This amendment modifies a solicitation for design-build construction services for two operations center projects at Camp Lejeune, North Carolina. The solicitation seeks proposals to design and construct a multi-story facility for II Marine Expeditionary Force Headquarters and the Littoral Warfare Training Center, along with a multi-story addition for 2nd Marine Division Headquarters and renovations to an existing building. The amendment revises responses to prior questions regarding secure network connectivity requirements in conference rooms and workspaces, clarifying that only designated conference rooms will receive JWICS drops and that the watch floor and training room will receive classified and unclassified networks at each seat instead of JWICS. Offerors should reference this amendment when preparing proposals, which are due in accordance with the original solicitation schedule.

View the file

Other files

File Type Posted
Amendment 0013.pdf PDF
Amendment 0011.pdf PDF
H1 Scan Key.pdf PDF
TruView QuickGuide.pdf PDF
Building 2 Sign.docx DOCX document
P1800 and1801 Virtual Site Visit Information.docx DOCX document
Amendment 0010.pdf PDF
Amendment 0009.pdf PDF
C.2.1MARDIV Affinity Diagram.pdf PDF
BO_11014.3 Sign Policy MCB CLNC.pdf PDF
Wallace Creek Survey Revised.pdf PDF
0008.pdf PDF
Amendment 0007.pdf PDF
Amendment 0006.pdf PDF
15911601632589rfp03of03.pdf PDF
15911601632589rfp01of03.pdf PDF
Amendment 0005 Phase II.pdf PDF
P1800-1801 Price Proposal Rev 2.docx DOCX document
15911601632589rfp02of03.pdf PDF
0004.pdf PDF
Amendment 0003.pdf PDF
0002.pdf PDF
0001.pdf PDF
ATTACHMENT H.docx DOCX document
Attachment E - Small Business Participation and Commitment Strategy.docx DOCX document
Attachment F - Past Performance Questionnaire.docx DOCX document
ATTACHMENT C Construction Design Exp.docx DOCX document
Attachment B _SECNAV_5512_Attachment B.pdf PDF
Attachment D - Small Business Subcontracting Record.docx DOCX document
Final RFP.pdf PDF
Attachment G- SBSP Template.doc DOC document
Attachment A PPII log.doc DOC document
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ACQR5632652

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this Amendment is:

1. REVISE responses to PPI's # 240 and #240 as show n on the attached continuation page.

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 24-Aug-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008519R9147

X 9B. DATED (SEE ITEM 11)

07-Feb-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

24-Aug-2020

CODE

NAVFAC MID ATLANTIC

ACQUISITION CORE

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008519R9147

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AM 0012 - REVISED PPI

REVISE/REPLACE the response to PPI responses #240 and #241 as shown in Amendment 0011 as follows:

240 Part 3.1 –

Chapter 5 D503001 For Conference

Spaces, how many Cat 6 cables are required for SIPR and/or JWICS connectivity? Is SIPR/JWICS only required in command rooms, or all conference spaces?

Only Conference Rooms within the G-2/G-3 department will receive JWICS with a ratio of (1) drop per (5) seats (round up for fractions). SIPR should be provided in the same density for all Conference Room space.

241 Part 3.1 – Chapter 5

D503001 Please confirm how many Cat 6 cables are required for SIPR and JWICS connectivity in the Watch Floor and LWTC Training Room.

The Watch Floor and LWTC will not receive JWICS. Both spaces will receive

(4) classified and

(2) unclassified networks at every seat within the space(s) - Refer to Building Requirements for seat counts.

(End of Summary of Changes)