This document contains a functional assessment plan (FAP) for facility investment projects and a related federal contract opportunity for emergency generator maintenance and repair services.

The FAP outlines performance standards and assessment levels for maintenance and repair of facilities, structures, equipment and systems at various military installations. It specifies response times for emergency, urgent and routine service orders as well as preventative maintenance requirements. Key performance metrics include completing emergency service orders within two hours, urgent orders within five days, and routine orders within 30 days. The FAP also requires monthly meter readings and developing a preventative maintenance program in accordance with manufacturers' recommendations.

The federal contract opportunity involves providing preventative, routine and emergency maintenance and repair services for multiple emergency generators at the Naval Submarine Base in New London, Connecticut. The base period of performance is 12 months with four additional 12-month options. Only the base period offers a minimum guarantee. The Navy's Naval Facilities Engineering Command is listed as the contracting agency.

View the file

Other files for this federal contract opportunity

Other files attached to Emergency Generators Maintenance and Repair, newest first.
File Type Posted
Amendment 5.pdf PDF
Amendment 3.pdf PDF
Amendment 4.pdf PDF
Amendment 2.pdf PDF
Amendment 1.pdf PDF
UPDATED PROPOSAL DUE DATE.docx DOCX document
CSI Estimate Worksheet.xlsx XLSX spreadsheet
ELINS J-0200000-09 Generators.xls XLS spreadsheet
1502000 M Generators.doc DOC document
N40085-20-R-3002 Gen RFP.pdf PDF
J-1502000-06 Service Order Summary Report.xlsx XLSX spreadsheet
1502000 C Generators Facility Investment ver 2.4.doc DOC document
BASE MAP J-1502000-04.pdf PDF
Generator Performance Assessment Plan v3.1.doc DOC document
J-1502000-07 Maintenance Summary Report.xlsx XLSX spreadsheet
NEPA_Emergency_generators_signed.pdf PDF
1502000 J FI Generators Facility Investment ver 2.4.doc DOC document
20-R-3304 Emergency Gen. Synopsis.doc DOC document
J-020000-06 Quality Inspection and Surveillance report.xlsx XLSX spreadsheet
0100000 C General Info Generators.doc DOC document
J-020000-07 On site Labor Summary Report.xlsx XLSX spreadsheet
J-1502000-09 Integral base tank inspection forms.pdf PDF
Wage Determination.pdf PDF
0200000 F Management and Administration Generators.docx DOCX document
J-0200000-08 Equipment Summary Report.xlsx XLSX spreadsheet
0200000 C Management and Administration Generators.docx DOCX document
1502000 F Generators Facility Investment ver 2.4.doc DOC document
0200000 J Management and Administration Generators.docx DOCX document
J-1502000-03 Generator Inventory 2019.xlsx XLSX spreadsheet
J-1502000-08 Monthly readings.xls XLS spreadsheet
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FUNCTIONAL ASSESSMENT PLAN (FAP)

FACILITY INVESTMENT

1502000

FACILITY INVESTMENT FAP

Assessment Levels (AL)
Assessment Frequency (Freq)

A – Annually

Q – Quarterly

M – Once per month

BW – Once every 13-16 days

W – Once per week

R – As required

Method of Assessment (MOA)

PS – Periodic Sampling

VCC – Validated Customer Complaints

UV – Unscheduled Visits

CE – Customer’s Evaluation

AL1
Start assessment at this Level
AL2
Add this Level if Contractor performance for AL1 is Unsatisfactory
AL3
Add this Level if Contractor performance at AL1 or AL2 is Unsatisfactory

Note: Return to appropriate Assessment Level when performance improves.

Note: The first method listed in the MOA column below is the primary assessment method.

Spec

Item

Performance Objective
Performance Standard
MOA
Assessment Level
Sample Size
Freq
AL1
AL2
AL3
UOM (total)
Normal
Reduced
3.1
Service Orders

The Contractor shall perform service order work in a timely manner and ensure facilities, ground structures, personal property equipment and installed equipment and systems are restored to a safe, normal working condition and function properly.

Service order work is responded to and completed within the specified time.

Facilities, ground structures, personal property equipment and installed equipment and systems are restored to normal working condition, including recertification if applicable.

When repair is complete the facility, ground structure, personal property equipment or installed equipment and system does not present danger to personnel or equipment.

PS

VCC

N/A
N/A
10%
5%
M
3.1.1
Emergency Service Orders

The Contractor shall respond to emergency service orders and arrest emergent conditions to minimize and mitigate damage facilities, ground structures, personal property equipment, and installed equipment and systems and danger to personnel.

Emergency service orders responded to within two hours of receipt of call.

Emergency service orders are arrested within 24 hours of receipt of call.

Work is continued without interruption until emergent condition is arrested.

PS

VCC

N/A

N/A

10%
N/A
M
3.1.2
Urgent Service Orders

The Contractor shall complete urgent service orders in a timely manner and facilities, ground structures, personal property equipment, and installed equipment and systems are restored to a safe, normal working condition and function properly.

Urgent service orders are completed within five working days.

PS

N/A

N/A

10%
N/A
M
3.1.3
Routine Service Orders

The Contractor shall complete routine service orders in a timely manner and ensure facilities, ground structures, personal property equipment, and installed equipment and systems are restored to a safe, normal working condition and function properly.

Routine service orders are completed within 30 calendar days.
PS

N/A

N/A

10%
N/A
M
3.2
Preventive Maintenance (PM) Program

The Contractor shall develop and implement a PM program for facilities, ground structures, personal property equipment, and installed equipment and systems to ensure proper operation, to minimize breakdowns, and to maximize useful life.

Maintenance is accomplished in accordance with the Contractor’s PM program and work schedule.

PM is performed in accordance with manufacturers’ recommended procedures and OEM standards.

PS

N/A
N/A
10%
5%
M
3.2.1
Emergency Generators

The Contractor shall perform maintenance on emergency generators to ensure safe, reliable, uninterrupted service.

Maintenance is performed in accordance with Contractor's PM program and work schedule.

Emergency generators provide electrical power to meet the load demand for the duration of a power outage.

Emergency generators activated to restore electrical power within five minutes following loss of power.

Adequate fuel additive to prevent freezing for size fuel tank is added.

PS
N/A

N/A

10%
N/A
M
3.2.1.1
Meter Readings

The Contractor shall perform monthly and annual meter readings as required.

All meter readings are performed on time and reported to the Environmental Division at the required time.
PS
N/A

N/A

10%
N/A
M
4
Non-Recurring Work

Non-Recurring work may be ordered utilizing DoD EMALL in accordance with Section H or on a task order in accordance with the PROCEDURES FOR ISSUING ORDERS clause in Section G. The order will specify the exact locations and types of work to be accomplished. The period of performance will be specified in each order.

PS
N/A
N/A
N/A
As Required
N/A
R

Monthly Performance Assessment Summary Contract #: ___________________ Installation/Site:

Annex/sub-annex: 1502000 Facility Investment Month/Year:

Spec
Title
AL1
AL2/AL3
VCC
Safety
QMS review

Item

E
M
N
E
M
N
Pos
Neg
Issues
# Samples
A
U
3.1
Service Orders
3.1.1
Emergency Service Orders
3.1.2
Urgent Service Orders
3.1.3
Routine Service Orders
3.2
Preventive Maintenance (PM) Program
4
Non-Recurring Work

Comments:

Recommended Actions:

Technical Ratings (mark using "X")

E
VG
S
M
U

Overall Technical Rating for Recurring Work

Overall Technical Rating for Non-Recurring Work

COR Signature:

Date:

E = Standards Exceeded; M = Standards Met; N = Standards Not Met