirements. Please see numbers 2 and 3 below.
e. Boat Operations
2. MAGTF Team Room
• Refrigerator with Ice Maker (Full Height)
• Microwave
• Coffee Maker
3. MEU Team Room
• Refrigerator with Ice Maker (Full Height)
• Microwave
• Coffee Maker
1) Please confirm what rooms these appliances should be assigned to.
MAGTF Team Room and MEU
Team Room function have been eleminated. Refrigerators and Ice
Makers are FF&E.
Part 3 -
Chapter 6 /
ESR C30 -
Part 3, 5.0
Room Reqs
Part 3 5.0 Room Requirements asks for loose-lay entrance mats at various locations. Loose-lay entrance mats are typically included in FF&E as they are not attached to the building.
Please confirm that loose-lay entrance mats are to be provided in the FF&E budget and not the construction budget.
Loose lay entrance mats are not identified in Part 6, Chapter G.
Loose lay entrance mats. Loose lay entrance mats are CFCI.
Chapter 6 /
ESR C10 -
Chapter G -
FF&E
Estimated
Cost
Summary
C103005 lists lockers as funded as part of the construction contract. FF&E Cost Summary calls for lockers as well.
Please confirm that all lockers are to included in the construction contract, and no lockers are to be provided in the FF&E package.
Lockers are CFCI.
Part 2, Section 01 33
The RFP sustainability checklist notes compliance with ASHRAE 90.1-2013. UFC 1-200-02 indicates that projects designed after 4/7/23 should be designed for compliance with ASHRAE 90.1-
2019. Please confirm which standard applies to this project.
Follow effective requirements at time of Bid.
Part 3
Section
General
System
Description
D30
RFP section D30 General system requirements states “Duty Hut and Duty Bunk rooms must be served by dedicated A/C split system heat pump to allow for 24/7 operation. Outside air must be duct to the system from an exterior wall louver.”
However, There are no references to the duty hut and duty bunk in the room requirements or the any other section of the RFP. Please confirm that duty bunk and duty hut is not required. Provide room requirements of both rooms for each building if they are required.
A Duty Hut / Bunk is not required.
193 803 G4010 1
G4010 Electrical Distribution indicates to "connect to the existing medium voltage (12.47 kV L-L) three-phase, three wire, 60 Hertz electrical power system. The connection point to the existing power system is overhead. The electrical service must transition underground and must be installed in a ductbank to a pad mounted transformer at the new building location."
1. Please confirm which existing pole shall be the
Overhead service to connect to overhead pole west and closest pole south of "unamed road".
Service must cross Battalion
Complex Road and transition to underground ductbank along the
"unnamed road". Services to each building to be extended from underground ductbank to pad mounted transformers at each
Point of Connection for this system?
2. Please confirm it is acceptable to extend the overhead 12.47 kV system along the "unnamed road" indicated on drawing C250 in Part 6
Attachments, Chapter B. Services to each building can be extended underground from new overhead lines to pad mounted transformers at each building.
building.
194 803 G401002 1
G401002 Transformers indicates to "provide a three phase pad mounted transformer, installed on a precast concrete box pad, for each facility minus the hazardous material storage building."
1. Please confirm that a separate pad mounted transformer is required for the wash rack and pad.
Separate pad mounted transformer is not required for wash rack and pad. It can be powered from the Combined
Vehicle Maintenance Facility &
Boat Operations Facility Building
195 804 G401007 1
G401007 Dutbanks, Manholes, Handholes and
Raceways states "provide a system of concrete encased ductbanks, handholes and manholes for all underground power wiring."
1. Please confirm that concrete encasement of ductbanks shall be provided in accordance with
UFC 3-550-01 for "primary distribution conduits between underground structures, and between underground structures and associated equipment
Concrete encasement required in accordance with UFC 3-550-01
Room Reqs
(Supply
Warehouse), Admin
Estimated
Cost
Summary
FF&E
Information for
Coordination
Admin
Part 3 5.0 Room Requirements for the Supply
Warehouse, Admin, state that "Printers and scanners etc, are GFGI". Chapter G - FF&E Cost
Comparison includes two (2) shredders for the
Supply Warehouse, Admin. Please confirm if the shredders are GFGI or are to be included in the
FF&E package.
Shredders are GFGI. Contractor to provide power. Provide dedicated circuits where warranted.
Chapter 6 /
ESR10 -
Estimated
(Supply
Warehouse)
E109002 For the Supply Warehouse Building, E109002
Residential or Light Commercial Electric Kitchen
Equipment lists appliances types and quantities that vary from those listed in the Chapter 6 - FF&E
Cost Summary, and in instances with the infrastructure listed in the 5.0 Room Requirements.
Please see the appliance type and quantity discrepancies listed out below.
Break Room:
E109002: Ice Maker, Refrigerator
(Full Size), (1) Microwave
FF&E Cost Summary: Refrigerator (Full Size),
(2) Microwaves, (1) non-Plumbed Coffee Maker
Mother's Room:
E109002: *None Listed
FF&E Cost Summary: Refrigerator (Full Size), Microwave
5.0 Room Req's: Provide GFI receptacles at
counter height at counter.
Under Counter
Refrigerator (CFCI) - Provide dedicated power receptacle (GFCI).
1) Please confirm the type and quantities of appliances and the infrastructure to be provided for appliances for each room.
Refrigerators, microwaves, and coffee makers are GFGI.
Contractor to provide power.
2) Please confirm if listed appliances are to be included in the construction or FF&E budget.
Chapter 6 /
ESR10 -
Estimated
(Elec-Comm-
Vehicle
Maint-Boat
Ops)
E109002 For the Elec-Comm-Vehicle Maint-Boat Ops
Building, E109002 Residential or Light
Commercial Electric Kitchen Equipment lists appliances types and quantities that vary from those listed in the Chapter 6 - FF&E Cost
Summary, and in instances with the infrastructure listed in the 5.0 Room Requirements. Please see the appliance type and quantity discrepancies listed out below.
Work Room / Break Room:
E109002: Refrigerator (Full Size), Microwave
FF&E Cost Summary: Refrigerator (Full Size)
5.0 Room Req's: Ice Maker (CFCI) - Under
Counter Ice Maker with 2" drain and 1/2" water connection with filtration. Refer to D502001
Receptacle Outlets.
Refrigerator (CFCI) -
Full height receptacle. Refer to D502001
Receptacle Outlets.
Microwave (CFCI) -
Refer to D502001 Receptacle Outlets.
Mother's Room:
E109002: Undercounter Refrigerator
FF&E Cost Summary: Refrigerator (Full Size), Microwave
5.0 Room Req's: Provide GFI receptacles at
counter height at counter.
Under Counter
Refrigerator (CFCI) - Provide dedicated power receptacle (GFCI).
Admin Space:
E109002: Coffee Maker
FF&E Cost Summary: Refrigerator (Full Size), Microwave
5.0 Room Req's: *None listed for coffee
maker, refrigerator, or microwave.
1) Please confirm the type and quantities of appliances and the infrastructure to be provided for appliances for each room.
2) Please confirm if listed appliances are to be included in the construction or FF&E budget.
See respone to PPI 197.
199 806 G403001 1
RFP G403001 paragraph 1 states: "The connection point for the site telecommunications systems must be underground to the nearest point of presence
(demarcation) and extended to the project site as large consolidated trunk underground cabling (with Splicing) in a system of manholes, handholes, and ductbanks to the site that branch off and distribute to individual building telecommunications entrance facilities coordinated with Base Communications office as needed to:.."
Based on site utilities, two potential locations are available for the telecommunications POC:
1. An existing manhole located NW of WC507 to
Contractor to provide new manhole for POC at utility extending N-S along Battalion
Complex Road.
the NW of the new site. Please note, the Project
Limits would need to be extended to reach this manhole.
2. Underground distribution along Holcomb Blvd.
A manhole does not appear to be in close proximity to the site and coordination with the
Base G6 would be required for outages to locate a manhole and feed the new site.
Please confirm the intended location for the telecommunications point of connection.
200 N/A N/A N/A
Telecom SIPRNet:
Please confirm SIPRNet and/or other secured networks are not a project requirement.
SIPRNet and/or other secured networks are not a project requirement.
2.3.7
D306001
D503006
G302003
1-4
Cybersecurity UMCS/EMCS:
The RFP appears to utilizes the terms Utility
Management Control System (UMCS) and Energy
Management Control System (EMCS) interchangeably. The RFP states the UMCS current
ATO impact rating is L-M-M. The RFP states the
EMCS current ATO impact rating is both L-M-M and L-L-L.
Questions:
1. Please confirm the UMCS and EMCS are the same systems and can be covered by a single 25 05
11 spec section.
2. Please confirm the ATO impact rating that should be used for UMCS/EMCS or EMCS if separate than UMCS.
1. The terms UMCS and EMCS are used synonymously. The
UMCS/EMCS can be covered by one 25 05 11 specification, if the
FRCS addressed by that specifically address the needs of the facility's Heating, Ventilation, and Air Conditioning (HVAC) and connected Electrical Systems
(ES). Note: The DPW department will perform the integration of the new EMCS/UMCS systems.
2. The UMCS/EMCS ATO
Impact Rating is L-M-M.
(01of01)
(03of03)
Part 3 - 5.0 -
Parachute -
Training
AV
Estimated
Cost
N/A
Parachute Maint Training Room AV:
The room data sheet (RDS) for the Parachute
Maint Training Room states to provide one (1) flat screen wall monitor 60"-65" and (16)-(25) ceiling speakers.
The AV cost estimate uses one (1) 80-90" display and (9) ceiling speakers for the cost estimate.
Question: Please confirm the display size and the quantity of ceiling speakers estimates for the
Parachute Maint Training Room.
AV Equipment will be funded separately as a modification to the construction contract.
Infrastructure to support AV equipment is included in the construction contract.
(01of01)
(01of01)
(03of03)
D503002
D503003
AV
Estimated
Cost
Summary
N/A
Public Address (PA) & Intercom System Funding:
Section D50 of the RFP includes the scope for PA and Intercom systems.
The AV cost estimate includes the push-to-talk microphones and 70v horns for the PA system.
Questions: Please confirm if the PA and intercom systems are to be funded with the building construction and the AV mics/speakers are to be funded with the AV funding.
AV Equipment will be funded separately as a modification to the construction contract.
Infrastructure to support AV equipment is included in the construction contract.
Part 3 - 5.0 -
Combined
Bldg -
Automotive
Maintenance
Bays
AV
Estimated
Cost
Public Address (PA) Vehicle Bays Horn
Quantities:
The room data sheets for the Combo Bldg Vehicle
Bays states (2) 70v horn-type speakers are required.
The AV cost estimate includes an estimate for (4)
70v horn-type speakers.
Questions: Please confirm the quantity of 70v horn-type speakers required for the Vehicle Bays.
AV Equipment will be funded separately as a modification to the construction contract.
Infrastructure to support AV equipment is included in the construction contract.
Part 3 - 5.0 -
Combined
Bldg - Break
Room
AV
Combo Bldg Break Room AV:
The room data sheet states to provide (1) 50-55" flat screen wall monitor (CFCI) for digital signage and/or television with built-in speakers.
The AV Estimated Cost Summary does not appear
AV Equipment will be funded separately as a modification to the construction contract.
Infrastructure to support AV equipment is included in the
Estimated to include these requirements in the Combo Bldg.
Question: Please confirm the (1) 50-55" flat screen wall monitor (CFCI) is required in the Combo Bldg
Break Room and please confirm this monitor falls into the AV funding.
construction contract.
206 --
UFC 3-600-
Section 2-
1.28.2
Is the facility power source considered reliable as defined by UFC 3-600-01 Section 2-1.28.2
(Change 6, 6 May 2021)?
Not since hurricane Florence.
207 --
Part 3, 5.0
Room
Requirement s, Hazardous
Material
Storage
Facility
Please provide a list and quantity of hazardous materials stored in the Hazardous Material Storage
Building.
PENDING RESPONSE
Part 3 - 5.0 -
Combined
Bldg - Boat
Operations
Training
Room
Combo Bldg
Affinity
Diagrams
AV
Estimated
Cost
Combo Bldg Training Room(s) AV:
The room data sheet for the Boat Operations
Training Room states to provide AV conduit, boxes recessed as required under D503090 and to provide (16)-(25) ceiling speakers under E102009.
The AV list provided in E102009 states to provide large-format flat screen wall monitor/LED display, ceiling speakers, AV enabled Lectern.
The AV cost estimate includes (2) classrooms: a 50
Person Classroom A and a 50 Person Classroom B.
For each of these classrooms, the AV cost estimate includes (1) 146" display, (1) lectern or teaching station, (1) laptop presentation input in lectern or wallplate, (25) ceiling speakers, and cabling.
The Combo Bldg Affinity Diagram appears to show a single classroom/training room: Boat
Operations B4 Training Room.
Questions:
1. Please confirm if one or two classroom/training rooms are to be provided in the Combo Bldg.
2. Please confirm if the design intent is for a single classroom with a movable partition.
3. Please confirm the design intent for AV in the one or two classrooms.
AV Equipment will be funded separately as a modification to the construction contract.
Infrastructure to support AV equipment is included in the construction contract. Thee is one classroom without an operable partition.
209 page 4
Overall Site
Plan Dwg.
C250, Part 3, Chapter 3
At the southwest site, Drawing C250 quadrant BC-
1; a square block west of the Paraloft Facility is shown. No hatch pattern or identifier is provided.
Please confirm this is the 6,400 SF space for training noted in Part 3, Chapter 3, Southwest Site, page 4, and provide the Project requirements for this space.
Refer to PPI reponse 130.
ESR D30
Part 3, Chapter 6
D303001
Chilled
Water
Systems
The RFP states "Chillers may not be located in the same equipment yard as generators". The electrical section does not require generators for the buildings. For clarity, please confirm the buildings do not require generators, or if generators are required, provide the requirement per building.
Emergency generators are not required.
ESR D30
Part 3, Chapter 6;
D30 General
System
Requirement s
D30 HVAC - General System Requirements - The second paragraph states that HVAC rooftop equipment is not allowed and that all major HVAC equipment must be in mechanical rooms. The third paragraph states that all exterior equipment, including AHU's shall have corrosion protection.
The intent appears to be that AHU equipment is indoor equipment, but the RFP does not appear to specifically exclude the use of exterior equipment that is mounted on grade. Which of the following equipment types are allowed to be exterior
The dry air packaged unit for the parachute drying tower may be located outside. If located outside, AHU corrosion protection is requried.
mounted on grade:
AHU's?
DOAS?
Dry Air Packaged Units for the parachute drying tower? Note that this equipment could potentially be large and require large volumes of outside air.
This type of equipment is often outdoors.
ESR D40
Part 3, Chapter 6;
D4020
The electrical section of the RFP does not mention a requirement for generators for any of the facilities. D4020 states “Fire flow test show fire pumps will be required to meet the demand for
Parachute Maintenance and Paraloft Facility and
Supply Warehouse.” Per NFPA 20, which is also referenced, these facilities would require a generator or diesel driven pump unless the power is considered reliable. Please confirm the power is considered reliable to the AHJ. If not, is the intent of the RFP to require a dedicated generator or diesel driven pump at each facility?
See response to PPI 210.
ESR D50
Part 3, Chapter 6;
D501002
D501002 Service Entrance Equipment, states
"Provide a Main Switchboard (MSB) as service equipment." Switchboard construction is uncommon for equipment less than 1200 amps. Is panelboard construction acceptable for building services less 1200 amps?
For less than 1200A, panelboard construction is acceptable.
ESR D30
page 2;
ESR E10
page 5 & 6
Part 3, Chapter 6;
Part 3, Chapter 5
D30 General
System
Requirement s; D304007;
E103004
The RFP states in D30, General System
Requirements, Page 4, that Vehicle Maintenance bays are heated and ventilated only. Part 3, Chapter
5 Room Requirements, Electrical / Comm
Maintenance Bays, D304007 identifies a Vehicle
Exhaust Fume Extractor and states "Vehicle engines are not running while vehicles are in bays."
Part 3, Chapter 5 Room Requirements, Automotive Maintenance Bays, D304007 identifies a Vehicle Exhaust and states "Ducted for running vehicles. Vehicle engines are not normally running while vehicles are in bays." Part 3, Chapter
6 / ESR E103004, c. Electrical / Comm
Maintenance Bays does not include a "Vehicle
Exhaust Capture System". E103004, d. Vehicle
Maintenance Bays includes a "Vehicle Exhaust
Capture System". Confirm the bays/ spaces that require an exhaust capture system.
Provide vehicle exhaust capture system in Automotive
Maintenance and Electrical /
Comm Maintenanc Bays. Doors will be closed during winter months.
ESR D50,
Part 3, Chpater 6
D503006
Chilled
Water
Systems
The RFP requires an Industrial Control System distribtion for these facilties. Which buildings will require this infrastructure? Will the associated racks be located in the telecomm rooms.
Facilities that require this infrastructure are the Parachute
Maintenance with Paraloft
Facility, the Supply Warehouse, and the Combined Elec-Comm
Maintenance, Boat Operations
Facility. Associated racks be located in the telecomm rooms.
Part 4, Section E10 E1090 1.01
Parachute Drying System, 11. states "Attachment hooks to be drop forged safety hook fitted with self-closing, spring loaded stainless steel safety latch. Hook must be hot-dip galvanized and have a load rating of no less". Provide omitted load rating of hook.
Provide safety hooks with ability to support water ladden T-10 personnel parachutes.
217 page 12 Section 01 45
00.05 20
1.4.5.1.2, c., (8)
FPQC Roles and Responsibilities During
Construction, para. 1.4.5.1.2, c., (8) states "Visual inspection of aircraft hangar IR detector layout, sprinkler heads, and mains, obstructions, and riser piping." Please confirm an aircraft hangar and aircraft hangar IR detectors are not to be provided in this project.
Aircraft hangar IR detectors are not required.
ESR D30
page 2;
ESR E10
page 1 & 4
Part 3, Chapter 6;
Part 3, Chapter 5
D30 General
System
Requirement s;
The RFP requires that the Supply Warehouse building be conditioned with a VAV AHU with chilled water and hot water and also a DOAS. The
RFP also states that the warehouse area of this facikty is heated and ventilated only. The warehouse is the majority of the building, leaving less than 3K SF of conditioned area. An RTU is a more appropriate system type for this scale application. Shall a pad-mounted VAV RTU with electric reheat be used in lieu of the VAV AHU, chillers, boilers, and DOAS?
Proposed systems outlined in the
LCCA (provided by the
Government) require a VAV
AHU system w/ boilers and chillers. HDR has no objection to the proposed system type but defer to NAVFAC/Camp Lejeune for direction.
ESR B30
Part 3, Chapter 6 B30 Roofing
B30 Roofing: Can Gable Roofs be provided for all roof structures or are Hip Roofs required? See
BEAP Wallace Creek, page 60 - Roof Form: Hip
(yes), Gable (no), Gable-on-hip (yes), shed (no), mansard (no), low slope (no).
For Wallace Creek, the BEAP allows Gable-on hip and hip roofs only.
page 3, 4
Part 3, Chapter 2;
Part 6, Chapter C
2.1.5.
Project
Objectives;
Affinity
Diagram
The Wash Rack and Wash Pad Project Objectives specifies four lanes total, two elevated and two at grade lanes. Further, it states "One wash rack must be elevated at 6'-0" above grade." Later it states, "Eight stations consisting of a stainless-steel remote-control panel, stainless steel pressure washer reel with 100 feet of hose and stainless-steel manual water cannon reel with 100 ft. hose.
Four stations along the elevated lanes and four stations along the at grade wash pad lanes." The
Part 6, Chapter C - Wash Rack and Pad Affinity
Diagram shows only two lanes, one elevated
(Wash Rack) and one at grade (Wash Pad). Please confirm the number of elevated and at grade wash lanes, and the number of wash stations per lane.
Refer to PPI respone 187. Provide two stations along the elevated lanes and two stations along the at grade wash pad lanes.
221 Page 2 Part 3, Chapter 3
3.1.1
Existing Site Conditions - Has a wetland delineation report been prepared for the existing wetlands? If so, please provide this report.
NAVFAC. Wetlands are deleniated in part 6 Chapter B, Partial Re-survey.
Can the HAZMAT building's electrical and communication requirements be served from the adjacent, Combined Maintenance Building or will dedicated services need to be provided?
This building can be powered from the Combined Vehicle
Maintenance, and Electric
Communications facility
Part 6, Estimated
Electrical
Load
Please confirm that the estimated electrical load listed for the wash rack does not include electric heat. The wash rack is required to have natural gas heating per Part 3, Chapter 2, Page 5 of the RFP.
The estimated load does not include heat.
Volume 1 of
Page 515 of Attachment A RFP Volume 1 of 3 includes a reference to Mechanical Mezzanine.
Please confirm if this is intended to add space to the under-programmed main Mechanical Room room size.
Mechanical mezzanines are not allowed. Contactor to size
Mechanical Room to accomodate systems proposed. Square footage of Mechanical Room to be deducted building's grossing factor (1.31) or 1,596 sf.
Volume 1 of
Page 515 of Attachment A RFP Volume 1 of 3 includes a reference to Mechanical Mezzanine.
That cell in the Table includes what looks like a truncated statement “(SQFT not counted per”.
Please provide what looks like missing information based on the parenthesis not being closed.
Mechanical mezzanines are not allowed.
Part 02 of 03 Affinity
Diagrams
The Affinity Diagram for the Parachute Inspection
And Packing Area uses the dashed “Space Outline
– NonEnclosed” symbol found in the Key at bottom right of page. Since those spaces often include Standard Interior Door requirements that have Interior Door Hardware with locksets, please…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .