Amendment 0006 - PPI 129 - Estimated Electrical Loads - Combined Facility.pdf

PDF 73 KB Posted

Attached to
DESIGN-BUILD, P-1458 2ND RADIO BATTALION COMPLEX, PHASE 2 MARINE CORPS BASE, CAMP LEJEUNE, NORTH CAROLINA
Solicitation number
N4008523R2557
Issued by

View the file

Other files

File Type Posted
AMENDMENT 0010.pdf PDF
Amendment 0010 - Attachment B - Price Proposal Form - REV 3.docx DOCX document
Amendment 0009 - 23 09 23.13 - BACNET DIRECT DIGITAL CONTROL SYSTEMS FOR HVAC.pdf PDF
Amendment 0009 - PPI 393 2015-2020_MCBCL_INRMP_MASTER.pdf PDF
Amendment 0009 - 25 05 11.00 - CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS - ISOLATED SYSTEMS.pdf PDF
Amendment 0009 - 01 78 23 - OPERATION AND MAINTENANCE DATA.pdf PDF
Amendment 0009 - 01 78 30.00 22 - GIS DATA DELIVERABLES.pdf PDF
AMENDMENT 0009.pdf PDF
Amendment 0009 - Attachment B - Price Proposal Form - REV 2.docx DOCX document
Amendment 0009 - 01 31 23.13 20 - ELECTRONIC CONSTRUCTION AND FACILITY SUPPORT CONTRACT MANAGEMENT SYSTEM.pdf PDF
Amendment 0009 - 6_ESR_E20 - Furnishings.pdf PDF
Amendment 0009 - 01 78 00 - CLOSEOUT SUBMITTALS.pdf PDF
Amendment 0008.pdf PDF
Amendment 0007.pdf PDF
Amendment 0006 - PPI 129 - Supply Warehouse Space Tabulation.pdf PDF
Amendment 0006 - Attachment F - DFARS 252.225-7059 AND 7060.pdf PDF
Amendment 0006 - PPI 129 - Supply Warehouse Affinity Diagram.pdf PDF
Amendment 0006.pdf PDF
Amendment 0005.pdf PDF
Amendment 0004.pdf PDF
Amendment 0003.pdf PDF
Amendment 0003 - Attachment 1 - Combined Vehicle Maintenace Facility and Boat Operations Facility.pdf PDF
Amendment 0003 - P1458 MACC General Requirements - Rev 1.pdf PDF
Amendment 0002.pdf PDF
Amendment 0002 - Site Visit Roster P-1458.pdf PDF
Amendment 0001 - Attachment 1 - 01 78 00 PPI 3.pdf PDF
Amendment 0001 - Attachment 2 - REGISTER.pdf PDF
Amendment 0001.pdf PDF
Amendment 0001 - Attachment 3 - Table of Contents.pdf PDF
P1458 MACC General Requirements.pdf PDF
Attachment E - PIEE Vendor Access Instructions.pdf PDF
Attachment C - Pre-Proposal Inquiry (PPI) Form.xlsx XLSX spreadsheet
Attachment A - 1397586rfp02of03.pdf PDF
Attachment A - 1397586rfp01of03.pdf PDF
Attachment A - 1397586rfp03of03.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ESTIMATED ELECTRICAL LOAD

Client: Name

Project: 2nd Radio Battalion RFP

Location Jackonsville, NC

Project Number:

Date: 14-Jun-19

Load Description Area [Sqft]

LPD

[Watts/Sqft]

Allowable

Wattage

Lighting KVA Volts Phase

Coincident

Demand

Connected kVA Load

Paraloft 480 3

Admin Spaces 326.8 0.98 320.3 3.2 120 1 1.0 3.2

Secure Parachute Storage Room 253.33 0.63 159.6 1.1 120 1 1.0 1.1

Female Head 82.22 0.98 80.6 1.4 120 1 1.0 1.4

Male Head 276.16 0.98 270.6 1.6 120 1 1.0 1.6

Electrical Room 74.67 0.95 70.9 0.6 120 1 1.0 0.6

Telecom Room 80 0.95 76.0 1.8 120 1 1.0 1.8

HRST 255.03 0.95 242.3 1.3 120 1 1.0 1.3

Fire Pump Room 64 0.95 60.8 2.9 120 1 1.0 2.9

Mechanical 488.72 0.95 464.3 164.3 480 3 1.0 164.3

Janitor 37.86 0.63 23.9 0.2 120 1 1.0 0.2

Training Area 584.86 1.24 725.2 2.8 120 1 1.0 2.8

Parachute Inspection and Packing Area 1374.98 1.29 1773.7 7.3 120 1 1.0 7.3

Parachute Repair Room 229.64 1.29 296.2 1.4 120 1 1.0 1.4

Parachute Drying Tower 1433.48 1.23 1763.2 4.6 120 1 1.0 4.6

Subtotal KVA 194.7

Subtotal AMPS 234.2

Total KVA 282.3

Total AMPS 339.6

Supply Warehouse 480 3

Shipping Receiving Co Issue 2572.02 1.19 3060.7 5.9 120 1 1.0 5.9

HQTRS Co 2D Rad BN 4754.18 1.19 5657.5 13.4 120 1 1.0 13.4

PN Effects HQTRS 281.61 1.19 335.1 0.7 120 1 1.0 0.7

PN Effects MAGTF 220.09 1.19 261.9 0.6 120 1 1.0 0.6

PN Effects MEU 220.09 1.19 261.9 0.6 120 1 1.0 0.6

PN Effects Info WAR 220.09 1.19 261.9 0.6 120 1 1.0 0.6

Break Room 395.93 0.73 289.0 2.1 120 1 1.0 2.1

Female Head 193.71 0.98 189.8 1.5 120 1 1.0 1.5

Male Head 276.16 0.98 270.6 1.6 120 1 1.0 1.6

Janitor 20.68 0.63 13.0 0.2 120 1 1.0 0.2

Mechanical Room 592.53 0.95 562.9 261.3 480 3 1.0 261.3

Electrical Room 125.33 0.95 119.1 0.8 120 1 1.0 0.8

Telecom Room 80 0.95 76.0 1.6 120 1 1.0 1.6

Fire Pump Room 64 0.95 60.8 1.6 120 1 1.0 1.6

Administrative 974.39 0.98 954.9 10.5 120 1 1.0 10.5

Office 1 90 1.11 99.9 1.2 120 1 1.0 1.2

Office 2 90 1.11 99.9 1.2 120 1 1.0 1.2

Subtotal KVA 305.5

Subtotal AMPS 367.5

Total KVA 443.0

Total AMPS 532.9

1/13/2023

Load Description Area [Sqft]

LPD

[Watts/Sqft]

Allowable

Wattage

Lighting KVA Volts Phase

Coincident

Demand

Connected kVA Load

Combined Electrical / Communication Vehicle Maintenance Facility and Boat Operations Facility480 3

HQ CO Shops 3359.85 1.59 5342.2 22.1 120 1 1.0 22.1

EM Cage 735.82 1.59 1170.0 1.2 120 1 1.0 1.2

Service Bay Circ 333.33 1.19 396.7 1.5 120 1 1.0 1.5

Maintenance Bay 1 640 1.19 761.6 4.9 120 1 1.0 4.9

Maintenance Bay 2 640 1.19 761.6 4.9 120 1 1.0 4.9

Maintenance Bay 3 640 1.19 761.6 5.6 120 1 1.0 5.6

Male Head 1 336.72 0.98 330.0 1.7 120 1 1.0 1.7

Female Head 1 204.94 0.98 200.8 1.6 120 1 1.0 1.6

Janitor 1 49.58 0.63 31.2 0.2 120 1 1.0 0.2

Office 1 90.75 1.11 100.7 1.2 120 1 1.0 1.2

Office 2 89.83 1.11 99.7 1.2 120 1 1.0 1.2

Office 3 90.69 1.11 100.7 1.2 120 1 1.0 1.2

Admin Space 318.68 1.11 353.7 2.2 120 1 1.0 2.2

Storage Room 520.1 1.11 577.3 2.4 120 1 1.0 2.4

Training Room 1100.9 1.11 1222.0 3.0 120 1 1.0 3.0

MEU Support 302.45 1.11 335.7 2.1 120 1 1.0 2.1

MAGTF Ove 153.12 0.95 145.5 0.9 120 1 1.0 0.9

MAGTF/MEU Boat Stor Room 628.12 0.98 615.6 5.7 120 1 1.0 5.7

Mechanical Room 653.05 0.95 620.4 213.3 480 3 1.0 213.3

Mechanical Fan Room 801.67 0.95 761.6 213.5 480 3 1.0 213.5

Telecom Room 1 88 0.95 83.6 6.3 120 1 1.0 6.3

Electrical Room 508.32 0.95 482.9 1.0 120 1 1.0 1.0

Telecom Room 2 88 0.95 83.6 6.3 120 1 1.0 6.3

Mothers Room 58.23 0.95 55.3 0.4 120 1 1.0 0.4

Break Room 137.69 0.73 100.5 1.9 120 1 1.0 1.9

Male Head 2 296.01 0.98 290.1 1.7 120 1 1.0 1.7

Female Head 2 93.71 0.98 91.8 1.5 120 1 1.0 1.5

Janitor 2 64.94 0.63 40.9 0.2 120 1 1.0 0.2

Entry Corridor 895.6 0.66 591.1 1.5 120 1 1.0 1.5

Office 95.4 1.11 105.9 1.0 120 1 1.0 1.0

Office 125.53 1.11 139.3 1.0 120 1 1.0 1.0

Office 125.53 1.11 139.3 1.0 120 1 1.0 1.0

Open Office 240.63 0.98 235.8 1.7 120 1 1.0 1.7

Office 130.4 1.11 144.7 1.4 120 1 1.0 1.4

Office 95.44 1.11 105.9 1.0 120 1 1.0 1.0

Corridor 440.24 0.66 290.6 1.0 120 1 1.0 1.0

OVE 371.43 0.95 352.9 1.1 120 1 1.0 1.1

Tool and Layettes 638.26 0.63 402.1 0.6 120 1 1.0 0.6

Compressor 125.67 0.95 119.4 10.1 480 3 1.0 10.1

Common Work Area 1788 0.98 1752.2 4.5 120 1 1.0 4.5

POL 151.8 0.95 144.2 0.9 120 1 1.0 0.9

Battery Charging 95.68 0.95 90.9 5.8 480 3 1.0 5.8

Work Area 1 470.42 0.98 461.0 3.2 120 1 1.0 3.2

Maintenance Bay 1 640 1.59 1017.6 5.1 120 1 1.0 5.1

Maintenance Bay 2 640 1.59 1017.6 5.1 120 1 1.0 5.1

Maintenance Bay 3 640 1.59 1017.6 5.1 120 1 1.0 5.1

Maintenance Bay 4 640 1.59 1017.6 5.1 120 1 1.0 5.1

Maintenance Bay 5 640 1.59 1017.6 5.1 120 1 1.0 5.1

Maintenance Bay 4 640 1.59 1017.6 5.1 120 1 1.0 5.1

Maintenance Bay 5 640 1.59 1017.6 5.1 120 1 1.0 5.1

Subtotal KVA 581.1

Subtotal AMPS 698.9

Total KVA 774.3

Total AMPS 931.3

Hazardous Material Storage Facility 480 3

New POL 167.62 0.63 105.6 0.3 480 3 1.0 0.3New NON-POL 138.72 0.63 87.4 0.3 3 0.3Used POL/NON-POL 138.72 0.63 87.4 0.3 3 0.3

MISC 144.5 0.63 91.0 0.3 480 3 1.0 0.3

Expended Batteries 138.72 0.63 87.4 0.3 480 3 1.0 0.3

Subtotal KVA 1.4

Subtotal AMPS 1.6

Total KVA 2.0

Total AMPS 2.4

Load Description Area [Sqft]

LPD

[Watts/Sqft]

Allowable

Wattage

Lighting KVA Volts Phase

Coincident

Demand

Connected kVA Load

Wash Rack and Pad 480 3

Load N/A 250 480 3 1.0 250.0

Subtotal KVA 250.0

Subtotal AMPS 300.7

Total KVA 362.5

Total AMPS 436.0

SUMMARY TABLE

System 3 Phase Voltage 480V

Connected KVA

Connected Amps

Total (With Spare Capacity) KVA

Total (With Spare Capacity) Amps 2,242.2

1,332.7

1,603.0

1,864.1

File details come from the government source that posted it. Updated .