CSI Estimate Worksheet.xlsx

XLSX spreadsheet 347 KB Posted

Attached to
Emergency Generators Maintenance and Repair Federal contract opportunity
Solicitation number
N40085-20-R-3002
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

This document provides specifications for a federal contract solicitation seeking preventative, routine, and emergency maintenance and repair services for multiple emergency generators at the Naval Submarine Base New London in Groton, Connecticut. The solicitation is identified as number N40085-20-R-3002 and involves services including all labor, transportation, supervision, management, materials, and equipment necessary to perform the required work. The base period of performance is 12 months with four additional 12-month options that may be exercised. Only the base period includes a minimum guarantee. The contracting agency is the Naval Facilities Engineering Command within the Department of the Navy.

View the file

Other files for this federal contract opportunity

Other files attached to Emergency Generators Maintenance and Repair, newest first.
File Type Posted
Amendment 5.pdf PDF
Amendment 3.pdf PDF
Amendment 4.pdf PDF
Amendment 2.pdf PDF
Amendment 1.pdf PDF
UPDATED PROPOSAL DUE DATE.docx DOCX document
ELINS J-0200000-09 Generators.xls XLS spreadsheet
1502000 M Generators.doc DOC document
N40085-20-R-3002 Gen RFP.pdf PDF
J-1502000-06 Service Order Summary Report.xlsx XLSX spreadsheet
1502000 C Generators Facility Investment ver 2.4.doc DOC document
BASE MAP J-1502000-04.pdf PDF
Generator Performance Assessment Plan v3.1.doc DOC document
J-1502000-07 Maintenance Summary Report.xlsx XLSX spreadsheet
NEPA_Emergency_generators_signed.pdf PDF
1502000 J FI Generators Facility Investment ver 2.4.doc DOC document
20-R-3304 Emergency Gen. Synopsis.doc DOC document
J-020000-06 Quality Inspection and Surveillance report.xlsx XLSX spreadsheet
0100000 C General Info Generators.doc DOC document
J-020000-07 On site Labor Summary Report.xlsx XLSX spreadsheet
J-1502000-09 Integral base tank inspection forms.pdf PDF
1502000 FAP generators Facility Investment ver 2.5.doc DOC document
Wage Determination.pdf PDF
0200000 F Management and Administration Generators.docx DOCX document
J-0200000-08 Equipment Summary Report.xlsx XLSX spreadsheet
0200000 C Management and Administration Generators.docx DOCX document
1502000 F Generators Facility Investment ver 2.4.doc DOC document
0200000 J Management and Administration Generators.docx DOCX document
J-1502000-03 Generator Inventory 2019.xlsx XLSX spreadsheet
J-1502000-08 Monthly readings.xls XLS spreadsheet
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Instructions
1. Enter direct costs in the Prime and Sub tables5. Create multiple tabs for more room or multiple subs
a. Create one line per Definable Feature of Work (DFOW)a. Right Click on the "Estimate" tab
b. Enter a CSI Division Number. The Division Title will automatically populate but may be overridden with a project-specific description.b. Click "Move or Copy"
c. Enter the material quantity (QY), unit of measure (UM), and unit price (UP) associated with each DFOW. The total material price for that line item will automatically calculate.c. Select the appropriate place and check "Create Copy"
d. Enter the number of labor hours (HR) and hourly price (UP) for that DFOW. The total labor price for that line item will automatically calculate.
e. Enter the equipment costs for the DFOW. Label contractor-owned equipment with 'O' and rented equipment with 'R'.
f. The total amount for each DFOW and the aggregate totals for Labor, Materials, and Equipment will automatically calculate.
g. If copying from another sheet or program, do not attempt to copy the total columns (material, labor, equipment, or DFOW). It is often helpful to use “Paste Values” rather than “Paste” to avoid formula errors.
· Right click on the cell to be pasted into
· Click the “123” button
2. Multiple lines may be used with the same CSI number to describe different areas of the project
· For example, there may be one line for “Sidewalks” and another for “Parking lot,” both using the CSI number 03 30 00 – Cast-in-place concrete
3. The “CSI Titles” tab may be used to find appropriate CSI Numbers
a. Use the + and – buttons on the far left to expand and collapse divisions
b. Use the 1, 2, 3, 4, and 5 buttons at the top of the + and – buttons to mass-expand or –collapse the list.
c. Copy and paste number values
· Right click on the cell to be pasted into
· Click the “123” button

4. Indirect rates are added in the summary table.

Estimate

Work Duration:3months
ESTIMATE FOR CONTRACT MODIFICATIONDATE:PRIME CONTRACTORSUBCONTRACTORALTERNATE METHOD OF PROFIT DETERMINATION
CSI NumberDescriptionMaterialLaborOEquipmentCSI NumberDescriptionMaterialLaborOEquipmentERROR:#DIV/0!
CONTRACT TITLE:CONTRACT NO:N40085-15-C-9607QYUMUPTotalHRUPTotalRQYUPTotalQYUMUPTotalHRUPTotalRQYUPTotalPRIME CONTRACTOR'S PROFIT
1.000ERROR:#VALUE!1.000ERROR:#VALUE!FactorRateWeightValueCommentsRISK
ROICC OFFICE:2.000ERROR:#VALUE!2.000ERROR:#VALUE!Degree of risk20.00%0.030.6%LOWRiskDegree of risk
PWD New London** FOR OFFICIAL USE ONLY **3.000ERROR:#VALUE!3.000ERROR:#VALUE!Difficulty of Work15.00%0.030.5%LOWHIGH0.12
DESCRIPTION:4.000ERROR:#VALUE!4.000ERROR:#VALUE!Size of Job15.00%0.121.8%HIGHAVG-HIGH0.10
5.000ERROR:#VALUE!5.000ERROR:#VALUE!Period of Performance15.00%0.040.5%LOW-AVGAVG0.08
PRIME CONTRACTOR'S WORKRevisions/Comments6.000ERROR:#VALUE!6.000ERROR:#VALUE!Contractors Investment5.00%0.030.2%LOWLOW-AVG0.05
1.Direct Materials|0|7.000ERROR:#VALUE!7.000ERROR:#VALUE!Assistance by Government5.00%0.120.6%LOWLOW0.03
2.Sales Tax on Materials0.00%of line 10.00%0|8.000ERROR:#VALUE!8.000ERROR:#VALUE!Subcontracting25.00%ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!
3.Direct Labor|0|9.000ERROR:#VALUE!9.000ERROR:#VALUE!Profit ObjectiveERROR:#DIV/0!
4.Insurance, Taxes, and Fringe Benefits0.00%of line 30.00%0|10.000ERROR:#VALUE!10.000ERROR:#VALUE!
5.Rental Equipment|0|11.000ERROR:#VALUE!11.000ERROR:#VALUE!
6.Sales Tax on Rental Equipment0.00%of line 50.00%0|12.000ERROR:#VALUE!12.000ERROR:#VALUE!SUBCONTRACTOR'S PROFIT
7.Equipment Ownership and Operating Expenses|0|13.000ERROR:#VALUE!13.000ERROR:#VALUE!FactorRateWeightValueCommentsRISK
8.Subtotal||||||||||||||||||||||||||||||||||||||||||||||||||||||014.000ERROR:#VALUE!14.000ERROR:#VALUE!Degree of risk20.00%0.030.6%LOW
9.Prime's Field Office Overhead (M&E)0.00%of line 80.00%0|||||||||||||||||||||||||||||||||15.000ERROR:#VALUE!15.000ERROR:#VALUE!Difficulty of Work15.00%0.030.5%LOW
10.SUBTOTAL (add lines 8 and 9)||016.000ERROR:#VALUE!16.000ERROR:#VALUE!Size of Job15.00%0.121.8%HIGH
Prime's Remarks:17.000ERROR:#VALUE!17.000ERROR:#VALUE!Period of Performance15.00%0.040.5%LOW-AVG
18.000ERROR:#VALUE!18.000ERROR:#VALUE!Contractors Investment5.00%0.030.2%LOW
19.000ERROR:#VALUE!19.000ERROR:#VALUE!Assistance by Government5.00%0.120.6%LOW
SUBCONTRACTOR'S WORK20.000ERROR:#VALUE!20.000ERROR:#VALUE!Subcontracting25.00%0.030.8%LOW
11.Direct Materials|0|21.000ERROR:#VALUE!21.000ERROR:#VALUE!Profit Objective4.9%
12.Sales Tax on Materials0.00%of line 110.00%0|22.000ERROR:#VALUE!22.000ERROR:#VALUE!
13.Direct Labor|0|23.000ERROR:#VALUE!23.000ERROR:#VALUE!
14.Insurance, Taxes, and Fringe Benefits0.00%of line 130.00%0|24.000ERROR:#VALUE!24.000ERROR:#VALUE!
15.Rental Equipment|0|25.000ERROR:#VALUE!25.000ERROR:#VALUE!
16.Sales Tax on Rental Equipment0.00%of line 150.00%0|26.000ERROR:#VALUE!26.000ERROR:#VALUE!
17.Equip. Ownership and Operating Expns|0|27.000ERROR:#VALUE!27.000ERROR:#VALUE!
18.SUBTOTAL (add lines 11-17)||028.000ERROR:#VALUE!28.000ERROR:#VALUE!
19.Field Overhead0.00%of line 180.00%0|29.000ERROR:#VALUE!29.000ERROR:#VALUE!
20.Home Office Overhead0.00%of (18+19)0.00%0|30.000ERROR:#VALUE!30.000ERROR:#VALUE!
21.SUBTOTAL (add lines 18, 19, & 20)||031.000ERROR:#VALUE!31.000ERROR:#VALUE!
22.Profit (as determined)0.00%of line 210.00%0|32.000ERROR:#VALUE!32.000ERROR:#VALUE!
23.SUBTOTAL (Add Lines 21& 22)||033.000ERROR:#VALUE!33.000ERROR:#VALUE!
Sub's Remarks:For multiple Subs, Line 11 - 22 are 0; sum of Subs' quotes entered in Line 23. Copy this sheet as many times as needed and create a formula in Line 23 to carry each Sub's estimate (each line 23) to this sheet.34.000ERROR:#VALUE!34.000ERROR:#VALUE!
35.000ERROR:#VALUE!35.000ERROR:#VALUE!
36.000ERROR:#VALUE!36.000ERROR:#VALUE!
37.000ERROR:#VALUE!37.000ERROR:#VALUE!
38.000ERROR:#VALUE!38.000ERROR:#VALUE!
SUMMARY39.000ERROR:#VALUE!39.000ERROR:#VALUE!
24.Prime Contractor's Work (from line 10)|0|40.000ERROR:#VALUE!40.000ERROR:#VALUE!
25.Sub-contractor's Work (from line 23)|0|41.000ERROR:#VALUE!41.000ERROR:#VALUE!
26.SUBTOTAL (add lines 24 & 25)||042.000ERROR:#VALUE!42.000ERROR:#VALUE!
27.Prime's Overhead on sub-contractor0.00%of line 250.00%0|43.000ERROR:#VALUE!43.000ERROR:#VALUE!
28.Prime's Home Office Overhead0.00%of line 240.00%0|44.000ERROR:#VALUE!44.000ERROR:#VALUE!
29.SUBTOTAL (add lines 26, 27 & 28)||045.000ERROR:#VALUE!45.000ERROR:#VALUE!
30.Prime's Profit (as determined)0.00%of line 290.00%0|46.000ERROR:#VALUE!46.000ERROR:#VALUE!
31.SUBTOTAL (add lines 29 and 30)||047.000ERROR:#VALUE!47.000ERROR:#VALUE!
32.Prime Contractor's Bond Premium0.68%of line 310.68%0|48.000ERROR:#VALUE!48.000ERROR:#VALUE!
33.TOTAL COST (Add Lines 31 and 32)||049.000ERROR:#VALUE!49.000ERROR:#VALUE!
Estimated time extension and justification50.000ERROR:#VALUE!50.000ERROR:#VALUE!
51.000ERROR:#VALUE!51.000ERROR:#VALUE!
52.000ERROR:#VALUE!52.000ERROR:#VALUE!
53.000ERROR:#VALUE!53.000ERROR:#VALUE!
Prime Contractor name:54.000ERROR:#VALUE!54.000ERROR:#VALUE!
Subcontractor name:** FOR OFFICIAL USE ONLY **55.000ERROR:#VALUE!55.000ERROR:#VALUE!
56.000ERROR:#VALUE!56.000ERROR:#VALUE!
Signature & Title of preparer:57.000ERROR:#VALUE!57.000ERROR:#VALUE!
Note: This estimate wasDate:58.000ERROR:#VALUE!58.000ERROR:#VALUE!
prepared independently(Printed Name & Title)59.000ERROR:#VALUE!59.000ERROR:#VALUE!
60.000ERROR:#VALUE!60.000ERROR:#VALUE!
61.000ERROR:#VALUE!61.000ERROR:#VALUE!
62.000ERROR:#VALUE!62.000ERROR:#VALUE!
63.000ERROR:#VALUE!63.000ERROR:#VALUE!
64.000ERROR:#VALUE!64.000ERROR:#VALUE!
65.000ERROR:#VALUE!65.000ERROR:#VALUE!
66.000ERROR:#VALUE!66.000ERROR:#VALUE!
67.000ERROR:#VALUE!67.000ERROR:#VALUE!
68.000ERROR:#VALUE!68.000ERROR:#VALUE!
69.000ERROR:#VALUE!69.000ERROR:#VALUE!
70.000ERROR:#VALUE!70.000ERROR:#VALUE!
PRIME CONTRACTOR'S TOTALS0000SUBCONTRACTOR'S TOTALS000070

CSI Titles

NumberTitle
0Procurement and Contracting Requirements
101Project Title Page
103Project Directory
105Certifications Page
107Seals Page
110Table of Contents
115List of Drawing Sheets
120List of Schedules
1000Solicitation
1100Advertisements and Invitations
1113Advertisement for Bids
1115Advertisement for Prequalification of Bidders
1116Invitation to Bid
1119Request for Proposal
1153Request for Qualifications
2000Instructions for Procurement
2100Instructions
2113Instructions to Bidders
2116Instructions to Proposers
2200Supplementary Instructions
2213Supplementary Instructions to Bidders
2216Supplementary Instructions to Proposers
2300Procurement Definitions
2400Procurement Scopes
2413Scopes of Bids
2413.13Scopes of Bids (Multiple Contracts)
2413.16Scopes of Bids (Multiple-Prime Contract)
2416Scopes of Proposals
2416.13Scopes of Proposals (Multiple Contracts)
2416.16Scopes of Proposals (Multiple-Prime Contract)
2500Procurement Meetings
2513Pre-Bid Meetings
2516Pre-Proposal Meetings
2600Procurement Substitution Procedures
3000Available Information
3100Available Project Information
3113Preliminary Schedules
3113.13Preliminary Project Schedule
3113.16Preliminary Construction Schedule
3113.23Preliminary Project Phases
3113.26Preliminary Project Sequencing
3113.33Preliminary Project Milestones
3116Project Budget Information
3119Existing Condition Information
3119.13Movement and Vibration Information
3119.16Acoustic Information
3119.19Traffic Information
3119.23Existing Structural Information
3121Survey Information
3121.13Site Survey Information
3121.16Measured Drawing Information
3121.19Photographic Information
3124Environmental Assessment Information
3124.13Soil Contamination Report
3124.23Environmental Impact Study Report
3124.26Environmental Impact Report Evaluation
3124.29Record of Environmental Impact Decision
3124.33Environmental Impact Mitigation Report
3125Existing Material Information
3125.16Existing Concrete Information
3125.19Existing Masonry Information
3125.23Existing Metals Information
3125.26Existing Wood, Plastics, and Composites Information
3125.29Existing Thermal and Moisture Protection Information
3126Existing Hazardous Material Information
3126.23Existing Asbestos Information
3126.26Existing Lead Information
3126.29Existing Polychlorinate Biphenyl Information
3126.33Existing Mold Information
3126.36Existing Hazardous Waste Drum Information
3131Geophysical Data
3131.13Seismic Investigations Information
3131.16Gravity Investigations Information
3131.19Magnetic Investigations Information
3131.23Electromagnetic Investigations Information
3131.26Electrical Resistivity Investigations Information
3131.29Magnetotelluric Investigations Information
3132Geotechnical Data
3132.13Subsurface Drilling and Sampling Information
3132.16Material Testing Information
3132.19Exploratory Excavation Information
3132.23Geotechnical Monitoring Information
3143Permit Application
3146Permits
4000Procurement Forms and Supplements
4100Bid Forms
4113Bid Form - Stipulated Sum (Single-Prime Contract)
4116Bid Form - Stipulated Sum (Multiple-Prime Contract)
4123Bid Form - Construction Management (Single-Prime Contract)
4126Bid Form - Construction Management (Multiple-Prime Contract)
4133Bid Form - Cost-Plus-Fee (Single-Prime Contract)
4136Bid Form - Cost-Plus-Fee (Multiple-Prime Contract)
4143Bid Form - Unit Price (Single-Prime Contract)
4146Bid Form - Unit Price (Multiple-Prime Contract)
4153Bid Form - Design/Build (Single-Prime Contract)
4156Bid Form - Design/Build (Multiple-Prime Contract)
4163Bid Form - Purchase Contract
4200Proposal Forms
4213Proposal Form - Stipulated Sum (Single-Prime Contract)
4216Proposal Form - Stipulated Sum (Multiple-Prime Contract)
4223Proposal Form - Construction Management (Single-Prime Contract)
4226Proposal Form - Construction Management (Multiple-Prime Contract)
4233Proposal Form - Cost-Plus-Fee (Single-Prime Contract)
4236Proposal Form - Cost-Plus-Fee (Multiple-Prime Contract)
4243Proposal Form - Unit Price (Single-Prime Contract)
4246Proposal Form - Unit Price (Multiple-Prime Contract)
4253Proposal Form - Design/Build (Single-Prime Contract)
4256Proposal Form - Design/Build (Multiple-Prime Contract)
4263Proposal Form - Purchase Contract
4273Proposal Form - Performance Contract
4300Procurement Form Supplements
4313Bid Security Form
4321Allowance Form
4322Unit Prices Form
4323Alternates Form
4325Substitution Request Form (During Procurement)
4326Estimated Quantities Form
4327Separate Prices Break-Out Form
4328Tax Rebate Form
4333Proposed Products Form
4336Proposed Subcontractors Form
4339Minority Business Enterprise Statement of Intent Form
4343Wage Rates Form
4373Proposed Schedule of Values Form
4383Proposed Construction Schedule Form
4386Proposed Work Plan Schedule Form
4393Bid Submittal Checklist
4500Representations and Certifications
4513Bidder's Qualifications
4516Proposer's Qualifications
4519Non-Collusion Affidavit
4523Statement of Disposal Facility
4526Workers Compensation Certificate Schedule
4533Non-Segregated Facilities Affidavit
4536Equal Employment Opportunity Affidavit
4539Minority Business Enterprise Affidavit
4543Corporate Resolutions
4546Governmental Certifications
5000Contracting Forms and Supplements
5100Notice of Award
5200Agreement Forms
5213Agreement Form - Stipulated Sum (design/bid/build or design/negoiate/build)
5214Subcontract Form - Stipulated Sum (design/bid/build or design/negoiate/build)
5216Agreement Form - Cost-Plus (design/bid/build or design/negotiate/build)
5217Subcontract Form - Cost-Plus (design/bid/build or design/negotiate/build)
5223Agreement Form - Construction Manager as Agent or Advisor - Stipulated Sum
5224Subcontract Form - Construction Manager as Agent or Adviser - Stipulated Sum
5226Agreement Form - Construction Manager as Agent or Adviser - Cost-Plus
5227Subcontract Form - Construction Manager as Agent or Adviser - Cost-Plus
5233Agreement Form - Construction Manager at Risk - Stipulated Sum
5234Subcontract Form - Construction Manager at Risk - Stipulated Sum
5236Agreement Form - Construction Manager at Risk - Cost-Plus
5237Subcontract Form - Construction Manager at Risk - Cost-Plus
5251Public-Private Partnership Agreement
5252Agreement for Preliminary Services - Owner-Design/Builder
5253Agreement Form - Owner-Design/Builder - Stipulated Sum
5254Subcontract Form - Design/Build - Stipulated Sum
5256Agreement Form - Owner-Design/Builder - Cost-Plus
5257Subcontract Form - Design/Build - Cost-Plus
5263Agreement Form - Purchase - Stipulated Price
5273Agreement Form - Performance Contract
5293Multi-Party Agreement Form - Integrated Project Delivery
5296Agreement between Single-Purpose Entity and Owner - Integrated Project Delivery
5297Agreement between Single-Purpose Entity and Non-Owner - Integrated Project Delivery
5298Agreement between Single-Purpose Entity and Consultant - Integrated Project Delivery
5400Agreement Form Supplements
5413Supplementary Scope Statement
5421Allowances Schedule
5422Unit Prices Schedule
5433Digital/Electronic Data Protocol Exhibit
5436Building Information Modeling Exhibit
5500Notice to Proceed
6000Project Forms
6100Bond Forms
6113Performance and Payment Bond Form
6113.13Performance Bond Form
6113.16Payment Bond Form
6116Lien Bond Form
6119Maintenance Bond Form
6123Retainage Bond Form
6126Special Bond Form
6200Certificates and Other Forms
6211Submittal Transmittal Form
6216Certificate of Insurance Form
6219Infection Control Form
6223Construction Waste Diversion Form
6233Products Form
6234Recycled Content of Materials Form
6239Minority Business Enterprise Certification Form
6273Schedule of Values Form
6276Application for Payment Form
6276.13Sales Tax Form
6276.16Consent of Surety to Reduction of Retainage Form
6279Stored Material Form
6283Construction Schedule Form
6286Work Plan Schedule Form
6289Construction Equipment Form
6300Clarification and Modification Forms
6313Request for Interpretation Form
6319Clarification Form
6325Substitution Request Form (During Construction)
6333Supplemental Instruction Form
6336Field Order Form
6343Written Amendment Form
6346Construction Change Directive Form
6349Work Change Directive Form
6353Request for Proposal Form
6354Proposal Worksheet Summary Form
6355Proposal Worksheet Detail Form
6357Change Order Request Form
6363Change Order Form
6500Closeout Forms
6513Certificate of Compliance Form
6516Certificate of Substantial Completion Form
6519Certificate of Completion Form
6519.13Affidavit of Payment of Debts and Claims Form
6519.16Affidavit of Release of Liens Form
6519.19Consent of Surety to Final Payment Form
6519.23Acceptance Certificate Form
6519.26Final Settlement Certificate Form
6536Warranty Form
6573Statutory Declaration Form
7000Conditions of the Contract
7100Contracting Definitions
7200General Conditions
7213General Conditions - Stipulated Sum (Single-Prime Contract)
7216General Conditions - Stipulated Sum (Multiple-Prime Contract)
7223General Conditions - Construction Management (Single-Prime Contract)
7226General Conditions - Construction Management (Multiple-Prime Contract)
7233General Conditions - Cost Plus-Fee (Single-Prime Contract)
7236General Conditions - Cost-Plus-Fee (Multiple-Prime Contract)
7243General Conditions - Unit Price (Single-Prime Contract)
7246General Conditions - Unit Price (Multiple-Prime Contract)
7253General Conditions - Design/Build (Single-Prime Contract)
7256General Conditions - Design/Build (Multiple-Prime Contract)
7273General Conditions - Performance Contract
7295General Conditions - Integrated Project Delivery
7300Supplementary Conditions
7316Insurance Requirements
7319Health and Safety Requirements
7323Purchase Contracts
7326Assigned Contracts
7333Non-Segregated Facilities Requirements
7336Equal Employment Opportunity Requirements
7339Minority Business Enterprise Requirements
7343Wage Rate Requirements
7346Wage Determination Schedule
7349Labor Stabilization Agreement
7353Anti-Pollution Measures
7363Security Requirements
7373Statutory Requirements
7383Dispute Resolution
9000Revisions, Clarifications, and Modifications
9100Precontract Revisions
9113Addenda
9116Bid Revisions
9119Proposal Revisions
9300Record Clarifications and Proposals
9313Record Requests for Interpretation
9319Record Clarification Notices
9353Record Proposal Requests
9354Record Proposal Worksheet Summaries
9357Record Change Order Requests
9400Record Modifications
9433Record Minor Changes in the Work
9436Record Supplemental Instructions
9439Record Field Orders
9443Record Amendments
9446Record Construction Change Directives
9449Record Work Change Directives
9463Record Change Orders
10000General Requirements
11000Summary
11100Summary of Work
11113Work Covered by Contract Documents
11116Work by Owner
11119Purchase Contracts
11200Multiple Contract Summary
11213Summary of Contracts
11216Work Sequence
11219Contract Interface
11400Work Restrictions
11413Access to Site
11416Coordination with Occupants
11419Use of Site
11433Work in Rights-of-Way
11800Project Utility Sources
11813Utility Service Connections
12000Price and Payment Procedures
12100Allowances
12113Cash Allowances
12116Contingency Allowances
12119Testing and Inspecting Allowances
12123Installation Allowances
12126Product Allowances
12129Quantity Allowances
12143Time Allowances
12200Unit Prices
12213Unit Price Measurement
12216Unit Price Payment
12300Alternates
12400Value Analysis
12413Value Engineering
12500Substitution Procedures
12513Product Substitution Procedures
12516Execution Substitution Procedures
12600Contract Modification Procedures
12613Requests for Interpretation
12619Clarification Notices
12633Minor Changes in the Work
12636Supplemental Instructions
12639Field Orders
12643Amendments
12646Construction Change Directives
12649Work Change Directives
12653Proposal Requests
12654Proposal Worksheet Summaries
12657Change Order Requests
12663Change Orders
12900Payment Procedures
12973Schedule of Values
12976Progress Payment Procedures
12983Payment Procedures for Testing Laboratory Services
13000Administrative Requirements
13100Project Management and Coordination
13113Project Coordination
13114Facility Services Coordination
13116Multiple Contract Coordination
13119Project Meetings
13119.13Preconstruction Meetings
13119.16Site Mobilization Meetings
13119.23Progress Meetings
13119.33Preinstallation Meetings
13123Project Web Site
13126Electronic Communication Protocols
13200Construction Progress Documentation
13213Scheduling of Work
13216Construction Progress Schedule
13216.13Network Analysis Schedules
13219Submittals Schedule
13223Survey and Layout Data
13226Construction Progress Reporting
13229Periodic Work Observation
13233Photographic Documentation
13236Video Monitoring and Documentation
13243Purchase Order Tracking
13300Submittal Procedures
13313Certificates
13316Design Data
13319Field Test Reporting
13323Shop Drawings, Product Data, and Samples
13326Source Quality Control Reporting
13329Sustainable Design Reporting
13329.01Material Cost Summary Form
13329.02Wood-Containing Product List
13329.03Metal-Containing Product List
13329.04Material Content Form
13329.05New Product Source Form
13329.06Reused Product Form
13329.07Prohibited Content Installer Certification
13500Special Procedures
13503Conservation Treatment Procedures
13513Special Project Procedures
13513.13Special Project Procedures for Airport Facilities
13513.16Special Project Procedures for Detention Facilities
13513.19Special Project Procedures for Healthcare Facilities
13513.26Special Project Procedures for Clean Rooms
13513.43Special Project Procedures for Contaminated Sites
13516Alteration Project Procedures
13523Owner Safety Requirements
13526Governmental Safety Requirements
13529Health, Safety, and Emergency Response Procedures
13529.13Health, Safety, and Emergency Response Procedures for Contaminated Sites
13533Infection Control Procedures
13543Environmental Procedures
13543.13Environmental Procedures for Hazardous Materials
13543.16Environmental Procedures for Toxic Materials
13546Indoor Air Quality Procedures
13553Security Procedures
13563Sustainability Certification Project Requirements
13566Sustainability Certification Project Procedures
13573Delegated Design Procedures
13591Period Treatment Procedures
14000Quality Requirements
14100Regulatory Requirements
14113Codes
14116Laws
14119Rules
14123Fees
14126Permit Requirements
14200References
14213Abbreviations and Acronyms
14216Definitions
14219Reference Standards
14300Quality Assurance
14313Manufacturer Qualifications
14316Supplier Qualifications
14319Fabricator Qualifications
14323Installer Qualifications
14326Testing and Inspecting Agency Qualifications
14329Code-Required Special Inspector Qualifications
14333Manufacturer's Field Services
14336Field Samples
14339Mockups
14500Quality Control
14513Source Quality Control Procedures
14516Field Quality Control Procedures
14516.13Contractor Quality Control
14523Testing and Inspecting Services
14526Plant Inspection Procedures
14529Testing Laboratory Services
14533Code-Required Special Inspections and Procedures
15000Temporary Facilities and Controls
15100Temporary Utilities
15113Temporary Electricity
15116Temporary Fire Protection
15119Temporary Fuel Oil
15123Temporary Heating, Cooling, and Ventilating
15126Temporary Lighting
15129Temporary Natural-Gas
15133Temporary Telecommunications
15136Temporary Water
15200Construction Facilities
15213Field Offices and Sheds
15216First Aid Facilities
15219Sanitary Facilities
15300Temporary Construction
15313Temporary Bridges
15316Temporary Decking
15319Temporary Overpasses
15323Temporary Ramps
15326Temporary Runarounds
15400Construction Aids
15413Temporary Elevators
15416Temporary Hoists
15419Temporary Cranes
15423Temporary Scaffolding and Platforms
15426Temporary Swing Staging
15500Vehicular Access and Parking
15513Temporary Access Roads
15516Haul Routes
15519Temporary Parking Areas
15523Temporary Roads
15526Traffic Control
15529Staging Areas
15600Temporary Barriers and Enclosures
15613Temporary Air Barriers
15616Temporary Dust Barriers
15619Temporary Noise Barriers
15623Temporary Barricades
15626Temporary Fencing
15629Temporary Protective Walkways
15633Temporary Security Barriers
15636Temporary Security Enclosures
15639Temporary Tree and Plant Protection
15700Temporary Controls
15713Temporary Erosion and Sediment Control
15716Temporary Pest Control
15719Temporary Environmental Controls
15723Temporary Storm Water Pollution Control
15726Site Watering for Dust Control
15800Project Identification
15813Temporary Project Signage
15816Temporary Interior Signage
16000Product Requirements
16100Common Product Requirements
16113Software Licensing Requirements
16200Product Options
16400Owner-Furnished Products
16500Product Delivery Requirements
16600Product Storage and Handling Requirements
16613Product Storage and Handling Requirements for Hazardous Materials
16616Product Storage and Handling Requirements for Toxic Materials
17000Execution and Closeout Requirements
17100Examination and Preparation
17113Mobilization
17116Acceptance of Conditions
17123Field Engineering
17123.13Construction Layout
17123.16Construction Surveying
17133Protection of Adjacent Construction
17136Non-Destructive Concrete Examination
17300Execution
17313Application
17316Erection
17319Installation
17323Bracing and Anchoring
17326Existing Products
17329Cutting and Patching
17400Cleaning and Waste Management
17413Progress Cleaning
17416Site Maintenance
17419Construction Waste Management and Disposal
17423Final Cleaning
17500Starting and Adjusting
17513Checkout Procedures
17516Startup Procedures
17600Protecting Installed Construction
17700Closeout Procedures
17713Preliminary Closeout Reviews
17716Final Closeout Review
17719Closeout Requirements
17800Closeout Submittals
17813Completion and Correction List
17819Maintenance Contracts
17823Operation and Maintenance Data
17823.13Operation Data
17823.16Maintenance Data
17823.19Preventative Maintenance Instructions
17829Final Site Survey
17833Bonds
17836Warranties
17839Project Record Documents
17843Spare Parts
17846Extra Stock Materials
17853Sustainable Design Closeout Documentation
17900Demonstration and Training
18000Performance Requirements
18100Facility Performance Requirements
18113Sustainable Design Requirements
18116Facility Environmental Requirements
18119Indoor Air Quality Requirements
18200Facility Substructure Performance Requirements
18213Foundation Performance Requirements
18216Basement Construction Performance Requirements
18300Facility Shell Performance Requirements
18313Superstructure Performance Requirements
18316Exterior Enclosure Performance Requirements
18319Roofing Performance Requirements
18400Interiors Performance Requirements
18413Interior Construction Performance Requirements
18416Stairways Performance Requirements
18419Interior Finishes Performance Requirements
18500Conveying Equipment Performance Requirements
18600Facility Services Performance Requirements
18613Fire Suppression Performance Requirements
18616Plumbing Performance Requirements
18619HVAC Performance Requirements
18623Integrated Automation Performance Requirements
18626Electrical Performance Requirements
18629Communications Performance Requirements
18633Electronic Safety and Security Performance Requirements
18700Equipment and Furnishings Performance Requirements
18713Equipment Performance Requirements
18716Furnishings Performance Requirements
18800Other Facility Construction Performance Requirements
18813Special Construction Performance Requirements
18816Selective Construction Performance Requirements
18900Site Construction Performance Requirements
18913Site Preparation Performance Requirements
18916Site Improvements Performance Requirements
18919Site Plumbing Utilities Performance Requirements
18923Site HVAC Utilities Performance Requirements
18926Site Electrical Utilities Performance Requirements
18929Other Site Construction Performance Requirements
19000Life Cycle Activities
19100Commissioning
19113General Commissioning Requirements
19116Facility Substructure Commissioning
19116.13Foundation Commissioning
19116.53Basement Construction Commissioning
19119Facility Shell Commissioning
19119.13Superstructure Commissioning
19119.43Exterior Enclosure Commissioning
19119.73Roofing Commissioning
19123Interiors Commissioning
19123.13Interior Construction Commissioning
19123.43Stairways Commissioning
19123.73Interior Finishes Commissioning
19200Facility Operation
19213Facility Operation Procedures
19300Facility Maintenance
19313Facility Maintenance Procedures
19316Recycling Programs
19400Facility Decommissioning
19413Facility Decommissioning Procedures
20000Existing Conditions
20100Maintenance of Existing Conditions
20150Maintenance of Site Remediation
20165Maintenance of Underground Storage Tank Removal
20180Maintenance of Facility Remediation
20186Maintenance of Hazardous Waste Drum Handling
20300Conservation Treatment for Existing Period Conditions
20301Maintenance of Existing Period Conditions
20301.19Mothballing Period Structures
20341Selective Demolition for Period Structures
20342Removal and Salvage of Period Construction Materials
20343Period Structure Relocating
20344Shoring and Support of Period Structures
20500Common Work Results for Existing Conditions
20519Geosynthetics for Existing Conditions
20519.13Geotextiles for Existing Conditions
20519.16Geomembranes for Existing Conditions
20519.19Geogrids for Existing Conditions
20600Schedules for Existing Conditions
20613Geotechnical Baseline Report
20614Geotechnical Data Report
20630Schedules for Subsurface Investigations
20630.13Boring or Test Pit Log Schedule
20650Schedules for Site Remediation
20665Schedules for Underground Storage Tank Removal
20680Schedules for Facility Remediation
20686Schedules for Hazardous Waste Drum Handling
20800Commissioning of Existing Conditions
22000Assessment
22100Surveys
22113Site Surveys
22113.13Boundary and Survey Markers
22113.23Archeological and Historic Surveys
22116Measured Drawings
22200Existing Conditions Assessment
22213Movement and Vibration Assessment
22216Acoustic Assessment
22219Traffic Assessment
22223Accessibility Assessment
22400Environmental Assessment
22413Natural Environment Assessment
22413.13Air Assessment
22413.43Water Assessment
22413.73Land Assessment
22423Chemical Sampling and Analysis of Soils
22443Transboundary and Global Environmental Aspects Assessment
22500Existing Material Assessment
22516Existing Concrete Assessment
22516.13Concrete Assessment Drilling
22519Existing Masonry Assessment
22519.13Masonry Assessment Drilling
22523Existing Metals Assessment
22523.13Welding Investigations
22526Existing Wood, Plastics, and Composites Assessment
22529Existing Thermal and Moisture Protection Assessment
22529.13Waterproofing Investigations
22529.23Roofing Investigations
22600Hazardous Material Assessment
22623Asbestos Assessment
22626Lead Assessment
22629Polychlorinated Biphenyl Assessment
22633Biological Assessment
22633.13Mold Assessment
22636Hazardous Waste Drum Assessment
23000Subsurface Investigation
23100Geophysical Investigations
23113Seismic Investigations
23116Gravity Investigations
23119Magnetic Investigations
23123Electromagnetic Investigations
23126Electrical Resistivity Investigations
23129Magnetotelluric Investigations
23200Geotechnical Investigations
23213Subsurface Drilling and Sampling
23216Material Testing
23219Exploratory Excavations
23223Geotechnical Monitoring Before Construction
23223.13Groundwater Monitoring Before Construction
24000Demolition and Structure Moving
24100Demolition
24113Selective Site Demolition
24113.13Paving Removal
24113.23Utility Line Removal
24113.33Railtrack Removal
24116Structure Demolition
24116.13Building Demolition
24116.23Tower Demolition
24116.33Bridge Demolition
24116.43Dam Demolition
24119Selective Demolition
24119.13Selective Building Demolition
24119.16Selective Interior Demolition
24119.19Selective Facility Services Demolition
24119.33Selective Bridge Demolition
24200Removal and Salvage of Construction Materials
24213Deconstruction of Structures
24213.13Deconstruction of Buildings
24300Structure Moving
24313Structure Relocation
24313.13Building Relocation
24316Structure Raising
24316.13Building Raising
25000Site Remediation
25100Physical Decontamination
25113Coagulation and Flocculation Decontamination
25116Reverse-Osmosis Decontamination
25119Solidification and Stabilization Decontamination
25123Mechanical Filtration Decontamination
25126Radioactive Decontamination
25129Surface Cleaning Decontamination
25129.13High-Pressure Water Cleaning Decontamination
25129.16Vacuum Sweeping Cleaning Decontamination
25133Surface Removal Decontamination
25133.13Surface Removal Decontamination by Grinding
25133.16Surface Removal Decontamination by Sand Blasting
25133.19Surface Removal Decontamination by Ultrasound
25200Chemical Decontamination
25213Chemical Precipitation Decontamination
25216Ion Change Decontamination
25219Neutralization Decontamination
25300Thermal Decontamination
25313Incineration Decontamination
25313.13Remediation of Contaminated Soils and Sludges by Incineration
25316Thermal Desorption Decontamination
25316.13Remediation of Contaminated Soils by Thermal Desorption
25319Vitrification Decontamination
25400Biological Decontamination
25413Aerobic Processes Decontamination
25416Anaerobic Processes Decontamination
25419Bioremediation Decontamination
25419.13Bioremediation Using Landfarming
25419.16Bioremediation of Soils Using Windrow Composting
25419.19Bioremediation Using Bacteria Injection
25423Soil Washing through Separation/Solubilization
25426Organic Decontamination
25500Remediation Soil Stabilization
25600Site Containment
25613Waste Containment
25613.13Geomembrane Waste Containment
25619Gas Containment
25619.13Fluid-Applied Gas Barrier
25700Sinkhole Remediation
25713Sinkhole Remediation by Grouting
25713.13Sinkhole Remediation by Compaction Grouting
25713.16Sinkhole Remediation by Cap Grouting
25716Sinkhole Remediation by Backfilling
25800Snow Control
25813Snow Fencing
25816Snow Avalanche Control
26000Contaminated Site Material Removal
26100Removal and Disposal of Contaminated Soils
26113Excavation and Handling of Contaminated Material
26123Removal and Disposal of Polychlorinate Biphenyl Contaminated Soils
26126Removal and Disposal of Asbestos Contaminated Soils
26129Removal and Disposal of Organically Contaminated Soils
26200Hazardous Waste Recovery Processes
26213Air and Steam Stripping
26216Soil Vapor Extraction
26219Soil Washing and Flushing
26500Underground Storage Tank Removal
27000Water Remediation
27100Groundwater Treatment
27200Water Decontamination
27213Chemical Water Decontamination
27216Biological Water Decontamination
27219Electrolysis Water Decontamination
28000Facility Remediation
28100Transportation and Disposal of Hazardous Materials
28200Asbestos Remediation
28213Asbestos Abatement
28213.13Glovebag Asbestos Abatement
28213.16Precautions for Asbestos Abatement
28213.19Asbestos Floor Tile and Mastic Abatement
28213.33Asbestos Abatement for Utilities
28216Engineering Control of Asbestos Containing Materials
28233Removal and Disposal of Asbestos Containing Materials
28300Lead Remediation
28313Lead Hazard Control Activities
28319Lead-Based Paint Remediation
28319.13Lead-Based Paint Abatement
28333Removal and Disposal of Material Containing Lead
28333.13Lead-Based Paint Removal and Disposal
28400Polychlorinate Biphenyl Remediation
28416Handling of Lighting Ballasts and Lamps Containing PCBs and Mercury
28433Removal and Disposal of Polychlorinate Biphenyls
28600Hazardous Waste Drum Handling
28700Biohazard Remediation
28713Mold Remediation
28713.13Precautions for Mold Remediation
28713.16Mold Remediation Preparation and Containment
28713.19Mold Remediation Clearance Air Sampling
28713.33Removal and Disposal of Materials with Mold
28716Excrement Removal
28716.13Bird Excrement Removal
28716.16Rodent Excrement Removal
30000Concrete
30100Maintenance of Concrete
30110Maintenance of Concrete Forming and Accessories
30120Maintenance of Concrete Reinforcing
30123Maintenance of Stressing Tendons
30130Maintenance of Cast-in-Place Concrete
30130.51Cleaning of Cast-in-Place Concrete
30130.61Resurfacing of Cast-in-Place Concrete
30130.71Rehabilitation of Cast-in-Place Concrete
30130.72Strengthening of Cast-in-Place Concrete
30140Maintenance of Precast Concrete
30140.51Cleaning of Precast Concrete
30140.61Resurfacing of Precast Concrete
30140.71Rehabilitation of Precast Concrete
30140.72Strengthening of Precast Concrete
30150Maintenance of Cast Decks and Underlayment
30150.51Cleaning Cast Decks and Underlayment
30150.61Resurfacing of Cast Decks and Underlayment
30150.71Rehabilitation of Cast Decks and Underlayment
30150.72Strengthening of Cast Decks and Underlayment
30160Maintenance of Grouting
30170Maintenance of Mass Concrete
30180Maintenance of Concrete Cutting and Boring
30300Conservation Treatment for Period Concrete
30330Conservation Treatment for Period Cast-in-Place Concrete
30331Conservation Treatment for Period Structural Concrete
30333Conservation Treatment for Period Architectural Concrete
30500Common Work Results for Concrete
30505Selective Demolition for Concrete
30600Schedules for Concrete
30610Schedules for Concrete Forming and Accessories
30620Schedules for Concrete Reinforcing
30620.13Concrete Beam Reinforcing Schedule
30620.16Concrete Slab Reinforcing Schedule
30630Schedules for Cast-in-Place Concrete
30630.13Concrete Footing Schedule
30630.16Concrete Column Schedule
30630.19Concrete Slab Schedule
30630.23Concrete Shaft Schedule
30630.26Concrete Beam Schedule
30640Schedules for Precast Concrete
30640.13Precast Concrete Panel Schedule
30650Schedules for Cast Decks and Underlayment
30660Schedules for Grouting
30670Schedules for Mass Concrete
30680Schedules for Concrete Cutting and Boring
30800Commissioning of Concrete
31000Concrete Forming and Accessories
31100Concrete Forming
31113Structural Cast-in-Place Concrete Forming
31113.13Concrete Slip Forming
31113.16Concrete Shoring
31113.19Falsework
31116Architectural Cast-in Place Concrete Forming
31116.13Concrete Form Liners
31119Insulating Concrete Forming
31123Permanent Stair Forming
31126Permanent Tier Forming
31500Concrete Accessories
31513Waterstops
31513.13Non-Expanding Waterstops
31513.16Expanding Waterstops
31513.19Combination Expanding and Injection Hose Waterstops
31513.21Injection Hose Waterstops
31516Concrete Construction Joints
31519Cast-In Concrete Anchors
31521Termite Barrier
32000Concrete Reinforcing
32100Reinforcement Bars
32111Plain Steel Reinforcement Bars
32113Galvanized Reinforcement Steel Bars
32116Epoxy-Coated Reinforcement Steel Bars
32119Stainless Steel Reinforcement Bars
32121Composite Reinforcement Bars
32121.11Glass Fiber-Reinforced Polymer Reinforcement Bars
32121.13Organic Fiber-Reinforced Polymer Reinforcement Bars
32121.16Carbon Fiber-Reinforced Polymer Reinforcement Bars
32200Fabric and Grid Reinforcing
32213Galvanized Welded Wire Fabric Reinforcing
32216Epoxy-Coated Welded Wire Fabric Reinforcing
32219Composite Grid Reinforcing
32300Stressed Tendon Reinforcing
32400Fibrous Reinforcing
32500Composite Reinforcing
32513Glass Fiber-Reinforced Polymer Reinforcing
32516Organic Fiber-Reinforced Polymer Reinforcing
32519Carbon Fiber-Reinforced Polymer Reinforcing
33000Cast-in-Place Concrete
33053Miscellaneous Cast-in-Place Concrete
33100Structural Concrete
33113Heavyweight Structural Concrete
33116Lightweight Structural Concrete
33119Shrinkage-Compensating Structural Concrete
33123High-Performance Structural Concrete
33124Ultra High-Performance Structural Concrete
33126Self-Compacting Concrete
33300Architectural Concrete
33313Heavyweight Architectural Concrete
33316Lightweight Architectural Concrete
33400Low Density Concrete
33500Concrete Finishing
33513High-Tolerance Concrete Floor Finishing
33516Heavy-Duty Concrete Floor Finishing
33519Colored Concrete Finishing
33523Exposed Aggregate Concrete Finishing
33526Grooved Concrete Surface Finishing
33529Tooled Concrete Finishing
33533Stamped Concrete Finishing
33543Polished Concrete Finishing
33543.13Polished and Dyed Concrete Finishing
33543.16Polished and Stained Concrete Finishing
33546Concrete Topical Treatments
33700Specialty Placed Concrete
33713Shotcrete
33716Pumped Concrete
33719Pneumatically Placed Concrete
33723Roller-Compacted Concrete
33726Underwater Placed Concrete
33800Post-Tensioned Concrete
33813Post-Tensioned Concrete Preparation
33816Unbonded Post-Tensioned Concrete
33819Bonded Post-Tensioned Concrete
33900Concrete Curing
33913Water Concrete Curing
33916Sand Concrete Curing
33923Membrane Concrete Curing
33923.13Chemical Compound Membrane Concrete Curing
33923.23Sheet Membrane Concrete Curing
34000Precast Concrete
34100Precast Structural Concrete
34113Precast Concrete Hollow Core Planks
34116Precast Concrete Slabs
34123Precast Concrete Stairs
34133Precast Structural Pretensioned Concrete
34136Precast Structural Post-Tensioned Concrete
34500Precast Architectural Concrete
34513Faced Architectural Precast Concrete
34533Precast Architectural Pretensioned Concrete
34536Precast Architectural Post-Tensioned Concrete
34700Site-Cast Concrete
34713Tilt-Up Concrete
34716Lift-Slab Concrete
34800Precast Concrete Specialties
34813Precast Concrete Bollards
34813.11Precast Concrete Security Bollards
34816Precast Concrete Splash Blocks
34819Precast Concrete Stair Treads
34826Precast Concrete Parking Bumpers
34833Precast Pre-Framed Concrete Panels
34843Precast Concrete Trim
34900Glass-Fiber-Reinforced Concrete
34913Glass-Fiber-Reinforced Concrete Column Covers
34916Glass-Fiber-Reinforced Concrete Spandrels
34943Glass-Fiber-Reinforced Concrete Trim
35000Cast Decks and Underlayment
35100Cast Roof Decks
35113Cementitious Wood Fiber Decks
35116Gypsum Concrete Roof Decks
35200Lightweight Concrete Roof Insulation
35213Composite Concrete Roof Insulation
35216Lightweight Insulating Concrete
35216.13Lightweight Cellular Insulating Concrete
35216.16Lightweight Aggregate Insulating Concrete
35300Concrete Topping
35313Emery-Aggregate Concrete Topping
35316Iron-Aggregate Concrete Topping
35319Concrete Overlayment
35400Cast Underlayment
35413Gypsum Cement Underlayment
35416Hydraulic Cement Underlayment
36000Grouting
36100Cementitious Grouting
36113Dry-Pack Grouting
36200Non-Shrink Grouting
36213Non-Metallic Non-Shrink Grouting
36216Metallic Non-Shrink Grouting
36300Epoxy Grouting
36400Injection Grouting
36423Epoxy Injection Grouting
37000Mass Concrete
37100Mass Concrete for Raft Foundations
37200Mass Concrete for Dams
38000Concrete Cutting and Boring
38100Concrete Cutting
38113Flat Concrete Sawing
38116Track Mounted Concrete Wall Sawing
38119Wire Concrete Wall Sawing
38123Hand Concrete Wall Sawing
38126Chain Concrete Wall Sawing
38200Concrete Boring
38213Concrete Core Drilling
40000Masonry
40100Maintenance of Masonry
40120Maintenance of Unit Masonry
40120.41Unit Masonry Stabilization
40120.51Unit Masonry Maintenance
40120.52Unit Masonry Cleaning
40120.91Unit Masonry Restoration
40120.93Testing and Sampling Brick Units for Restoration
40140Maintenance of Stone Assemblies
40140.51Stone Maintenance
40140.52Stone Cleaning
40140.91Stone Restoration
40150Maintenance of Refractory Masonry
40160Maintenance of Corrosion-Resistant Masonry
40170Maintenance of Manufactured Masonry
40300Conservation Treatment for Period Masonry
40301Maintenance for Period Masonry
40301.13Period Masonry Cleaning
40305Common Work Results for Period Masonry
40305.13Period Masonry Mortaring
40305.16Period Masonry Grouting
40305.19Period Masonry Anchorage and Reinforcing
40321Conservation Treatment for Period Clay Unit Masonry
40321.19Clay Brick Conservation Treatment
40321.21Terra Cotta Conservation Treatment
40321.23Fiance Block Conservation Treatment
40322Conservation Treatment for Period Concrete Unit Masonry
40324Conservation Treatment for Period Adobe Unit Masonry
40343Conservation Treatment for Period Stone Masonry
40500Common Work Results for Masonry
40505Selective Demolition for Masonry
40513Masonry Mortaring
40513.16Chemical-Resistant Masonry Mortaring
40513.19Epoxy Masonry Mortaring
40513.23Surface Bonding Masonry Mortaring
40513.26Engineered Masonry Mortaring
40513.29Refractory Masonry Mortaring
40513.91Masonry Restoration Mortaring
40516Masonry Grouting
40516.16Chemical-Resistant Masonry Grouting
40516.26Engineered Masonry Grouting
40519Masonry Anchorage and Reinforcing
40519.13Continuous Joint Reinforcing
40519.16Masonry Anchors
40519.26Masonry Reinforcing Bars
40519.29Stone Anchors
40521Masonry Strengthening
40523Masonry Accessories
40523.13Masonry Control and Expansion Joints
40523.16Masonry Embedded Flashing
40523.19Masonry Cavity Drainage, Weepholes, and Vents
40600Schedules for Masonry
40620Schedules for Unit Masonry
40620.13Masonry Unit Schedule
40640Schedules for Stone Assemblies
40650Schedules for Refractory Masonry
40660Schedules for Corrosion-Resistant Masonry
40670Schedules for Manufactured Masonry
40800Commissioning of Masonry
42000Unit Masonry
42100Clay Unit Masonry
42113Brick Masonry
42113.13Brick Veneer Masonry
42113.23Surface-Bonded Brick Masonry
42116Ceramic Glazed Clay Masonry
42119Clay Tile Masonry
42123Structural Clay Tile Masonry
42126Glazed Structural Clay Tile Masonry
42129Terra Cotta Masonry
42200Concrete Unit Masonry
42200.13Concrete Unit Veneer Masonry
42200.16Surface-Bonded Concrete Unit Masonry
42219Insulated Concrete Unit Masonry
42223Architectural Concrete Unit Masonry
42223.13Exposed Aggregate Concrete Unit Masonry
42223.16Fluted Concrete Unit Masonry
42223.19Molded-Face Concrete Unit Masonry
42223.23Prefaced Concrete Unit Masonry
42223.26Sound-Absorbing Concrete Unit Masonry
42223.29Split-Face Concrete Unit Masonry
42226Autoclaved Aerated Concrete Unit Masonry
42233Interlocking Concrete Unit Masonry
42300Glass Unit Masonry
42313Vertical Glass Unit Masonry
42316Glass Unit Masonry Floors
42319Glass Unit Masonry Skylights
42400Adobe Unit Masonry
42413Site-Cast Adobe Unit Masonry
42416Manufactured Adobe Unit Masonry
42500Unit Masonry Panels
42513Metal-Supported Unit Masonry Panels
42600Single-Wythe Unit Masonry
42613Masonry Veneer
42700Multiple-Wythe Unit Masonry
42713Composite Unit Masonry
42723Cavity Wall Unit Masonry
42800Concrete Form Masonry Units
42813Dry-Stacked, Concrete-Filled Masonry Units
42823Mortar-Set, Concrete-Filled Masonry Units
42900Engineered Unit Masonry
44000Stone Assemblies
44100Dry-Placed Stone
44200Exterior Stone Cladding
44213Masonry-Supported Stone Cladding
44216Steel-Stud-Supported Stone Cladding
44219Strongback-Frame-Supported Stone Cladding

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .